87 pending office actions • 31 art units • 77 examiners • 0 of 87 (0%) have an AI response strategy ready • 233 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 25 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 25 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 2 (2%) |
| §101 + other | 4 (5%) |
| §103 only | 33 (38%) |
| §102 only | 3 (3%) |
| §112 only | 8 (9%) |
| Double-patenting only | 1 (1%) |
| Double-patenting + other | 1 (1%) |
| Multi-statute (no §101) | 35 (40%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| KIM, TAE JUN | 4 | 63.9% | +26.1% |
| DUGER, JASON H | 3 | 70.5% | +51.4% |
| NG, HENRY | 2 | 63.6% | +58.2% |
| NOVAK, PETER MICHAEL | 2 | 88.4% | +8.5% |
| BURKE, THOMAS P | 2 | 43.8% | +23.0% |
| BUTLER, KEVIN C | 2 | 89.5% | +8.8% |
| HARRINGTON, ALYSON JOAN | 2 | 74.9% | +64.3% |
| FLORES, JUAN G | 1 | 79.3% | +14.7% |
| WALTHOUR, SCOTT J | 1 | 78.5% | +69.8% |
| THOMAS, KYLE ROBERT | 1 | 72.5% | +29.3% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18660436 | POWER ELECTRONICS CONVERTER | NOVAK, PETER MICHAEL | 22d |
| 18791814 | PROBE | BUTLER, KEVIN C | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 17556211 | HYDROGEN STORAGE TANK WITH LEAK MANAGEMENT FUNCTIONALITY | PATEL, SUHANI JITENDRA | 140d overdue |
| 18771137 | METHOD OF MANUFACTURING A COMPONENT OF A GAS TURBINE ENGINE | PENNY, TABATHA L | 128d overdue |
| 18732814 | HEAT EXCHANGER | JONES, GORDON A | 44d overdue |
| 18892678 | FUEL SPRAY NOZZLES | KIM, TAE JUN | 26d overdue |
| 19228821 | LEAN BURN COMBUSTOR | DUGER, JASON H | 23d overdue |
| 18738941 | BATTERY HEALTH DETERMINATION APPARATUS AND METHOD | LE, SON T | 16d overdue |
| 19021605 | GAS TURBINE ENGINE HEAT EXCHANGE | CHABREYRIE, RODOLPHE ANDRE | 2d overdue |
| 18016777 | REFUELLING AND/OR STORAGE NEUTRON-ABSORBING RODS | DAVIS, SHARON M | 1d overdue |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18892678 | FUEL SPRAY NOZZLES | KIM, TAE JUN | 26d overdue |
| 19228821 | LEAN BURN COMBUSTOR | DUGER, JASON H | 23d overdue |
| 18892673 | AIRCRAFT MISSION INDEX WITH SUSTAINABLE AVAITION FUEL VERSUS HYDROCARBRON BASED FUEL | DUGER, JASON H | 14d |
| 19229076 | ENGINE CORE SIZE | NG, HENRY | 30d |
| 18892741 | Engine Core Size | NG, HENRY | 30d |
| 18741985 | GAS TURBINE ENGINE FUEL SYSTEM | KIM, TAE JUN | 36d |
| 18949542 | COMBUSTION EQUIPMENT FOR A GAS TURBINE ENGINE | KIM, TAE JUN | 84d |
| 19376364 | FLUID FLOW MACHINE AND RELATED METHOD | FLORES, JUAN G | — |
| Art Unit | Apps |
|---|---|
| 3741 | 15 |
| 3745 | 5 |
| 3799 | 4 |
| 3761 | 3 |
| 2858 | 3 |
| 2836 | 2 |
| 3642 | 2 |
| 3762 | 2 |
| 1734 | 2 |
| 3646 | 2 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19376364 | FLUID FLOW MACHINE AND RELATED METHOD | FLORES, JUAN G | 3745 | §103§112 | Non-Final OA | — | Pending | Oct 31, 2025 |
| 19364678 | GAS TURBINE PERFORMANCE | WALTHOUR, SCOTT J | 3741 | §102 | Non-Final OA | — | Pending | Oct 21, 2025 |
| 19323341 | GAS TURBINE ENGINE | THOMAS, KYLE ROBERT | 3741 | §103 | Final Rejection | — | Pending | Sep 09, 2025 |
| 19283496 | ELECTRICAL POWER SYSTEM AND METHOD OF CONTROL | LY, XUAN | 2836 | §101§103 | Non-Final OA | — | Pending | Jul 29, 2025 |
| 19228821 | LEAN BURN COMBUSTOR | DUGER, JASON H | 3741 | §103§112 | Final Rejection | 23d overdue | Pending | Jun 05, 2025 |
| 19229076 | ENGINE CORE SIZE | NG, HENRY | 3741 | §103§112 | Final Rejection | 30d | Pending | Jun 05, 2025 |
| 19218930 | METHOD AND APPARATUS FOR HEATING A FLOW OF HYDROGEN | GREENE, MARK L | 3747 | §102§103§112 | Non-Final OA | — | Pending | May 27, 2025 |
| 19202055 | BRUSH SEAL | KONERU, LAKSHMI S | 3675 | §103 | Non-Final OA | — | Pending | May 08, 2025 |
| 19180117 | GAS TURBINE ENGINE | CHAU, ALAIN | 3741 | §103§112 | Non-Final OA | — | Pending | Apr 15, 2025 |
| 19173071 | CABIN BLOWER CONTROL SYSTEM AND METHOD | DAVIS, JASON GREGORY | 3745 | §101§112 | Non-Final OA | — | Pending | Apr 08, 2025 |
| 19077144 | POWER ELECTRONICS CONVERTER | INGE, JOSEPH N | 2836 | §103 | Non-Final OA | — | Pending | Mar 12, 2025 |
| 19049772 | THERMAL BARRIER STRUCTURE AND COATING | VO, HAI | — | §102§103§112 | Non-Final OA | — | Pending | Feb 10, 2025 |
| 19045864 | SYSTEM AND METHOD FOR ASSEMBLING A FAN CASE OF A GAS TURBINE ENGINE | RIVERA, JOSHEL | — | §102 | Non-Final OA | — | Pending | Feb 05, 2025 |
| 19021605 | GAS TURBINE ENGINE HEAT EXCHANGE | CHABREYRIE, RODOLPHE ANDRE | 3761 | §103§112Other | Final Rejection | 2d overdue | Pending | Jan 15, 2025 |
| 19014705 | MULTIPHASE ELECTRICAL MACHINE CONDITION MONITORING | RIOS RUSSO, RAUL J | — | §112 | Non-Final OA | — | Pending | Jan 09, 2025 |
| 19009039 | POWER ELECTRONICS MODULE CONDITION MONITORING | ZAKARIA, AKM | 2858 | §112 | Non-Final OA | — | Pending | Jan 03, 2025 |
| 18980072 | DC:DC POWER CONVERTER | NOVAK, PETER MICHAEL | — | §102§103§112 | Non-Final OA | — | Pending | Dec 13, 2024 |
| 18969412 | AIRCRAFT | MEILLER, SEAN V | 3741 | §103§112 | Non-Final OA | 26d | Pending | Dec 05, 2024 |
| 18967800 | POSITIVE DISPLACEMENT PUMP SYSTEM | DAVIS, MARY ALICE | 3746 | §103 | Non-Final OA | 34d | Pending | Dec 04, 2024 |
| 18960510 | VARIABLE STIFFNESS TOOL | MELENDEZ, ARMAND | 1759 | §102§103 | Non-Final OA | — | Pending | Nov 26, 2024 |
| 18954875 | IMAGING | WERNER, DAVID N | 2877 | §102§103 | Non-Final OA | — | Pending | Nov 21, 2024 |
| 18952295 | METHOD AND CONTROLLER FOR CONTROLLING A VAPOUR-COMPRESSION SYSTEM WITH THERMODYNAMIC CONSTRAINTS SATISFACTION | BRADFORD, JONATHAN | — | §103 | Non-Final OA | — | Pending | Nov 19, 2024 |
| 18952302 | FUEL SPRAY NOZZLE FOR A GAS TURBINE ENGINE | KIM, CRAIG SANG | — | §103 | Non-Final OA | — | Pending | Nov 19, 2024 |
| 18949542 | COMBUSTION EQUIPMENT FOR A GAS TURBINE ENGINE | KIM, TAE JUN | 3799 | §102§103§112 | Non-Final OA | 84d | Pending | Nov 15, 2024 |
| 18948716 | METHOD FOR REDUCING DAMAGE TO COMPONENTS OF GAS TURBINE ENGINES | HTAY, AYE SU MON | 3745 | §103 | Final Rejection | 4d overdue | Pending | Nov 15, 2024 |
| 18948019 | METHOD FOR SCANNING A COMPONENT | KAO, CHIH CHENG G | — | §103 | Non-Final OA | — | Pending | Nov 14, 2024 |
| 18944372 | BLADE MONITORING | DULANEY, BENJAMIN O | — | §101§112 | Non-Final OA | — | Pending | Nov 12, 2024 |
| 18944908 | DETERMINING PROPERTIES ASSOCIATED WITH SHROUD GAPS | SAJOUS, WESNER | — | §112 | Non-Final OA | — | Pending | Nov 12, 2024 |
| 18936481 | FUEL DELIVERY | NGUYEN, THUYHANG NGOC | 3761 | §103 | Final Rejection | — | Pending | Nov 04, 2024 |
| 18907918 | AN IMPROVED GAS TURBINE ENGINE | BURKE, THOMAS P | 3741 | §103§112 | Non-Final OA | — | Pending | Oct 07, 2024 |
| 18907721 | SOLENOID FAULT DETECTION | ADNAN, MUHAMMAD | — | §102§103 | Non-Final OA | — | Pending | Oct 07, 2024 |
| 18907952 | AN IMPROVED GAS TURBINE ENGINE | BURKE, THOMAS P | 3741 | §103§112 | Non-Final OA | — | Pending | Oct 07, 2024 |
| 18906737 | ELECTRICAL MACHINE CONDITION MONITORING | GONZALEZ QUINONES, JOSE A | — | §102§103 | Non-Final OA | — | Pending | Oct 04, 2024 |
| 18892707 | LEAN BURN COMBUSTOR | DUGER, JASON H | 3741 | §103§112 | Final Rejection | — | Pending | Sep 23, 2024 |
| 18892741 | Engine Core Size | NG, HENRY | 3741 | §103§112 | Final Rejection | 30d | Pending | Sep 23, 2024 |
| 18892678 | FUEL SPRAY NOZZLES | KIM, TAE JUN | 3799 | §103§112 | Final Rejection | 26d overdue | Pending | Sep 23, 2024 |
| 18892673 | AIRCRAFT MISSION INDEX WITH SUSTAINABLE AVAITION FUEL VERSUS HYDROCARBRON BASED FUEL | DUGER, JASON H | 3741 | §103 | Final Rejection | 14d | Pending | Sep 23, 2024 |
| 18825092 | ENGINE CONTROL AND MONITORING SYSTEM | HEIBER, SHANTELL LAKETA | — | §102§103DP | Non-Final OA | — | Pending | Sep 05, 2024 |
| 18791814 | PROBE | BUTLER, KEVIN C | — | §103 | Non-Final OA | — | Pending | Aug 01, 2024 |
| 18729431 | AIRCRAFT WING COMPRISING A STORAGE TANK FOR GASEOUS HYDROGEN | GORDON, ANNA L | 3642 | §112 | Non-Final OA | — | Pending | Jul 16, 2024 |
| 18771137 | METHOD OF MANUFACTURING A COMPONENT OF A GAS TURBINE ENGINE | PENNY, TABATHA L | 1712 | §102§103§112 | Non-Final OA | 128d overdue | Pending | Jul 12, 2024 |
| 18768149 | POWER ELECTRONICS CONVERTER | MONSUR, NASIMA | 2858 | §102 | Non-Final OA | 15d overdue | Pending | Jul 10, 2024 |
| 18764516 | GAS TURBINE ENGINE STARTING METHOD | KIM, TAE JUN | 3799 | §103 | Final Rejection | — | Pending | Jul 05, 2024 |
| 18753161 | GAS TURBINE HEAT EXCHANGER | HARRINGTON, ALYSON JOAN | 3741 | §112 | Final Rejection | — | Pending | Jun 25, 2024 |
| 18752004 | INSPECTION | MERCADO, ALEXANDER A | — | §103§112 | Non-Final OA | — | Pending | Jun 24, 2024 |
| 18747619 | PROBE AND METHOD FOR NON-DESTRUCTIVE TESTING OF A COMPONENT | BUTLER, KEVIN C | — | §102§103 | Non-Final OA | — | Pending | Jun 19, 2024 |
| 18741985 | GAS TURBINE ENGINE FUEL SYSTEM | KIM, TAE JUN | 3799 | §103§112 | Non-Final OA | 36d | Pending | Jun 13, 2024 |
| 18738941 | BATTERY HEALTH DETERMINATION APPARATUS AND METHOD | LE, SON T | 2858 | §102§103§112 | Final Rejection | 16d overdue | Pending | Jun 10, 2024 |
| 18738784 | FUEL SYSTEM | MALATEK, KATHERYN A | 3741 | §103 | Non-Final OA | — | Pending | Jun 10, 2024 |
| 18732814 | HEAT EXCHANGER | JONES, GORDON A | 3763 | §102§103 | Non-Final OA | 44d overdue | Pending | Jun 04, 2024 |
| 18660436 | POWER ELECTRONICS CONVERTER | NOVAK, PETER MICHAEL | 2838 | §103 | Final Rejection | 22d | Pending | May 10, 2024 |
| 18701722 | FUEL CELL SYSTEM | GATEWOOD, DANIEL S | — | §112 | Non-Final OA | — | Pending | Apr 16, 2024 |
| 18609248 | AIR PRESSURISATION SYSTEM | CARTER, AMY ELIZABETH | 3762 | §103§112 | Final Rejection | — | Pending | Mar 19, 2024 |
| 18593417 | IN-SITU MODEL COMPARISON FOR ADDITIVE MANUFACTURING SYSTEMS | DUNN, DARRIN D | 2117 | §103 | Non-Final OA | — | Pending | Mar 01, 2024 |
| 18593465 | POWDER CONTROL FOR ADDITIVE MANUFACTURING SYSTEMS | TSUI, YUNG-SHENG M | 1684 | DP | Non-Final OA | — | Pending | Mar 01, 2024 |
| 18593575 | MASS AND HEAT FLOW IN ADDITIVE MANUFACTURING SYSTEMS WITH MACHINE LEARNING CONTROL | STILES, JACOB BENJAMIN | — | §103§112 | Non-Final OA | — | Pending | Mar 01, 2024 |
| 18589542 | BATTERY COOLING BLOCK | MATHEW, ISWARYA | — | §103 | Non-Final OA | — | Pending | Feb 28, 2024 |
| 18588431 | PODDED ENGINE ADAPTOR | MICHENER, JOSHUA J | 3642 | §103§112 | Final Rejection | 16d | Pending | Feb 27, 2024 |
| 18442573 | AIR PRESSURISATION SYSTEM | WEINERT, WILLIAM C | 3762 | §103 | Non-Final OA | — | Pending | Feb 15, 2024 |
| 18580364 | COMPUTER-IMPLEMENTED METHODS, APPARATUS, COMPUTER PROGRAMS, AND NON-TRANSITORY COMPUTER-READABLE STORAGE MEDIUMS | LIANG, LEONARD S | — | §101§102§103 | Non-Final OA | — | Pending | Jan 18, 2024 |
| 18372836 | METHOD OF OPERATING A GAS TURBINE ENGINE | AMAR, MARC J | 3741 | §103§112 | Final Rejection | — | Pending | Sep 26, 2023 |
| 18226972 | ELECTRICAL-DISCHARGE MACHINING | BACHNER, ROBERT G | 2898 | §103 | Non-Final OA | — | Pending | Jul 27, 2023 |
| 18358242 | METHOD OF MANUFACTURING A COMPONENT | YANG, JIE | 1734 | §103 | Non-Final OA | — | Pending | Jul 25, 2023 |
| 18215558 | WOVEN FABRICS FOR COMPOSITE COMPONENTS | MATZEK, MATTHEW D | 1786 | §103 | Final Rejection | — | Pending | Jun 28, 2023 |
| 18038520 | SYSTEM FOR REPLY GENERATION | JACKSON, JAKIEDA R | 2657 | §112 | Non-Final OA | 34d | Pending | May 24, 2023 |
| 18197159 | ABLATION TOOL | KIM, SANG K | 3745 | §103 | Final Rejection | — | Pending | May 15, 2023 |
| 18016777 | REFUELLING AND/OR STORAGE NEUTRON-ABSORBING RODS | DAVIS, SHARON M | 3646 | §102§103 | Non-Final OA | 1d overdue | Pending | Jan 18, 2023 |
| 17967603 | ENGINEERING COMPONENTS | OCHOA, JUAN CARLOS | 2186 | §103§112 | Non-Final OA | 62d | Pending | Oct 17, 2022 |
| 17917489 | ABRASIVE MATERIAL, A METHOD FOR MANUFACTURING AN ABRASIVE MATERIAL AND A SUBSTRATE COATED WITH AN ABRASIVE MATERIAL | PATEL, RONAK C | 1788 | §103 | Final Rejection | — | Pending | Oct 06, 2022 |
| 17751054 | AIRCRAFT BATTERY SYSTEMS | SMITH, NICHOLAS A | 1752 | §103 | Non-Final OA | 127d overdue | Pending | May 23, 2022 |
| 17556211 | HYDROGEN STORAGE TANK WITH LEAK MANAGEMENT FUNCTIONALITY | PATEL, SUHANI JITENDRA | 1783 | §103§112 | Non-Final OA | 140d overdue | Pending | Dec 20, 2021 |
| 19008084 | NOSECONES FOR TURBINE ENGINE | DELRUE, BRIAN CHRISTOPHER | 3745 | §103 | Non-Final OA | — | Pending | Jan 02, 2025 |
| 18667602 | VEHICLE ELECTRICAL POWER SYNCHRONIZATION VIA HYDRAULICS | QUIGLEY, THOMAS K | 2834 | §103 | Final Rejection | — | Pending | May 17, 2024 |
| 18667616 | VEHICLE ELECTRICAL POWER SYNCHRONIZATION VIA HYDRAULICS | HARRINGTON, ALYSON JOAN | 3741 | §103 | Final Rejection | — | Pending | May 17, 2024 |
| 18661009 | QUANTIFYING MICROSTRUCTURAL FEATURES IN THERMAL SPRAY COATINGS USING IMAGE ANALYSIS TECHNIQUES | BACA, MATTHEW WALTER | — | §101 | Non-Final OA | — | Pending | May 10, 2024 |
| 18417605 | COOLING HOLE AIR FLOW FOR THERMAL SPRAY COATINGS | THOMAS, BINU | — | §103 | Non-Final OA | — | Pending | Jan 19, 2024 |
| 18368803 | SYSTEM FOR CONTROL OF EXTERNALLY HEATED TURBINE ENGINE | BOGUE, JESSE SAMUEL | 3646 | §103Other | Non-Final OA | — | Pending | Sep 15, 2023 |
| 18213561 | METHOD OF FORMING A SMOOTH AS-FABRICATED CERAMIC MATRIX COMPOSITE (CMC) SURFACE | GROSS, CARSON | 1783 | §103 | Non-Final OA | — | Pending | Jun 23, 2023 |
| 18144425 | AIRCRAFT DC POWER BUS REGULATION AND WING DE-ICER | MACEDA, KRYSTENE NHE BANDONG | 3761 | §103§112 | Final Rejection | 29d | Pending | May 08, 2023 |
| 18899827 | DYNAMIC DATA DELIVERABLE TOOL | DELICH, STEPHANIE ZAGARELLA | 3623 | §101 | Final Rejection | — | Pending | Sep 27, 2024 |
| 18813730 | COATING SYSTEMS FOR SILICON-CONTAINING SUBSTRATES | LA VILLA, MICHAEL EUGENE | — | §103§112 | Non-Final OA | — | Pending | Aug 23, 2024 |
| 18633076 | POST DEPOSITION HEAT TREATMENT OF COATING ON SUBSTRATE | BAREFORD, KATHERINE A | 1718 | §103 | Non-Final OA | 29d | Pending | Apr 11, 2024 |
| 18593438 | FUNCTIONALLY GRADED MATERIALS FROM THERMAL PROCESSING | WEN, KEVIN GUANHUA | — | §103 | Non-Final OA | — | Pending | Mar 01, 2024 |
| 18432988 | METHOD FOR MAKING TURBINE ENGINE COMPONENTS USING METAL INJECTION MOLDING | WANG, NICHOLAS A | 1734 | §112Other | Final Rejection | — | Pending | Feb 05, 2024 |
| 18051237 | ELECTRODE FOR PULSED ELECTROCHEMICAL MACHINING | VAN, LUAN V | 1795 | §103§112 | Non-Final OA | — | Pending | Oct 31, 2022 |
| 17887955 | ELECTRIC MACHINE WITH AIR COOLED ROTOR | STEFANON, JUSTIN | 2834 | §103 | Non-Final OA | — | Pending | Aug 15, 2022 |
| 17661430 | NON-ELECTROLYTIC DEPOSITION OF ELECTRODE FOR PULSED ELECTROCHEMICAL MACHINING | WITTENBERG, STEFANIE S | 1795 | §103 | Non-Final OA | 2d overdue | Pending | Apr 29, 2022 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial