← Back to Tyco Fire & Security GmbH
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19106601 | MUFFLER AND REFRIGERATING SYSTEM COMPRISING MUFFLER | TRAN, BINH Q | 3746 | §101§102§103 | Non-Final OA | — | Pending | Dec 16, 2025 |
| 19376595 | TREND ANALYSIS AND DATA MANAGEMENT SYSTEM FOR TEMPERATURE, PRESSURE, AND HUMIDITY COMPLIANCE | GILKEY, CARRIE STRODER | 3626 | §101§103§112 | Non-Final OA | — | Pending | Oct 31, 2025 |
| 19473380 | FIRE DETECTION SYSTEM DATA DEVICE | YANG, JAMES J | 2686 | §103 | Non-Final OA | — | Pending | Oct 07, 2025 |
| 19160768 | OIL CONDUIT SYSTEM FOR HVAC&R SYSTEM | DOYLE, BENJAMIN C | 3746 | §102§103§112 | Non-Final OA | — | Pending | Aug 28, 2025 |
| 19307708 | BUILDING SECURITY SYSTEM WITH ARTIFICIAL INTELLIGENCE VIDEO ANALYSIS AND NATURAL LANGUAGE VIDEO SEARCHING | ANDERSEN, KRISTOPHER E | 2159 | §103 | Final Rejection | — | Pending | Aug 22, 2025 |
| 19270253 | INTEGRATING WIRELESS COMMUNICATIONS IN A CAMERA TO EXTEND AN ENTERPRISE NETWORK | COULTER, KENNETH R | 2445 | §103Other | Non-Final OA | — | Pending | Jul 15, 2025 |
| 19268066 | FACIAL RECOGNITION BY A SECURITY / AUTOMATION SYSTEM CONTROL PANEL | WRIGHT, BRYAN F | 2497 | §103 | Non-Final OA | — | Pending | Jul 14, 2025 |
| 19248064 | TECHNIQUES FOR PREEMPTIVE SUPPLEMENTAL VIDEO RECORDING | ZHAO, DAQUAN | 2484 | §101§102 | Non-Final OA | — | Pending | Jun 24, 2025 |
| 19239845 | MULTIMODAL ELECTRONIC LOCKING DEVICE AND SYSTEM | PENDLETON, DIONNE | 2689 | §103DP | Non-Final OA | — | Pending | Jun 16, 2025 |
| 19232359 | FIRE ALARM PERIPHERAL ADDRESSING USING A SMARTPHONE | TWEEL JR, JOHN ALEXANDER | 2689 | DP | Non-Final OA | — | Pending | Jun 09, 2025 |
| 19224342 | FRAME ASSEMBLIES AND CONTROLS OF AN EVAPORATIVE COOLING SYSTEM AND METHOD | BANKS, KEONA LAUREN | 3763 | §102§103§112 | Non-Final OA | — | Pending | May 30, 2025 |
| 19202969 | METHODS AND SYSTEMS FOR MANAGING A QUEUE IN HIGH-THROUGHPUT VIDEO SYSTEMS | HONG, MICHAEL HYUN | 2426 | §101§102§103 | Non-Final OA | — | Pending | May 08, 2025 |
| 19175845 | UNIVERSAL LOCKING APPARATUS, SYSTEM, AND METHODS OF USE | WILLIAMS, MARK A | 3675 | §102§103 | Non-Final OA | — | Pending | Apr 10, 2025 |
| 19172447 | WATER BOX MIXING MANIFOLD | MA, KUN KAI | 3763 | Other | Non-Final OA | — | Pending | Apr 07, 2025 |
| 19169323 | SYSTEMS AND METHODS OF ENABLING BLOCKCHAIN-BASED BUILDING AUTOMATION SYSTEMS | STEINLE, ANDREW J | 2497 | §103Other | Non-Final OA | — | Pending | Apr 03, 2025 |
| 19074081 | MAINTENANCE SCHEDULING AND OPTIMIZATION SYSTEM FOR CONNECTED EQUIPMENT | DELICH, STEPHANIE ZAGARELLA | 3623 | §101§103 | Non-Final OA | — | Pending | Mar 07, 2025 |
| 19109542 | HEAT PUMP SYSTEM AND FOUR-WAY VALVE | BABAA, NAEL N | 3763 | §102 | Non-Final OA | — | Pending | Mar 06, 2025 |
| 19109006 | GENERATOR | MYERS, KEITH STANLEY | 3763 | §102§103§112 | Non-Final OA | — | Pending | Mar 05, 2025 |
| 19054660 | DATA SECURITY MEASURES FOR CYBERSECURITY THREATS | CAREY, FORREST L | 2491 | §101§103 | Non-Final OA | — | Pending | Feb 14, 2025 |
| 19053252 | ENERGY EFFICIENT HEAT PUMP WITH EJECTOR SYSTEM | BRADFORD, JONATHAN | 3763 | §102§103 | Non-Final OA | — | Pending | Feb 13, 2025 |
| 19039412 | SYSTEMS AND METHODS FOR SHARING ANALYTICAL RESOURCES IN A CAMERA NETWORK | TOPGYAL, GELEK W | 2481 | §103Other | Non-Final OA | 1d overdue | Pending | Jan 28, 2025 |
| 19025970 | BUILDING SYSTEM WITH AIR QUALITY CONTROL BASED ON ENERGY, MOLD RISK, AND PRODUCTIVITY MODELING | ZERVOS, NIKOLAOS PHILLIP | 2117 | §102§103§112 | Non-Final OA | — | Pending | Jan 16, 2025 |
| 18995718 | COMPRESSOR SYSTEM FOR HEATING, VENTILATION, AIR CONDITIONING & REFRIGERATION SYSTEM | GAYE, SAMBA NMN | 3763 | §102§103§112 | Non-Final OA | — | Pending | Jan 16, 2025 |
| 19022520 | HVAC ACTUATOR WITH INDUCTIVE POSITION SENSING USING PATTERNS | IMTIAZ, ZOHEB S | 2837 | §102§103 | Non-Final OA | — | Pending | Jan 15, 2025 |
| 18995053 | SILENCING UNIT AND SILENCING STRUCTURE | LUKS, JEREMY AUSTIN | 2837 | §102 | Non-Final OA | — | Pending | Jan 15, 2025 |
| 19019222 | Load Balancing Method for Two Compressors | FURDGE, LARRY L | 3763 | §102§112Other | Non-Final OA | — | Pending | Jan 13, 2025 |
| 19014575 | CAMERA OPERATION VERIFICATION SYSTEM AND METHOD | TRAN, TRANG U | 2422 | §103 | Final Rejection | 22d | Pending | Jan 09, 2025 |
| 19015292 | HVAC&R SYSTEM WITH CHILLER AND FREE COOLING | BRADFORD, JONATHAN | 3763 | §102§103 | Non-Final OA | — | Pending | Jan 09, 2025 |
| 18878578 | METHOD AND SYSTEM TO PROVIDE ALARM RISK SCORE ANALYSIS AND INTELLIGENCE | RUSHING, MARK S | 2689 | §102§103 | Final Rejection | 29d | Pending | Dec 23, 2024 |
| 19000522 | SYSTEMS AND METHODS FOR PROVIDING PERSONALIZED AND CONTEXTUALIZED ENVIRONMENT SECURITY INFORMATION | RUSHING, MARK S | 2689 | §103 | Final Rejection | 34d | Pending | Dec 23, 2024 |
| 18877199 | METHODS AND SYSTEMS FOR DETECTING BULLYING IN REAL TIME USING ARTIFICIAL INTELLIGENCE | DANG, DUY M | 2668 | §102§103 | Non-Final OA | — | Pending | Dec 19, 2024 |
| 18876117 | COMPRESSOR SYSTEM FOR HEATING, VENTILATION, AIR CONDITIONING, AND/OR REFRIGERATION SYSTEM | DIAZ, MIGUEL ANGEL | 3763 | §102 | Non-Final OA | — | Pending | Dec 17, 2024 |
| 18876128 | COMPRESSOR SYSTEM FOR HVAC&R SYSTEM | DELEON, DARIO ANTONIO | 3763 | §102§103§112 | Non-Final OA | — | Pending | Dec 17, 2024 |
| 18874071 | PRE-SUBCOOLER FOR A CONDENSER | TRPISOVSKY, JOSEPH F | 3763 | §102 | Non-Final OA | — | Pending | Dec 11, 2024 |
| 18974601 | ENERGY EFFICIENT HEAT PUMP WITH FLOW REGULATION SYSTEM | FURDGE, LARRY L | 3763 | Other | Final Rejection | — | Pending | Dec 09, 2024 |
| 18872604 | COMPRESSOR ARRANGEMENT FOR HVAC&R SYSTEM | ZERPHEY, CHRISTOPHER R | 3799 | §102§103 | Final Rejection | — | Pending | Dec 06, 2024 |
| 18945213 | SYSTEM AND METHOD FOR INDICATING RECORDING STATUS OF CAMERA | TOPGYAL, GELEK W | 2481 | §103 | Non-Final OA | 34d | Pending | Nov 12, 2024 |
| 18938927 | SYSTEMS AND METHODS FOR USE OF AUTONOMOUS ROBOTS FOR BLIND SPOT COVERAGE | BUI, NHI QUYNH | 3656 | §103§112Other | Final Rejection | 50d overdue | Pending | Nov 06, 2024 |
| 18930971 | SYSTEMS AND METHODS OF DEVICE PROVISIONING FOR BUILDING MANAGEMENT SYSTEMS | IDOWU, OLUGBENGA O | 2494 | §103 | Final Rejection | — | Pending | Oct 29, 2024 |
| 18927135 | DISTRIBUTED MACHINE LEARNING MODEL RESOURCE ALLOCATION FOR BUILDING MANAGEMENT SYSTEMS | DYER, ANDREW R | 3662 | §102§103Other | Non-Final OA | — | Pending | Oct 25, 2024 |
| 18912308 | COIL GUARD FOR AN HVAC SYSTEM | TAVAKOLDAVANI, KAMRAN | 3763 | §103 | Non-Final OA | — | Pending | Oct 10, 2024 |
| 18907305 | BUILDING ENERGY PLATFORM | CLARE, MARK C | 3628 | §101§102§103§112 | Non-Final OA | — | Pending | Oct 04, 2024 |
| 18902754 | A MULTIPROTOCOL WIRELESS INTERNET OF THINGS MODULE | LIN, SHERMAN L | 2447 | §103 | Final Rejection | 26d | Pending | Sep 30, 2024 |
| 18900548 | ADAPTIVE FLOW CONTROLLER FOR USE WITH A FLOW CONTROL SYSTEM AND METHOD | EVERETT, CHRISTOPHER E | — | §103 | Non-Final OA | — | Pending | Sep 27, 2024 |
| 18900553 | BUILDING HVAC SYSTEM WITH MODEL CALIBRATION | CHOI, ALICIA M | 2117 | §102§103§112 | Non-Final OA | — | Pending | Sep 27, 2024 |
| 18900359 | CONTROL SYSTEM FOR HVAC BLOWER | BRADFORD, JONATHAN | 3763 | §112 | Non-Final OA | — | Pending | Sep 27, 2024 |
| 18900541 | BUILDING MANAGEMENT SYSTEM WITH AUTOMATED EQUIPMENT TESTING AND COMMISSIONING | SKRZYCKI, JONATHAN MICHAEL | — | §101§102§103 | Non-Final OA | — | Pending | Sep 27, 2024 |
| 18900413 | CENTRAL PLANT SYSTEM WITH AUTOMATED SYSTEM CURVES CALIBRATION FOR PUMPS | HARTMAN JR, RONALD D | 2119 | §102§103 | Non-Final OA | — | Pending | Sep 27, 2024 |
| 18900561 | BUILDING MANAGEMENT SYSTEM WITH SELF-IDENTIFIED NON-REDUNDANT DATA | WU, TONY | 2166 | §102§103 | Non-Final OA | — | Pending | Sep 27, 2024 |
| 18898350 | AUTOMATED EDGE DEVICE CONFIGURATION FOR BUILDING MANAGEMENT SYSTEMS | TRAN, VI N | 2117 | §103 | Non-Final OA | — | Pending | Sep 26, 2024 |
| 18894931 | BUILDING EQUIPMENT WITH EMBEDDED CONNECTIVITY | SANDERS, JOSHUA T | 2119 | §102§103 | Non-Final OA | — | Pending | Sep 24, 2024 |
| 18890375 | INTEGRATED SERVICE PLATFORM | WOODWORTH, II, ALLAN J | 3622 | §101§102§103 | Non-Final OA | — | Pending | Sep 19, 2024 |
| 18888853 | CHILLER SYSTEM WITH EFFICIENCY ESTIMATION | EVERETT, CHRISTOPHER E | 2117 | §102§103 | Non-Final OA | — | Pending | Sep 18, 2024 |
| 18827532 | SYSTEMS AND METHODS TO AUTOMATE SECURITY ASSETS DISCOVERY AND ONBOARDING | WILCOX, JAMES J | 2439 | §103 | Final Rejection | — | Pending | Sep 06, 2024 |
| 18825841 | CONTROL SYSTEM WITH AUTOMATIC TRAINING DATA SELECTION FOR ONLINE SYSTEM IDENTIFICATION | CARTER, CHRISTOPHER W | 2117 | DP | Non-Final OA | — | Pending | Sep 05, 2024 |
| 18819974 | ANALYSIS SYSTEM WITH MACHINE LEARNING BASED INTERPRETATION | WORKU, KIDEST | 2119 | §101§103DP | Non-Final OA | — | Pending | Aug 29, 2024 |
| 18817055 | COMPREHENSIVE SITE TIMELINE WITH OVERLAY OF INSTALL AND SERVICE ACTIVITIES | SWARTZ, STEPHEN S | 3625 | §101§103 | Non-Final OA | 10d overdue | Pending | Aug 27, 2024 |
| 18807595 | ACTUATOR WITH MODULAR FAIL-SAFE ASSEMBLY | SANCHEZ-MEDINA, REINALDO | 3753 | §102§103 | Non-Final OA | — | Pending | Aug 16, 2024 |
| 18805381 | AUGMENTED REALITY OVERLAY AND MAP ON MOBILE VIDEO MANAGEMENT SYSTEM | BROOME, SAID A | 2612 | §103§112 | Final Rejection | 28d | Pending | Aug 14, 2024 |
| 18797224 | MODULAR CONTROLLER FOR A BUILDING MANAGEMENT SYSTEM | CORTES, HOWARD | 2118 | §102§103 | Non-Final OA | — | Pending | Aug 07, 2024 |
| 18794916 | BUILDING MANAGEMENT SYSTEM WITH AUTO-CONFIGURATION USING EXISTING POINTS | ONAT, UMUT | 2194 | §102§103§112 | Non-Final OA | — | Pending | Aug 05, 2024 |
| 18785557 | SYSTEMS AND METHODS OF MAINTAINING USER-SPECIFIC CONTEXT INFORMATION FOR CONVERSATIONAL INTERFACES FOR BUILDING MANAGEMENT SYSTEMS | TITCOMB, WILLIAM D | 2178 | §102§103 | Non-Final OA | — | Pending | Jul 26, 2024 |
| 18779871 | BUILDING MANAGEMENT SYSTEM WITH ADAPTING IOT HUB | SIDDIQUEE, TAMEEM | 2116 | §103 | Non-Final OA | — | Pending | Jul 22, 2024 |
| 18774706 | EDGE COMPUTING PLATFORM | MUI, WEI YUN | 2191 | §103Other | Non-Final OA | — | Pending | Jul 16, 2024 |
| 18773223 | BUILDING MANAGEMENT SYSTEM WITH INTEGRATED ENTITY MANAGEMENT | MA, KAM WAN | 2688 | §103 | Final Rejection | — | Pending | Jul 15, 2024 |
| 18771622 | RISK MONITORING SYSTEM WITH SYNTHETIC TRAINING IMAGE GENERATION AND BLENDING USING GENERATIVE ARTIFICIAL INTELLIGENCE | ZALALEE, SULTANA MARCIA | 2614 | §103 | Final Rejection | 14d | Pending | Jul 12, 2024 |
| 18762294 | HEAT EXCHANGER WITH SPRING TUBE COIL | SCHERMERHORN, JON | 3763 | §102 | Final Rejection | 26d | Pending | Jul 02, 2024 |
| 18731877 | Gunshot Detection System with Encrypted, Wireless Transmission | WOLDEMARIAM, NEGA | 2407 | §102§103 | Final Rejection | 76d | Pending | Jun 03, 2024 |
| 18680955 | GENERATIVE ARTIFICIAL INTELLIGENCE USER INTERFACE SERVER | MISIR, DAYWAYSHWAR D | 2127 | §103 | Non-Final OA | — | Pending | May 31, 2024 |
| 18680865 | BUILDING MANAGEMENT SYSTEM WITH AI-BASED SELF-OPTIMIZATION AND SELF-HEALING | PAN, YUHUI R | 2116 | §102§103 | Non-Final OA | — | Pending | May 31, 2024 |
| 18680942 | BUILDING SYSTEM WITH OCCUPANT ASSISTANT APPLICATION | TRAN, AMY NMN | 2126 | §103 | Non-Final OA | — | Pending | May 31, 2024 |
| 18680403 | BUILDING MANAGEMENT SYSTEM WITH EQUIPMENT SERVICE RECOMMENDATIONS AND ANALYTICS USING LARGE LANGUAGE MODEL FINE-TUNED WITH EQUIPMENT SERVICE RECORDS | JIANG, HAIMEI | 2142 | §101§102 | Non-Final OA | — | Pending | May 31, 2024 |
| 18679191 | BUILDING MANAGEMENT SYSTEM WITH BUILDING EQUIPMENT SERVICING | ALUNKAL, THOMAS D | 2686 | §102 | Non-Final OA | — | Pending | May 30, 2024 |
| 18677664 | BUILDING MANAGEMENT SYSTEM WITH BUILDING EQUIPMENT SERVICING | PATEL, DHRUVKUMAR | 2119 | §101§102§103 | Non-Final OA | — | Pending | May 29, 2024 |
| 18663780 | BUILDING MANAGEMENT SYSTEM WITH PLANT SIMULATION GENERATION | LIN, JASON | 2117 | §103 | Non-Final OA | — | Pending | May 14, 2024 |
| 18664186 | BUILDING MANAGEMENT SYSTEM WITH BUILDING LIFECYCLE WORKFLOW APPLCATION | BOYCE, ANDRE D | 3623 | §101§102§103 | Non-Final OA | — | Pending | May 14, 2024 |
| 18663723 | BUILDING DIGITAL TWIN SYSTEM FOR BUILDING HEALTH | TANG, MICHAEL XUEFEI | 2115 | §103 | Non-Final OA | — | Pending | May 14, 2024 |
| 18663793 | SYNTHETIC TRAINING DATA GENERATION FOR BUILDING MANAGEMENT SYSTEM WITH ARTIFICIAL INTELLIGENCE-BASED RISK MONITORING | AKHAVANNIK, HADI | 2676 | §103 | Non-Final OA | — | Pending | May 14, 2024 |
| 18661045 | BUILDING SYSTEM WITH GENERATIVE AI-BASED ANALYSIS AND CONTEXTUAL INSIGHT GENERATION | BARBEE, MANUEL L | 2857 | §101§102§103 | Non-Final OA | — | Pending | May 10, 2024 |
| 18661057 | MACHINE LEARNING ARCHITECTURES FOR BUILDING MANAGEMENT SYSTEM WITH BUILDING EQUIPMENT SERVICING | AZAD, MD ABUL K | 2119 | §103§112Other | Non-Final OA | — | Pending | May 10, 2024 |
| 18658587 | SYSTEMS AND METHODS FOR PROVIDING ATTESTED VERIFICATION OF PERSONAL DATA | RAHMAN, MAHFUZUR | 2498 | §103 | Final Rejection | — | Pending | May 08, 2024 |
| 18633024 | BUILDING MANAGEMENT SYSTEM WITH GENERATIVE AI-BASED UNSTRUCTURED SERVICE DATA INGESTION | CORRIELUS, JEAN M | 2159 | §112 | Non-Final OA | — | Pending | Apr 11, 2024 |
| 18633086 | BUILDING MANAGEMENT SYSTEM WITH GENERATIVE AI-BASED AUTOMATED MAINTENANCE SERVICE SCHEDULING AND MODIFICATION | SITTNER, MATTHEW T | 3629 | §101§103 | Non-Final OA | — | Pending | Apr 11, 2024 |
| 18633097 | BUILDING MANAGEMENT SYSTEM WITH GENERATIVE AI-BASED AUTOMATED INTERVENTION | MULLINAX, CLINT LEE | 2123 | §101§103 | Non-Final OA | — | Pending | Apr 11, 2024 |
| 18633068 | BUILDING MANAGEMENT SYSTEM WITH GENERATIVE AI-BASED COUPLING OF UNSTRUCTURED SERVICE DATA TO OTHER INPUT / OUTPUT DATA SOURCES AND ANALYTICS | BOOKER, KELVIN | 2119 | §101§112 | Non-Final OA | — | Pending | Apr 11, 2024 |
| 18631678 | BUILDING SYSTEM WITH GENERATIVE AI-BASED FAULT DETECTION AND DIAGNOSTICS USING MULTI-MODAL DATA | SAAVEDRA, EMILIO J | 2117 | §101§103§112 | Non-Final OA | — | Pending | Apr 10, 2024 |
| 18616781 | AUTOMATED ANIMAL DETECTION AND RESPONSE | WILSON, BRIAN P | 2689 | §103 | Final Rejection | 84d | Pending | Mar 26, 2024 |
| 18695787 | VIBRATION FREQUENCY ADJUSTMENT SYSTEM | BURCH, MELODY M | 3616 | §102§103 | Non-Final OA | — | Pending | Mar 26, 2024 |
| 18610929 | SYSTEMS AND METHODS FOR FEEDBACK CONTROL OF DISINFECTION | CONLEY, SEAN EVERETT | 1799 | §102 | Non-Final OA | — | Pending | Mar 20, 2024 |
| 18608410 | ADDRESSABLE PROCESSOR FOR INTERFACING WITH A NON-ADDRESSABLE PROCESSOR ON A REMOTE DEVICE | KING, CURTIS J | 2685 | §103 | Non-Final OA | — | Pending | Mar 18, 2024 |
| 18581678 | SMOKE DETECTOR UNIT | UNDERWOOD, JARREAS C | 2877 | §103 | Non-Final OA | 22d | Pending | Feb 20, 2024 |
| 18582476 | AUTOMATIC AND ITERATIVE CONFIGURATION OF BUILDING DEVICE RELATIONSHIPS | CONNOLLY, MARK A | 2115 | §102§103 | Non-Final OA | — | Pending | Feb 20, 2024 |
| 18441909 | FAN MOUNTING ASSEMBLY SYSTEMS AND METHODS | GIORDANO, MICHAEL JAMES | 3762 | §103 | Non-Final OA | — | Pending | Feb 14, 2024 |
| 18454536 | FIRE ALARM VOICE GENERATOR | SHEN, SAMUEL | 2179 | §103 | Final Rejection | 28d | Pending | Aug 23, 2023 |
| 18223330 | BUILDINGS WITH PRIORITIZED SUSTAINABLE INFRASTRUCTURE | MEINECKE DIAZ, SUSANNA M | 3625 | §101§102§103 | Non-Final OA | — | Pending | Jul 18, 2023 |
| 18207544 | LOW CHARGE CHILLER AND FREE COOLING | MYERS, KEITH STANLEY | 3763 | §103 | Non-Final OA | — | Pending | Jun 08, 2023 |
| 17692014 | MULTI-STAGE THERMAL MANAGEMENT SYSTEMS AND METHODS | AHMED, ISTIAQUE | 2116 | §102§103 | Final Rejection | — | Pending | Mar 10, 2022 |