25 pending office actions • 20 art units • 25 examiners • 0 of 25 (0%) have an AI response strategy ready • 122 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 25 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 25 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 18 (72%) |
| §102 only | 4 (16%) |
| §112 only | 2 (8%) |
| No statute on record | 1 (4%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| HIGA, BRENDAN Y | 1 | 85.6% | +8.5% |
| MCDUFFIE, MICHAEL D | 1 | 67.5% | -10.6% |
| MUNOZ, DANIEL | 1 | 75.4% | +21.7% |
| KIM, YONCHAN J | 1 | 80.2% | +21.9% |
| LIE, ANGELA M | 1 | 76.8% | +8.0% |
| DUONG, DUC T | 1 | 89.3% | +2.0% |
| HENEGHAN, MATTHEW E | 1 | 84.1% | +4.0% |
| DUONG, DIEU HIEN | 1 | 78.2% | +17.0% |
| HO, ANH N | 1 | 81.1% | +14.4% |
| CORRIELUS, JEAN B | 1 | 89.5% | +15.7% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 6 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18751218 | RADIO ACCESS NETWORK SYSTEM WITH ORCHESTRATION ENTITY | DUONG, DUC T | 142d overdue |
| 18879689 | ROLE SWAPPING FOR REDUNDANCY IN VIRTUALIZED DISTRIBUTED ANTENNA SYSTEM | HIGA, BRENDAN Y | 8d |
| 18692715 | FLEXIBLE ANTENNA CONFIGURATIONS | CORRIELUS, JEAN B | 14d |
| 18712601 | MULTI-BAND PHASE SHIFTER ASSEMBLY, MULTI-BAND ANTENNA SYSTEM AND BASE STATION ANTENNA | HO, ANH N | 20d |
| 18742718 | DIGITAL MULTICHANNEL INTERFACE WITHIN A RADIO DISTRIBUTION SYSTEM | HENEGHAN, MATTHEW E | 30d |
| 18847978 | RADIATOR ASSEMBLY FOR BASE STATION ANTENNAS | KIM, YONCHAN J | 83d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 5 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18717738 | HIGH PERFORMANCE PATCH-TYPE RADIATING ELEMENTS FOR MASSIVE MIMO COMMUNICATION SYSTEMS | DUONG, DIEU HIEN | 10d overdue |
| 18692715 | FLEXIBLE ANTENNA CONFIGURATIONS | CORRIELUS, JEAN B | 14d |
| 18855480 | METAL 3D PRINTED ANTENNA HAVING CROSS-DIPOLE RADIATING ELEMENTS THEREIN AND METHODS OF MANUFACTURING SAME | MUNOZ, DANIEL | 16d |
| 18712601 | MULTI-BAND PHASE SHIFTER ASSEMBLY, MULTI-BAND ANTENNA SYSTEM AND BASE STATION ANTENNA | HO, ANH N | 20d |
| 18847978 | RADIATOR ASSEMBLY FOR BASE STATION ANTENNAS | KIM, YONCHAN J | 83d |
| Art Unit | Apps |
|---|---|
| 2845 | 4 |
| 3992 | 3 |
| 2441 | 1 |
| 3632 | 1 |
| 2896 | 1 |
| 2467 | 1 |
| 2633 | 1 |
| 2465 | 1 |
| 2466 | 1 |
| 2469 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18879689 | ROLE SWAPPING FOR REDUNDANCY IN VIRTUALIZED DISTRIBUTED ANTENNA SYSTEM | HIGA, BRENDAN Y | 2441 | §103 | Non-Final OA | 8d | Pending | Dec 27, 2024 |
| 18951857 | ANCHORING SYSTEMS FOR USE ON TELECOMMUNICATION STRUCTURES | MCDUFFIE, MICHAEL D | 3632 | §103 | Non-Final OA | 41d | Pending | Nov 19, 2024 |
| 18855480 | METAL 3D PRINTED ANTENNA HAVING CROSS-DIPOLE RADIATING ELEMENTS THEREIN AND METHODS OF MANUFACTURING SAME | MUNOZ, DANIEL | 2896 | §103 | Non-Final OA | 16d | Pending | Oct 09, 2024 |
| 18847978 | RADIATOR ASSEMBLY FOR BASE STATION ANTENNAS | KIM, YONCHAN J | 2845 | §103 | Non-Final OA | 83d | Pending | Sep 17, 2024 |
| 18783910 | DUAL-BAND INTERSPERSED CELLULAR BASESTATION ANTENNAS | LIE, ANGELA M | 3992 | §103 | Non-Final OA | 36d | Pending | Jul 25, 2024 |
| 18751218 | RADIO ACCESS NETWORK SYSTEM WITH ORCHESTRATION ENTITY | DUONG, DUC T | 2467 | §102 | Final Rejection | 142d overdue | Pending | Jun 22, 2024 |
