Technology areas: Chemistry & Materials • Transportation, E-Commerce & Mechanical Systems
64 pending office actions • 36 clients • 63 examiners • 47 art units • 0 of 64 (0%) have an AI response strategy ready
Kolitch Romano Dascenzo Gates LLP specializes in the Chemistry & Materials technology area, where it has filed 2885 career applications. The firm maintains a resolved allowance rate of 86.16 percent, showing the percentage of its cases that reach a grant. This performance metric indicates the firm's experience in navigating the requirements of the patent office for chemical and material science innovations across its 2885 career applications.
The firm's prosecution process involves an average of 2.2 office actions per allowance. This metric indicates the typical number of interactions between the firm and patent examiners before an application reaches an allowance. Currently, there are 48 pending office actions on the firm's docket, representing its active workload within the Chemistry & Materials sector. These 48 pending office actions are fewer than the 2885 career applications on record.
The 86.16 percent allowance rate and the 2.2 office actions per allowance provide specific benchmarks for the firm's prosecution performance. The 48 pending office actions reflect the firm's current activity, while the 2885 career applications document its historical involvement in the field. These figures offer a data-grounded view of the firm's results.
Based on the USPTO statutory response window for each pending office action. 18 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 18 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 5 (8%) |
| §103 only | 19 (30%) |
| §102 only | 3 (5%) |
| §112 only | 2 (3%) |
| Double-patenting + other | 2 (3%) |
| Multi-statute (no §101) | 33 (52%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| BERNS, DANIEL J | 2 | 73.1% | +34.1% |
| FEITL, LEAH M | 1 | 22.6% | +5.8% |
| CARY, KELSEY E | 1 | 75.0% | +24.9% |
| FLETCHER III, WILLIAM P | 1 | 76.2% | +16.4% |
| CHANDRASIRI, UPUL PRIYADARSHAN | 1 | 8.7% | -14.3% |
| AZUBUOGU, CHIEMERIE CHIBUZOR | 1 | 0.0% | +0.0% |
| HAO, YI | 1 | 34.0% | +46.4% |
| BROWN, JOSEPH HENRY | 1 | 60.4% | +38.0% |
| COLLISTER, ELIZABETH A | 1 | 81.5% | +14.3% |
| KUNTZ, JEWEL A | 1 | 70.9% | +16.4% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19070285 | SYSTEMS AND METHODS FOR COMPUTER-AIDED DESIGN (CAD) EXCHANGE | HAO, YI | 99d overdue |
| 18457970 | SIPHONIC WATER CLOSET PAN | ROS, NICHOLAS A | 74d overdue |
| 18620422 | FLOOR-TO-FLOOR FACADE PANEL MOUNTING SYSTEM | MUDD, HENRY HOOPER | 42d overdue |
| 18623358 | METHOD FOR LIVE STREAMING INTERACTION AND ELECTRONIC DEVICE | VU, THANH T | 1d overdue |
| 18062570 | STANDARDIZED ASSET LOCATION TRACKING | LUDWIG, PETER L | 1d overdue |
| 18415318 | TOY CONSTRUCTION KITS AND RELATED METHODS | STANCZAK, MATTHEW BRIAN | 27d |
| 18645243 | METHOD FOR PLAYING VIDEO AND ELECTRONIC DEVICE | TSUI, WILSON W | 30d |
| 18889062 | AUTOMATIC WORKOUT ADJUSTMENT BASED ON HEART RATE VARIABILITY DATA | NG, JONATHAN K | 36d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19070285 | SYSTEMS AND METHODS FOR COMPUTER-AIDED DESIGN (CAD) EXCHANGE | HAO, YI | 99d overdue |
| 19277219 | APPARATUSES COMPRSING SEAL COMPONENTS AND METHODS COMPRISING SEAL COMPONENTS | CARY, KELSEY E | — |
| 19236592 | SOLUTIONS AND METHODS FOR FORMING AN EXOGENOUS FLEXIBLE FILM ON A PLANT AND PLANTS INCLUDING THE EXOGENOUS FLEXIBLE FILM | FLETCHER III, WILLIAM P | — |
| 19053033 | DRIVE SYSTEM | BROWN, JOSEPH HENRY | — |
| 19003785 | ELASTOMER COMPONENTS AND APPARATUSES AND METHODS COMPRISING ELASTOMER COMPONENTS | COLLISTER, ELIZABETH A | — |
| 18875578 | METHOD FOR DETERMINING AVAILABLE RANGE, AND HYBRID ELECTRIC VEHICLE AND STORAGE MEDIUM | KUNTZ, JEWEL A | — |
| 18560364 | DECARBONATION PROCESS OF CARBONATED MATERIALS IN A MULTI-SHAFT VERTICAL KILN | BERNS, DANIEL J | — |
| 18560357 | DECARBONATION PROCESS OF CARBONATED MATERIALS IN A MULTI-SHAFT VERTICAL KILN | BERNS, DANIEL J | — |
| Art Unit | Apps |
|---|---|
| 1738 | 3 |
| 3642 | 2 |
| 1736 | 2 |
| 2147 | 1 |
| 3753 | 1 |
| 3665 | 1 |
| 3772 | 1 |
| 2187 | 1 |
| 3618 | 1 |
| 1784 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19373505 | MULTIMODAL AI-GENERATED PERSONALIZED MOTIVATIONAL, WELLNESS, AND EDUCATIONAL CONTENT SYSTEM | Iconic Inventions LLC | FEITL, LEAH M | 2147 | §103§112 | Final Rejection | — | Pending | Oct 29, 2025 |
| 19277219 | APPARATUSES COMPRSING SEAL COMPONENTS AND METHODS COMPRISING SEAL COMPONENTS | The Boeing Company | CARY, KELSEY E | 3753 | §103§112 | Non-Final OA | — | Pending | Jul 22, 2025 |
| 19236592 | SOLUTIONS AND METHODS FOR FORMING AN EXOGENOUS FLEXIBLE FILM ON A PLANT AND PLANTS INCLUDING THE EXOGENOUS FLEXIBLE FILM | Cultiva, LLC | FLETCHER III, WILLIAM P | §102§112DP | Non-Final OA | — | Pending | Jun 12, 2025 | |
| 19133984 | METHOD FOR CONTROLLING VEHICLE, VEHICLE, AND STORAGE MEDIUM | Chery Automobile Co., Ltd. | CHANDRASIRI, UPUL PRIYADARSHAN | 3665 | §102§103 | Non-Final OA | — | Pending | May 29, 2025 |
| 19176994 | ACCESSORY FOR CURLING LOCKS OF HAIR | BABYLISS FACO SRL | AZUBUOGU, CHIEMERIE CHIBUZOR | 3772 | §103 | Final Rejection | — | Pending | Apr 11, 2025 |
| 19070285 | SYSTEMS AND METHODS FOR COMPUTER-AIDED DESIGN (CAD) EXCHANGE | Ntopology Inc. | HAO, YI | 2187 | §101§103 | Non-Final OA | 99d overdue | Pending | Mar 04, 2025 |
| 19053033 | DRIVE SYSTEM | Jörg Beutler | BROWN, JOSEPH HENRY | 3618 | §103 | Final Rejection | — | Pending | Feb 13, 2025 |
| 19003785 | ELASTOMER COMPONENTS AND APPARATUSES AND METHODS COMPRISING ELASTOMER COMPONENTS | The Boeing Company | COLLISTER, ELIZABETH A | 1784 | §102§103 | Non-Final OA | — | Pending | Dec 27, 2024 |
| 18875578 | METHOD FOR DETERMINING AVAILABLE RANGE, AND HYBRID ELECTRIC VEHICLE AND STORAGE MEDIUM | Chery Automobile Co., Ltd. | KUNTZ, JEWEL A | 3666 | §101§103 | Non-Final OA | — | Pending | Dec 16, 2024 |
| 18874793 | COMMUNICATION SYSTEM AND METHOD BASED ON END-TO-END DATA ENCRYPTION | Chery Automobile Co., Ltd. | REVAK, CHRISTOPHER A | 2407 | §103 | Final Rejection | — | Pending | Dec 13, 2024 |
| 18874543 | HYDRAULIC SYSTEM FOR HYBRID GEARBOX AND VEHICLE | Chery Automobile Co., Ltd. | WIBLIN, MATTHEW | §103 | Non-Final OA | — | Pending | Dec 12, 2024 | |
| 18872031 | PARAMETER SETTING METHOD AND PARAMETER SETTING APPARATUS | Chery Automobile Co., Ltd. | AHMED, MASUD | 3657 | §103 | Final Rejection | 40d | Pending | Dec 05, 2024 |
| 18965920 | PORTABLE MACHINE TOOL KITS WITH ADAPTIVE GEARBOXES | Climax Portable Machine Tools, Inc. | GATES, ERIC ANDREW | §103 | Non-Final OA | — | Pending | Dec 02, 2024 | |
| 18863210 | POSITIONING METHOD AND SYSTEM FOR COMPENSATION OF INTERNAL PROPAGATION DELAYS | Ecole Royale Militaire - Koninklijke Militaire School | PERVIN, NUZHAT | §103§112 | Non-Final OA | — | Pending | Nov 05, 2024 | |
| 18920598 | RADIOTHERAPY SYSTEM AND METHOD FOR CONTROLLING THE SAME | Our United Corporation | GUNBERG, EDWIN C | 2884 | §102§103 | Non-Final OA | — | Pending | Oct 18, 2024 |
| 18855135 | A WORKREST FOR A GRINDING MACHINE | Fives Landis Limited | CRANDALL, JOEL DILLON | §102§103§112 | Non-Final OA | — | Pending | Oct 08, 2024 | |
| 18852927 | MEDICAL TOOL TIP, ACTUATION DEVICE, SURGICAL INSTRUMENT, AND SECURING METHOD | Kammerer Medical Systems GmbH & Co. Kg | JAMIALAHMADI, MAJID | 3771 | §102 | Non-Final OA | — | Pending | Sep 30, 2024 |
| 18853017 | MEDICAL PUNCH TIP, SURGICAL INSTRUMENT AND METHOD | Kammerer Medical Systems GmbH & Co. Kg | MERRIAM, AARON ROGERS | §103§112 | Non-Final OA | — | Pending | Sep 30, 2024 | |
| 18850017 | CUTTER HOLDER FOR FACILITATING PLANT MATERIAL CUTTING | Pro Mac Equipment Ltd. | TRAN, JULIA C | §103 | Non-Final OA | — | Pending | Sep 23, 2024 | |
| 18889062 | AUTOMATIC WORKOUT ADJUSTMENT BASED ON HEART RATE VARIABILITY DATA | Velopro, Inc. | NG, JONATHAN K | 3619 | §101§103 | Final Rejection | 36d | Pending | Sep 18, 2024 |
| 18740182 | INERTIAL ACTUATION DEVICE FOR MODAL TESTING OF STRUCTURES | The Boeing Company | DAVIS-HOLLINGTON, OCTAVIA L | 2855 | §102 | Non-Final OA | — | Pending | Jun 11, 2024 |
| 18733328 | CURRENT DETECTION DEVICE AND RELATED DEVICES, SYSTEMS AND METHODS THEREOF | Basis Nz Limited | ALEJNIKOV JR, ROBERT P | 2857 | §102§103 | Non-Final OA | — | Pending | Jun 04, 2024 |
| 18677676 | BEAM DIRECTORS | The Boeing Company | DUNNING, RYAN S | 2872 | §102§112 | Non-Final OA | — | Pending | May 29, 2024 |
| 18713356 | GAS-DISCHARGE LAMP, LAMP ARRAY FOR HIGH OPERATING VOLTAGES, AND USE OF SUCH LAMPS | Flaxtec GmbH | WILLIAMS, JOSEPH L | 2875 | §102Other | Non-Final OA | — | Pending | May 24, 2024 |
| 18657398 | OPTICAL ASSEMBLIES COMPRISING ADHESIVE CONFIGURED FOR HIGH TEMPERATURES | The Boeing Company | CHIEM, DINH D | 2874 | §103 | Non-Final OA | — | Pending | May 07, 2024 |
| 18706906 | A VALVE FOR AN OSTOMY APPLIANCE | Salts Healthcare Limited | TRAN, NHU | 3781 | §102§103§112Other | Non-Final OA | — | Pending | May 02, 2024 |
| 18653114 | SLIDING GUARDRAIL SYSTEMS AND METHODS OF UTILIZING SLIDING GUARDRAIL SYSTEMS | The Boeing Company | MARTINEZ, DAVID E | 3634 | §102§103 | Non-Final OA | — | Pending | May 02, 2024 |
| 18705822 | RF PULSE AMPLIFIER COMPRISING A DC/DC CONVERTER AND METHOD OF AMPLIFYING AN RF PULSE | Prodrive Technologies Innovation Services B.V. | NGUYEN, KHANH V | §102§103 | Non-Final OA | — | Pending | Apr 29, 2024 | |
| 18645243 | METHOD FOR PLAYING VIDEO AND ELECTRONIC DEVICE | BEIJING DAJIA INTERNET INFORMATION TECHNOLOGY CO., LTD. | TSUI, WILSON W | 2172 | §102§103 | Non-Final OA | 30d | Pending | Apr 24, 2024 |
| 18702689 | METHOD FOR PREPARING AN EXTRACT OF HERB(S) AND/OR SPICE(S) FROM A VINEGAR SALT | Galactic S.A. | TRAN, LIEN THUY | 1793 | §103 | Final Rejection | 25d overdue | Pending | Apr 18, 2024 |
| 18699802 | COMBUSTION APPARATUS, COMBUSTION SYSTEM, AND COMBUSTION METHOD | Combustion Consulting Italy S.r.l. | BASICHAS, ALFRED | §102§103 | Non-Final OA | — | Pending | Apr 09, 2024 | |
| 18628512 | METHODS OF MANUFACTURING COMPOSITE SEALS, COMPOSITE SEALS, AND ASSEMBLIES WITH COMPOSITE SEALS | The Boeing Company | KENNEDY, TIMOTHY J | 1743 | §103 | Final Rejection | 56d | Pending | Apr 05, 2024 |
| 18623358 | METHOD FOR LIVE STREAMING INTERACTION AND ELECTRONIC DEVICE | BEIJING DAJIA INTERNET INFORMATION TECHNOLOGY CO., LTD. | VU, THANH T | 2179 | §103§112 | Non-Final OA | 1d overdue | Pending | Apr 01, 2024 |
| 18620422 | FLOOR-TO-FLOOR FACADE PANEL MOUNTING SYSTEM | Tion Cladding Systems, LLC | MUDD, HENRY HOOPER | 3642 | §102§103§112 | Final Rejection | 42d overdue | Pending | Mar 28, 2024 |
| 18690951 | COMPOSITE WEAR COMPONENT | Magotteaux International S.A. | SHAMS, NAZMUN NAHAR | §103§112 | Non-Final OA | — | Pending | Mar 11, 2024 | |
| 18588576 | CLAMP ELECTRODE DEVICE AND ELASTIC MEMBER FOR THE SAME | Inbody Co., Ltd. | SARCENO ROBLES, CHRISTIAN MANUEL | 3794 | §103 | Non-Final OA | — | Pending | Feb 27, 2024 |
| 18683173 | VALORISATION OF D-LACTIC ACID STREAM BY L/D SEPARATION IN THE PRODUCTION PROCESS OF L-POLYLACTIC ACID | Futerro S.A. | YOON, TAE H | §103§112 | Non-Final OA | — | Pending | Feb 12, 2024 | |
| 18683188 | VALORISATION OF D-LACTIC ACID STREAM IN THE PRODUCTION PROCESS OF L-POLYLACTIC ACID | Futerro S.A. | KARST, DAVID THOMAS | 1657 | §103 | Non-Final OA | — | Pending | Feb 12, 2024 |
| 18683148 | VALORISATION OF LACTIC ACID STREAM IN THE PRODUCTION PROCESS OF POLYLACTIC ACID | Futerro S.A. | DESTEFANO, AUDRA JEAN | §103§112 | Non-Final OA | — | Pending | Feb 12, 2024 | |
| 18293745 | METHOD FOR LACTIDE AND LACTIC ACID RECOVERY AT POLYLACTIDE (PLA) PRODUCTION STEPS | Futerro S.A. | DU, SURBHI M | §103§112 | Non-Final OA | — | Pending | Jan 30, 2024 | |
| 18415318 | TOY CONSTRUCTION KITS AND RELATED METHODS | Full Sun LLC | STANCZAK, MATTHEW BRIAN | 3711 | §103§112 | Non-Final OA | 27d | Pending | Jan 17, 2024 |
| 18510353 | COLLAPSIBLE GUARDRAILS | The Boeing Company | MCFARLAND, KATHLEEN MAVOURNEEN | 3635 | §102§103 | Final Rejection | — | Pending | Nov 15, 2023 |
| 18560364 | DECARBONATION PROCESS OF CARBONATED MATERIALS IN A MULTI-SHAFT VERTICAL KILN | Carmeuse Technologies SA | BERNS, DANIEL J | 1736 | §112 | Non-Final OA | — | Pending | Nov 10, 2023 |
| 18560332 | DECARBONATION PROCESS OF CARBONATED MATERIALS IN A MULTI-SHAFT VERTICAL KILN | Carmeuse Technologies SA | MOUDOU, EILEEN QI-YUN | 1738 | §103§112DP | Non-Final OA | — | Pending | Nov 10, 2023 |
| 18560357 | DECARBONATION PROCESS OF CARBONATED MATERIALS IN A MULTI-SHAFT VERTICAL KILN | Carmeuse Technologies SA | BERNS, DANIEL J | 1736 | §112 | Non-Final OA | — | Pending | Nov 10, 2023 |
| 18558638 | A HEATING AND COOLING SYSTEM FOR A VEHICLE | Equipmake Limited | GAYE, SAMBA NMN | 3763 | §103§112 | Non-Final OA | — | Pending | Nov 02, 2023 |
| 18462934 | CIRCUMFERENTIAL SKIN JOINTS FOR AEROSPACE STRUCTURES, METHODS OF ASSEMBLING THE JOINTS, AND METHODS OF MANUFACTURING FUSELAGE MEMBERS THAT DEFINE THE JOINTS | The Boeing Company | YANKEY, RYAN ANDREW | 3642 | §102§103§112 | Non-Final OA | — | Pending | Sep 07, 2023 |
| 18460420 | SYSTEMS AND METHODS FOR MANUFACTURING STIFFENED COMPOSITE STRUCTURES | The Boeing Company | PAGE, HANA C | 1745 | §103 | Final Rejection | 41d | Pending | Sep 01, 2023 |
| 18457970 | SIPHONIC WATER CLOSET PAN | Wallgate Limited | ROS, NICHOLAS A | 3754 | §103§112 | Final Rejection | 74d overdue | Pending | Aug 29, 2023 |
| 18353464 | PROOF-OF-LOCATION SYSTEMS AND METHODS | Youar Inc. | ISLAM, MEHRAZUL NMN | 2662 | §101§102§103§112 | Final Rejection | — | Pending | Jul 17, 2023 |
| 18327365 | GRIPPING AND SEALANT-DISPENSING DEVICES FOR FASTENER INSTALLATION | The Boeing Company | KURPLE, KARL | 1717 | §103 | Final Rejection | 4d overdue | Pending | Jun 01, 2023 |
| 18323750 | METHODS OF ADDITIVELY MANUFACTURING A MANUFACTURED COMPONENT, ADDITIVE MANUFACTURING SYSTEMS THAT PERFORM THE METHODS, AND STORAGE MEDIA THAT DIRECTS ADDITIVE MANUFACTURING SYSTEMS TO PERFORM THE METHODS | The Boeing Company | SONG, INJA | 1744 | §102§103§112 | Non-Final OA | — | Pending | May 25, 2023 |
| 18253028 | METHOD FOR CODING VIDEO, DEVICE, AND STORAGE MEDIUM | BIGO TECHNOLOGY PTE. LTD. | HUBER, JEREMIAH CHARLES | 2481 | §103 | Final Rejection | 3d overdue | Pending | May 15, 2023 |
| 18184503 | SUNSCREEN-ACTIVE MIXTURES, METHODS OF FORMING TREATED MIXTURES FOR SUNSCREEN COMPOSITIONS, SUNSCREEN COMPOSITIONS, AND METHODS OF FORMING SUNSCREEN COMPOSITIONS | Sav Consultants LLC | WRIGHT, SARAH C | 1619 | §103 | Final Rejection | 40d | Pending | Mar 15, 2023 |
| 18182187 | INTRAUTERINE ENVIRONMENT SIMULATION SYSTEM | Ontogenetics Inc. | TRAN, LARA LINH | 3791 | §102§103 | Final Rejection | — | Pending | Mar 10, 2023 |
| 18043876 | PROCESS FOR DECARBONATING CARBONATED MATERIALS AND DEVICE THEREFOR | CONSEJO SUPERIOR DE INVESTIGACIONES CIENTÍFICAS | QUIST, NICOLE LEE | 1738 | §103§112 | Final Rejection | — | Pending | Mar 02, 2023 |
| 18041361 | POLYMERISATION PROCESSES | The University of Bath | FANG, SHANE | 1766 | §103 | Final Rejection | 16d | Pending | Feb 10, 2023 |
| 18062570 | STANDARDIZED ASSET LOCATION TRACKING | The Boeing Company | LUDWIG, PETER L | 3627 | §101§103 | Final Rejection | 1d overdue | Pending | Dec 06, 2022 |
| 18000073 | CERAMIC-METAL COMPOSITE WEAR PART | Magotteaux International S.A. | CARPENTER, JOSHUA S | 1733 | §103§112 | Non-Final OA | — | Pending | Nov 28, 2022 |
| 17759263 | INTERLAYER FOR SOLID OXIDE CELL | Ceres Intellectual Property Company Limited | ROSENBAUM, AMANDA R | 1752 | §103 | Non-Final OA | 33d | Pending | Jul 21, 2022 |
| 17789132 | METHOD AND APPARATUS FOR TRAINING INFORMATION PREDICTION MODELS, METHOD AND APPARATUS FOR PREDICTING INFORMATION, AND STORAGE MEDIUM AND DEVICE THEREOF | BIGO TECHNOLOGY PTE. LTD. | MAUNI, HUMAIRA ZAHIN | 2141 | §103 | Final Rejection | 22d | Pending | Jun 24, 2022 |
| 17631342 | INFORMATION DISPLAY APPARATUS AND METHOD FOR SOCIAL APPLICATION, DISPLAY TERMINAL, AND MEDIUM | BIGO TECHNOLOGY PTE. LTD. | SITTNER, MICHAEL J | 3621 | §103§112 | Non-Final OA | — | Pending | Jan 28, 2022 |
| 17491345 | COMPOSITE WEAR COMPONENT | Magotteaux International S.A. | POLLOCK, AUSTIN M | 1738 | §103§112 | Non-Final OA | — | Pending | Sep 30, 2021 |
| 17475907 | DUAL-WALLED FLUID TRANSPORTATION SYSTEMS AND RELATED METHODS | The Boeing Company | RUFRANO, ALEXANDER TYLER | 3679 | §103§112 | Final Rejection | — | Pending | Sep 15, 2021 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial