← Back to Schlumberger Technology Corporation
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19575204 | SYSTEMS AND METHODS FOR DETERMINIG DEPTH-DEPENDENT DRILLING PARAEMTER LIMITS | STEPHENSON, DANIEL P | 3676 | §101Other | Non-Final OA | — | Pending | Mar 23, 2026 |
| 19568179 | METHOD FOR SINGLE-STAGE TREATMENT OF SILICEOUS SUBTERRANEAN FORMATIONS | RUNYAN, SILVANA C | 1616 | §102 | Non-Final OA | — | Pending | Mar 16, 2026 |
| 19379961 | CONTINUOUS ROTATION COILED TUBING ORIENTING TOOL WITH PASSIVE HYDRAULIC CONTROL | MACDONALD, STEVEN A | 3674 | §102§103§112 | Non-Final OA | — | Pending | Nov 05, 2025 |
| 19378627 | SHOCK DAMPING RING DESIGN FOR DOWNHOLE ELECTRONIC SYSTEMS | GAY, JENNIFER HAWKINS | 3619 | §101§102 | Non-Final OA | — | Pending | Nov 04, 2025 |
| 19368169 | HIGH-TEMPERATURE FOAM FRACTURING FLUID WITH SYNTHETIC POLYMER | VARMA, ASHISH K | 3674 | §102§103 | Non-Final OA | — | Pending | Oct 24, 2025 |
| 19365792 | ELECTRIC ANNULAR BLOWOUT PREVENTER WITH RADIAL COMPRESSION OF PACKER | BARRY, DAPHNE MARIE | 3753 | DP | Non-Final OA | — | Pending | Oct 22, 2025 |
| 19318410 | MITIGATING DRILL STRING HFTO | PATEL, NEEL G | 3676 | §102§103 | Non-Final OA | — | Pending | Sep 04, 2025 |
| 19305104 | COMMON RISK SEGMENTS, FRACTURE RANKING, AND TEXTURE SIMILARITY FOR COMPLETION DECISIONS | SINGLETARY, TYRONE E | 3625 | §103 | Non-Final OA | — | Pending | Aug 20, 2025 |
| 19290704 | SYSTEMS AND METHODS FOR DATA MIGRATION | WALDRON, SCOTT A | 2156 | §103 | Non-Final OA | — | Pending | Aug 05, 2025 |
| 19290024 | METHODOLOGY AND SYSTEM FOR UTILIZING RIG POWER AND MUD PUMP ASSEMBLY | LOIKITH, CATHERINE A | 3674 | Other | Non-Final OA | — | Pending | Aug 04, 2025 |
| 19284852 | PREDICTING SUSTAINABILITY ACTION PLAN PERFORMANCE OVER TIME | GILLS, KURTIS | 3624 | §101§103 | Non-Final OA | — | Pending | Jul 30, 2025 |
| 19284438 | METHODS FOR CREATING AN INFRASTRUCTURE FOR A PLURALITY OF CLOUD PROVIDERS TO ENHANCE SERVICE RESILIENCY | SHITAYEWOLDETSADI, BERHANU | 2455 | §103 | Non-Final OA | — | Pending | Jul 29, 2025 |
| 19276541 | Well Construction Equipment Framework | SHECHTMAN, CHERYL MARIA | 2164 | §101§103 | Non-Final OA | — | Pending | Jul 22, 2025 |
| 19276993 | DEEP LEARNING INFERENCE OPTIMIZATION AND BENCHMARKING FOR GATEWAY SYSTEMS | HENDERSON, ESTHER BENOIT | 2458 | §102 | Non-Final OA | — | Pending | Jul 22, 2025 |
| 19266305 | PROBE AND METHOD FOR SAMPLING FLUIDS FROM A SUBTERRANEAN ENVIRONMENT | YAO, THEODORE N | 3676 | §103§112 | Final Rejection | — | Pending | Jul 11, 2025 |
| 19146935 | SYSTEMS AND METHODS FOR GENERATING ONTOLOGICAL DATASETS FOR ENERGY DEVELOPMENT | VINCENT, ROSS MICHAEL | 2196 | §103 | Final Rejection | — | Pending | Jul 10, 2025 |
| 19143924 | FLUID LOSS CONTROL FOR GEOPOLYMER SYSTEM | SKAIST, AVI T. | 3674 | §103 | Non-Final OA | — | Pending | Jun 27, 2025 |
| 19142641 | DEVICES, SYSTEMS, AND METHODS FOR A BIT HAVING AN INTEGRAL METALLIC CONNECTION | FORD, DARRELL CHRISTOPHER | 3726 | §103§112 | Non-Final OA | — | Pending | Jun 24, 2025 |
| 19244983 | BLUNT-NOSED ROLLER CONE HYBRID BIT | RO, YONG-SUK | 3676 | §102§103§112 | Non-Final OA | 45d overdue | Pending | Jun 20, 2025 |
| 19141069 | DISPLACEMENT UNIT FOR AN ELECTRIC SUBMERSIBLE PUMP | DAVIS, MARY ALICE | 3746 | §103§112 | Non-Final OA | — | Pending | Jun 19, 2025 |
| 19239759 | SYSTEMS AND METHODS FOR ENHANCING DATA ACQUISITION OPERATIONS IN SEISMIC SURVEYS | ARMSTRONG, JONATHAN D | 3645 | §102 | Non-Final OA | — | Pending | Jun 16, 2025 |
| 19138686 | BACK-UP RING ASSEMBLY FOR PACKER APPLICATIONS | WALLACE, KIPP CHARLES | 3674 | §102§103 | Non-Final OA | — | Pending | Jun 13, 2025 |
| 19138123 | PACKER FOR USE WITHIN WELLBORE | MACDONALD, STEVEN A | 3674 | §102§103§112 | Non-Final OA | — | Pending | Jun 12, 2025 |
| 19137333 | PASSIVELY ORIENTATED GUN FOR PLUG AND ABANDONMENT APPLICATIONS | MACDONALD, STEVEN A | 3674 | §102§103§112 | Non-Final OA | — | Pending | Jun 10, 2025 |
| 19133244 | PREDICTION OF FLUID DENSITY BASED ON OPTICAL ABSORPTION MEASUREMENTS | ANDREWS, DAVID L | 3672 | §103DP | Non-Final OA | — | Pending | May 28, 2025 |
| 19220139 | AUTOMATED TWO-HOLE DRILLING USING RANGING | PATEL, NEEL G | 3676 | §103 | Non-Final OA | — | Pending | May 28, 2025 |
| 19133246 | SYSTEMS AND METHODS FOR DEPLOYING ELECTRIC SUBMERSIBLE PUMPS | ANDREWS, DAVID L | 3672 | §102§103 | Non-Final OA | — | Pending | May 28, 2025 |
| 19218653 | WELL PLANNING SYSTEM | RONI, SYED A | 2432 | §102 | Non-Final OA | — | Pending | May 27, 2025 |
| 19212276 | SPACER FLUIDS CONTAINING SWELLABLE ABRASIVE PARTICLES | LEFF, ANGELA MARIE DITRAN | 3674 | §103 | Non-Final OA | — | Pending | May 19, 2025 |
| 19198194 | ROCK CHARACTERIZATION SYSTEM | MALEVIC, DJURA | 2884 | §102§103 | Non-Final OA | — | Pending | May 05, 2025 |
| 19122256 | ELASTOMER SEAL | CUMAR, NATHAN | 3675 | §103 | Non-Final OA | — | Pending | Apr 18, 2025 |
| 19119778 | PUMP STATOR TIE LAYER | FREAY, CHARLES GRANT | 3746 | §102§103§112 | Non-Final OA | — | Pending | Apr 10, 2025 |
| 19119779 | SUPPRESSING REFLECTIONS WITH VECTOR REFLECTIVITY ACOUSTIC MODELING | ARMSTRONG, JONATHAN D | 3645 | §101§102 | Non-Final OA | — | Pending | Apr 10, 2025 |
| 19093774 | DOMAIN ADAPTING A LLM IN THE ENERGY INDUSTRY | OBISESAN, AUGUSTINE KUNLE | 2156 | §103 | Non-Final OA | — | Pending | Mar 28, 2025 |
| 19059449 | SYSTEMS AND METHODS FOR SEALING A WELLBORE | SKAIST, AVI T. | 3674 | §103§112 | Non-Final OA | 46d overdue | Pending | Feb 21, 2025 |
| 19051699 | SYSTEMS AND METHODS FOR SYNTHESIZING EQUIPMENT DATA | ROBERTS, SHAUN A | 2655 | §103 | Non-Final OA | — | Pending | Feb 12, 2025 |
| 19036204 | DRILL BIT DESIGN AND DRILLING OPERATION CONTROL WORKFLOW FOR MITIGATING TORQUE OSCILLATIONS | QUAIM, LAMIA | 3676 | §112 | Non-Final OA | — | Pending | Jan 24, 2025 |
| 19021997 | WELL AND ASSET ANALYSIS WITH AI-DRIVEN SCREENING | YESILDAG, LAURA G | 3629 | §101 | Non-Final OA | 71d | Pending | Jan 15, 2025 |
| 18994875 | ELECTRO-MECHANICAL ACTUATOR ASSEMBLY | GRAY, GEORGE STERLING | 3676 | §102§103§112 | Non-Final OA | — | Pending | Jan 15, 2025 |
| 18993055 | WORKFLOW TO CONVERT DUAL ARRIVAL EVENTS INTO CURTAIN PLOT SECTION OF FORMATION SLOWNESS AND LOGS OF TOOL LAYER AND SHOULDER BED SLOWNESS | ISLAM, MOHAMMAD K | 2857 | §101 | Non-Final OA | — | Pending | Jan 10, 2025 |
| 19013197 | GENERATING RISK ANALYSIS REPORTS USING A RISK MODEL | MINOR, AYANNA YVETTE | 3624 | §101§102§103 | Non-Final OA | 13d | Pending | Jan 08, 2025 |
| 19007210 | EVENT DRIVEN CONTROL SCHEMAS FOR ARTIFICIAL LIFT | FULLER, ROBERT EDWARD | 3676 | §101§112Other | Final Rejection | 51d overdue | Pending | Dec 31, 2024 |
| 18991855 | DOWNHOLE LITHIUM DETECTION BY ACCUMULATION | CULLER, JILL E | 2853 | §102§103 | Non-Final OA | — | Pending | Dec 23, 2024 |
| 18948570 | SYSTEM AND METHOD FOR MONITORING AND OPERATING GROUND-SOURCE HEAT PUMPS | KHATIB, RAMI | 3669 | §101§102§112 | Non-Final OA | — | Pending | Nov 15, 2024 |
| 18941732 | PAIRWISE LABELLING TO CAPTURE SUBJECTIVE ESTIMATES | NGUYEN, KENNY | 2171 | §102§103 | Non-Final OA | — | Pending | Nov 08, 2024 |
| 18926356 | WELL BARRIER AND METHOD | PATEL, NEEL G | 3676 | §103 | Non-Final OA | 20d | Pending | Oct 25, 2024 |
| 18906919 | AUTOMATING THE MONITORING OF A LARGE POPULATION OF FIELD SYSTEMS | NGUYEN, NGA B | 3625 | §101§103 | Non-Final OA | — | Pending | Oct 04, 2024 |
| 18900952 | DOWNHOLE MEASUREMENT SYSTEM | SCHINDLER, DAVID M | 2858 | §112 | Final Rejection | — | Pending | Sep 30, 2024 |
| 18888694 | METHANE EMISSION LEAK ATTRIBUTION | HOPKINS, BRANDI N | — | §102§112 | Non-Final OA | — | Pending | Sep 18, 2024 |
| 18845940 | PERMANENT DOWNHOLE PLUG-IN CONNECTOR | DZIERZYNSKI, EVAN P | 2875 | §103 | Non-Final OA | — | Pending | Sep 11, 2024 |
| 18783786 | BRINE MIXING SYSTEMS AND METHODS | INSLER, ELIZABETH | 1774 | §102§103 | Non-Final OA | — | Pending | Jul 25, 2024 |
| 18783519 | AUTOMATION OF DEFECT RECOGNITION USING LARGE FOUNDATION MODEL | SHERALI, ISHRAT I | — | §103 | Non-Final OA | — | Pending | Jul 25, 2024 |
| 18832534 | TRANSFER LEARNING FOR ML-ASSISTED SEISMIC INTERPRETATION | MENSING, RODGER STEWART | 2857 | §101§103 | Non-Final OA | — | Pending | Jul 24, 2024 |
| 18725547 | PROCESSING GEOPHYSICS DATA IN THE IMAGE DOMAIN IN REAL-TIME | MANG, LAL C | 2857 | §101 | Non-Final OA | 233d overdue | Pending | Jun 28, 2024 |
| 18723648 | ROCK PROPERTY MEASUREMENTS BASED ON SPECTROSCOPY DATA | HUYNH, PHUONG | 2857 | §101§102 | Non-Final OA | — | Pending | Jun 24, 2024 |
| 18723751 | SINGLE-PHASE RETARDED ACID BASED ON AN AMPHOTERIC SURFACTANT | FIGUEROA, JOHN J | 1763 | §102 | Non-Final OA | — | Pending | Jun 24, 2024 |
| 18746341 | AUTOMATED THIRD INTERFACE ECHO RECOGNITION USING A LARGE FOUNDATION MODEL | EVANS, GEOFFREY T | — | §101 | Non-Final OA | — | Pending | Jun 18, 2024 |
| 18720793 | OFFSET WELL IDENTIFICATION AND PARAMETER SELECTION | GEISS, BRIAN BUTLER | 2857 | §101§103 | Non-Final OA | — | Pending | Jun 17, 2024 |
| 18714924 | SOURCE SEPARATION USING MULTISTAGE INVERSION WITH RADON IN THE SHOT DOMAIN | NYAMOGO, JOSEPH A | 2858 | §103 | Non-Final OA | — | Pending | May 30, 2024 |
| 18711386 | FIELD OPERATIONS FRAMEWORK | TORRES CHANZA, GABRIEL JOSE | 3625 | §101§103 | Non-Final OA | 19d overdue | Pending | May 17, 2024 |
| 18654936 | SYSTEMS AND METHODS FOR PRODUCT CIRCULARITY | NGUYEN, TAN D | 3629 | §101§103 | Non-Final OA | — | Pending | May 03, 2024 |
| 18653466 | SUBSURFACE STRATIGRAPHIC FRAMEWORK | ZAYKOVA-FELDMAN, LYUDMILA | 2857 | §101§103 | Non-Final OA | — | Pending | May 02, 2024 |
| 18706764 | CALIBRATED VIRTUAL FLOW METER | EVANS, GEOFFREY T | 2852 | §101 | Non-Final OA | — | Pending | May 02, 2024 |
| 18703642 | SYSTEM AND METHOD FOR MULTIDIMENSIONAL DECONVOLUTION | LE, JOHN H | 2857 | §101§102§103 | Non-Final OA | — | Pending | Apr 22, 2024 |
| 18633631 | CORROSION INHIBITOR AND RELATED METHODS OF INHIBITING THE CORROSION OF METAL SURFACES | RUNYAN, SILVANA C | 1616 | §103 | Non-Final OA | — | Pending | Apr 12, 2024 |
| 18630011 | APPROXIMATING SPATIAL AND TEMPORAL SATURATION AND PRESSURE OF A CARBON DIOXIDE INJECTION INTO AN AQUIFER | QUIGLEY, KYLE ROBERT | 2857 | §101§103 | Final Rejection | — | Pending | Apr 09, 2024 |
| 18698152 | MACHINE LEARNING MODEL DEPLOYMENT, MANAGEMENT AND MONITORING AT SCALE | VIRREIRA, ROLANDO PATRICK | 2143 | §101§102 | Non-Final OA | — | Pending | Apr 03, 2024 |
| 18697789 | DRILL STRING STICK/SLIP PREDICTION AND MITIGATION | KARAVIAS, DENISE R | 2857 | §101§103§112 | Non-Final OA | — | Pending | Apr 02, 2024 |
| 18693074 | TRI-JACK HYDRAULIC WORKOVER UNIT | GARFT, CHRISTOPHER | 3632 | §102§103 | Final Rejection | — | Pending | Mar 18, 2024 |
| 18691725 | METHODS FOR AUTOMATED STRATIGRAPHY INTERPRETATION FROM WELL LOGS AND CONE PENETRATION TESTS DATA | CHEEMA, NOOR FATIMA | 2142 | §101§103§112 | Non-Final OA | — | Pending | Mar 13, 2024 |
| 18598018 | LOGGING TOOL CHANNEL PRIORITIZATION | WHITE, JAY MICHAEL | 2188 | §103§112 | Non-Final OA | — | Pending | Mar 07, 2024 |
| 18591241 | USING A DEEP NEURAL MODEL TO GENERATE JOINT QUALITY SCORES FOR A CASING CONNECTION | GEISS, BRIAN BUTLER | 2857 | §101§103 | Non-Final OA | — | Pending | Feb 29, 2024 |
| 18537958 | DIGITAL SEISMIC FILE INGESTION | NGHIEM, MICHAEL P | 2857 | §101§103§112 | Non-Final OA | — | Pending | Dec 13, 2023 |
| 18517936 | WELLBORE CLEAN-UP OPTIMIZATIONS | COTHRAN, BERNARD E | 2188 | §102§103 | Non-Final OA | — | Pending | Nov 22, 2023 |
| 18558966 | FACILITY DEVELOPMENT PLANNING AND COST ESTIMATION | GOLDBERG, IVAN R | 3619 | §101§112 | Non-Final OA | 75d | Pending | Nov 03, 2023 |
| 18459610 | ELECTROLYSIS SYSTEM | COHEN, BRIAN W | 1759 | §103 | Non-Final OA | — | Pending | Sep 01, 2023 |
| 18453668 | WELLBORE CLEAN-UP SCENARIO-BASED OPTIMIZATION | CALLE, ANGEL JAVIER | 2189 | §101§103§112 | Non-Final OA | — | Pending | Aug 22, 2023 |
| 18452677 | SLUG INDUCEMENT IN WELLBORE CLEAN-UP OPTIMIZATION | COCCHI, MICHAEL EDWARD | 2188 | §101§103 | Non-Final OA | — | Pending | Aug 21, 2023 |
| 18546108 | RESERVOIR MODELING | GEBRESILASSIE, KIBROM K | 2189 | §102§103 | Non-Final OA | — | Pending | Aug 11, 2023 |
| 18344906 | HYBRID LOW-HIGH TEMPERATURE ELECTROLYSIS WITH HEAT RECOVERY | WILKINS III, HARRY D | 1794 | §103 | Non-Final OA | — | Pending | Jun 30, 2023 |
| 18257967 | DYNAMIC ADJUSTMENTS OF DRILLING PARAMETER LIMITS | SULTANA, DILARA | 2858 | §103 | Non-Final OA | 61d | Pending | Jun 16, 2023 |
| 18333313 | WELLBORE CLEAN-UP APPARATUS AND METHOD | COCCHI, MICHAEL EDWARD | 2188 | §101§102§103§112 | Non-Final OA | — | Pending | Jun 12, 2023 |
| 18317950 | RECOVERY OF WASTE ENERGY FROM BATTERY ENERGY STORAGE SYSTEMS | BARGERO, JOHN E | 3762 | §103 | Final Rejection | 40d | Pending | May 16, 2023 |
| 18251085 | CENTRALLY COLLECTING AND TRACKING MODEL UPDATE INPUTS | AUSTIN, JAMIE H | 3625 | §101§112 | Final Rejection | — | Pending | Apr 28, 2023 |
| 18148495 | MODULAR HYDROCARBON FACILITY PLACEMENT PLANNING SYSTEM | LABOGIN, DORETHEA L | 3624 | §101 | Final Rejection | 34d | Pending | Dec 30, 2022 |
| 18146561 | SLUG MONITORING AND FORECASTING IN PRODUCTION FLOWLINES THROUGH ARTIFICIAL INTELLIGENCE | HALL, KRISTYN A | 3672 | §101 | Non-Final OA | — | Pending | Dec 27, 2022 |
| 18063198 | DATA DRIVEN PRE-JOB PLANNING FOR WIRELINE OPERATIONS | HOCKER, JOHN PAUL | 2189 | §103§112 | Non-Final OA | — | Pending | Dec 08, 2022 |
| 17919433 | COMPOSITIONAL RESERVOIR SIMULATION | STOICA, ADRIAN | 2188 | §101§103 | Final Rejection | — | Pending | Oct 17, 2022 |
| 17817697 | DRILLING OPERATIONS FRICTION FRAMEWORK | HAO, YI | 2187 | §101§103§112 | Final Rejection | 38d overdue | Pending | Aug 05, 2022 |
| 17261785 | OPTIMIZED MULTI-STAGE INTERMITTENT FUGITIVE EMISSION DETECTION | SUN, XIUQIN | 2857 | §103 | Final Rejection | 169d overdue | Pending | Jan 20, 2021 |