54 pending office actions • 32 art units • 43 examiners • 0 of 54 (0%) have an AI response strategy ready • 158 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 52 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 52 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 42 (78%) |
| §102 only | 6 (11%) |
| §112 only | 3 (6%) |
| Double-patenting + other | 1 (2%) |
| No statute on record | 2 (4%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| TRIGGS, JAMES J | 4 | 87.7% | +9.8% |
| MEKHAEIL, SHIREF M | 3 | 62.7% | +64.5% |
| SARWAR, BABAR | 2 | 85.6% | +20.1% |
| MCFARLAND, KATHLEEN MAVOURNEEN | 2 | 59.3% | +13.6% |
| PEZZLO, BENJAMIN ALEXANDER | 2 | 100.0% | +0.0% |
| ADAMS, GREGORY W | 2 | 75.0% | +23.9% |
| MYERS, GLENN F | 2 | 77.3% | +19.4% |
| SNELTING, JONATHAN D | 2 | 68.8% | +31.7% |
| KECK, DANIEL M | 1 | 81.1% | +17.3% |
| NGUYEN, DUSTIN T | 1 | 72.5% | +17.3% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19264831 | STEERING ASSEMBLY FOR VEHICLE | KECK, DANIEL M | 5d overdue |
| 18453169 | SYSTEMS AND METHODS FOR BATTERY THERMAL MANAGEMENT ON A VEHICLE | TRIGGS, JAMES J | 1d overdue |
| 18441910 | LIFT DEVICE | PEZZLO, BENJAMIN ALEXANDER | 9d |
| 18441904 | LIFT DEVICE | PEZZLO, BENJAMIN ALEXANDER | 9d |
| 18443481 | DUAL-PUMP COOLING CIRCUIT | TRIGGS, JAMES J | 28d |
| 18926796 | SYSTEMS AND METHODS FOR OPERATING A REFUSE VEHICLE | SARWAR, BABAR | 39d |
| 18618804 | AUXILIARY POWER SYSTEM FOR REFUSE VEHICLE | TRIGGS, JAMES J | 54d |
| 18116703 | AUXILIARY POWER SYSTEM FOR ELECTRIC REFUSE VEHICLE | TRIGGS, JAMES J | — |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18397904 | LIFT ASSEMBLY FOR ELECTRIFIED REFUSE VEHICLE | SNELTING, JONATHAN D | 15d overdue |
| 19264831 | STEERING ASSEMBLY FOR VEHICLE | KECK, DANIEL M | 5d overdue |
| 18927810 | VEHICLE WITH PENDULUM AXLES | MCFARLAND, KATHLEEN MAVOURNEEN | 2d overdue |
| 18524549 | REFUSE COLLECTION SYSTEM | MYERS, GLENN F | 12d |
| 18399537 | PACK AND EJECT SYSTEM FOR REFUSE VEHICLE | MYERS, GLENN F | 13d |
| 18397910 | LIFT ASSEMBLY FOR ELECTRIFIED REFUSE VEHICLE | SNELTING, JONATHAN D | 13d |
| 18200179 | SCISSOR LIFT WITH ELECTRIC ACTUATOR | MEKHAEIL, SHIREF M | 19d |
| 18399544 | REFUSE VEHICLE WITH EXTENSION AND LIFT APPARATUS | ADAMS, GREGORY W | 30d |
| Art Unit | Apps |
|---|---|
| 3652 | 7 |
| 3634 | 6 |
| 3663 | 5 |
| 3615 | 4 |
| 3614 | 2 |
| 3667 | 2 |
| 3635 | 2 |
| 3655 | 2 |
| 3745 | 1 |
| 3619 | 1 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19264831 | STEERING ASSEMBLY FOR VEHICLE | KECK, DANIEL M | 3614 | §103 | Non-Final OA | 5d overdue | Pending | Jul 09, 2025 |
| 19196309 | ELECTROHYDROSTATIC ACTUATOR WITH INTEGRATED PUMP | NGUYEN, DUSTIN T | 3745 | §102 | Non-Final OA | 34d | Pending | May 01, 2025 |
| 19091556 | ENERGY MANAGEMENT FOR ELECTRIFIED FIRE FIGHTING VEHICLE | LEWIS, TISHA D | 3619 | §103 | Final Rejection | 6d | Pending | Mar 26, 2025 |
| 19086543 | AUTONOMOUS MOBILE ROBOT | TAN, OLIVER E | 3669 | §112 | Non-Final OA | — | Pending | Mar 21, 2025 |
| 19045057 | ELECTRIFIED FIRE FIGHTING VEHICLE SYSTEM | ZEROUAL, OMAR | 3628 | §103 | Final Rejection | 28d | Pending | Feb 04, 2025 |
| 19004121 | WEARABLE TECHNOLOGY FOR A REFUSE VEHICLE AND RECHARGING OF WEARABLES | LEE, JUSTIN S | 3668 | §103 | Non-Final OA | 3d overdue | Pending | Dec 27, 2024 |
| 18980952 | Autonomy Systems and Methods for a Vocational Vehicle | SILVA, MICHAEL THOMAS | 3663 | §103 | Non-Final OA | 1d overdue | Pending | Dec 13, 2024 |
| 18953855 | CONDITION BASED VEHICLE PERFORMANCE MANAGEMENT | HANNAN, B M M | 3657 | §103 | Non-Final OA | 22d | Pending | Nov 20, 2024 |
| 18941223 | CONTROL SYSTEM FOR A REFUSE VEHICLE | SARWAR, BABAR | 3667 | Other | Non-Final OA | 41d | Pending | Nov 08, 2024 |
| 18926796 | SYSTEMS AND METHODS FOR OPERATING A REFUSE VEHICLE | SARWAR, BABAR | 3667 | §103 | Non-Final OA | 39d | Pending | Oct 25, 2024 |
| 18927810 | VEHICLE WITH PENDULUM AXLES | MCFARLAND, KATHLEEN MAVOURNEEN | 3635 | §103 | Non-Final OA | 2d overdue | Pending | Oct 25, 2024 |
| 18923922 | OPERATOR FEEDBACK AND TRAINING FOR REFUSE VEHICLE | ULLAH, ARIF | 3625 | §103 | Non-Final OA | 19d overdue | Pending | Oct 23, 2024 |
| 18922057 | REFUSE VEHICLE CONTROL SYSTEMS | MILLER, PRESTON JAY | 3661 | §103 | Non-Final OA | 15d overdue | Pending | Oct 21, 2024 |
| 18918732 | ELECTRIFIED FIRE FIGHTING VEHICLE | LEE, TYLER J | 3663 | §102 | Non-Final OA | 12d | Pending | Oct 17, 2024 |
| 18918685 | REFUSE VEHICLE WITH OBJECT DETECTION AND SORTING SYSTEM | LE, TIEN MINH | 3656 | §103 | Non-Final OA | 15d overdue | Pending | Oct 17, 2024 |
| 18800323 | EQUIPMENT VISUAL STATUS INDICATOR SYSTEM AND METHOD | WILSON, BRIAN P | 2689 | §103 | Non-Final OA | 4d overdue | Pending | Aug 12, 2024 |
| 18759136 | SAFETY JUNCTION BOX | FORTICH, ALVARO E | 2858 | §103 | Non-Final OA | 14d | Pending | Jun 28, 2024 |
| 18655483 | ONBOARD DOCUMENTATION SYSTEM AND METHODS | HOANG, HAU HAI | 2154 | §103 | Non-Final OA | 28d | Pending | May 06, 2024 |
| 18618804 | AUXILIARY POWER SYSTEM FOR REFUSE VEHICLE | TRIGGS, JAMES J | 3615 | §103 | Final Rejection | 54d | Pending | Mar 27, 2024 |
| 18600217 | MACHINE BASED WEATHER MAPPING SYSTEM AND METHOD | ZHOU, QINGZHANG | 3752 | §103 | Non-Final OA | 30d | Pending | Mar 08, 2024 |
| 18443481 | DUAL-PUMP COOLING CIRCUIT | TRIGGS, JAMES J | 3615 | §103 | Non-Final OA | 28d | Pending | Feb 16, 2024 |
| 18443633 | FENDER MOUNTING FOR REFUSE VEHICLE | FLEMING, FAYE M | 3612 | §102 | Non-Final OA | 28d | Pending | Feb 16, 2024 |
| 18441910 | LIFT DEVICE | PEZZLO, BENJAMIN ALEXANDER | 3634 | §103 | Non-Final OA | 9d | Pending | Feb 14, 2024 |
| 18441813 | LIFT DEVICE | TRAN, DIEM M | 3654 | §102 | Non-Final OA | 20d | Pending | Feb 14, 2024 |
| 18441904 | LIFT DEVICE | PEZZLO, BENJAMIN ALEXANDER | 3634 | §103 | Non-Final OA | 9d | Pending | Feb 14, 2024 |
| 18399531 | SUBHOPPER ASSEMBLY FOR REFUSE VEHICLE | ADAMS, GREGORY W | 3652 | §103 | Non-Final OA | 33d | Pending | Dec 28, 2023 |
| 18399537 | PACK AND EJECT SYSTEM FOR REFUSE VEHICLE | MYERS, GLENN F | 3652 | §103 | Non-Final OA | 13d | Pending | Dec 28, 2023 |
| 18399544 | REFUSE VEHICLE WITH EXTENSION AND LIFT APPARATUS | ADAMS, GREGORY W | 3652 | §103 | Non-Final OA | 30d | Pending | Dec 28, 2023 |
| 18397904 | LIFT ASSEMBLY FOR ELECTRIFIED REFUSE VEHICLE | SNELTING, JONATHAN D | 3652 | §112 | Non-Final OA | 15d overdue | Pending | Dec 27, 2023 |
| 18397910 | LIFT ASSEMBLY FOR ELECTRIFIED REFUSE VEHICLE | SNELTING, JONATHAN D | 3652 | Other | Non-Final OA | 13d | Pending | Dec 27, 2023 |
| 18541717 | CABLE HOLDER FOR A VEHICLE | MILLNER, MONICA E | 3632 | §103 | Non-Final OA | 8d overdue | Pending | Dec 15, 2023 |
| 18524283 | REFUSE COLLECTION SYSTEM | MARU, TEMESGEN MALLEDE | 3655 | §103 | Non-Final OA | 6d | Pending | Nov 30, 2023 |
| 18524549 | REFUSE COLLECTION SYSTEM | MYERS, GLENN F | 3652 | §103 | Non-Final OA | 12d | Pending | Nov 30, 2023 |
| 18505671 | INTEGRATED GROUND PAD | CHAVCHAVADZE, COLLEEN MARGARET | 3634 | DPOther | Non-Final OA | 61d | Pending | Nov 09, 2023 |
| 18501356 | ELECTRIFIED FIRE FIGHTING VEHICLE | DANG, TINH | 3655 | §103 | Non-Final OA | 84d | Pending | Nov 03, 2023 |
| 18489384 | IMPLEMENT POSITION TRACKING FOR A LIFT DEVICE | HENSON, BRANDON JAMES | 3648 | §103 | Non-Final OA | 1d overdue | Pending | Oct 18, 2023 |
| 18458243 | ELECTRIC POWER TAKE-OFF SYSTEM | SWENSON, BRIAN L | 3613 | §103 | Non-Final OA | 28d | Pending | Aug 30, 2023 |
| 18453169 | SYSTEMS AND METHODS FOR BATTERY THERMAL MANAGEMENT ON A VEHICLE | TRIGGS, JAMES J | 3615 | §102 | Non-Final OA | 1d overdue | Pending | Aug 21, 2023 |
| 18236268 | SYSTEMS AND METHODS FOR BATTERY THERMAL MANAGEMENT ON A VEHICLE | LIU, JINGCHEN | 3741 | §103 | Final Rejection | 5d | Pending | Aug 21, 2023 |
| 18235979 | QUICK RELEASE DETACHABLE PLATFORM GATE | HAYES, KRISTEN C | 3642 | §102 | Non-Final OA | 84d | Pending | Aug 21, 2023 |
| 18200179 | SCISSOR LIFT WITH ELECTRIC ACTUATOR | MEKHAEIL, SHIREF M | 3634 | §103 | Non-Final OA | 19d | Pending | May 22, 2023 |
| 18200188 | ELECTRIC ACTUATOR FOR A SCISSOR LIFT | MEKHAEIL, SHIREF M | 3634 | §103 | Non-Final OA | 30d | Pending | May 22, 2023 |
| 18199458 | LIFT STEERING SYSTEMS AND METHODS | MCFARLAND, KATHLEEN MAVOURNEEN | 3635 | §103 | Non-Final OA | 71d | Pending | May 19, 2023 |
| 18195741 | LOCAL DEVICE NETWORK | HUDA, MUHAMMAD AINUL | 2467 | §103 | Non-Final OA | 6d | Pending | May 10, 2023 |
| 18312152 | BODY ASSEMBLY FOR A REFUSE VEHICLE | DHANANI, SHAMS | 3614 | §103 | Non-Final OA | 19d overdue | Pending | May 04, 2023 |
| 18116703 | AUXILIARY POWER SYSTEM FOR ELECTRIC REFUSE VEHICLE | TRIGGS, JAMES J | 3615 | §103 | Final Rejection | — | Pending | Mar 02, 2023 |
| 18116006 | DIRECT CHARGE CONCRETE MIXER | COOLEY, CHARLES E | 1774 | §112 | Non-Final OA | 70d | Pending | Mar 01, 2023 |
| 18111673 | ADAPTIVE ENVELOPE SYSTEM | MOSCOLA, MATTHEW JOHN | 3663 | §103 | Final Rejection | 68d | Pending | Feb 20, 2023 |
| 18171144 | VEHICLE HVAC SYSTEM | GIORDANO, MICHAEL JAMES | 3762 | §103 | Final Rejection | 22d | Pending | Feb 17, 2023 |
| 18110947 | ERGONOMIC VEHICLE CAB | TISSOT, ADAM D | 3663 | §103 | Non-Final OA | 31d overdue | Pending | Feb 17, 2023 |
| 18171129 | VEHICLE CAMERA AND LIGHT PROJECTION SYSTEMS | ROMANO, ASHLEY K | 3652 | §103 | Final Rejection | 12d | Pending | Feb 17, 2023 |
| 17576798 | MACHINE CONNECTIVITY MODULE WITH INTEGRATED BEACON | LEVY, MERRITT E | 3663 | §103 | Non-Final OA | 49d | Pending | Jan 14, 2022 |
| 17193065 | ADVANCED ACCESS CONTROL USING BIOMETRIC DATA | CARRASQUILLO, ALEX DANIEL | 2498 | §103 | Final Rejection | 17d overdue | Pending | Mar 05, 2021 |
| 16811634 | FULLY-ELECTRIC SCISSOR LIFT | MEKHAEIL, SHIREF M | 3634 | §103 | Non-Final OA | 30d | Pending | Mar 06, 2020 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial