66 pending office actions • 15 clients • 62 examiners • 43 art units • 0 of 66 (0%) have an AI response strategy ready
Based on the USPTO statutory response window for each pending office action. 25 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 25 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 + other | 8 (12%) |
| §103 only | 21 (32%) |
| §102 only | 6 (9%) |
| §112 only | 2 (3%) |
| Double-patenting + other | 1 (2%) |
| Multi-statute (no §101) | 28 (42%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| HILL, STEPHANI A | 3 | 29.6% | +44.3% |
| FREEDMAN, LAURA | 2 | 87.2% | +1.3% |
| O'KEEFE, SEAN P | 2 | 65.5% | +12.6% |
| PIZIALI, JEFFREY J | 1 | 42.7% | +5.2% |
| MOLNAR, HUNTER A | 1 | 50.8% | +32.6% |
| REFAI, SAM M | 1 | 34.8% | +7.5% |
| STRICKLER, SCOTT LAWRENCE | 1 | 78.1% | +16.6% |
| DULANEY, BENJAMIN O | 1 | 62.1% | +11.5% |
| SPAMER, DONALD R | 1 | 59.7% | +31.5% |
| DHOOGE, DEVIN J | 1 | 70.8% | +32.8% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19097150 | CURTAIN AIRBAG DEVICE | FREEDMAN, LAURA | 76d |
| 18775722 | BATTERY COVER | FREEDMAN, LAURA | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18974159 | VEHICLE FRONT BODY STRUCTURE | STRICKLER, SCOTT LAWRENCE | 84d overdue |
| 17112485 | INTERNAL-LOAD CALCULATION APPARATUS AND METHOD OF CALCULATING INTERNAL LOAD | PUENTE, EMERSON C | 71d overdue |
| 18124358 | CONTACTLESS CHARGER | KOTOWSKI, LISA MICHELLE | 36d overdue |
| 18541754 | VEHICLE BODY FRAME STRUCTURE | CRAIG, DANIEL THOMAS | 4d overdue |
| 19049181 | INFORMATION MANAGEMENT SYSTEM AND INFORMATION MANAGEMENT METHOD | MOLNAR, HUNTER A | 8d |
| 18233707 | POWER STORAGE DEVICE | PILLAY, DEVINA | 8d |
| 18126824 | CERAMIC SUBSTRATE, CERAMIC DIVIDED SUBSTRATE, AND METHOD FOR MANUFACTURING CERAMIC SUBSTRATE | BURNS, TREMESHA WILLIS | 12d |
| 18287521 | STEEL MATERIAL FOR CARBONITRIDING AND CARBONITRIDED STEEL MATERIAL | ROE, JESSEE RANDALL | 26d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18974159 | VEHICLE FRONT BODY STRUCTURE | STRICKLER, SCOTT LAWRENCE | 84d overdue |
| 19049181 | INFORMATION MANAGEMENT SYSTEM AND INFORMATION MANAGEMENT METHOD | MOLNAR, HUNTER A | 8d |
| 17774910 | POWDER MATERIAL | O'KEEFE, SEAN P | 33d |
| 18958738 | REMOTE CONTROL SYSTEM AND REMOTE CONTROL METHOD | DULANEY, BENJAMIN O | — |
| 18958841 | LIGHT SOURCE MODULE | SPAMER, DONALD R | — |
| 18941322 | MONITORING DEVICE AND MONITORING METHOD | DHOOGE, DEVIN J | — |
| 18285775 | WIREDRAWN PRODUCT AND METHOD FOR MANUFACTURING WIREDRAWN PRODUCT | HILL, STEPHANI A | — |
| 18265615 | FERRITE-BASED STAINLESS STEEL WELDING WIRE | O'KEEFE, SEAN P | — |
| Art Unit | Apps |
|---|---|
| 3612 | 5 |
| 1735 | 3 |
| 3614 | 2 |
| 1784 | 2 |
| 2841 | 2 |
| 1759 | 2 |
| 1729 | 2 |
| 1738 | 2 |
| 1724 | 2 |
| 2628 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19287119 | DISPLAY DEVICE, MULTI-DISPLAY SYSTEM, AND DISPLAY CONTROL METHOD | Sharp NEC Display Solutions, Ltd. | PIZIALI, JEFFREY J | 2628 | §103§112 | Non-Final OA | — | Pending | Jul 31, 2025 |
| 19097150 | CURTAIN AIRBAG DEVICE | Subaru Corporation | FREEDMAN, LAURA | 3614 | §112 | Non-Final OA | 76d | Pending | Apr 01, 2025 |
| 19049181 | INFORMATION MANAGEMENT SYSTEM AND INFORMATION MANAGEMENT METHOD | Sharp NEC Display Solutions, Ltd. | MOLNAR, HUNTER A | 3628 | §101§103 | Final Rejection | 8d | Pending | Feb 10, 2025 |
| 19048081 | INFORMATION PROCESSING DEVICE, INFORMATION PROCESSING METHOD, AND INFORMATION PROCESSING SYSTEM | Sharp NEC Display Solutions, Ltd. | REFAI, SAM M | 3621 | §101§102§112 | Non-Final OA | — | Pending | Feb 07, 2025 |
| 18974159 | VEHICLE FRONT BODY STRUCTURE | Subaru Corporation | STRICKLER, SCOTT LAWRENCE | 3612 | §102§103 | Non-Final OA | 84d overdue | Pending | Dec 09, 2024 |
| 18958738 | REMOTE CONTROL SYSTEM AND REMOTE CONTROL METHOD | Sharp NEC Display Solutions, Ltd. | DULANEY, BENJAMIN O | 2113 | §102§103 | Non-Final OA | — | Pending | Nov 25, 2024 |
| 18958841 | LIGHT SOURCE MODULE | Toyoda Gosei Co., Ltd. | SPAMER, DONALD R | §102§103§112 | Non-Final OA | — | Pending | Nov 25, 2024 | |
| 18941322 | MONITORING DEVICE AND MONITORING METHOD | Sharp NEC Display Solutions, Ltd. | DHOOGE, DEVIN J | §101§103 | Non-Final OA | — | Pending | Nov 08, 2024 | |
| 18937864 | FERRITIC STAINLESS STEEL AND STEEL SHEET | Daido Steel Co., Ltd. | KRUPICKA, ADAM C | 1784 | §103 | Non-Final OA | 84d | Pending | Nov 05, 2024 |
| 18888427 | LIGHT SOURCE DEVICE, PROJECTOR, CONTROL METHOD FOR LIGHT SOURCE DEVICE, AND PROGRAM | Sharp NEC Display Solutions, Ltd. | BROOKS, JERRY L. | §102§103 | Non-Final OA | — | Pending | Sep 18, 2024 | |
| 18884685 | INFORMATION PROCESSING DEVICE, DISPLAY SYSTEM, AND INFORMATION PROCESSING METHOD | Sharp NEC Display Solutions, Ltd. | COLEMAN, STEPHEN P | §101§103 | Non-Final OA | — | Pending | Sep 13, 2024 | |
| 18829984 | WIRE ROD, ENAMELED WIRE, AND METHOD FOR MANUFACTURING ENAMELED WIRE | Proterial, Ltd. | LEE, HWA S | 2877 | §102 | Non-Final OA | 77d | Pending | Sep 10, 2024 |
| 18826976 | INFORMATION PROCESSING DEVICE AND INFORMATION PROCESSING METHOD | Sharp NEC Display Solutions, Ltd. | ADEDIRAN, ABDUL -SAMAD A | §102 | Non-Final OA | — | Pending | Sep 06, 2024 | |
| 18799425 | INFORMATION PROCESSING DEVICE, DISPLAY SYSTEM, AND DISPLAY METHOD | Sharp NEC Display Solutions, Ltd. | SOFRONIOU, MICHAEL MARIO | 2661 | §103§112 | Non-Final OA | — | Pending | Aug 09, 2024 |
| 18794325 | MOUNTING STRUCTURE OF EXTERIOR MEMBER OF VEHICLE | Subaru Corporation | ESQUIVEL, DENISE LYNNE | §103 | Non-Final OA | — | Pending | Aug 05, 2024 | |
| 18834537 | INFORMATION PROCESSING DEVICE AND CONGESTION INFORMATION GENERATION METHOD | Sharp NEC Display Solutions, Ltd. | KOESTER, MICHAEL RICHARD | 3624 | §101§103 | Final Rejection | 27d | Pending | Jul 30, 2024 |
| 18775722 | BATTERY COVER | Subaru Corporation | FREEDMAN, LAURA | 3614 | §103 | Non-Final OA | — | Pending | Jul 17, 2024 |
| 18748831 | PROTECTIVE STRUCTURE | Subaru Corporation | GUTMAN, HILARY L | 3612 | §102§112 | Non-Final OA | — | Pending | Jun 20, 2024 |
| 18680720 | METHOD OF ESTIMATING HEALTH SCORE AND METHOD OF ESTIMATING CHANGES IN POSITIONS OF PARTS OF UPPER BODY | National University Corporation Tokai National Higher Education And Research System | SASS, KIMBERLY A. | 3686 | §101§103 | Non-Final OA | — | Pending | May 31, 2024 |
| 18608527 | LIGHT EMITTING ELEMENT AND PRODUCTION METHOD THEREFOR | Toyoda Gosei Co., Ltd. | MOHAMED-ALY, KAREEM M | 2898 | §103 | Non-Final OA | — | Pending | Mar 18, 2024 |
| 18692711 | NEGATIVE ELECTRODE MATERIAL POWDER FOR LITHIUM ION BATTERY | Daido Steel Co., Ltd. | HOLBROOK, MIA KEILANI | §103 | Non-Final OA | — | Pending | Mar 15, 2024 | |
| 18602855 | SEMICONDUCTOR DECIVE AND PRODUCTION METHOD THEREFOR | Toyoda Gosei Co., Ltd. | CHI, SUBERR L | 2893 | §102§103 | Non-Final OA | — | Pending | Mar 12, 2024 |
| 18601613 | CHILD SEAT | Subaru Corporation | XAVIER, VALENTINA | 3642 | §101§112 | Non-Final OA | — | Pending | Mar 11, 2024 |
| 18601682 | SYSTEM AND METHOD FOR MEASURING HARDNESS OF MOLDED PRODUCT | Kikusui Seisakusho Ltd. | RAEVIS, ROBERT R | 2855 | §102§103 | Final Rejection | 27d | Pending | Mar 11, 2024 |
| 18421329 | LIGHT-EMITTING DEVICE | Toyoda Gosei Co., Ltd. | SANTIAGO, MARICELI | 2875 | §102§103 | Final Rejection | — | Pending | Jan 24, 2024 |
| 18419993 | LIGHT EMITTING ELEMENT AND MANUFACTURING METHOD THEREOF | Toyoda Gosei Co., Ltd. | REAMES, MATTHEW L | 2896 | §103§112 | Final Rejection | — | Pending | Jan 23, 2024 |
| 18416127 | RELAY APPARATUS | Subaru Corporation | JOHNSON, AMY COHEN | 2465 | §103 | Final Rejection | — | Pending | Jan 18, 2024 |
| 18541754 | VEHICLE BODY FRAME STRUCTURE | Subaru Corporation | CRAIG, DANIEL THOMAS | 3676 | §102§103§112 | Final Rejection | 4d overdue | Pending | Dec 15, 2023 |
| 18535807 | VEHICLE FRONT STRUCTURE | Subaru Corporation | SCHUSTER, ALMA DONGFENG | 3612 | §102§103 | Non-Final OA | — | Pending | Dec 11, 2023 |
| 18531043 | CROSSLINKED FLUORORESIN, CROSSLINKED FLUORORESIN PRODUCING METHOD, MOLDED BODY, AND MOLDED BODY MANUFACTURING METHOD | Proterial, Ltd. | LENIHAN, JEFFREY S | §102§103§112 | Non-Final OA | — | Pending | Dec 06, 2023 | |
| 18531006 | MULTICORE CABLE | Proterial, Ltd. | NGUYEN, CHAU N | 2841 | §103 | Final Rejection | 2d overdue | Pending | Dec 06, 2023 |
| 18529851 | LIGHT EMITTING ELEMENT | Toyoda Gosei Co., Ltd. | ZHU, SHENG-BAI | 2897 | §103 | Non-Final OA | 28d | Pending | Dec 05, 2023 |
| 18508584 | VEHICLE-BODY FRONT STRUCTURE | Subaru Corporation | MORROW, JASON S | 3612 | §112 | Final Rejection | — | Pending | Nov 14, 2023 |
| 18385755 | MATERIAL DATA PROCESSING DEVICE AND MATERIAL DATA PROCESSING METHOD | Proterial, Ltd. | BROWN, MICHAEL J | 4100 | §103 | Non-Final OA | — | Pending | Oct 31, 2023 |
| 18384185 | Ni-BASED ALLOY AND METHOD FOR MANUFACTURING THE SAME, AND Ni-BASED ALLOY MEMBER | Daido Steel Co., Ltd. | YANG, JIE | 1734 | §103§112 | Final Rejection | — | Pending | Oct 26, 2023 |
| 18383767 | VEHICLE | Subaru Corporation | KENLAW, GRACE A | §103§112 | Non-Final OA | — | Pending | Oct 25, 2023 | |
| 18287521 | STEEL MATERIAL FOR CARBONITRIDING AND CARBONITRIDED STEEL MATERIAL | Daido Steel Co., Ltd. | ROE, JESSEE RANDALL | 1759 | §103§112 | Non-Final OA | 26d | Pending | Oct 19, 2023 |
| 18285813 | HEAT- TREATED STEEL AND HEAT TREATMENT METHOD FOR STEEL | Tokyo Rope Mfg. Co., Ltd. | KESSLER, CHRISTOPHER S | 1759 | §102 | Non-Final OA | — | Pending | Oct 05, 2023 |
| 18285775 | WIREDRAWN PRODUCT AND METHOD FOR MANUFACTURING WIREDRAWN PRODUCT | Tokyo Rope Mfg. Co., Ltd. | HILL, STEPHANI A | 1735 | §102§103§112DPOther | Non-Final OA | — | Pending | Oct 05, 2023 |
| 18373693 | MARK FOR CLUB HEAD MEASUREMENT AND IMAGE PROCESSING DEVICE | Amplus Co., Ltd. | MAIDEN, MICHAEL KIM | 2665 | §102 | Final Rejection | — | Pending | Sep 27, 2023 |
| 18370225 | STEEL MATERIAL AND MOLD | Daido Steel Co., Ltd. | STILES, JACOB BENJAMIN | 1733 | §103 | Non-Final OA | 85d | Pending | Sep 19, 2023 |
| 18240464 | METHOD OF DESIGNING AIRCRAFT PART AND METHOD OF PRODUCING AIRCRAFT PART | Subaru Corporation | FLYNN, ABBY J | §103 | Non-Final OA | — | Pending | Aug 31, 2023 | |
| 18233707 | POWER STORAGE DEVICE | Subaru Corporation | PILLAY, DEVINA | 1726 | §102§103§112 | Final Rejection | 8d | Pending | Aug 14, 2023 |
| 18233719 | COOLING STRUCTURE OF BATTERY PACK | Subaru Corporation | WALLS-MURRAY, JESSIE LOGAN | 1728 | §103§112 | Non-Final OA | 65d | Pending | Aug 14, 2023 |
| 18233462 | COOLING STRUCTURE OF BATTERY PACK | Subaru Corporation | GATEWOOD, DANIEL S | 1729 | §102 | Non-Final OA | — | Pending | Aug 14, 2023 |
| 18231042 | MULTICORE CABLE AND MULTICORE CABLE ASSEMBLY | Proterial, Ltd. | MAYO III, WILLIAM H | 2841 | §103 | Non-Final OA | — | Pending | Aug 07, 2023 |
| 18271017 | WIRE ROD FOR FORMING MOLTEN METAL, AND WELDING PRODUCT | Daido Steel Co., Ltd. | OMORI, MARY I | 1784 | §103 | Non-Final OA | 36d overdue | Pending | Jul 05, 2023 |
| 18218435 | WELDING WIRE | Daido Steel Co., Ltd. | GAUTHIER, NICHOLAS FREDRICK | 3761 | §102 | Non-Final OA | — | Pending | Jul 05, 2023 |
| 18217116 | ELECTRIC WIRE CONNECTION STRUCTURE, ELECTRIC WIRE CONNECTION METHOD, MEDICAL DEVICE, AND METHOD OF MANUFACTURING MEDICAL DEVICE | Proterial, Ltd. | OUYANG, BO | 3794 | §102§103 | Final Rejection | — | Pending | Jun 30, 2023 |
| 18269904 | RENTAL EQUIPMENT MANAGEMENT METHOD, AND RENTAL EQUIPMENT MANAGEMENT SYSTEM | Sharp NEC Display Solutions, Ltd. | SANTOS-DIAZ, MARIA C | 3629 | §101§102§103§112 | Non-Final OA | 84d | Pending | Jun 27, 2023 |
| 18265615 | FERRITE-BASED STAINLESS STEEL WELDING WIRE | Daido Steel Co., Ltd. | O'KEEFE, SEAN P | 1738 | §102§103 | Final Rejection | — | Pending | Jun 06, 2023 |
| 18198555 | VEHICLE SIDE DOOR | BARU CORPORATION | CONDO, VERONICA MARIE | 3612 | §103 | Final Rejection | 22d | Pending | May 17, 2023 |
| 18126824 | CERAMIC SUBSTRATE, CERAMIC DIVIDED SUBSTRATE, AND METHOD FOR MANUFACTURING CERAMIC SUBSTRATE | Proterial, Ltd. | BURNS, TREMESHA WILLIS | 2847 | §102§103 | Final Rejection | 12d | Pending | Mar 27, 2023 |
| 18124358 | CONTACTLESS CHARGER | Subaru Corporation | KOTOWSKI, LISA MICHELLE | 2859 | §103§112 | Non-Final OA | 36d overdue | Pending | Mar 21, 2023 |
| 18025133 | Ni-BASED ALLOY POWDER AND METHOD FOR MANUFACTURING LAMINATION MOLDED ARTICLE USING SAID Ni-BASED ALLOY POWDER | Proterial, Ltd. | HILL, STEPHANI A | 1735 | §103 | Non-Final OA | — | Pending | Mar 07, 2023 |
| 18018930 | ENERGY STORAGE APPARATUS | Gs Yuasa International Ltd. | RHEE, JANE J | 1724 | §103 | Non-Final OA | 27d | Pending | Jan 31, 2023 |
| 17918376 | MACHINING METHOD FOR WORKPIECE | Fanuc Corporation | TRAVERS, MATTHEW P | 3722 | §103 | Non-Final OA | — | Pending | Oct 12, 2022 |
| 17915963 | FRP REINFORCING MEMBER, METHOD METHOD FOR PRODUCING THE SAME, FRP MOLDED BODY, AND FRP CONNECTION STRUCTURE | Jon72 Co., Ltd. | HANDVILLE, BRIAN | 1783 | §103 | Final Rejection | 32d overdue | Pending | Sep 29, 2022 |
| 17914696 | ENERGY STORAGE FACILITY | Gs Yuasa International Ltd. | EGGERDING, ALIX ECHELMEYER | 1729 | §103 | Non-Final OA | 5d | Pending | Sep 26, 2022 |
| 17858505 | VITAL SIGN MEASUREMENT DEVICE | Subaru Corporation | FARDANESH, MARJAN | 3791 | §102§103 | Final Rejection | — | Pending | Jul 06, 2022 |
| 17782259 | ENERGY STORAGE APPARATUS | Gs Yuasa International Ltd. | CORNO JR, JAMES ANTHONY JOHN | 1722 | §103 | Final Rejection | — | Pending | Jun 03, 2022 |
| 17774910 | POWDER MATERIAL | Daido Steel Co., Ltd. | O'KEEFE, SEAN P | 1738 | §103§112 | Non-Final OA | 33d | Pending | May 06, 2022 |
| 17770255 | ENERGY STORAGE APPARATUS | Gs Yuasa International Ltd. | NEDIALKOVA, LILIA V | 1724 | §102§103§112 | Non-Final OA | — | Pending | Apr 19, 2022 |
| 17689722 | POWDER MATERIAL AND PRODUCING METHOD FOR THE SAME | Daido Steel Co., Ltd. | HILL, STEPHANI A | 1735 | §103 | Final Rejection | — | Pending | Mar 08, 2022 |
| 17112485 | INTERNAL-LOAD CALCULATION APPARATUS AND METHOD OF CALCULATING INTERNAL LOAD | Subaru Corporation | PUENTE, EMERSON C | 2187 | §102§103 | Final Rejection | 71d overdue | Pending | Dec 04, 2020 |
| 16399772 | BODYPAINTING INKS, BODYPAINTING INSTRUMENTS AND METHODS FOR MANUFACTURING BODYPAINTING INKS | Hobbic Study Incorporated | GULLEDGE, BRIAN M | 1699 | §102§103 | Non-Final OA | 55d | Pending | Apr 30, 2019 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial