Prosecution Insights
Last updated: October 04, 2026

Kolitch Romano Dascenzo Gates LLP

Technology areas: Chemistry & Materials • Transportation, E-Commerce & Mechanical Systems

64 pending office actions • 36 clients • 63 examiners • 47 art units • 0 of 64 (0%) have an AI response strategy ready

Analysis

Kolitch Romano Dascenzo Gates LLP specializes in the Chemistry & Materials technology area, where it has filed 2885 career applications. The firm maintains a resolved allowance rate of 86.16 percent, showing the percentage of its cases that reach a grant. This performance metric indicates the firm's experience in navigating the requirements of the patent office for chemical and material science innovations across its 2885 career applications.

The firm's prosecution process involves an average of 2.2 office actions per allowance. This metric indicates the typical number of interactions between the firm and patent examiners before an application reaches an allowance. Currently, there are 48 pending office actions on the firm's docket, representing its active workload within the Chemistry & Materials sector. These 48 pending office actions are fewer than the 2885 career applications on record.

The 86.16 percent allowance rate and the 2.2 office actions per allowance provide specific benchmarks for the firm's prosecution performance. The 48 pending office actions reflect the firm's current activity, while the 2885 career applications document its historical involvement in the field. These figures offer a data-grounded view of the firm's results.

Written from this page's own data; every figure is computed from USPTO records and verified before publication.

Quality Metrics (n=2885 apps, methodology: how we score firms)

86.2%
Allowance Rate
n=2885
+0.38σ
Allowance Rate (norm)
n=2885
2.2
OAs to Allowance
n=1898
-0.79σ
OAs to Allow (norm)
n=1898
827 days
Time to Allowance
n=1898
+6.6pp
Interview Lift
n=2885
14.2%
RCE Rate
n=2885
2.6%
Appeal Rate
n=2885

Rejection Performance (% of received rejections ultimately overcome)

63.9%
§101 Overcome
n=166
71.2%
§102 Overcome
n=707
71.4%
§103 Overcome
n=1145
74.5%
§112 Overcome
n=654

Specialization & Scale

G06F, H01M, B62K
Top CPC Subclasses
10%
Top-3 CPC Share
n=2885
0
Practitioners
n=2885
—
Apps / Practitioner
n=2885 (min 20)

Portfolio Summary

64
Total Pending OAs
41
Non-Final OAs
22
Final Rejections
1
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 18 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

8
Overdue
0
Due this week
4
Due this month
6
Due in next 60 days
0
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 18 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (8)Due ≤ 30 days (4)Due ≤ 60 days (6)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

38
Hard (59%)
24
Medium (38%)
2
Easy (3%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§101 + other5 (8%)
§103 only19 (30%)
§102 only3 (5%)
§112 only2 (3%)
Double-patenting + other2 (3%)
Multi-statute (no §101)33 (52%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

16
Life Sciences
25% of docket
7
Information Tech
11% of docket
1
Communications
2% of docket
6
Semiconductors
9% of docket
21
Mechanical / Eng
33% of docket
13
Business / Other
20% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

640 h
Manual time on pending OAs
128 h
Time saved (low, 20%)
224 h
Time saved (mid, 35%)
5.6 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
BERNS, DANIEL J 2 73.1% +34.1%
FEITL, LEAH M 1 22.6% +5.8%
CARY, KELSEY E 1 75.0% +24.9%
FLETCHER III, WILLIAM P 1 76.2% +16.4%
CHANDRASIRI, UPUL PRIYADARSHAN 1 8.7% -14.3%
AZUBUOGU, CHIEMERIE CHIBUZOR 1 0.0% +0.0%
HAO, YI 1 34.0% +46.4%
BROWN, JOSEPH HENRY 1 60.4% +38.0%
COLLISTER, ELIZABETH A 1 81.5% +14.3%
KUNTZ, JEWEL A 1 70.9% +16.4%

Hard Cases (39)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
19070285 SYSTEMS AND METHODS FOR COMPUTER-AIDED DESIGN (CAD) EXCHANGE HAO, YI 99d overdue
18457970 SIPHONIC WATER CLOSET PAN ROS, NICHOLAS A 74d overdue
18620422 FLOOR-TO-FLOOR FACADE PANEL MOUNTING SYSTEM MUDD, HENRY HOOPER 42d overdue
18623358 METHOD FOR LIVE STREAMING INTERACTION AND ELECTRONIC DEVICE VU, THANH T 1d overdue
18062570 STANDARDIZED ASSET LOCATION TRACKING LUDWIG, PETER L 1d overdue
18415318 TOY CONSTRUCTION KITS AND RELATED METHODS STANCZAK, MATTHEW BRIAN 27d
18645243 METHOD FOR PLAYING VIDEO AND ELECTRONIC DEVICE TSUI, WILSON W 30d
18889062 AUTOMATIC WORKOUT ADJUSTMENT BASED ON HEART RATE VARIABILITY DATA NG, JONATHAN K 36d

Interview Candidates (8)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
19070285 SYSTEMS AND METHODS FOR COMPUTER-AIDED DESIGN (CAD) EXCHANGE HAO, YI 99d overdue
19277219 APPARATUSES COMPRSING SEAL COMPONENTS AND METHODS COMPRISING SEAL COMPONENTS CARY, KELSEY E —
19236592 SOLUTIONS AND METHODS FOR FORMING AN EXOGENOUS FLEXIBLE FILM ON A PLANT AND PLANTS INCLUDING THE EXOGENOUS FLEXIBLE FILM FLETCHER III, WILLIAM P —
19053033 DRIVE SYSTEM BROWN, JOSEPH HENRY —
19003785 ELASTOMER COMPONENTS AND APPARATUSES AND METHODS COMPRISING ELASTOMER COMPONENTS COLLISTER, ELIZABETH A —
18875578 METHOD FOR DETERMINING AVAILABLE RANGE, AND HYBRID ELECTRIC VEHICLE AND STORAGE MEDIUM KUNTZ, JEWEL A —
18560364 DECARBONATION PROCESS OF CARBONATED MATERIALS IN A MULTI-SHAFT VERTICAL KILN BERNS, DANIEL J —
18560357 DECARBONATION PROCESS OF CARBONATED MATERIALS IN A MULTI-SHAFT VERTICAL KILN BERNS, DANIEL J —

Client Portfolio (36 clients)

Top Art Units

Art UnitApps
17383
36422
17362
21471
37531
36651
37721
21871
36181
17841

Pending Office Actions

App #TitleClientExaminerArt UnitStatutesStatusDue inAIFiled
19373505 MULTIMODAL AI-GENERATED PERSONALIZED MOTIVATIONAL, WELLNESS, AND EDUCATIONAL CONTENT SYSTEM Iconic Inventions LLC FEITL, LEAH M 2147 §103§112 Final Rejection — Pending Oct 29, 2025
19277219 APPARATUSES COMPRSING SEAL COMPONENTS AND METHODS COMPRISING SEAL COMPONENTS The Boeing Company CARY, KELSEY E 3753 §103§112 Non-Final OA — Pending Jul 22, 2025
19236592 SOLUTIONS AND METHODS FOR FORMING AN EXOGENOUS FLEXIBLE FILM ON A PLANT AND PLANTS INCLUDING THE EXOGENOUS FLEXIBLE FILM Cultiva, LLC FLETCHER III, WILLIAM P §102§112DP Non-Final OA — Pending Jun 12, 2025
19133984 METHOD FOR CONTROLLING VEHICLE, VEHICLE, AND STORAGE MEDIUM Chery Automobile Co., Ltd. CHANDRASIRI, UPUL PRIYADARSHAN 3665 §102§103 Non-Final OA — Pending May 29, 2025
19176994 ACCESSORY FOR CURLING LOCKS OF HAIR BABYLISS FACO SRL AZUBUOGU, CHIEMERIE CHIBUZOR 3772 §103 Final Rejection — Pending Apr 11, 2025
19070285 SYSTEMS AND METHODS FOR COMPUTER-AIDED DESIGN (CAD) EXCHANGE Ntopology Inc. HAO, YI 2187 §101§103 Non-Final OA 99d overdue Pending Mar 04, 2025
19053033 DRIVE SYSTEM Jörg Beutler BROWN, JOSEPH HENRY 3618 §103 Final Rejection — Pending Feb 13, 2025
19003785 ELASTOMER COMPONENTS AND APPARATUSES AND METHODS COMPRISING ELASTOMER COMPONENTS The Boeing Company COLLISTER, ELIZABETH A 1784 §102§103 Non-Final OA — Pending Dec 27, 2024
18875578 METHOD FOR DETERMINING AVAILABLE RANGE, AND HYBRID ELECTRIC VEHICLE AND STORAGE MEDIUM Chery Automobile Co., Ltd. KUNTZ, JEWEL A 3666 §101§103 Non-Final OA — Pending Dec 16, 2024
18874793 COMMUNICATION SYSTEM AND METHOD BASED ON END-TO-END DATA ENCRYPTION Chery Automobile Co., Ltd. REVAK, CHRISTOPHER A 2407 §103 Final Rejection — Pending Dec 13, 2024
18874543 HYDRAULIC SYSTEM FOR HYBRID GEARBOX AND VEHICLE Chery Automobile Co., Ltd. WIBLIN, MATTHEW §103 Non-Final OA — Pending Dec 12, 2024
18872031 PARAMETER SETTING METHOD AND PARAMETER SETTING APPARATUS Chery Automobile Co., Ltd. AHMED, MASUD 3657 §103 Final Rejection 40d Pending Dec 05, 2024
18965920 PORTABLE MACHINE TOOL KITS WITH ADAPTIVE GEARBOXES Climax Portable Machine Tools, Inc. GATES, ERIC ANDREW §103 Non-Final OA — Pending Dec 02, 2024
18863210 POSITIONING METHOD AND SYSTEM FOR COMPENSATION OF INTERNAL PROPAGATION DELAYS Ecole Royale Militaire - Koninklijke Militaire School PERVIN, NUZHAT §103§112 Non-Final OA — Pending Nov 05, 2024
18920598 RADIOTHERAPY SYSTEM AND METHOD FOR CONTROLLING THE SAME Our United Corporation GUNBERG, EDWIN C 2884 §102§103 Non-Final OA — Pending Oct 18, 2024
18855135 A WORKREST FOR A GRINDING MACHINE Fives Landis Limited CRANDALL, JOEL DILLON §102§103§112 Non-Final OA — Pending Oct 08, 2024
18852927 MEDICAL TOOL TIP, ACTUATION DEVICE, SURGICAL INSTRUMENT, AND SECURING METHOD Kammerer Medical Systems GmbH & Co. Kg JAMIALAHMADI, MAJID 3771 §102 Non-Final OA — Pending Sep 30, 2024
18853017 MEDICAL PUNCH TIP, SURGICAL INSTRUMENT AND METHOD Kammerer Medical Systems GmbH & Co. Kg MERRIAM, AARON ROGERS §103§112 Non-Final OA — Pending Sep 30, 2024
18850017 CUTTER HOLDER FOR FACILITATING PLANT MATERIAL CUTTING Pro Mac Equipment Ltd. TRAN, JULIA C §103 Non-Final OA — Pending Sep 23, 2024
18889062 AUTOMATIC WORKOUT ADJUSTMENT BASED ON HEART RATE VARIABILITY DATA Velopro, Inc. NG, JONATHAN K 3619 §101§103 Final Rejection 36d Pending Sep 18, 2024
18740182 INERTIAL ACTUATION DEVICE FOR MODAL TESTING OF STRUCTURES The Boeing Company DAVIS-HOLLINGTON, OCTAVIA L 2855 §102 Non-Final OA — Pending Jun 11, 2024
18733328 CURRENT DETECTION DEVICE AND RELATED DEVICES, SYSTEMS AND METHODS THEREOF Basis Nz Limited ALEJNIKOV JR, ROBERT P 2857 §102§103 Non-Final OA — Pending Jun 04, 2024
18677676 BEAM DIRECTORS The Boeing Company DUNNING, RYAN S 2872 §102§112 Non-Final OA — Pending May 29, 2024
18713356 GAS-DISCHARGE LAMP, LAMP ARRAY FOR HIGH OPERATING VOLTAGES, AND USE OF SUCH LAMPS Flaxtec GmbH WILLIAMS, JOSEPH L 2875 §102Other Non-Final OA — Pending May 24, 2024
18657398 OPTICAL ASSEMBLIES COMPRISING ADHESIVE CONFIGURED FOR HIGH TEMPERATURES The Boeing Company CHIEM, DINH D 2874 §103 Non-Final OA — Pending May 07, 2024
18706906 A VALVE FOR AN OSTOMY APPLIANCE Salts Healthcare Limited TRAN, NHU 3781 §102§103§112Other Non-Final OA — Pending May 02, 2024
18653114 SLIDING GUARDRAIL SYSTEMS AND METHODS OF UTILIZING SLIDING GUARDRAIL SYSTEMS The Boeing Company MARTINEZ, DAVID E 3634 §102§103 Non-Final OA — Pending May 02, 2024
18705822 RF PULSE AMPLIFIER COMPRISING A DC/DC CONVERTER AND METHOD OF AMPLIFYING AN RF PULSE Prodrive Technologies Innovation Services B.V. NGUYEN, KHANH V §102§103 Non-Final OA — Pending Apr 29, 2024
18645243 METHOD FOR PLAYING VIDEO AND ELECTRONIC DEVICE BEIJING DAJIA INTERNET INFORMATION TECHNOLOGY CO., LTD. TSUI, WILSON W 2172 §102§103 Non-Final OA 30d Pending Apr 24, 2024
18702689 METHOD FOR PREPARING AN EXTRACT OF HERB(S) AND/OR SPICE(S) FROM A VINEGAR SALT Galactic S.A. TRAN, LIEN THUY 1793 §103 Final Rejection 25d overdue Pending Apr 18, 2024
18699802 COMBUSTION APPARATUS, COMBUSTION SYSTEM, AND COMBUSTION METHOD Combustion Consulting Italy S.r.l. BASICHAS, ALFRED §102§103 Non-Final OA — Pending Apr 09, 2024
18628512 METHODS OF MANUFACTURING COMPOSITE SEALS, COMPOSITE SEALS, AND ASSEMBLIES WITH COMPOSITE SEALS The Boeing Company KENNEDY, TIMOTHY J 1743 §103 Final Rejection 56d Pending Apr 05, 2024
18623358 METHOD FOR LIVE STREAMING INTERACTION AND ELECTRONIC DEVICE BEIJING DAJIA INTERNET INFORMATION TECHNOLOGY CO., LTD. VU, THANH T 2179 §103§112 Non-Final OA 1d overdue Pending Apr 01, 2024
18620422 FLOOR-TO-FLOOR FACADE PANEL MOUNTING SYSTEM Tion Cladding Systems, LLC MUDD, HENRY HOOPER 3642 §102§103§112 Final Rejection 42d overdue Pending Mar 28, 2024
18690951 COMPOSITE WEAR COMPONENT Magotteaux International S.A. SHAMS, NAZMUN NAHAR §103§112 Non-Final OA — Pending Mar 11, 2024
18588576 CLAMP ELECTRODE DEVICE AND ELASTIC MEMBER FOR THE SAME Inbody Co., Ltd. SARCENO ROBLES, CHRISTIAN MANUEL 3794 §103 Non-Final OA — Pending Feb 27, 2024
18683173 VALORISATION OF D-LACTIC ACID STREAM BY L/D SEPARATION IN THE PRODUCTION PROCESS OF L-POLYLACTIC ACID Futerro S.A. YOON, TAE H §103§112 Non-Final OA — Pending Feb 12, 2024
18683188 VALORISATION OF D-LACTIC ACID STREAM IN THE PRODUCTION PROCESS OF L-POLYLACTIC ACID Futerro S.A. KARST, DAVID THOMAS 1657 §103 Non-Final OA — Pending Feb 12, 2024
18683148 VALORISATION OF LACTIC ACID STREAM IN THE PRODUCTION PROCESS OF POLYLACTIC ACID Futerro S.A. DESTEFANO, AUDRA JEAN §103§112 Non-Final OA — Pending Feb 12, 2024
18293745 METHOD FOR LACTIDE AND LACTIC ACID RECOVERY AT POLYLACTIDE (PLA) PRODUCTION STEPS Futerro S.A. DU, SURBHI M §103§112 Non-Final OA — Pending Jan 30, 2024
18415318 TOY CONSTRUCTION KITS AND RELATED METHODS Full Sun LLC STANCZAK, MATTHEW BRIAN 3711 §103§112 Non-Final OA 27d Pending Jan 17, 2024
18510353 COLLAPSIBLE GUARDRAILS The Boeing Company MCFARLAND, KATHLEEN MAVOURNEEN 3635 §102§103 Final Rejection — Pending Nov 15, 2023
18560364 DECARBONATION PROCESS OF CARBONATED MATERIALS IN A MULTI-SHAFT VERTICAL KILN Carmeuse Technologies SA BERNS, DANIEL J 1736 §112 Non-Final OA — Pending Nov 10, 2023
18560332 DECARBONATION PROCESS OF CARBONATED MATERIALS IN A MULTI-SHAFT VERTICAL KILN Carmeuse Technologies SA MOUDOU, EILEEN QI-YUN 1738 §103§112DP Non-Final OA — Pending Nov 10, 2023
18560357 DECARBONATION PROCESS OF CARBONATED MATERIALS IN A MULTI-SHAFT VERTICAL KILN Carmeuse Technologies SA BERNS, DANIEL J 1736 §112 Non-Final OA — Pending Nov 10, 2023
18558638 A HEATING AND COOLING SYSTEM FOR A VEHICLE Equipmake Limited GAYE, SAMBA NMN 3763 §103§112 Non-Final OA — Pending Nov 02, 2023
18462934 CIRCUMFERENTIAL SKIN JOINTS FOR AEROSPACE STRUCTURES, METHODS OF ASSEMBLING THE JOINTS, AND METHODS OF MANUFACTURING FUSELAGE MEMBERS THAT DEFINE THE JOINTS The Boeing Company YANKEY, RYAN ANDREW 3642 §102§103§112 Non-Final OA — Pending Sep 07, 2023
18460420 SYSTEMS AND METHODS FOR MANUFACTURING STIFFENED COMPOSITE STRUCTURES The Boeing Company PAGE, HANA C 1745 §103 Final Rejection 41d Pending Sep 01, 2023
18457970 SIPHONIC WATER CLOSET PAN Wallgate Limited ROS, NICHOLAS A 3754 §103§112 Final Rejection 74d overdue Pending Aug 29, 2023
18353464 PROOF-OF-LOCATION SYSTEMS AND METHODS Youar Inc. ISLAM, MEHRAZUL NMN 2662 §101§102§103§112 Final Rejection — Pending Jul 17, 2023
18327365 GRIPPING AND SEALANT-DISPENSING DEVICES FOR FASTENER INSTALLATION The Boeing Company KURPLE, KARL 1717 §103 Final Rejection 4d overdue Pending Jun 01, 2023
18323750 METHODS OF ADDITIVELY MANUFACTURING A MANUFACTURED COMPONENT, ADDITIVE MANUFACTURING SYSTEMS THAT PERFORM THE METHODS, AND STORAGE MEDIA THAT DIRECTS ADDITIVE MANUFACTURING SYSTEMS TO PERFORM THE METHODS The Boeing Company SONG, INJA 1744 §102§103§112 Non-Final OA — Pending May 25, 2023
18253028 METHOD FOR CODING VIDEO, DEVICE, AND STORAGE MEDIUM BIGO TECHNOLOGY PTE. LTD. HUBER, JEREMIAH CHARLES 2481 §103 Final Rejection 3d overdue Pending May 15, 2023
18184503 SUNSCREEN-ACTIVE MIXTURES, METHODS OF FORMING TREATED MIXTURES FOR SUNSCREEN COMPOSITIONS, SUNSCREEN COMPOSITIONS, AND METHODS OF FORMING SUNSCREEN COMPOSITIONS Sav Consultants LLC WRIGHT, SARAH C 1619 §103 Final Rejection 40d Pending Mar 15, 2023
18182187 INTRAUTERINE ENVIRONMENT SIMULATION SYSTEM Ontogenetics Inc. TRAN, LARA LINH 3791 §102§103 Final Rejection — Pending Mar 10, 2023
18043876 PROCESS FOR DECARBONATING CARBONATED MATERIALS AND DEVICE THEREFOR CONSEJO SUPERIOR DE INVESTIGACIONES CIENTÍFICAS QUIST, NICOLE LEE 1738 §103§112 Final Rejection — Pending Mar 02, 2023
18041361 POLYMERISATION PROCESSES The University of Bath FANG, SHANE 1766 §103 Final Rejection 16d Pending Feb 10, 2023
18062570 STANDARDIZED ASSET LOCATION TRACKING The Boeing Company LUDWIG, PETER L 3627 §101§103 Final Rejection 1d overdue Pending Dec 06, 2022
18000073 CERAMIC-METAL COMPOSITE WEAR PART Magotteaux International S.A. CARPENTER, JOSHUA S 1733 §103§112 Non-Final OA — Pending Nov 28, 2022
17759263 INTERLAYER FOR SOLID OXIDE CELL Ceres Intellectual Property Company Limited ROSENBAUM, AMANDA R 1752 §103 Non-Final OA 33d Pending Jul 21, 2022
17789132 METHOD AND APPARATUS FOR TRAINING INFORMATION PREDICTION MODELS, METHOD AND APPARATUS FOR PREDICTING INFORMATION, AND STORAGE MEDIUM AND DEVICE THEREOF BIGO TECHNOLOGY PTE. LTD. MAUNI, HUMAIRA ZAHIN 2141 §103 Final Rejection 22d Pending Jun 24, 2022
17631342 INFORMATION DISPLAY APPARATUS AND METHOD FOR SOCIAL APPLICATION, DISPLAY TERMINAL, AND MEDIUM BIGO TECHNOLOGY PTE. LTD. SITTNER, MICHAEL J 3621 §103§112 Non-Final OA — Pending Jan 28, 2022
17491345 COMPOSITE WEAR COMPONENT Magotteaux International S.A. POLLOCK, AUSTIN M 1738 §103§112 Non-Final OA — Pending Sep 30, 2021
17475907 DUAL-WALLED FLUID TRANSPORTATION SYSTEMS AND RELATED METHODS The Boeing Company RUFRANO, ALEXANDER TYLER 3679 §103§112 Final Rejection — Pending Sep 15, 2021

Managing Kolitch Romano Dascenzo Gates LLP's Patent Prosecution?

IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month