76 pending office actions • 31 clients • 74 examiners • 52 art units • 0 of 76 (0%) have an AI response strategy ready
Based on the USPTO statutory response window for each pending office action. 21 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 21 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 2 (3%) |
| §101 + other | 2 (3%) |
| §103 only | 30 (39%) |
| §102 only | 1 (1%) |
| §112 only | 3 (4%) |
| Double-patenting + other | 1 (1%) |
| Multi-statute (no §101) | 36 (47%) |
| No statute on record | 1 (1%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| FERGUSON, MICHAEL P | 2 | 63.4% | +73.0% |
| CARLSON, MARC | 2 | 71.1% | +23.4% |
| WOLFORD, NAOMI M | 1 | 55.8% | +40.0% |
| GRAMLING, SEAN P | 1 | 66.5% | +28.2% |
| DUNAY, CHRISTOPHER E | 1 | 76.2% | +13.8% |
| GEDEON, DEBORAH TALITHA | 1 | 54.4% | +61.8% |
| CAIN, AARON G | 1 | 43.0% | +29.3% |
| MATTHEWS, MADISON ROSE | 1 | 80.1% | +35.4% |
| CIRNU, ALEXANDRU | 1 | 42.8% | +21.0% |
| LATHERS, KEVIN ANTHONY | 1 | 80.0% | +15.9% |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18761546 | METHOD FOR PRODUCING HIGH-QUALITY ULTRASONICALLY WELDED SPOT JOINTS | GAMINO, CARLOS J | 73d overdue |
| 18732945 | FRICTION PRESSURE WELDING OF SIMILAR AND/OR DISSIMILAR MATERIALS | STONER, KILEY SHAWN | 32d overdue |
| 18606129 | METHOD OF JOINING TWO DISSIMILAR ALLOYS AND COMPOSITE ARTICLES INCLUDING THE SAME | JANSSEN, REBECCA | 28d overdue |
| 19100768 | SYSTEM COMPRISING A PALLET, CONTAINERS AND STACKING PINS | SANGHERA, SYMREN K | 10d overdue |
| 18589566 | SURFACE CLEANING APPARATUS WITH VAPOR DISPENSING | CARLSON, MARC | 3d overdue |
| 18213477 | METHODS AND DEVICES FOR OPERATING PREDICTIVE ENGINES | ZENG, WENWEI | 1d overdue |
| 18720928 | METHOD AND APPARATUS TO CLEAN ADDITIVELY MANUFACTURED COMPONENTS | ZHANG, RICHARD Z | 20d |
| 18733099 | VACUUM HOLSTER | GOLIK, ARTHUR PAUL | 22d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18657042 | BALUSTER ATTACHMENT SYSTEM | FERGUSON, MICHAEL P | 15d overdue |
| 18589566 | SURFACE CLEANING APPARATUS WITH VAPOR DISPENSING | CARLSON, MARC | 3d overdue |
| 18524746 | Untitled | WOLFORD, NAOMI M | — |
| 19414556 | A LIGHTING DEVICE FOR A MOTOR VEHICLE, IN PARTICULAR A HEADLAMP FOR A MOTOR VEHICLE | GRAMLING, SEAN P | — |
| 19302948 | MOTOR VEHICLE WITH A LIGHTING DEVICE AND A CONDENSATION PROTECTION SYSTEM | DUNAY, CHRISTOPHER E | — |
| 19270002 | PATIENT SUPPORT WITH LIFT ASSEMBLY | GEDEON, DEBORAH TALITHA | — |
| 19266667 | DISPLAYING A DYNAMICALLY CHANGING WET CLEAN PATH OF AN AUTONOMOUS FLOOR CLEANER | CAIN, AARON G | — |
| 19143723 | PATIENT SUPPORT APPARATUS WITH CPR FEATURES | MATTHEWS, MADISON ROSE | — |
| Art Unit | Apps |
|---|---|
| 3752 | 4 |
| 3747 | 3 |
| 3723 | 3 |
| 2875 | 2 |
| 3745 | 2 |
| 3619 | 2 |
| 1735 | 2 |
| 3679 | 2 |
| 2834 | 2 |
| 3783 | 2 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 18524746 | Untitled | DENSO CORPORATION | WOLFORD, NAOMI M | 3648 | §103§112 | Non-Final OA | — | Pending | |
| 19414556 | A LIGHTING DEVICE FOR A MOTOR VEHICLE, IN PARTICULAR A HEADLAMP FOR A MOTOR VEHICLE | Hella GmbH & Co. KGaA | GRAMLING, SEAN P | 2875 | §102 | Non-Final OA | — | Pending | Dec 10, 2025 |
| 19302948 | MOTOR VEHICLE WITH A LIGHTING DEVICE AND A CONDENSATION PROTECTION SYSTEM | Hella GmbH & Co. KGaA | DUNAY, CHRISTOPHER E | 2875 | §112 | Non-Final OA | — | Pending | Aug 18, 2025 |
| 19270002 | PATIENT SUPPORT WITH LIFT ASSEMBLY | Stryker Corporation | GEDEON, DEBORAH TALITHA | Other | Non-Final OA | — | Pending | Jul 15, 2025 | |
| 19266667 | DISPLAYING A DYNAMICALLY CHANGING WET CLEAN PATH OF AN AUTONOMOUS FLOOR CLEANER | BISSELL Inc. | CAIN, AARON G | 3656 | §103§112 | Non-Final OA | — | Pending | Jul 11, 2025 |
| 19143723 | PATIENT SUPPORT APPARATUS WITH CPR FEATURES | Stryker Corporation | MATTHEWS, MADISON ROSE | 3673 | §102§112 | Non-Final OA | — | Pending | Jun 26, 2025 |
| 19238961 | SYSTEM AND METHOD OF DETERMINING REAL-TIME LOCATION | DENSO CORPORATION | CIRNU, ALEXANDRU | 3628 | §101§103 | Non-Final OA | — | Pending | Jun 16, 2025 |
| 19133939 | FUEL INJECTOR | Phinia Delphi Luxembourg Sarl | LATHERS, KEVIN ANTHONY | 3747 | §102§112 | Non-Final OA | — | Pending | May 29, 2025 |
| 19222295 | PEFORATING GUN CLUSTER SYSTEM FOR WELLBORE OPERATIONS | Dynamic Blasting Solutions, LLC | LAMBE, PATRICK F | 3676 | §102§103 | Final Rejection | 27d | Pending | May 29, 2025 |
| 19196261 | DISINFECTION TRACKING NETWORK | UV Partners, Inc. | LEROUX, ETIENNE PIERRE | 2161 | §103 | Non-Final OA | 12d | Pending | May 01, 2025 |
| 19123629 | NOZZLE FOR AUTOMATIC CLEANING OF A SENSOR | A. Raymond et Cie | PHAM, TUONGMINH NGUYEN | 3752 | §102§103§112 | Non-Final OA | — | Pending | Apr 23, 2025 |
| 19079013 | ARRANGEMENT WITH A HOLDER AND A HOUSING FOR AN ELECTRONIC ASSEMBLY, IN PARTICULAR FOR A RADAR SENSOR, ASSEMBLY WITH SUCH AN ARRANGEMENT, AND METHOD FOR PRODUCING SUCH AN ARRANGEMENT | Hella GmbH & Co. KGaA | AUGUSTIN, CHRISTOPHER L | §102§103 | Non-Final OA | — | Pending | Mar 13, 2025 | |
| 19047925 | SYSTEM AND METHOD FOR ATOMIC-SCALE FABRICATION | UT-BATTELLE, LLC | MURATA, AUSTIN | 1712 | §103 | Non-Final OA | — | Pending | Feb 07, 2025 |
| 19100768 | SYSTEM COMPRISING A PALLET, CONTAINERS AND STACKING PINS | Schoeller Allibert GmbH | SANGHERA, SYMREN K | 3735 | §102§103§112 | Non-Final OA | 10d overdue | Pending | Feb 03, 2025 |
| 19038006 | DUAL DYNAMIC WIRELESS CHARGING | UT-BATTELLE, LLC | SHAFI, MUHAMMAD | 3666 | §103 | Non-Final OA | — | Pending | Jan 27, 2025 |
| 19035242 | MATERIAL PROCESSING DEVICE WITH VARIABLE OPERATING MECHANISM | Terex Gb Limited | BROWN, JOSEPH HENRY | 3618 | §102§112 | Final Rejection | 40d | Pending | Jan 23, 2025 |
| 19021361 | CROSSBOW SIGHT MOUNT | Killer Instinct, Inc. | DUCKWORTH, BRADLEY | 3632 | §103§112 | Non-Final OA | — | Pending | Jan 15, 2025 |
| 18879884 | MAGNIFIED LINEAR POWER GENERATION SYSTEM | Propitious Technical Services LLC | NGUYEN, DUSTIN T | 3745 | §103 | Non-Final OA | — | Pending | Dec 30, 2024 |
| 18872829 | FUEL INJECTOR FOR DIRECT INJECTION OF GASEOUS FUEL | Phinia Delphi Luxembourg Sarl | MOUBRY, JAMES G | 3747 | §112 | Non-Final OA | — | Pending | Dec 08, 2024 |
| 18946425 | MULTI-SCALE GLOBAL LAND USE MODEL BASED ON POINTS OF INTEREST | UT-BATTELLE, LLC | LINHARDT, LAURA E | 3663 | §101§103 | Non-Final OA | — | Pending | Nov 13, 2024 |
| 18925435 | RETRACTABLE LOW-PROFILE FOLD-DOWN STEP SYSTEM FOR BOATS | The New Sealift, LLC | HESTON, JUSTIN MICHAEL | §103 | Non-Final OA | — | Pending | Oct 24, 2024 | |
| 18921157 | VIBRATION MONITORING SYSTEM | Terex Gb Limited | ZHONG, XIN Y | §102§103§112 | Non-Final OA | — | Pending | Oct 21, 2024 | |
| 18858027 | MULTILAYER FORMULATION COMPRISING MODIFIED TAPIOCA STARCH FOR CONTROLLED-RELEASE OF ACTIVE AGENTS | Access Business Group International LLC | TRUONG, QUANGLONG N | §103 | Non-Final OA | — | Pending | Oct 18, 2024 | |
| 18882209 | THERMAL ENERGY STORAGE SYSTEMS INCLUDING ANISOTROPIC THERMAL CONDUCTIVE CARBON FIBERS FOR ENHANCING THERMAL EFFICIENCY OF PHASE CHANGE MATERIALS | UT-BATTELLE, LLC | RUBY, TRAVIS C | 3763 | §102§103§112 | Non-Final OA | — | Pending | Sep 11, 2024 |
| 18816367 | PET HEALTH AQUEOUS COMPOSITION AND ASSOCIATED CONTAINER | Susu Pets, LLC | THAKUR, VIREN A | §103§112 | Non-Final OA | — | Pending | Aug 27, 2024 | |
| 18839812 | SUPPORT COMPONENT FOR INTEGRATION INTO AN APRON OF A MOTOR VEHICLE | Hella GmbH & Co. KGaA | LE, HUAN G | §103 | Non-Final OA | — | Pending | Aug 20, 2024 | |
| 18789876 | DEVICE OR METHOD FOR PRODUCING A FOOD PRODUCT FROM A PORTION OF FOOD | Eberhardt GmbH | NGUYEN, HUNG D | 1742 | §103§112 | Non-Final OA | — | Pending | Jul 31, 2024 |
| 18777843 | HIDDEN FASTENER UNIT AND RELATED METHOD OF USE | National Nail Corp. | FERGUSON, MICHAEL P | 3619 | §103 | Non-Final OA | — | Pending | Jul 19, 2024 |
| 18761546 | METHOD FOR PRODUCING HIGH-QUALITY ULTRASONICALLY WELDED SPOT JOINTS | UT-BATTELLE, LLC | GAMINO, CARLOS J | 1735 | §103§112 | Final Rejection | 73d overdue | Pending | Jul 02, 2024 |
| 18751753 | PLUG CUTTING TOOL AND RELATED METHOD OF USE | National Nail Corp. | COZART, JERMIE E | 3799 | §112 | Non-Final OA | — | Pending | Jun 24, 2024 |
| 18720928 | METHOD AND APPARATUS TO CLEAN ADDITIVELY MANUFACTURED COMPONENTS | A. Raymond et Cie | ZHANG, RICHARD Z | 1714 | §103§112 | Final Rejection | 20d | Pending | Jun 17, 2024 |
| 18734407 | MEMBRANE SOLVENT EXTRACTION PROCESS FOR SEPARATING LITHIUM FROM ALUMINUM | UT-BATTELLE, LLC | NORRIS, CLAIRE A | §103Other | Non-Final OA | — | Pending | Jun 05, 2024 | |
| 18733099 | VACUUM HOLSTER | Tommy Enterprises, Inc. | GOLIK, ARTHUR PAUL | 3745 | §102§103§112 | Non-Final OA | 22d | Pending | Jun 04, 2024 |
| 18732945 | FRICTION PRESSURE WELDING OF SIMILAR AND/OR DISSIMILAR MATERIALS | UT-BATTELLE, LLC | STONER, KILEY SHAWN | 1735 | §102§103§112 | Final Rejection | 32d overdue | Pending | Jun 04, 2024 |
| 18678039 | FLOOR CLEANING NOZZLE FOR SURFACE CLEANING APPARATUS | BISSELL Inc. | CARLSON, MARC | §102§103 | Non-Final OA | — | Pending | May 30, 2024 | |
| 18713740 | METHOD FOR PRODUCING A PINTLE FOR A FUEL INJECTOR | Phinia Delphi Luxembourg Sarl | SCHWARTZ, KEVIN EDWARD | 3752 | §103§112 | Final Rejection | — | Pending | May 28, 2024 |
| 18670829 | MAINTENANCE PLATFORM FOR CONE CRUSHERS | Terex Gb Limited | PEZZLO, BENJAMIN ALEXANDER | 3725 | §102§103 | Non-Final OA | — | Pending | May 22, 2024 |
| 18710924 | PASS THROUGH ASSEMBLY CONFIRMATION QUICK CONNECTOR | A. Raymond et Cie | DRAGICEVICH, ZACHARY T | 3679 | §102§103 | Final Rejection | — | Pending | May 16, 2024 |
| 18664727 | SELF-PROPELLED FRONT NUTRIENT SPREADING VEHICLE | Mensch Manufacturing, LLC | LEE, CHEE-CHONG | 3752 | §102§103§112 | Non-Final OA | — | Pending | May 15, 2024 |
| 18663158 | PATIENT SUPPORT USABLE WITH BARIATRIC PATIENTS | Stryker Corporation | CONLEY, FREDRICK C | 3679 | §102§103 | Final Rejection | — | Pending | May 14, 2024 |
| 18657042 | BALUSTER ATTACHMENT SYSTEM | Novo Building Products, LLC | FERGUSON, MICHAEL P | 3619 | §103 | Final Rejection | 15d overdue | Pending | May 07, 2024 |
| 18647165 | Cable Binder for Vehicles, Cable-Binding Assembly, and Vehicle Lamp with the Assembly | Hella Autotechnik Nova S.R.O. | DO, ROWLAND | 3677 | §102§103 | Non-Final OA | — | Pending | Apr 26, 2024 |
| 18606129 | METHOD OF JOINING TWO DISSIMILAR ALLOYS AND COMPOSITE ARTICLES INCLUDING THE SAME | UT-BATTELLE, LLC | JANSSEN, REBECCA | 1733 | §102§103§112 | Final Rejection | 28d overdue | Pending | Mar 15, 2024 |
| 18603920 | STORAGE SYSTEM | Kindred Products LLC | DANGOL, ASHESH | 3642 | §103 | Non-Final OA | 65d | Pending | Mar 13, 2024 |
| 18589566 | SURFACE CLEANING APPARATUS WITH VAPOR DISPENSING | BISSELL Inc. | CARLSON, MARC | 3723 | §102§103§112 | Final Rejection | 3d overdue | Pending | Feb 28, 2024 |
| 18585633 | METHOD OF INCREASING ANISOTROPY OF MAGNETIC MATERIALS | Iowa State University Research Foundation, Inc. | FLORES, JAVIER | §103 | Non-Final OA | — | Pending | Feb 23, 2024 | |
| 18435309 | FIRE BARRIER ARRANGEMENT AND HYBRID ELECTRIC VEHICLE INCLUDING THE SAME | Phinia Jersey Holdings LLC | HASAN, SYED O | 3747 | §103 | Final Rejection | 11d overdue | Pending | Feb 07, 2024 |
| 18291171 | CONTACT SYSTEM AND BATTERY SET COMPRISING IT | A. Raymond et Cie | PAUMEN, GARY F | 2834 | §103 | Non-Final OA | — | Pending | Jan 22, 2024 |
| 18418492 | APPARATUS AND METHOD FOR MECHANICAL MIXING OF MEAT PRODUCTS | Eberhardt GmbH | LEFF, STEVEN N | 1792 | §102§103 | Final Rejection | — | Pending | Jan 22, 2024 |
| 18417196 | BACK SUPPORT ATTACHMENT SYSTEM FOR AN OFFICE CHAIR | Haworth, Inc. | KWIECINSKI, RYAN D | 3635 | §103 | Final Rejection | — | Pending | Jan 19, 2024 |
| 18409522 | PROCESS FOR MANUFACTURING FIBER-REINFORCED ADDITIVELY MANUFACTURED COMPOSITES | UT-BATTELLE, LLC | MELENDEZ, ARMAND | 1759 | §103 | Non-Final OA | 30d | Pending | Jan 10, 2024 |
| 18576971 | ROLLER TAPPET ASSEMBLY | Phinia Delphi Luxembourg Sarl | LARGI, MATTHEW THOMAS | 3700 | §103 | Final Rejection | — | Pending | Jan 05, 2024 |
| 18545435 | SYSTEMS AND METHODS FOR DETERMINING WELD QUALITY AND PROPERTIES IN RESISTANCE SPOT WELDING | UT-BATTELLE, LLC | SULTANA, DILARA | 2858 | §102§103 | Non-Final OA | — | Pending | Dec 19, 2023 |
| 18286443 | FAR FIELD LIDAR NOZZLE ASSEMBLY AND BLOWER BRACKET | A. Raymond et Cie | CERNOCH, STEVEN MICHAEL | 3752 | §103 | Non-Final OA | — | Pending | Oct 11, 2023 |
| 18286442 | CAMERA NOZZLE ASSEMBLY | A. Raymond et Cie | CHAUDHRI, OMAIR | 1711 | §103 | Final Rejection | — | Pending | Oct 11, 2023 |
| 18371739 | LAYER STRUCTURED MULTIFUNCTIONAL MONOLITH CATALYST FOR ENERGY-EFFICIENT CONVERSION OF CO2 TO DIMETHYL ETHER | UT-BATTELLE, LLC | LALISSE, REMY FREDERIC | 1732 | §102§103§112 | Non-Final OA | — | Pending | Sep 22, 2023 |
| 18239438 | MACHINING PARAMETER RECOMMENDATIONS USING IN-PROCESS MACHINING DATA AGGREGATION | UT-BATTELLE, LLC | NORTON, JENNIFER L | 2117 | §101 | Non-Final OA | — | Pending | Aug 29, 2023 |
| 18237478 | SURFACE CLEANING APPARTAUS | BISSELL Inc. | MCFARLAND, TYLER JAMES | 3723 | §103 | Non-Final OA | — | Pending | Aug 24, 2023 |
| 18237176 | LARGE-SCALE CONTINUOUS FIBER ADDITIVE MANUFACTURED-COMPRESSION MOLDED COMPOSITE | UT-BATTELLE, LLC | SULTANA, NAHIDA | 1743 | §103 | Final Rejection | 20d | Pending | Aug 23, 2023 |
| 18228120 | AIR PURIFIER WITH ROTATABLE FILTER | BISSELL Inc. | ANBACHT, BRIT ELIZA | 1776 | §103 | Non-Final OA | 70d | Pending | Jul 31, 2023 |
| 18221580 | LIFT NUT MOUNTING BRACKET FOR PREFABRICATED WALL PANELS | A. Raymond et Cie | GLESSNER, BRIAN E | 3633 | §102§103 | Non-Final OA | — | Pending | Jul 13, 2023 |
| 18213477 | METHODS AND DEVICES FOR OPERATING PREDICTIVE ENGINES | Automated Machine Learning Limited | ZENG, WENWEI | 2146 | §101 | Final Rejection | 1d overdue | Pending | Jun 23, 2023 |
| 18211784 | POLYMERIC SHELLS AND PARTICLES FOR VACUUM INSULATION PANELS | UT-BATTELLE, LLC | KRYLOVA, IRINA | 1764 | §103 | Final Rejection | — | Pending | Jun 20, 2023 |
| 18200196 | WEIGELA PLANTS | Spring Meadow Nursery, Inc. | KRUSE, DAVID H | 1663 | §102§112 | Non-Final OA | 27d | Pending | May 22, 2023 |
| 18118804 | METHOD OF DESIGNING MAGNETISM IN COMPOSITIONALLY COMPLEX OXIDES | UT-BATTELLE, LLC | EDMONDSON, LYNNE RENEE | 1734 | §103 | Non-Final OA | — | Pending | Mar 08, 2023 |
| 18021786 | MAGNIFIED LINEAR POWER GENERATION SYSTEM | Propitious Technologies, LLC | ALMAWRI, MAGED M | 2834 | §103 | Final Rejection | — | Pending | Feb 16, 2023 |
| 18103736 | LOW PROFILE LIGHT DELIVERY SYSTEM | UV Partners, Inc. | STOFFA, WYATT A | 2881 | §103§112 | Final Rejection | 71d | Pending | Jan 31, 2023 |
| 18093513 | SURFACE CLEANING APPARATUS WITH USER INTERFACE | BISSELL Inc. | ZAWORSKI, JONATHAN R | 3723 | §103 | Final Rejection | — | Pending | Jan 05, 2023 |
| 18089878 | SYSTEM AND METHOD FOR ON-SITE DETERMINATION OF CHARGING CURRENT FOR A BATTERY | Hong Kong Applied Science and Technology Research Institute Company Limited | PELTON, NATHANIEL R | 2859 | §103 | Final Rejection | — | Pending | Dec 28, 2022 |
| 18011638 | PATIENT SUPPORT APPARATUS COVER | Stryker Corporation | KIDWELL, MICHELE M | 3781 | §103 | Final Rejection | — | Pending | Dec 20, 2022 |
| 17875745 | BONE PREPARATION METHOD FOR ENHANCING OSSEOINTEGRATION | Kinamed, Inc. | PRICE, NATHAN R | 3783 | §103 | Final Rejection | — | Pending | Jul 28, 2022 |
| 17793227 | POLYLACTIC ACID FLAME RESISTANT BLEND | Floreon-Transforming Packaging Ltd. | CAI, WENWEN | 1763 | §103§112 | Final Rejection | 41d | Pending | Jul 15, 2022 |
| 17708088 | Multi-Functional Material for EMI Shielding and Structural Health Monitoring of Carbon Fiber Reinforced Plastics | UT-BATTELLE, LLC | SYLVESTER, KEVIN | 1794 | §103 | Non-Final OA | 13d | Pending | Mar 30, 2022 |
| 17548838 | SYNTHESIS OF TRANSITION METAL LAYERED OXIDE MATERIALS FOR BATTERY CATHODES | UT-BATTELLE, LLC | YUAN, DAH WEI D | 1717 | §102§112 | Non-Final OA | — | Pending | Dec 13, 2021 |
| 17268041 | AQUEOUS DISPERSION COMPOSITION AND USE THEREOF | Dow Toray Co., Ltd. | ISNOR, ALEXANDRA NICOLE | 1611 | §103DP | Final Rejection | — | Pending | Jul 06, 2021 |
| 17343989 | BONE PREPARATION SYSTEM | Kinamed, Inc. | VARGAS, ANNA ELIZABETH | 3783 | §102§103§112 | Non-Final OA | — | Pending | Jun 10, 2021 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial