Prosecution Insights
Last updated: October 04, 2026

Billion & Armitage - Aptiv

Technology area: Semiconductors, Circuits & Optics

30 pending office actions • 3 clients • 22 examiners • 4 art units • 0 of 30 (0%) have an AI response strategy ready • 64 patents granted in the last 365 days

Analysis

Billion & Armitage - Aptiv operates in the Semiconductors, Circuits & Optics sector, having managed 1717 career applications. The firm maintains a resolved allowance rate of 92.49 percent, showing its ability to secure patent grants. Currently, the firm is addressing 13 pending office actions, which is a small number compared to the 1717 career applications in its history.

The firm averages 2.49 office actions per allowance, which indicates the typical prosecution cycle length. This 2.49 average suggests that the firm often reaches an allowance after several interactions with the patent office. For practitioners, the 92.49 percent resolved allowance rate provides a substantial benchmark of success in Semiconductors, Circuits & Optics. The 13 pending office actions and the 2.49 office actions per allowance metric further illustrate the firm's active prosecution strategy. These data points together offer a reliable view of the firm's performance and its typical outcomes for clients.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Quality Metrics (n=1717 apps, methodology: how we score firms)

92.5%
Allowance Rate
n=1717
+0.56σ
Allowance Rate (norm)
n=1717
2.5
OAs to Allowance
n=1083
-0.46σ
OAs to Allow (norm)
n=1083
847 days
Time to Allowance
n=1083
+2.4pp
Interview Lift
n=1717
16.7%
RCE Rate
n=1717
1.5%
Appeal Rate
n=1717

Rejection Performance (% of received rejections ultimately overcome)

77.4%
§101 Overcome
n=31
81.7%
§102 Overcome
n=535
82.2%
§103 Overcome
n=675
86.0%
§112 Overcome
n=422

Specialization & Scale

H01R, B62M, B62D
Top CPC Subclasses
19%
Top-3 CPC Share
n=1717
6
Practitioners
n=1717
286.2
Apps / Practitioner
n=1717

Portfolio Summary

30
Total Pending OAs
24
Non-Final OAs
6
Final Rejections
0
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 6 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

0
Overdue
0
Due this week
5
Due this month
1
Due in next 60 days
0
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 6 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Due ≤ 30 days (5)Due ≤ 60 days (1)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

18
Hard (60%)
11
Medium (37%)
1
Easy (3%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§103 only4 (13%)
§102 only7 (23%)
Double-patenting only1 (3%)
Multi-statute (no §101)18 (60%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

0
Life Sciences
0% of docket
0
Information Tech
0% of docket
0
Communications
0% of docket
11
Semiconductors
37% of docket
1
Mechanical / Eng
3% of docket
18
Business / Other
60% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

300 h
Manual time on pending OAs
60 h
Time saved (low, 20%)
105 h
Time saved (mid, 35%)
2.6 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
CHAMBERS, TRAVIS SLOAN 3 86.3% +11.5%
TA, THO DAC 2 86.4% +15.2%
PATEL, HARSHAD C 2 82.8% +8.5%
HARCUM, MARCUS E 2 89.3% +5.6%
LE, THANH TAM T 2 86.4% +13.8%
KRATT, JUSTIN M 2 86.7% +5.4%
ABRAMS, NEIL 2 82.8% +12.4%
SHIN, JEFFREY M 1 85.4% +9.7%
NORRIS, JEREMY C 1 86.8% +4.4%
RAHMAN, THASLIMUR 1 87.9% +8.2%

Quick Wins (8)

Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18503512 ELECTRICAL CONNECTOR ARRANGEMENT WITH MATE-ASSIST SLIDER KRATT, JUSTIN M 23d
18533411 HIGH SPEED ELECTRICAL CONNECTOR AND METHOD OF MANUFACTURING SAME KRATT, JUSTIN M 35d
18899878 GRID PATTERN INTERCONNECT METHOD FOR ELECTRICAL CIRCUITS AND SPLICING DEVICE FOR SAME NORRIS, JEREMY C —
18886314 ELECTRICAL CABLE TERMINAL WITH TWO PIECE COAXIAL CRIMPED OUTER FERRULE CHAMBERS, TRAVIS SLOAN —
18816766 ELECTRICAL CONNECTOR ASSEMBLY WITH THERMAL MANAGEMENT TA, THO DAC —
18811684 PASS-THROUGH CONNECTOR WITH LOCKING ELEMENT PATEL, HARSHAD C —
18753313 THROUGH-APERTURE ELECTRICAL CONNECTOR CHAMBERS, TRAVIS SLOAN —
18104485 CONNECTOR ASSEMBLY WITH AN UNSEATED TERMINAL DETECTION FEATURE ABRAMS, NEIL —

Hard Cases (18)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18604877 PUNCHING TOOL RILEY, JONATHAN G 13d
18536640 ELECTRICAL CONNECTOR LE, THANH TAM T 16d
19207926 BATTERY ISOLATION MODULE SHIN, JEFFREY M —
18777041 CHARGING CONNECTOR ASSEMBLY WITH A REPLACEABLE ELECTRICAL TERMINAL TA, THO DAC —
18772451 CONNECTOR ASSEMBLY AND METHOD OF ASSEMBLING SUCH A CONNECTOR ASSEMBLY RAHMAN, THASLIMUR —
18753622 SHIELDING DEVICE FOR ELECTROMAGNETIC SHIELDING CHAMBERS, TRAVIS SLOAN —
18734265 SEALED CONNECTOR ASSEMBLY WITH COMBINATION CONNECTOR SEAL HARCUM, MARCUS E —
18672527 CONNECTOR SYSTEM WITH CONNECTOR POSITION ASSURANCE ELEMENT PATEL, HARSHAD C —

Interview Candidates (9)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18536640 ELECTRICAL CONNECTOR LE, THANH TAM T 16d
18886314 ELECTRICAL CABLE TERMINAL WITH TWO PIECE COAXIAL CRIMPED OUTER FERRULE CHAMBERS, TRAVIS SLOAN —
18816766 ELECTRICAL CONNECTOR ASSEMBLY WITH THERMAL MANAGEMENT TA, THO DAC —
18777041 CHARGING CONNECTOR ASSEMBLY WITH A REPLACEABLE ELECTRICAL TERMINAL TA, THO DAC —
18753313 THROUGH-APERTURE ELECTRICAL CONNECTOR CHAMBERS, TRAVIS SLOAN —
18753622 SHIELDING DEVICE FOR ELECTROMAGNETIC SHIELDING CHAMBERS, TRAVIS SLOAN —
18664824 CABLE SEAL LE, THANH TAM T —
18512441 ELECTRICAL CONNECTOR WITH A DUAL-PURPOSE TERMINAL LOCK ABRAMS, NEIL —

Client Portfolio (3 clients)

Top Art Units

Art UnitApps
28345
28315
28491
37241

Pending Office Actions

App #TitleClientExaminerArt UnitStatutesStatusDue inAIFiled
19207926 BATTERY ISOLATION MODULE Aptiv Technologies AG SHIN, JEFFREY M 2849 §102§103 Non-Final OA — Pending May 14, 2025
18899878 GRID PATTERN INTERCONNECT METHOD FOR ELECTRICAL CIRCUITS AND SPLICING DEVICE FOR SAME Aptiv Manufacturing Management Services GmbH NORRIS, JEREMY C §103 Non-Final OA — Pending Sep 27, 2024
18886314 ELECTRICAL CABLE TERMINAL WITH TWO PIECE COAXIAL CRIMPED OUTER FERRULE Aptiv Technologies AG CHAMBERS, TRAVIS SLOAN DP Non-Final OA — Pending Sep 16, 2024
18816766 ELECTRICAL CONNECTOR ASSEMBLY WITH THERMAL MANAGEMENT Aptiv Technologies AG TA, THO DAC 2834 §102 Final Rejection — Pending Aug 27, 2024
18811684 PASS-THROUGH CONNECTOR WITH LOCKING ELEMENT Aptiv Technologies AG PATEL, HARSHAD C §103 Non-Final OA — Pending Aug 21, 2024
18777041 CHARGING CONNECTOR ASSEMBLY WITH A REPLACEABLE ELECTRICAL TERMINAL Aptiv Technologies AG TA, THO DAC 2834 §102§103 Non-Final OA — Pending Jul 18, 2024
18772451 CONNECTOR ASSEMBLY AND METHOD OF ASSEMBLING SUCH A CONNECTOR ASSEMBLY Aptiv Technologies AG RAHMAN, THASLIMUR §102§103§112 Non-Final OA — Pending Jul 15, 2024
18753313 THROUGH-APERTURE ELECTRICAL CONNECTOR Aptiv Technologies AG CHAMBERS, TRAVIS SLOAN §102 Non-Final OA — Pending Jun 25, 2024
18753622 SHIELDING DEVICE FOR ELECTROMAGNETIC SHIELDING Aptiv Technologies AG CHAMBERS, TRAVIS SLOAN §102§103 Non-Final OA — Pending Jun 25, 2024
18734265 SEALED CONNECTOR ASSEMBLY WITH COMBINATION CONNECTOR SEAL Aptiv Technologies AG HARCUM, MARCUS E §102§103 Non-Final OA — Pending Jun 05, 2024
18672527 CONNECTOR SYSTEM WITH CONNECTOR POSITION ASSURANCE ELEMENT Aptiv Technologies AG PATEL, HARSHAD C §102§103 Non-Final OA — Pending May 23, 2024
18664824 CABLE SEAL Aptiv Technologies AG LE, THANH TAM T §102§103 Non-Final OA — Pending May 15, 2024
18659486 ELECTRICAL CONNECTOR WITH REMOVABLE FACEPLATE Aptiv Technologies AG HARCUM, MARCUS E §102§103 Non-Final OA — Pending May 09, 2024
18659149 ELECTRICAL CONNECTOR WITH ERGONOMIC AXIAL MATING ASSIST DEVICE Aptiv Technologies AG JIMENEZ, OSCAR C §102§112 Non-Final OA — Pending May 09, 2024
18654500 ELECTRONIC MODULE WITH INTEGRATED CONNECTOR POSITION ASSURANCE DEVICE Aptiv Technologies AG BURGOS-GUNTIN, NELSON R §102 Non-Final OA — Pending May 03, 2024
18652100 DUAL LOCKING SYSTEM Aptiv Technologies AG HYEON, HAE M §102§112 Non-Final OA — Pending May 01, 2024
18652057 CONNECTOR ASSEMBLY WITH A TERMINAL POSITION ASSURANCE FUNCTION INTEGRATED TO A CONNECTOR POSITION ASSURANCE MEMBER Aptiv Technologies AG PAUMEN, GARY F §102 Non-Final OA — Pending May 01, 2024
18604877 PUNCHING TOOL Aptiv Technologies AG RILEY, JONATHAN G 3724 §102§103 Final Rejection 13d Pending Mar 14, 2024
18604872 ELECTRICAL CONNECTOR ASSEMBLY WITH POTTING MATERIAL SEAL Aptiv Technologies AG NGUYEN, THANG H §103§112 Non-Final OA — Pending Mar 14, 2024
18430206 ELECTRICAL CONNECTION SYSTEM FOR CHARGING VEHICLES Aptiv Technologies AG LABAZE, EDWYN §102§103 Non-Final OA — Pending Feb 01, 2024
18411514 ELECTRICAL CONNECTION SYSTEM FOR CHARGING VEHICLES Aptiv Technologies AG MAI, THIEN T §102§103 Non-Final OA — Pending Jan 12, 2024
18397152 RECEPTACLE CONNECTOR ASSEMBLY Antaya Technologies Corporation WANG, FRANKLIN JEFFERSON §102§103Other Non-Final OA — Pending Dec 27, 2023
18536640 ELECTRICAL CONNECTOR Aptiv Technologies AG LE, THANH TAM T 2831 §102§103 Final Rejection 16d Pending Dec 12, 2023
18533411 HIGH SPEED ELECTRICAL CONNECTOR AND METHOD OF MANUFACTURING SAME Aptiv Electrical Centers (Shanghai) Co. Ltd. KRATT, JUSTIN M 2831 §103 Final Rejection 35d Pending Dec 08, 2023
18512441 ELECTRICAL CONNECTOR WITH A DUAL-PURPOSE TERMINAL LOCK Aptiv Technologies AG ABRAMS, NEIL 2834 §102§103§112 Non-Final OA — Pending Nov 17, 2023
18503512 ELECTRICAL CONNECTOR ARRANGEMENT WITH MATE-ASSIST SLIDER Aptiv Technologies AG KRATT, JUSTIN M 2831 §102 Non-Final OA 23d Pending Nov 07, 2023
18239277 FLAT CABLE CONNECTOR Aptiv Technologies (2) S.À R.L. MANGOT, GREGORY LAWRENCE 2834 §102§103 Non-Final OA — Pending Aug 29, 2023
18143893 BUSBAR FIXING Aptiv Manufacturing Management Services GmbH BAILLARGEON, PAUL D 2831 §103 Final Rejection 29d Pending May 05, 2023
18142214 ELECTRICAL CONNECTOR FOR VEHICLE CHARGING INLET Aptiv Technologies AG ALHAWAMDEH, NADER J 2831 §102 Final Rejection 13d Pending May 02, 2023
18104485 CONNECTOR ASSEMBLY WITH AN UNSEATED TERMINAL DETECTION FEATURE Aptiv Technologies AG ABRAMS, NEIL 2834 §102 Non-Final OA — Pending Feb 01, 2023

Managing Billion & Armitage - Aptiv's Patent Prosecution?

IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month