Prosecution Insights
Last updated: October 14, 2026

Getz Balich LLC

Technology area: Medical Devices & Mechanical Engineering

99 pending office actions • 16 clients • 81 examiners • 49 art units • 0 of 99 (0%) have an AI response strategy ready

Quality Metrics (n=3144 apps, methodology: how we score firms)

94.6%
Allowance Rate
n=3144
+0.64σ
Allowance Rate (norm)
n=3144
3.6
OAs to Allowance
n=2124
+0.00σ
OAs to Allow (norm)
n=2124
1010 days
Time to Allowance
n=2124
+4.3pp
Interview Lift
n=3144
32.6%
RCE Rate
n=3144
4.0%
Appeal Rate
n=3144

Rejection Performance (% of received rejections ultimately overcome)

77.5%
§101 Overcome
n=80
84.2%
§102 Overcome
n=1275
82.3%
§103 Overcome
n=1708
85.5%
§112 Overcome
n=997

Specialization & Scale

F05D, F01D, F02C
Top CPC Subclasses
40%
Top-3 CPC Share
n=3144
10
Practitioners
n=3144
314.4
Apps / Practitioner
n=3144

Portfolio Summary

99
Total Pending OAs
55
Non-Final OAs
37
Final Rejections
7
Advisory / Quayle

Response Deadline Pressure

Based on the USPTO statutory response window for each pending office action. 42 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.

27
Overdue
0
Due this week
10
Due this month
4
Due in next 60 days
1
Due later

Deadline Fire Line

Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 42 of the docket's apps have a known mailing date.

-30dToday30d60d90d120d
Overdue (27)Due ≤ 30 days (10)Due ≤ 60 days (4)Due later (1)

Case Difficulty Mix

Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.

51
Hard (52%)
45
Medium (45%)
3
Easy (3%)
0
Unknown (0%)

Rejection Statute Mix

BucketCases
§101 + other6 (6%)
§103 only39 (39%)
§102 only4 (4%)
§112 only1 (1%)
Double-patenting only2 (2%)
Double-patenting + other2 (2%)
Multi-statute (no §101)45 (45%)

Industry Mix

How the docket's pending cases split across USPTO tech-center bands.

13
Life Sciences
13% of docket
2
Information Tech
2% of docket
2
Communications
2% of docket
16
Semiconductors
16% of docket
66
Mechanical / Eng
67% of docket
0
Business / Other
0% of docket

Time-on-OA Estimate

Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.

990 h
Manual time on pending OAs
198 h
Time saved (low, 20%)
346 h
Time saved (mid, 35%)
8.7 wks
FTE-weeks freed (mid)

Top Examiners on this docket

ExaminerApps on this docketAllow rateInterview lift
KIM, TAE JUN 5 63.9% +25.8%
MEILLER, SEAN V 4 73.9% +38.1%
NGUYEN, HOANG M 2 75.9% +16.3%
BURKE, THOMAS P 2 43.9% +21.7%
WRIGHT, ALEXANDER SCOTT 2 73.5% -0.6%
CHIDIAC, NICHOLAS J 2 54.3% +34.4%
LUKS, JEREMY AUSTIN 2 73.6% +22.0%
DIXON, ANNETTE FREDRICKA 2 74.3% +26.0%
SILVA, FRANK ALEXIS 2 28.9% +49.8%
KANG, EDWIN G 2 64.1% +66.6%

Hard Cases (52)

Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18403092 LATCH ASSEMBLY FOR AN AIRCRAFT PROPULSION SYSTEM COWL LUGO, CARLOS 142d overdue
18841251 DEVICE AND ROBOT FOR PERFORMING TASKS AND COMPUTER PROGRAM HOLWERDA, STEPHEN 97d overdue
18646411 UNITARY SHAPED SOFT GOODS ARTICLE HAVING VARIABLE PHYSICAL CHARACTERISTICS BETWEEN DIFFERENT REGIONS THOMPSON, CAMIE S 77d overdue
18594925 ENERGY GENERATING DEVICE MEILLER, SEAN V 43d overdue
18202733 AIRCRAFT PROPULSION SYSTEM WITH ADJUSTABLE THRUST PROPULSOR MEILLER, SEAN V 32d overdue
17942045 ADAPTIVE MANUFACTURING USING CT SCAN DATA KOSSEK, MAGDALENA IZABELLA 31d overdue
18121424 COUPLING OPTICAL FIBERS AND FLUID PASSAGES HAYES, MARY A 19d overdue
18643622 THERMAL MANAGEMENT ASSEMBLY FOR A HYBRID-ELECTRIC AIRCRAFT PROPULSION SYSTEM STANEK, KELSEY L 8d overdue

Interview Candidates (23)

Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.

App #TitleExaminerDue in
18594925 ENERGY GENERATING DEVICE MEILLER, SEAN V 43d overdue
18511352 FORMING A CONTOURED FINISHED SOFT GOOD FROM A FLATTER FIBROUS INTERMEDIATE PART CHIDIAC, NICHOLAS J 43d overdue
18114691 FUEL INJECTOR AIR SWIRLER STRUCTURE WITH CANTED FLOW GUIDE SURFACE KANG, EDWIN G 42d overdue
18202733 AIRCRAFT PROPULSION SYSTEM WITH ADJUSTABLE THRUST PROPULSOR MEILLER, SEAN V 32d overdue
18654335 PARTIAL-ADMISSION TURBINE ASSEMBLY FOR AN AIRCRAFT AND METHOD FOR CONTROLLING SAME KIM, TAE JUN 15d overdue
18211100 SYSTEM AND METHOD FOR TURBINE ENGINE TURBINE COMPONENT COOLING MEILLER, SEAN V 2d overdue
18807515 ENGINE FUEL NOZZLE WITH COAXIAL FUEL AND AIR FLOWS KIM, TAE JUN 8d
18422343 INTERMEDIATE CASE FOR AIRCRAFT PROPULSION SYSTEM HOUSING KIM, TAE JUN 27d

Client Portfolio (16 clients)

Top Art Units

Art UnitApps
374117
37996
37455
28575
37614
17483
28553
28373
28593
37982

Pending Office Actions

App #TitleClientExaminerArt UnitStatutesStatusDue inAIFiled
19481691 IMAGE GUIDED PROCEDURES Dicom Director LLC LI, JOHN DENNY 3798 §101§102§103§112 Non-Final OA — Pending Nov 05, 2025
19310222 CLUTCHED ELECTRIC POWERPLANT FOR AIRCRAFT PROPULSION SYSTEM Pratt & Whitney Canada Corp. GREEN, RICHARD R 3647 §102§103 Non-Final OA — Pending Aug 26, 2025
19309285 SPINAL IMPLANT DEVICE Spineology Inc. JOHANAS, JACQUELINE T 3773 §102§103 Non-Final OA — Pending Aug 25, 2025
19246269 THRUST DIVERTER FOR AN OPEN ROTOR AIRCRAFT PROPULSION SYSTEM Rtx Corporation NG, HENRY 3741 §102§103§112Other Non-Final OA — Pending Jun 23, 2025
19225706 GAS TURBINE ENGINE WITH BYPASS TOBI COOLING/PURGE FLOW AND METHOD Rtx Corporation FORD, RENE D 3741 §102 Non-Final OA — Pending Jun 02, 2025
19212272 MESH SPACER HYBRID Spineology Inc. WOODALL, NICHOLAS W 3775 §101DP Non-Final OA — Pending May 19, 2025
19068794 Hybrid Electric Propulsion System with Start Sequence and Shutdown Sequence Pratt & Whitney Canada Corp. SUNG, GERALD LUTHER 3741 §112 Non-Final OA — Pending Mar 03, 2025
19101490 SYSTEM AND METHOD FOR ACCOUNTING FOR A CONFOUNDING FACTOR IN THE DETERMINATION OF A PHYSIOLOGIC PARAMETER OR CONDITION BECTON, DICKINSON AND COMPANY CHEN, TSE W 3791 §103 Non-Final OA — Pending Feb 05, 2025
19044310 FLEX COUPLER FOR HYBRID GAS TURBINE ENGINE POWERPLANT Pratt & Whitney Canada Corp. OLYNICK, DAVID 3741 §102§103 Non-Final OA — Pending Feb 03, 2025
19041622 GEARBOX WITH INTEGRATED MECHANICAL DISCONNECT Pratt & Whitney Canada Corp. PERVIN, FARHANA 3655 §102§103 Non-Final OA — Pending Jan 30, 2025
19036670 COLD SPRAYING COATING ONTO TURBINE ENGINE COMPONENT Rtx Corporation EMPIE, NATHAN H 1712 §102§103§112 Final Rejection — Pending Jan 24, 2025
19034226 SULFONATION TREATMENT FOR A THERMOPLASTIC PART Rohr, Inc. ROLLAND, ALEX A 1759 §103§112 Final Rejection 4d overdue Pending Jan 22, 2025
19034238 SULFONATED THERMOPLASTIC PART AND METHOD FOR FORMING SAME Rohr, Inc. TAVARES-CROCKETT, ULA CORINNA 1729 §103 Non-Final OA — Pending Jan 22, 2025
19032892 GAS TURBINE ENGINE WITH A ROTOR STAGE SHROUD Pratt & Whitney Canada Corp. SEHN, MICHAEL L 3745 §102§103 Non-Final OA — Pending Jan 21, 2025
19018823 FORMING DUCT STRUCTURE WITH OVERBRAIDED WOVEN FIBER SLEEVE Rohr, Inc. BEHA, CAROLINE 1748 §103 Non-Final OA — Pending Jan 13, 2025
19014903 AIRCRAFT PROPULSION SYSTEM WITH ELECTRIC MACHINE SYSTEM COOLING CIRCUIT Rtx Corporation NGUYEN, HOANG M 3746 §102§103 Final Rejection — Pending Jan 09, 2025
18980869 ATTACHMENT FOR MOUNTING AIRCRAFT PROPULSION SYSTEM TO PYLONG STRUCTURE Rtx Corporation MCDUFFIE, MICHAEL D 3632 §102§103 Final Rejection — Pending Dec 13, 2024
18977558 MACHINING COMPONENT USING SCAN DATA OF INTERNAL ARTIFACT(S) Rtx Corporation BEKELE, MEKONEN T 2699 §103 Non-Final OA — Pending Dec 11, 2024
18973948 INTERNAL COMBUSTION ENGINE WITH MONOLITHIC PILOT CHAMBER STRUCTURE Pratt & Whitney Canada Corp. NGUYEN, HOANG M 3746 §102§103 Non-Final OA — Pending Dec 09, 2024
18966996 GAS TURBINE ENGINE WITH ADAPTIVE TURBINE COOLING AIR SYSTEM AND METHOD Rtx Corporation BURKE, THOMAS P 3741 §103 Final Rejection — Pending Dec 03, 2024
18949285 LUBRICANT SYSTEM Pratt & Whitney Canada Corp. RIEGELMAN, MICHAEL A 3654 §103 Non-Final OA — Pending Nov 15, 2024
18934863 SHAFT ASSEMBLY FOR A GAS TURBINE ENGINE Pratt & Whitney Canada Corp. CHRISTENSEN, DANIELLE M 3745 §102 Non-Final OA — Pending Nov 01, 2024
18927563 THERMAL MANAGEMENT SYSTEM FOR OPEN ROTOR AIRCRAFT PROPULSION SYSTEM Rtx Corporation KIM, TAE JUN 3799 §103 Non-Final OA — Pending Oct 25, 2024
18927542 SYSTEMS AND METHODS FOR OPERATING AN AIRCRAFT ENGINE USING MULTIPLE FUEL TYPES Pratt & Whitney Canada Corp. KIM, TAE JUN 3799 §103 Final Rejection — Pending Oct 25, 2024
18921688 AUTOREGULATION SYSTEM AND METHOD USING TISSUE OXIMETRY AND BLOOD PRESSURE BECTON, DICKINSON AND COMPANY LIU, CHU CHUAN 3791 DP Non-Final OA — Pending Oct 21, 2024
18918632 ANTI-ROTATION TOOL FOR AIRCRAFT ENGINE ROTATIONAL EQUIPMENT Pratt & Whitney Canada Corp. TRAVERS, MATTHEW P 3726 §103§112 Non-Final OA — Pending Oct 17, 2024
18913888 BATTERY MANAGEMENT SYSTEM TEMPERATURE SENSING SYSTEMS AND METHODS Pratt & Whitney Canada Corp. PEDERSEN, DAVID RUBEN 3658 §103 Final Rejection — Pending Oct 11, 2024
18841251 DEVICE AND ROBOT FOR PERFORMING TASKS AND COMPUTER PROGRAM DEUTSCHES ZENTRUM FÜR LUFT- UND RAUMFAHRT E.V. HOLWERDA, STEPHEN 3656 §102§103 Final Rejection 97d overdue Pending Aug 23, 2024
18807515 ENGINE FUEL NOZZLE WITH COAXIAL FUEL AND AIR FLOWS Pratt & Whitney Canada Corp. KIM, TAE JUN 3799 §102§103§112 Non-Final OA 8d Pending Aug 16, 2024
18781576 AIRCRAFT EXTERNAL POWER ASSEMBLY, GROUND-BASED POWER ASSEMBLY, AND METHOD FOR OPERATING SAME Pratt & Whitney Canada Corp. DANGOL, ASHESH 3642 §103 Non-Final OA — Pending Jul 23, 2024
18769058 REPAIRING COMPOSITE THERMOPLASTIC COMPONENT USING INDUCTION / CONDUCTIVE HEATING Rohr, Inc. WRIGHT, ALEXANDER SCOTT 1745 §102§103DP Final Rejection 46d overdue Pending Jul 10, 2024
18756032 THERMOPLASTIC COMPOSITE COMPONENTS AND METHOD FOR FORMING SAME Rohr, Inc. CHIDIAC, NICHOLAS J 1744 §102§103 Final Rejection — Pending Jun 27, 2024
18722886 DETECTION CIRCUITRY Myenergi Limited FERDOUS, ZANNATUL 2858 §102§103§112 Non-Final OA 4d overdue Pending Jun 21, 2024
18680640 ACTUATABLE GUIDE TUBE FOR ELECTRONIC INSPECTION SCOPE Rtx Corporation DAVIS HOLLINGTON, OCTAVIA L 2855 §102§103 Non-Final OA — Pending May 31, 2024
18680577 METHOD FOR INSPECTING A POWERPLANT COMPONENT Rtx Corporation KAY, DOUGLAS 2857 §101§103§112 Non-Final OA — Pending May 31, 2024
18662506 METHOD FOR INSPECTING A POWERPLANT COMPONENT USING AN INSPECTION SCOPE Rtx Corporation LAU, TUNG S 2857 §101§102§103§112 Non-Final OA — Pending May 13, 2024
18659943 METHOD FOR INSPECTING A POWERPLANT COMPONENT USING AN INSPECTION SCOPE Rtx Corporation RIVERA VARGAS, MANUEL A 2857 §102 Non-Final OA — Pending May 09, 2024
18658446 INSPECTING INTERNAL POWERPLANT COMPONENT USING INSPECTION SCOPE Rtx Corporation HUANG, DAVID Z 2855 §102§103§112 Non-Final OA — Pending May 08, 2024
18656097 ANIMAL TRAP Field Engine Wildlife Research And Management LLC ARK, DARREN W 3647 §103Other Final Rejection 8d overdue Pending May 06, 2024
18656146 METHOD FOR INSPECTING A POWERPLANT COMPONENT USING AN INSPECTION SCOPE Rtx Corporation ZAYKOVA-FELDMAN, LYUDMILA 2857 §101§103 Non-Final OA — Pending May 06, 2024
18656184 METHOD FOR INSPECTING A POWERPLANT COMPONENT USING AN INSPECTION SCOPE Rtx Corporation CORDERO, LINA M 2857 §101§103 Non-Final OA — Pending May 06, 2024
18654335 PARTIAL-ADMISSION TURBINE ASSEMBLY FOR AN AIRCRAFT AND METHOD FOR CONTROLLING SAME Pratt & Whitney Canada Corp. KIM, TAE JUN 3799 §103 Non-Final OA 15d overdue Pending May 03, 2024
18646411 UNITARY SHAPED SOFT GOODS ARTICLE HAVING VARIABLE PHYSICAL CHARACTERISTICS BETWEEN DIFFERENT REGIONS Simplifyber, Inc. THOMPSON, CAMIE S 1786 §102§103§112 Final Rejection 77d overdue Pending Apr 25, 2024
18643622 THERMAL MANAGEMENT ASSEMBLY FOR A HYBRID-ELECTRIC AIRCRAFT PROPULSION SYSTEM Rtx Corporation STANEK, KELSEY L 3741 §103§112 Non-Final OA 8d overdue Pending Apr 23, 2024
18635743 MOUNTING COMPONENTS FOR A POWERPLANT FLUID SYSTEM Pratt & Whitney Canada Corp. WALTHOUR, SCOTT J 3632 §102§103 Non-Final OA — Pending Apr 15, 2024
18630718 INSPECTING INTERNAL POWERPLANT COMPONENT USING PIEZOELECTRIC DEVICE Rtx Corporation KIRKLAND III, FREDDIE 2855 §103 Final Rejection — Pending Apr 09, 2024
18623673 RIVETING TOOL YOKE Pratt & Whitney Canada Corp. TOLAN, EDWARD THOMAS 3725 §103 Non-Final OA 16d overdue Pending Apr 01, 2024
18606258 TRAINING CUP Jmbh Holdings, LLC POOS, MADISON LYNN 3733 §103 Final Rejection — Pending Mar 15, 2024
18601332 AIRCRAFT ACOUSTIC PANEL WITH PERFORATED CAVITY WALLS Rohr, Inc. LUKS, JEREMY AUSTIN 2837 §102§103 Final Rejection — Pending Mar 11, 2024
18600204 AIRCRAFT ACOUSTIC PANEL WITH INTEGRATED FIRE-RESISTANT MATERIAL Pratt & Whitney Canada Corp. LUKS, JEREMY AUSTIN 2837 §103 Non-Final OA 29d Pending Mar 08, 2024

View all 99 →

Managing Getz Balich LLC's Patent Prosecution?

IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.

Start Free Trial

Frequently Asked Questions

What is Getz Balich LLC's patent allowance rate?

94.6% of resolved applications prosecuted by Getz Balich LLC were allowed, across 3,144 applications in USPTO records.

How many office actions does Getz Balich LLC average before allowance?

3.61 office actions per allowed application on average.

How many pending office actions does Getz Balich LLC have?

99 pending office actions as of October 2026, for 16 clients, before 81 examiners in 49 art units.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month