| 18742718 | DIGITAL MULTICHANNEL INTERFACE WITHIN A RADIO DISTRIBUTION SYSTEM | HENEGHAN, MATTHEW E | 3992 | §112 | Final Rejection | 30d | Pending | Jun 13, 2024 |
| 18717738 | HIGH PERFORMANCE PATCH-TYPE RADIATING ELEMENTS FOR MASSIVE MIMO COMMUNICATION SYSTEMS | DUONG, DIEU HIEN | 2845 | §103 | Non-Final OA | 10d overdue | Pending | Jun 07, 2024 |
| 18712601 | MULTI-BAND PHASE SHIFTER ASSEMBLY, MULTI-BAND ANTENNA SYSTEM AND BASE STATION ANTENNA | HO, ANH N | 2845 | §103 | Non-Final OA | 20d | Pending | May 22, 2024 |
| 18692715 | FLEXIBLE ANTENNA CONFIGURATIONS | CORRIELUS, JEAN B | 2633 | §103 | Non-Final OA | 14d | Pending | Mar 15, 2024 |
| 18595151 | SYSTEMS AND METHODS FOR PREVENTING POWER IMBALANCE ACROSS ANTENNAS FOR DMRS TRANSMISSIONS | HO, DUC CHI | 2465 | §103 | Non-Final OA | 30d | Pending | Mar 04, 2024 |
| 18589067 | VIRTUALIZATION AND ORCHESTRATION OF A RADIO ACCESS NETWORK | HAQUE, ABUSAYEED M | 2466 | Other | Non-Final OA | 20d | Pending | Feb 27, 2024 |
| 18584780 | RACH OCCASION BLOCKING FOR 5G NR TDD SYSTEMS | JANGBAHADUR, LAKERAM | 2469 | §103 | Non-Final OA | 28d overdue | Pending | Feb 22, 2024 |
| 18579821 | CHANNEL RECOMMENDATIONS FOR NETWORK ELEMENTS IN A SHARED SPECTRUM COMMUNICATION NETWORK | CHEN, PETER | 2462 | §103 | Non-Final OA | 23d overdue | Pending | Jan 16, 2024 |
| 18402432 | SYSTEMS AND METHODS FOR USING A RADIO INTELLIGENT CONTROLLER WITH A DISTRIBUTED ANTENNA SYSTEM AND FRONTHAUL MULTIPLEXER/FRONTHAUL GATEWAY | FIGUEROA, MARISOL | 2643 | §102 | Non-Final OA | 62d | Pending | Jan 02, 2024 |
| 18568416 | ANTENNAS HAVING POWER DIVIDERS INTEGRATED WITH A CALIBRATION BOARD OR A FEED BOARD | MOORE, WHITNEY | 3646 | §103 | Final Rejection | 37d overdue | Pending | Dec 08, 2023 |
| 18517094 | CELLULAR BASE STATION ANTENNA AND POLE ASSEMBLY | STOYTCHEV, MARIN STOYTCHEV | 2845 | §103 | Final Rejection | 23d overdue | Pending | Nov 22, 2023 |
| 18514114 | GANGED COAXIAL CONNECTOR ASSEMBLY | LE, THANH TAM T | 2831 | §103 | Non-Final OA | 71d | Pending | Nov 20, 2023 |
| 18485479 | TWIN-BEAM ANTENNAS HAVING HYBRID COUPLERS | JENKINS, KIMBERLY YVETTE | 3648 | §103 | Non-Final OA | 10d overdue | Pending | Oct 12, 2023 |
| 18358781 | CONFIGURING A REPEATER SYSTEM ACCORDING TO CONFIGURATION OF BASE STATION | HENSON, JAMAAL R | 2411 | §102 | Final Rejection | 19d | Pending | Jul 25, 2023 |
| 18326239 | BASE STATION ANTENNAS HAVING AT LEAST ONE GRID REFLECTOR AND RELATED DEVICES | TRAN, MINH | 2844 | §103 | Non-Final OA | 63d | Pending | May 31, 2023 |
| 18135852 | OVERCURRENT PROTECTION CIRCUIT, CONTROL DEVICE, REMOTE ELECTRICAL TILT SYSTEM AND BASE STATION ANTENNA | LAUGHLIN, CHARLES S | 2846 | §102 | Final Rejection | 35d | Pending | Apr 18, 2023 |
| 17884280 | SYSTEMS AND METHODS FOR FRONTHAUL OPTIMIZATION USING SOFTWARE DEFINED NETWORKING | REYES ORTIZ, HECTOR E | 2472 | §103 | Non-Final OA | 31d overdue | Pending | Aug 09, 2022 |
| 17828766 | CONNECTING ELEMENT, CONNECTION DEVICE, RADOME SUPPORTING MEMBER AND BASE STATION ANTENNA | SULLIVAN, MATTHEW J | 3677 | §103 | Non-Final OA | 7d | Pending | May 31, 2022 |
| 17350984 | EXTRACTING SUB-BANDS FROM SIGNALS IN A FREQUENCY DOMAIN | DESAI, RACHNA SINGH | 3992 | §112 | Final Rejection | 40d | Pending | Jun 17, 2021 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial