← Back to Patterson + Sheridan, L.L.P.
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19370582 | IMPROVED SEALING ON SERVICE PACKERS | Expro North Sea Limited | STEPHENSON, DANIEL P | 3676 | §103 | Non-Final OA | — | Pending | Oct 27, 2025 |
| 19474059 | PONDLESS HYDROMECHANICAL STORAGE SYSTEM | Sage Geosystems Inc. | DOUNIS, LAERT | 3746 | §102§103 | Non-Final OA | — | Pending | Oct 09, 2025 |
| 19162462 | GEOTHERMAL POWER SYSTEMS AND PROCESSES | Sage Geosystems Inc. | STANEK, KELSEY L | 3741 | §102§103 | Non-Final OA | — | Pending | Sep 05, 2025 |
| 19296598 | CRANE SYSTEMS AND PUMP MANIFOLD SYSTEMS, AND RELATED METHODS, FOR PUMPING OPERATIONS | Forum US, Inc. | GARDNER, NICOLE | 3753 | §102§103Other | Non-Final OA | — | Pending | Aug 11, 2025 |
| 19291197 | RESERVING A SECURE ADDRESS RANGE | Qualcomm Incorporated | PATEL, KAUSHIKKUMAR M | 2138 | §112DP | Non-Final OA | — | Pending | Aug 05, 2025 |
| 19272094 | PACKAGING FOR RAPIDLY INFUSING COMPOSITION | Orcosa Inc. | REYNOLDS, STEVEN ALAN | 3735 | DP | Non-Final OA | — | Pending | Jul 17, 2025 |
| 19232644 | MULTI-VECTOR RENAMING TO AVOID BANK WRITE CONFLICTS | Qualcomm Incorporated | HUISMAN, DAVID J | 2183 | §102§112Other | Non-Final OA | — | Pending | Jun 09, 2025 |
| 19225992 | LIMITED OUT-OF-ORDER EXECUTION FOR MATRIX INSTRUCTIONS | Qualcomm Incorporated | ALROBAYE, IDRISS N | 2181 | §102§103§112 | Non-Final OA | — | Pending | Jun 02, 2025 |
| 19217327 | CENTRALIZED BEAM DETERMINATION FOR FULL DUPLEX COMMUNICATIONS | Qualcomm Incorporated | PANWALKAR, VINEETA S | 2635 | §101§103DP | Non-Final OA | — | Pending | May 23, 2025 |
| 19208390 | FOLDING RIFLE STOCK | Gunwerks LLC | TILLMAN, JR, REGINALD S | 3641 | §102 | Final Rejection | — | Pending | May 14, 2025 |
| 19185776 | HYBRID PREDICTIVE AND GENERATIVE ARTIFICIAL INTELLIGENCE DECISION LOGIC FOR ORCHESTRATING AN AUTONOMOUS WORKFLOW | Westlake Corporation | OPSASNICK, MICHAEL N | 2658 | §102 | Non-Final OA | — | Pending | Apr 22, 2025 |
| 19184665 | METHODS AND APPARATUS FOR CONSTRUCTING POLAR CODES | Qualcomm Incorporated | ABRAHAM, ESAW T | 2112 | DP | Non-Final OA | — | Pending | Apr 21, 2025 |
| 19118498 | VORTEX-INDUCED VIBRATION (VIV) SUPPRESSION APPARATUS AND METHOD OF INSTALLATION | J. Ray Mcdermott, S.A. | ARMSTRONG, KYLE | 3619 | §102§103 | Non-Final OA | — | Pending | Apr 04, 2025 |
| 19093654 | DETECTION OF VIOLATIONS AND POTENTIAL ACTIONS FOR AERIAL DEVICES | Qualcomm Incorporated | PENDLETON, DIONNE | 2689 | §102§103 | Non-Final OA | — | Pending | Mar 28, 2025 |
| 19085654 | CAPACITOR AND METHOD OF ITS MANUFACTURING BASED ON OXIDATIVE POLYMERIZATION DISPERSION | Kemet Electronics Corporation | YOUNG, WILLIAM D | 1761 | §102§103§112 | Non-Final OA | — | Pending | Mar 20, 2025 |
| 19067670 | METHOD FOR PERFORMING INTRA-SIMD DATA MOVEMENT FOR LANE-WISE OPERATED SINGLE INSTRUCTION, MULTIPLE DATA (SIMD) COPROCESSORS | Qualcomm Incorporated | SNYDER, STEVEN G | 2184 | §103Other | Non-Final OA | — | Pending | Feb 28, 2025 |
| 19107791 | MULTIPHASE FREQUENCY MODULATION FOR REDUCED PEAK DEVIATION | Qualcomm Incorporated | JOHNSON, RYAN | 2836 | §102§103 | Non-Final OA | — | Pending | Feb 28, 2025 |
| 19065649 | ENHANCED REGION TAGGING | Qualcomm Incorporated | KORTMAN, CURTIS JAMES | 2139 | §101§103 | Final Rejection | — | Pending | Feb 27, 2025 |
| 18999000 | POWER RESETTING FOR UNIFIED TRANSMISSION CONFIGURATION INDICATOR | Qualcomm Incorporated | VO, NGUYEN THANH | 2646 | §102 | Non-Final OA | — | Pending | Jan 27, 2025 |
| 19019882 | SPATIOTEMPORAL ATTENTION IN GENERATIVE MACHINE LEARNING MODELS | Qualcomm Incorporated | BROWN, SHEREE N | 2612 | §103 | Non-Final OA | — | Pending | Jan 14, 2025 |
| 18994127 | A COMPUTER-IMPLEMENTED METHOD OF DETERMINING IF A MEDICAL DATA SAMPLE REQUIRES REFERRAL FOR INVESTIGATION FOR A DISEASE | University Of Liverpool | HAMILTON, MATTHEW L | 3682 | §101§102§103 | Non-Final OA | — | Pending | Jan 14, 2025 |
| 18992542 | REPORTING DESIGN FOR DOPPLER DOMAIN CHANNEL STATE INFORMATION | Qualcomm Incorporated | KHAN, MEHMOOD B | 2463 | §102§103§112 | Non-Final OA | — | Pending | Jan 08, 2025 |
| 19009559 | SOUNDING AND CSI FEEDBACK FOR COORDINATED BEAMFORMING | Qualcomm Incorporated | VLAHOS, SOPHIA | 2633 | §102§103 | Non-Final OA | — | Pending | Jan 03, 2025 |
| 19005813 | BATTERY HOT SWAPPING | Qualcomm Incorporated | TRAN, NGUYEN | §103 | Non-Final OA | — | Pending | Dec 30, 2024 | |
| 18989461 | PARTIAL SUM MANAGEMENT AND RECONFIGURABLE SYSTOLIC FLOW ARCHITECTURES FOR IN-MEMORY COMPUTATION | Qualcomm Incorporated | KIM, SEOKJIN | 2845 | §102§103 | Non-Final OA | — | Pending | Dec 20, 2024 |
| 18989816 | EFFICIENT SEARCHING OF STRUCTURED DATA USING MACHINE LEARNING MODELS | Qualcomm Incorporated | ALMANI, MOHSEN | 2159 | §102§103 | Non-Final OA | — | Pending | Dec 20, 2024 |
| 18986451 | MICRO-ACOUSTIC MULTIBAND FILTENNA | Qualcomm Incorporated | VO, NGUYEN THANH | 2646 | §103 | Non-Final OA | — | Pending | Dec 18, 2024 |
| 18976008 | SHARED VOLTAGE RAIL FRAMEWORK FOR HETEROGENEOUS CPU CLUSTER | Qualcomm Incorporated | REHMAN, MOHAMMED H | 2176 | §103 | Final Rejection | — | Pending | Dec 10, 2024 |
| 18975422 | SIDELINK POSITIONING VIA MESSAGING BETWEEN WIRELESS NODES | Qualcomm Incorporated | LEE, SIU M | Other | Non-Final OA | — | Pending | Dec 10, 2024 | |
| 18975919 | CORE NETWORK VISIBLE QUALITY OF EXPERIENCE (QOE) MEASUREMENTS | Qualcomm Incorporated | MENSAH, PRINCE AKWASI | 2474 | §102§103 | Non-Final OA | — | Pending | Dec 10, 2024 |
| 18972487 | INTRODUCTION DEVICE INCLUDING AN ELECTROACTIVE TIP ON A GUIDEWIRE | BOARD OF REGENTS OF THE UNIVERSITY OF TEXAS SYSTEM | HENSON, DEVIN B | §103§112 | Non-Final OA | — | Pending | Dec 06, 2024 | |
| 18968863 | METHODS AND APPARATUS FOR COMPACTLY DESCRIBING LIFTED LOW-DENSITY PARITY-CHECK (LDPC) CODES | Qualcomm Incorporated | TORRES, JOSEPH D | 2112 | DP | Non-Final OA | — | Pending | Dec 04, 2024 |
| 18966260 | ABSORBENT PAD FOR A GARMENT AND A GARMENT COMPRISING THE ABSORBENT PAD | Mas Innovation (Private) Limited | STEPHENS, JACQUELINE F | 3781 | §102§103 | Non-Final OA | — | Pending | Dec 03, 2024 |
| 18871421 | POLAR CODE CONSTRUCTION AND CONFIGURATION FOR BLOCK-CODE-BASED SHAPING | Qualcomm Incorporated | PERRY, VICTOR NICHOLAS | 2111 | §103 | Non-Final OA | 36d | AI Ready | Dec 03, 2024 |
| 18967151 | PRIORITIZING COMMANDS IN A COMMAND QUEUE FOR A SYSTEM MEMORY MANAGEMENT UNIT | Qualcomm Incorporated | BLUST, JASON W | 2132 | §103 | Final Rejection | — | Pending | Dec 03, 2024 |
| 18957340 | MICROPHONE ASSEMBLY AND SYSTEM ADAPTED TO FORM CONTINUOUSLY VARIABLE POLAR PATTERNS | Logitech Europe S.A. | KANG, ANNABELLE | 2695 | §102§103Other | Non-Final OA | — | Pending | Nov 22, 2024 |
| 18868656 | SPLIT MAIN AND PREDISTORTION SIGNAL PATHS WITH SEPARATE DIGITAL-TO-ANALOG CONVERTERS FOR SUPPORTING DIGITAL PREDISTORTION IN TRANSMITTERS | Qualcomm Incorporated | DEPPE, BETSY LEE | 2633 | §102§103§112 | Final Rejection | 28d | AI Ready | Nov 22, 2024 |
| 18867777 | SECURE WIRELESS TRANSMISSION MECHANISMS | Qualcomm Incorporated | AVERY, JEREMIAH L | 2431 | §102§103 | Final Rejection | — | AI Ready | Nov 20, 2024 |
| 18952502 | OPERATING FREQUENCY ADJUSTMENT FOR MISMATCHED POWER SUPPLY CIRCUITS | Qualcomm Incorporated | TIKU, SISAY G | 2838 | §102§103 | Final Rejection | — | Pending | Nov 19, 2024 |
| 18864453 | NETWORK-ASSISTED MOBILITY FOR NETWORK-BASED AVIATION SERVICES | Qualcomm Incorporated | VO, DON NGUYEN | 2634 | §102 | Non-Final OA | — | Pending | Nov 08, 2024 |
| 18864424 | PAYLOAD AND TRANSMISSION OF LOW POWER WAKE-UP SIGNAL FOR PAGING INDICATION | Qualcomm Incorporated | CHOI, HAESHIL JESSICA | 2469 | §103§112 | Non-Final OA | — | Pending | Nov 08, 2024 |
| 18864461 | MEASUREMENT ALIGNMENT IN IDLE AND INACTIVE STATES | Qualcomm Incorporated | TILAHUN, ALAZAR | 2424 | §102§103 | Non-Final OA | — | Pending | Nov 08, 2024 |
| 18939177 | AVOIDING PING-PONG BETWEEN DIFFERENT ANTENNA TUNING CONFIGURATIONS | Qualcomm Incorporated | VO, NGUYEN THANH | 2646 | §102§103Other | Non-Final OA | — | Pending | Nov 06, 2024 |
| 18932345 | MOBILITY DURING SMALL DATA TRANSMISSION (SDT) PROCEDURE | Qualcomm Incorporated | GELIN, JEAN ALLAND | 2643 | §102§103 | Non-Final OA | — | Pending | Oct 30, 2024 |
| 18930633 | IDLE/INACTIVE MODE PROCEDURES FOR REDUCED CAPABILITY USER EQUIPMENT | Qualcomm Incorporated | GUADALUPE CRUZ, AIXA AMYR | 2466 | §102§103 | Non-Final OA | — | Pending | Oct 29, 2024 |
| 18930962 | MICROPHONE ASSEMBLY ADAPTED TO FORM CONTINUOUSLY VARIABLE POLAR PATTERNS | Logitech Europe S.A. | KANG, ANNABELLE | 2695 | §102§103 | Non-Final OA | — | Pending | Oct 29, 2024 |
| 18860512 | TIME DIVISION MULTIPLE ACCESS (TDMA) MULTI-RADAR CO-EXISTENCE WITH GROUP-BASED RESOURCE ALLOCATION | Qualcomm Incorporated | HENSON, BRANDON JAMES | 3646 | §102§103§112 | Non-Final OA | — | Pending | Oct 25, 2024 |
| 18920752 | METHODS AND DEVICES FOR A CONFIGURABLE MEDICAL INFORMATION PLATFORM | The Regents of the University of Colorado | YEN, SYLING | 3687 | §103 | Non-Final OA | — | Pending | Oct 18, 2024 |
| 18856906 | SIDELINK KIND PASSIVE COMMUNICATIONS | Qualcomm Incorporated | LOPATA, ROBERT J | 2471 | §102 | Non-Final OA | — | Pending | Oct 15, 2024 |
| 18857175 | PERIODIC POWER HEADROOM REPORT FOR UPLINK CARRIER AGGREGATION | Qualcomm Incorporated | BILODEAU, DAVID | 2648 | §102§112 | Non-Final OA | — | Pending | Oct 15, 2024 |
| 18856910 | RANDOM ACCESS CHANNEL PROCEDURE IN INTER-BAND CARRIER AGGREGATION WITH SYNCHRONIZATION SIGNAL BLOCK-LESS CARRIER | Qualcomm Incorporated | TRAN, MONG THUY THI | 2645 | §103§112 | Non-Final OA | — | Pending | Oct 15, 2024 |
| 18856833 | DIRECTIONAL DRILLING DEVICE | Kormee B.V. | CARROLL, DAVID P. | 3678 | §112 | Non-Final OA | 84d | Pending | Oct 14, 2024 |
| 18912126 | SUPPORT SYSTEM FOR DOUBLE-WALL LIQUID HYDROGEN STORAGE VESSEL | Cb&I Sts Delaware LLC | ORTIZ, RAFAEL ALFREDO | 3736 | §102§103 | Final Rejection | 2d overdue | Pending | Oct 10, 2024 |
| 18854633 | TRANSMIT SPUR MITIGATION | Qualcomm Incorporated | KUNTZ, CURTIS A | 2646 | §103 | Final Rejection | — | Pending | Oct 07, 2024 |
| 18907970 | BENDING FIXTURE | ULTRA CLEAN HOLDINGS, INC. | MORENO HERNANDEZ, JERZI H | 1743 | §102§103§112 | Non-Final OA | — | Pending | Oct 07, 2024 |
| 18854479 | A METHOD TO PRUNE CELL MEASUREMENT REPORTS | Qualcomm Incorporated | VU, HOANG-CHUONG Q | 2476 | §103§112 | Non-Final OA | — | Pending | Oct 04, 2024 |
| 18854034 | SIDELINK UNLICENSED (SL-U) RESOURCE SELECTION FOR LISTEN-BEFORE-TALK (LBT) PROCEDURE | Qualcomm Incorporated | JEAN BAPTISTE, JERRY T | 2481 | §102§103 | Non-Final OA | — | Pending | Oct 03, 2024 |
| 18905073 | SYSTEMS AND METHODS OF MANAGING COMMUNICATION ENDPOINTS | Inemsoft, Inc. | MARCELO, MELVIN C | 2463 | §101 | Non-Final OA | — | Pending | Oct 02, 2024 |
| 18853285 | QUALITY OF SERVICE (QOS) DIFFERENTIATION IN USER-PLANE PROCEDURES | Qualcomm Incorporated | SALL, EL HADJI MALICK | 2457 | §103 | Non-Final OA | 12d | AI Ready | Oct 01, 2024 |
| 18852351 | LAYER 2 (L2) PROCEDURES FOR APPLICATION DATA UNIT (ADU) BASED SCHEDULING | Qualcomm Incorporated | HO, DUC CHI | 2465 | §102§103§112 | Non-Final OA | — | Pending | Sep 27, 2024 |
| 18852154 | RECONFIGURABLE INTELLIGENT SURFACE REFERENCE SIGNALS | Qualcomm Incorporated | COSME, NATASHA W | §102§103 | Non-Final OA | — | Pending | Sep 27, 2024 | |
| 18894117 | SENSING-BASED PREDICTIVE THERMAL MANAGEMENT | Qualcomm Incorporated | NDIAYE, CHEIKH T | 2447 | §103 | Non-Final OA | — | Pending | Sep 24, 2024 |
| 18894666 | HYBRID BUCK CONVERTER | Qualcomm Incorporated | TRAN, NGUYEN | 2838 | §102§103Other | Final Rejection | — | Pending | Sep 24, 2024 |
| 18849969 | EXPEDITED MOBILITY BASED ON DEDICATED FREQUENCY PRIORITY LIST | Qualcomm Incorporated | VO, DON NGUYEN | 2634 | §103 | Non-Final OA | — | Pending | Sep 23, 2024 |
| 18892911 | DYNAMIC ADAPTIVE BIASING FOR AMPLIFICATION CIRCUITRY | Qualcomm Incorporated | AHN, SUNG S | 2631 | §103 | Non-Final OA | — | Pending | Sep 23, 2024 |
| 18849816 | METHOD OF FORMING A COMPOSITE SUBSTRATE | Zoltan Czigler | PATWARDHAN, ABHISHEK A | 1746 | §103§112 | Non-Final OA | — | Pending | Sep 23, 2024 |
| 18891993 | PEAK CURRENT DETECTION FOR SELECTING BETWEEN MEMORY POWER SUPPLY RAILS | Qualcomm Incorporated | DEROSE, VOLVICK | 2176 | §102§103 | Non-Final OA | — | Pending | Sep 20, 2024 |
| 18891945 | COMBUSTION SYSTEM USING OXYGEN AND HYDROGEN | Great Southern Flameless, LLC | SHIRSAT, VIVEK K | 3762 | §103 | Non-Final OA | — | Pending | Sep 20, 2024 |
| 18890565 | MICRO-ACOUSTIC FILTENNA | Qualcomm Incorporated | PEREZ, ANGELICA | 2845 | §102§103 | Non-Final OA | — | Pending | Sep 19, 2024 |
| 18889714 | SERVICE-BASED TRANSMIT ENERGY ALLOCATION AMONG DIFFERENT RADIOS | Qualcomm Incorporated | VO, NGUYEN THANH | 2646 | §102§103 | Non-Final OA | — | Pending | Sep 19, 2024 |
| 18888555 | CHANNEL SELECTION METHODS FOR MULTIPLE PRIMARY CHANNELS | Qualcomm Incorporated | GENACK, MATTHEW W | 2645 | §103 | Non-Final OA | — | Pending | Sep 18, 2024 |
| 18886681 | ENHANCEMENT FOR SINGLE-TRANSMIT RECEIVE POINT (S-TRP) SEPARATE UPLINK POWER CONTROL AND UNIFIED TRANSMISSION CONFIGURATION INDICATOR (TCI) STATES FOR SUB-BAND FULL DUPLEX (SBFD) AND NON-SBFD SYMBOLS | Qualcomm Incorporated | LEMA LEMOS, LUIS GUILLERMO | 2419 | §103 | Non-Final OA | — | Pending | Sep 16, 2024 |
| 18886946 | UPLINK CONTROL INFORMATION MULTIPLEXING ON PHYSICAL UPLINK SHARED CHANNELS IN NEW RADIO | Qualcomm Incorporated | SCHEIBEL, ROBERT C | 2467 | §102§103 | Non-Final OA | — | Pending | Sep 16, 2024 |
| 18845329 | LIMITING OVERALL POWER OF CONCURRENT ACTIVITIES ACROSS PROCESSORS | Qualcomm Incorporated | LU, WILLIAM | 2624 | §102§103 | Non-Final OA | — | Pending | Sep 09, 2024 |
| 18844157 | MACHINE LEARNING MODEL PERFORMANCE MONITORING REPORTING | Qualcomm Incorporated | CHEN, CAI Y | 2425 | §102 | Final Rejection | 13d | AI Ready | Sep 05, 2024 |
| 18825932 | DEMODULATION REFERENCE SIGNAL (DMRS) PATTERNS FOR CROSS START AND LENGTH INDICATOR VALUE (SLIV)/SLOT COMBINING | Qualcomm Incorporated | HOLLAND, JENEE LAUREN | 2469 | §102§103 | Non-Final OA | — | Pending | Sep 05, 2024 |
| 18824803 | INDICATION OF A PRESENCE OF A FIRST FRAME VIA A FIELD IN A SECOND FRAME | Qualcomm Incorporated | KAYAL, DAVID M | 2464 | §102§103 | Non-Final OA | — | Pending | Sep 04, 2024 |
| 18821896 | TOKEN SELECTION IN TRANSFORMER NEURAL NETWORKS FOR EFFICIENT INFERENCING | Qualcomm Incorporated | KWON, JUN | 2127 | §101§103§112 | Non-Final OA | — | Pending | Aug 30, 2024 |
| 18817935 | NON-VACUUM CARGO CONTAINMENT SYSTEMS | Cb&I Sts Delaware LLC | CASTELLANO, STEPHEN J | 3733 | §103 | Final Rejection | 78d overdue | Pending | Aug 28, 2024 |
| 18842305 | A MECHANISM TO ENABLE SERVICE INTERACTION WITH EXTERNAL FUNCTIONS FOR THE SUPPORT OF NETWORK-BASED AVIATION SERVICES | Qualcomm Incorporated | RAZA, MUHAMMAD A | 2449 | §103 | Final Rejection | — | Pending | Aug 28, 2024 |
| 18841980 | MACHINE LEARNING MODEL MANAGEMENT AND ASSISTANCE INFORMATION | Qualcomm Incorporated | DANG, PHILIP | §102§103§112 | Non-Final OA | — | Pending | Aug 27, 2024 | |
| 18815728 | TRANSMISSION RECEIVE POINT (TRP)-SPECIFIC BEAM FAILURE RECOVERY REQUEST (BFRQ) | Qualcomm Incorporated | SWEET, LONNIE V | §102Other | Non-Final OA | — | Pending | Aug 26, 2024 | |
| 18814262 | PRIMARY CHANNEL INDICATION FOR NON-PRIMARY CHANNEL ACCESS (NPCA) COMMUNICATIONS | Qualcomm Incorporated | MOHEBBI, KOUROUSH | 2471 | §102§103 | Non-Final OA | — | Pending | Aug 23, 2024 |
| 18841295 | A MECHANISM TO ENABLE RADIO ACCESS NETWORK CONFIGURATION FOR THE SUPPORT OF NETWORK-BASED AVIATION SERVICES | Qualcomm Incorporated | HSU, BAILOR CHIA-JONG | 2461 | §102 | Non-Final OA | — | Pending | Aug 23, 2024 |
| 18812582 | RANDOM ACCESS CHANNEL PROCEDURES IN SUBBAND FULL DUPLEX NETWORKS | Qualcomm Incorporated | COSME, NATASHA W | 2429 | §102 | Final Rejection | — | Pending | Aug 22, 2024 |
| 18810161 | ACCESS PROCEDURE OF SMART DIRECTIONAL REPEATERS | Qualcomm Incorporated | LAM, YEE F | 2465 | §103§112 | Non-Final OA | — | Pending | Aug 20, 2024 |
| 18809774 | WAKEUP SIGNAL (WUS) TRIGGERED UPLINK BEAM REPORTS | Qualcomm Incorporated | HO, DUC CHI | 2465 | §103 | Non-Final OA | — | Pending | Aug 20, 2024 |
| 18810019 | PUMP SYSTEM | Forum US, Inc. | FINK, THOMAS ANDREW | 3746 | §103§112 | Final Rejection | 76d | Pending | Aug 20, 2024 |
| 18799192 | SUBBAND FULL DUPLEX (SBFD) TRANSMISSION AND RECEPTION ACROSS SBFD AND NON-SBFD SYMBOLS | Qualcomm Incorporated | ETIENNE, CAMILLE JORDAN | 2464 | §102§103 | Non-Final OA | — | Pending | Aug 09, 2024 |
| 18793532 | WORKBENCH SYSTEM | Automata Technologies Limited | BESLER, CHRISTOPHER JAMES | 3725 | §102§103§112 | Non-Final OA | — | Pending | Aug 02, 2024 |
| 18835623 | PERIODIC BEAM SWITCHING REPORT FOR HIGH ALTITUDE PLATFORM STATIONS | Qualcomm Incorporated | CHANG, JUNGWON | 2454 | §103 | Non-Final OA | — | Pending | Aug 02, 2024 |
| 18833740 | UE DISCOVERY FOR UE COOPERATION | Qualcomm Incorporated | ALAWDI, SHEHAB A | 2466 | §102 | Non-Final OA | — | Pending | Jul 26, 2024 |
| 18782501 | VIBRATO MECHANISM | Taylor-Listug, Inc. D/B/A Taylor Guitars | LOCKETT, KIMBERLY R | 2837 | DP | Non-Final OA | — | Pending | Jul 24, 2024 |
| 18781348 | PROTECTION OF SEQUENCE NUMBERS IN AUTHENTICATION AND KEY AGREEMENT PROTOCOL | Qualcomm Incorporated | LYNCH, SHARON S | 2438 | §103 | Final Rejection | — | Pending | Jul 23, 2024 |
| 18775956 | URLLC INDICATIONS WITH MULTI-TRANSMISSION GRANTS | Qualcomm Incorporated | ACOLATSE, KODZOVI | 2478 | §102Other | Non-Final OA | — | Pending | Jul 17, 2024 |
| 18775792 | OF ANODE LEAD ATTACHMENT FOR SOLID CATHODE ELECTROLYTIC CAPACITOR | Kemet Electronics Corporation | TORRES, TIMOTHY JOSEPH | 2847 | §102§103§112 | Non-Final OA | — | Pending | Jul 17, 2024 |
| 18767952 | TRANSMISSION OPPORTUNITY HANDLING FOR MULTI-LINK COMMUNICATIONS | Qualcomm Incorporated | PATIDAR, SUDESH M | 2415 | §102§103Other | Non-Final OA | — | Pending | Jul 09, 2024 |
| 18727019 | POLYIMIDAZOLIUM-BASED CATIONIC ANTIMICROBIAL POLYMERS FOR NOVEL MASTITIS PROPHYLACTIC SOLUTIONS | Massachusetts Institute Of Technology | HOLLOMAN, NANNETTE | 1612 | §103 | Final Rejection | — | Pending | Jul 05, 2024 |
| 18755469 | PROCESS-AWARE BOOT-UP | Qualcomm Incorporated | PHAN, RAYMOND NGAN | 2175 | §103Other | Non-Final OA | 6d | AI Ready | Jun 26, 2024 |
| 18751740 | TWO-STEP RANDOM ACCESS CHANNEL (RACH) PROCEDURE TO FOUR-STEP RACH PROCEDURE FALLBACK | Qualcomm Incorporated | KAO, JUTAI | Other | Final Rejection | — | Pending | Jun 24, 2024 | |
| 18750413 | CRYOPUMPING-RESISTANT LH2 STORAGE VESSEL | Cb&I Sts Delaware LLC | MENGESHA, WEBESHET | 3763 | §103§112 | Final Rejection | 41d | Pending | Jun 21, 2024 |
| 18751090 | CHECK VALVE | Forum US, Inc. | GARDNER, NICOLE | 3753 | §103 | Final Rejection | 5d | Pending | Jun 21, 2024 |
| 18748963 | CRYOPUMPING-RESISTANT LH2 STORAGE VESSEL | Cb&I Sts Delaware LLC | ELOSHWAY, NIKI MARINA | 3736 | §103 | Final Rejection | 34d | Pending | Jun 20, 2024 |
| 18722396 | METHOD OF BACTERIAL IDENTIFICATION AND TESTING OF BACTERIUM RESISTANT TO ONE OR MORE ANTIBIOTICS | Nanyang Technological University | CRUM, MARY ABOU NADER | 1657 | §103§112 | Final Rejection | — | Pending | Jun 20, 2024 |
| 18721778 | PROCESS FOR RECOVERING AN ACETONITRILE | De Neef Chemical Processing N.V. | PILCHER, JONATHAN L | 1772 | §112 | Non-Final OA | — | Pending | Jun 19, 2024 |
| 18743939 | CODE BLOCK (CB) CYCLIC REDUNDANCY CHECK (CRC) BITS INSERTION | Qualcomm Incorporated | MERED, HABTE | 2474 | §102§103 | Final Rejection | — | Pending | Jun 14, 2024 |
| 18718653 | TIME DIVISION MULTIPLEXED RESOURCE SELECTION CODEBOOK | Qualcomm Incorporated | VAN ROIE, JUSTIN T | 2419 | §102§103 | Final Rejection | — | Pending | Jun 11, 2024 |
| 18739042 | CONTAINERS FOR STORING AND TRANSMITTING REPRESENTATIONS OF CUSTOMIZABLE PRODUCTS | Zazzle Inc. | MISIASZEK, MICHAEL | 3688 | §102§103 | Final Rejection | 34d | Pending | Jun 10, 2024 |
| 18737276 | ARTIFICIAL INTELLIGENCE WORKLOAD SCHEDULING | Qualcomm Incorporated | CULLIP, LUKE WILLIAM | 2194 | §101§102§103 | Non-Final OA | — | Pending | Jun 07, 2024 |
| 18737823 | FREQUENCY MODULATED CONTINUOUS WAVE BASED SYNCHRONIZATION SIGNAL | Qualcomm Incorporated | PARK, CHONGSUH | 2478 | §102§103 | Final Rejection | — | Pending | Jun 07, 2024 |
| 18737381 | ADAPTIVE DRIVE CONTROL FOR SWITCHING REGULATORS | Qualcomm Incorporated | NOVAK, PETER MICHAEL | 2838 | §103 | Non-Final OA | 22d | AI Ready | Jun 07, 2024 |
| 18717272 | REPORTING CHANNEL STATE INFORMATION FOR RESOURCES WITH DIFFERENT PERIODICITIES | Qualcomm Incorporated | DECKER, CASSANDRA L | 2466 | §102§103 | Final Rejection | — | Pending | Jun 06, 2024 |
| 18715624 | USER EQUIPMENT UPLINK ANTENNA PANEL SWITCHING FOR SIMULTANEOUS UPLINK TRANSMISSION | Qualcomm Incorporated | ANSARI, NAJEEBUDDIN | 2463 | §103 | Final Rejection | — | Pending | May 31, 2024 |
| 18714036 | ADAPTIVE SCHEDULING FOR EXECUTING MACHINE LEARNING OPERATIONS IN A MULTIPROCESSOR COMPUTING DEVICE | Qualcomm Incorporated | SUN, CHARLIE | 2198 | §101§103 | Non-Final OA | — | Pending | May 28, 2024 |
| 18713687 | RECONFIGURABLE DECLARATIVE GENERATION OF BUSINESS DATA SYSTEMS FROM A BUSINESS ONTOLOGY, INSTANCE DATA, ANNOTATIONS AND TAXONOMY | Graph Research Labs Limited | THAI, HANH B | 2163 | §101 | Non-Final OA | 71d | Pending | May 27, 2024 |
| 18713580 | PHARMACEUTICAL COMPOSITION CONTAINING PLATINUM DRUGS OR PLATINUM DRUG COCRYSTALS, AND USE THEREOF | Medoncare Pharmaceutical Co., Ltd. | CHICKS, ASHLI ARIANA | 1626 | §103§112 | Non-Final OA | — | Pending | May 24, 2024 |
| 18673516 | ABSORPTION MEDIUM AND METHOD FOR REMOVING CARBON DIOXIDE FROM COMBUSTION EXHAUST GAS | Eog Resources, Inc. | JONES, CHRISTOPHER P | 1776 | §103DP | Final Rejection | — | Pending | May 24, 2024 |
| 18674061 | MULTI-BAND BANDWIDTH PART (BWP) FOR A VIRTUAL CELL | Qualcomm Incorporated | CHOWDHURY, MOHAMMED SHAMSUL | 2467 | §103 | Final Rejection | — | Pending | May 24, 2024 |
| 18673132 | SUPPLEMENTARY PHYSICAL UPLINK CONTROL CHANNEL | Qualcomm Incorporated | WEISSBERGER, LUNA T | 2415 | §103 | Final Rejection | — | Pending | May 23, 2024 |
| 18712544 | TANDEM MOLECULAR FLUORESCENCE REPORTERS FOR DETECTION OF TUMOR-INFILTRATING LEUKOCYTES | Nanyang Technological University | DICKINSON, PAUL W | 1618 | §112 | Non-Final OA | — | Pending | May 22, 2024 |
| 18670434 | PREDICTIVE TRACKING FOR ANTENNA SWITCHING AND BEAM SWITCHING IN EXTENDED REALITY | Qualcomm Incorporated | HUA, QUAN M | 2645 | §103 | Final Rejection | — | Pending | May 21, 2024 |
| 18670473 | HYPERBARIC HYPER-HYPO THERMAL THERAPY SYSTEM | Life Express LLC | BUGG, PAIGE KATHLEEN | 3785 | §103 | Non-Final OA | — | Pending | May 21, 2024 |
| 18667988 | ASYNCHRONOUS OUTPUT GENERATION IN GENERATIVE ARTIFICIAL INTELLIGENCE MODELS | Qualcomm Incorporated | ANDERSON, SCOTT C | 3694 | §103 | Non-Final OA | — | Pending | May 17, 2024 |
| 18664531 | QUANTIZATION-AWARE TRAINING FOR MACHINE LEARNING MODEL ADAPTERS | Qualcomm Incorporated | ZENG, WENWEI | 2146 | §101§103 | Non-Final OA | — | Pending | May 15, 2024 |
| 18662598 | RETRIEVAL AUGMENTED GENERATION IN ARTIFICIAL INTELLIGENCE MODELS | Qualcomm Incorporated | DANG, PHILIP | 2488 | §103 | Non-Final OA | — | Pending | May 13, 2024 |
| 18662303 | FREQUENCY-DOMAIN MACHINE LEARNING MODEL ADAPTERS | Qualcomm Incorporated | THAI, JASMINE THANH | 2129 | §101§103§112 | Non-Final OA | — | Pending | May 13, 2024 |
| 18661249 | PROCESSES FOR CONVERTING C4 FEEDS TO ISOBUTYLENE, POLYISOBUTYLENE, OR DERIVATIVES THEREOF | Ntp Tec, LLC | TESKIN, FRED M | 1762 | §102§103§112Other | Non-Final OA | — | Pending | May 10, 2024 |
| 18708764 | LOCATION REPORTING PROCEDURES COMPRISING HEIGHT INFORMATION FOR AERIAL USER EQUIPMENT | Qualcomm Incorporated | PATEL, MAHENDRA R | 2645 | §103 | Final Rejection | — | Pending | May 09, 2024 |
| 18708948 | WEIGHT OSCILLATION MITIGATION DURING MACHINE LEARNING | Qualcomm Incorporated | HONORE, EVEL NMN | 2142 | §101§102§103 | Non-Final OA | — | Pending | May 09, 2024 |
| 18654661 | LOW-DROPOUT REGULATOR CIRCUIT WITH ADAPTIVE TRANSISTOR WELL SWITCHING | Qualcomm Incorporated | PEREZ, BRYAN REYNALDO | 2838 | §103 | Non-Final OA | 56d | AI Ready | May 03, 2024 |
| 18653804 | LAYER 1 (L1) AND LAYER 2 (L2) BASED MOBILITY PROCEDURES | Qualcomm Incorporated | HUYNH, NAM TRUNG | 2647 | §103 | Non-Final OA | — | Pending | May 02, 2024 |
| 18705906 | ADAPTIVE RADAR RESOURCE POOL FOR INTERFERENCE-FREE MULTI-RADAR CO-EXISTENCE | Qualcomm Incorporated | ULYSSE, JAEL M | 2428 | §103 | Non-Final OA | — | Pending | Apr 29, 2024 |
| 18645115 | TIME DIVISION DUPLEXING DOWNLINK-UPLINK CONFIGURATION IMPROVEMENTS | Qualcomm Incorporated | NGUYEN, THUONG | 2416 | §103 | Non-Final OA | — | Pending | Apr 24, 2024 |
| 18640330 | LIGHTWEIGHT LIVESTOCK EAR TAG DEVICE HOUSING | Jvd, Inc. | LEWIS, JUSTIN V | 3637 | §102§103 | Non-Final OA | — | Pending | Apr 19, 2024 |
| 18641043 | USER FEEDBACK AND CONTENT ADAPTATION FOR INFORMATION ASSIMILATION | Logitech Europe S.A. | HUERTA, ALEXANDER Q | 2425 | §102§103 | Final Rejection | — | Pending | Apr 19, 2024 |
| 18631594 | CURRENT-DRIVEN LOOPBACK CALIBRATION | Qualcomm Incorporated | HUANG, WEN WU | 2648 | §102§103 | Non-Final OA | — | Pending | Apr 10, 2024 |
| 18630902 | ENHANCED SCHEDULE REQUEST FOR SKIPPED CHANNEL STATE INFORMATION | Qualcomm Incorporated | ASANBAYEV, OLEG | 6221 | §103 | Non-Final OA | — | Pending | Apr 09, 2024 |
| 18697116 | PROGRAMMABLE SELECTIVE ACYLATION OF POLYOLS | Nanyang Technological University | MILLER, DALE R | 1693 | §102§103 | Non-Final OA | — | Pending | Mar 29, 2024 |
| 18697222 | METHOD FOR CONTROLLING A PLURALITY OF HAPTIC ACTUATORS | Actronika | LITTLEJOHN JR, MANCIL H | 2685 | §103 | Non-Final OA | 46d | Pending | Mar 29, 2024 |
| 18620474 | MEASUREMENT APPLICATION DEVICE, SIGNAL FILTER DEVICE, AND METHOD | Rohde & Schwarz GmbH & Co. Kg | DINH, LYNDA | 2857 | §101§103 | Non-Final OA | — | Pending | Mar 28, 2024 |
| 18695731 | PRECODING COMBINERS FOR RECONFIGURABLE INTELLIGENT SURFACE (RIS) AIDED COMMUNICATIONS | Qualcomm Incorporated | PANNELL, MARK G | 2642 | §102§103 | Final Rejection | — | Pending | Mar 26, 2024 |
| 18695719 | CONFIGURABLE ANTENNA RESOURCES FOR BACKHAUL AND ACCESS WITH UNIFORM CIRCULAR ARRAY PANEL | Qualcomm Incorporated | SOHRAB, MALICK ARIF | 2414 | §103§112 | Non-Final OA | — | Pending | Mar 26, 2024 |
| 18615432 | Electrically Functional Circuit Board Core Material | Kemet Electronics Corporation | TSO, STANLEY | 2847 | §103 | Final Rejection | — | Pending | Mar 25, 2024 |
| 18610784 | DYNAMICALLY CONFIGURABLE POWER CONVERSION TOPOLOGY | Qualcomm Incorporated | RIVERA-PEREZ, CARLOS O | 2838 | §103 | Final Rejection | 16d | AI Ready | Mar 20, 2024 |
| 18608563 | CONVERSION OF NEURAL NETWORKS BETWEEN DIFFERENT MEMORY LAYOUTS | Qualcomm Incorporated | HOANG, MICHAEL H | 2122 | §102§103 | Non-Final OA | — | Pending | Mar 18, 2024 |
| 18606951 | SYMBOL-LEVEL BASED LOG LIKELIHOOD RATIO (LLR) COMPANDING AND DECOMPANDING | Qualcomm Incorporated | SCHEIBEL, ROBERT C | 2467 | §103 | Non-Final OA | — | Pending | Mar 15, 2024 |
| 18606211 | LOW-DROPOUT (LDO) REGULATOR WITH AGGRESSOR CURRENT CANCELLATION | Qualcomm Incorporated | SHAW, LAUREN ASHLEY | 2838 | §102§103 | Non-Final OA | — | AI Ready | Mar 15, 2024 |
| 18605459 | USER EQUIPMENT CAPABILITY HANDLING FOR PRE-PAGING | Qualcomm Incorporated | DWYER, MATTHEW JAMES | 2649 | §103 | Non-Final OA | — | Pending | Mar 14, 2024 |
| 18691686 | MYCOBACTERIUM ABSCESSUS GROWTH INHIBITOR AND MODEL | Nanyang Technological University | REILLY, SOPHIA JANE | 1627 | §103§112 | Non-Final OA | — | Pending | Mar 13, 2024 |
| 18599741 | AFFORDANCE-BASED CONTROL SYSTEM | Qualcomm Incorporated | EL SAYAH, MOHAMAD O | 3658 | §103 | Non-Final OA | 16d overdue | Pending | Mar 08, 2024 |
| 18583291 | EFFICIENT ADAPTATION OF MACHINE LEARNING MODELS USING RANDOM MATRICES | Qualcomm Technologies, Inc. | ARDALE, HAYDEN YOUNG | 2122 | §101§102§103 | Non-Final OA | — | Pending | Feb 21, 2024 |
| 18583549 | ACOUSTIC IMAGING USING COLLOCATED PRESSURE AND PRESSURE GRADIENT DATA MEASUREMENTS | Exion Technologies, Inc. | ISLAM, MOHAMMAD K | 2857 | §101§102 | Non-Final OA | — | Pending | Feb 21, 2024 |
| 18583533 | CONSTELLATION FEATURE MATCHING FOR MACHINE LEARNING | Qualcomm Incorporated | MARCELINO HERNAND, JASMIN | 2676 | §103 | Non-Final OA | — | Pending | Feb 21, 2024 |
| 18685100 | CELL WITH COMBINED NONCONTIGUOUS SPECTRUMS | Qualcomm Incorporated | THOMPSON, JR, OTIS L | 2477 | §103 | Final Rejection | 30d overdue | AI Ready | Feb 20, 2024 |
| 18444410 | BORON-DOPED COBALT/COBALT NITRIDE INTERFACIAL CATALYSTS, PROCESSES FOR MAKING, AND USES THEREOF | UTAH STATE UNIVERSITY | SHERMAN, ERIC SCOTT | 1736 | §102 | Non-Final OA | — | Pending | Feb 16, 2024 |
| 18441527 | SYNCHRONIZATION SIGNAL BLOCK-BASED INTERFERENCE MEASUREMENT | Qualcomm Incorporated | RIVAS, RAUL | 2471 | §103 | Final Rejection | 28d | AI Ready | Feb 14, 2024 |
| 18441695 | Polymer Capacitors with Improved Reliability | Kemet Electronics Corporation | FERGUSON, DION | 2847 | §102§103 | Final Rejection | 29d | Pending | Feb 14, 2024 |
| 18437055 | INITIAL ACCESS WITH FREQUENCY-TRANSLATING NETWORK CONTROLLED REPEATER | Qualcomm Incorporated | SCIACCA, SCOTT M | 2478 | §103 | Final Rejection | 41d | AI Ready | Feb 08, 2024 |
| 18429585 | SELF-IMPROVING ARTIFICIAL INTELLIGENCE PROGRAMMING | Qualcomm Technologies, Inc. | LAHAM BAUZO, ALVARO SALIM | 2146 | §101§103 | Non-Final OA | — | Pending | Feb 01, 2024 |
| 18294472 | DISCOVERY OF A F-ATP SYNTHASE INHIBITOR FOR THE TREATMENT OF MYCOBACTERIUM ABSCESSUS DISEASES | Nanyang Technological University | ISMAIL, REHANA | 1625 | §103§112 | Non-Final OA | — | Pending | Feb 01, 2024 |
| 18427761 | MAXIMUM ALLOWED AND ACTIVE LINKS AT AN AP MLD FOR EACH CLIENT | Qualcomm Incorporated | DUFFY, JAMES P | 2461 | §102§103 | Non-Final OA | 23d | AI Ready | Jan 30, 2024 |
| 18426121 | CONFLICTION HANDLING BASED ON SBFD CONFIGURED SYMBOL TYPE | Qualcomm Incorporated | TRAN, PHUC H | 2471 | §103 | Non-Final OA | 36d overdue | AI Ready | Jan 29, 2024 |
| 18423208 | SOLVING INEQUALITY CONSTRAINED OPTIMIZATION PROBLEM ON HYBRID QUANTUM-CLASSICAL COMPUTING SYSTEM | IonQ, Inc. | SIPPEL, MOLLY CLARKE | 2122 | §101§103§112 | Non-Final OA | — | Pending | Jan 25, 2024 |
| 18420409 | SINGLE SYNCHRONIZATION SIGNAL BLOCK (SSB) WAKE-UP FOR LOOP TRACKING ON UPLINK AND DOWNLINK BEAMS | Qualcomm Incorporated | PARK, JEONG S | 2454 | §103 | Non-Final OA | 29d overdue | AI Ready | Jan 23, 2024 |
| 18420367 | CONCURRENT MATCHING RECEIVER WITH IMPROVED NOISE FIGURE | Qualcomm Incorporated | YUN, EUGENE | 2648 | §102§103 | Non-Final OA | — | Pending | Jan 23, 2024 |
| 18416746 | SAFETY DEVICES, LOCKING ASSEMBLIES, FLUID ENDS, AND RELATED METHODS FOR PUMPING OPERATIONS | Forum US, Inc. | WADDY, JONATHAN J | 3753 | §102§103§112 | Final Rejection | — | Pending | Jan 18, 2024 |
| 18578621 | FLEXIBLE TIME GAP INDICATION FOR MULTIPLE TRANSMISSION RECEPTION POINTS (M-TRP) OPERATION | Qualcomm Incorporated | CERLANEK, ADAM JOEL | 2478 | §103 | Non-Final OA | — | Pending | Jan 11, 2024 |
| 18576573 | Thermally Insulated Tubing for Geothermal Power Systems | Sage Geosystems Inc. | MATTHIAS, JONATHAN R | 3746 | §103§112 | Non-Final OA | — | Pending | Jan 04, 2024 |
| 18402051 | EFFICIENT EXECUTION OF MACHINE LEARNING MODELS BASED ON SPARSE DICTIONARIES | Qualcomm Incorporated | TRAN, AMY NMN | 2126 | §103§112 | Non-Final OA | — | Pending | Jan 02, 2024 |
| 18402523 | INDICATING SOUNDING REFERENCE SIGNAL PORTS FOR PHYSICAL UPLINK SHARED CHANNELS FOR SIMULTANEOUS TRANSMISSION ACROSS MULTIPLE PANELS WITH SHARED PORTS | Qualcomm Incorporated | CAI, WAYNE HUU | 2644 | §103 | Non-Final OA | — | AI Ready | Jan 02, 2024 |
| 18575583 | PHOTORESIST PROCESS | Helio Display Materials Limited | SULLIVAN, CALEEN O | 2899 | §102 | Non-Final OA | — | Pending | Dec 29, 2023 |
| 18543533 | HYBRID GENERATIVE ARTIFICIAL INTELLIGENCE MODELS | Qualcomm Incorporated | XIA, XUYANG | 2143 | §101§102§103 | Non-Final OA | — | Pending | Dec 18, 2023 |
| 18543436 | OPTIMAL SPLITTER PRECODING | Qualcomm Incorporated | VAN ROIE, JUSTIN T | 2469 | §102§103 | Final Rejection | 15d | AI Ready | Dec 18, 2023 |
| 18539770 | MICROPHONE THREE-DIMENSIONAL (3D) STACKED PACKAGE | Qualcomm Incorporated | NI, SUHAN | 2691 | §102§103 | Non-Final OA | 3d overdue | AI Ready | Dec 14, 2023 |
| 18537144 | INSTANCE NORMALIZATION IN MACHINE LEARNING MODELS USING LEARNED NORMALIZATION CONSTANTS | Qualcomm Incorporated | XIA, XUYANG | 2143 | §101§102§103 | Non-Final OA | — | Pending | Dec 12, 2023 |
| 18535483 | COMPOSITIONS OF ASCORBIC ACID SALTS | Shiseido Company, Ltd. | KRISHNAN, GANAPATHY | 1693 | §103§112 | Final Rejection | — | Pending | Dec 11, 2023 |
| 18569076 | METHODS FOR PRIORITIZING INTER-USER EQUIPMENT (UE) COORDINATION | Qualcomm Incorporated | NGUYEN, BRIAN D | 2475 | §102§103 | Non-Final OA | 3d overdue | AI Ready | Dec 11, 2023 |
| 18569065 | POWER HEADROOM REPORTING FOR UPLINK CHANNEL REPETITION | Qualcomm Incorporated | PATEL, MAHENDRA R | 2645 | §103 | Non-Final OA | 15d | AI Ready | Dec 11, 2023 |
| 18567544 | THREAD TILING FOR MEMORY LATENCY REDUCTION | Qualcomm Incorporated | METZGER, MICHAEL J | 2183 | §103 | Final Rejection | — | Pending | Dec 06, 2023 |
| 18566471 | ULTRABRIGHT CHEMILUMINESCENT PROBES FOR DETECTION AND IMAGING | Nanyang Technological University | DONOHUE, SEAN R | 1618 | §102§103§112 | Non-Final OA | — | Pending | Dec 01, 2023 |
| 18523297 | BEAMFORMED BISTATIC BACKSCATTERING | Qualcomm Incorporated | PHAM, TUAN | 2845 | §102§103§112 | Non-Final OA | — | Pending | Nov 29, 2023 |
| 18565414 | ACTIVATION BUFFER ARCHITECTURE FOR DATA-REUSE IN A NEURAL NETWORK ACCELERATOR | Qualcomm Incorporated | MRABI, HASSAN | 2147 | §101 | Final Rejection | — | Pending | Nov 29, 2023 |
| 18563501 | COFFEE MACHINE AND MILK TEXTURING DEVICE | Breville Pty Limited | LIU, CHRIS Q | 3761 | §103§112 | Final Rejection | — | Pending | Nov 22, 2023 |
| 18514178 | DECODER BASED LIFE-CYCLE MANAGEMENT FOR TWO-SIDED MODELS | Qualcomm Incorporated | SIVJI, NIZAR N | 2647 | §101§103Other | Final Rejection | 76d | Pending | Nov 20, 2023 |
| 18512330 | EFFICIENT EXECUTION OF MACHINE LEARNING MODELS IN HETEROGENEOUS PROCESSING ENVIRONMENTS | Qualcomm Incorporated | NGUYEN, VAN H | 2199 | §102 | Final Rejection | 33d | AI Ready | Nov 17, 2023 |
| 18513344 | ENHANCED HANDOVER FOR PDU SET LEVEL HANDLING | Qualcomm Incorporated | MENSAH, PRINCE AKWASI | 2474 | §103 | Final Rejection | — | Pending | Nov 17, 2023 |
| 18562136 | APPLICATION FUNCTION (AF) PROVISIONING STATIC INTERNET PROTOCOL (IP) ADDRESSES TO USER EQUIPMENTS | Qualcomm Incorporated | CHOWDHURY, MOHAMMED SHAMSUL | 2467 | §103 | Non-Final OA | — | Pending | Nov 17, 2023 |
| 18506831 | NETWORK RECOMMENDED SEAMLESS ROAMING | Qualcomm Incorporated | GAO, JING | 2647 | §102§103 | Final Rejection | 71d overdue | Pending | Nov 10, 2023 |
| 18506915 | COMPACT DATA AND REFERENCE SIGNAL REPRESENTATION WITH MODULATION COMPRESSION | Qualcomm Incorporated | SAMARA, LOUIS | 2476 | §103 | Non-Final OA | — | AI Ready | Nov 10, 2023 |
| 18289851 | RELIABILITY ENHANCEMENT FOR SIDELINK DISCOVERY | Qualcomm Incorporated | BROCKMAN, ANGEL T | 2412 | §103 | Non-Final OA | — | Pending | Nov 07, 2023 |
| 18500696 | FAST DATA PATH SWITCH IN LOWER LAYER MOBILITY | Qualcomm Incorporated | ZHAO, YONGHONG | 2472 | §103 | Non-Final OA | — | AI Ready | Nov 02, 2023 |
| 18498910 | BUILDING HEIGHT DETERMINATION | Ionx Networks Limited | KUAN, JOHN CHUNYANG | 2857 | §101§102§103 | Non-Final OA | — | Pending | Oct 31, 2023 |
| 18556711 | COMPOUNDS FOR USE IN THE TREATMENT OF CANCER | Nanyang Technological University | KUCHARCZK, JED A | 1623 | §102§112 | Non-Final OA | — | Pending | Oct 23, 2023 |
| 18556567 | SIDELINK CO-CHANNEL CO-EXISTENCE | Qualcomm Incorporated | TANG, KIET G | 2469 | §103 | Non-Final OA | — | Pending | Oct 20, 2023 |
| 18381923 | DATA COMMUNICATION CABLE AND METHOD OF MANUFACTURING SUCH CABLE | Mas Innovation (Private) Limited | ANDERSON, JOSHUA D | 3729 | §103§112 | Non-Final OA | — | Pending | Oct 19, 2023 |
| 18490049 | SUPPORT OF PARTIAL MIGRATION OF A MOBILE NODE | Qualcomm Incorporated | SEYMOUR, JAMES PAUL | 2419 | §102§103 | Non-Final OA | — | AI Ready | Oct 19, 2023 |
| 18555833 | METHOD FOR LAMINATING SOLAR CELLS | Lightyear Layer Ipco B.V. | DAM, DUSTIN Q | 1721 | §103 | Final Rejection | — | Pending | Oct 17, 2023 |
| 18487851 | PARTIALLY NETWORK-CONTROLLED REPEATER | Qualcomm Incorporated | COSME, NATASHA W | 2465 | §102§103 | Final Rejection | 50d | AI Ready | Oct 16, 2023 |
| 18486653 | EFFICIENT DECODING USING LARGE AND SMALL GENERATIVE ARTIFICIAL INTELLIGENCE MODELS | Qualcomm Incorporated | LAHAM BAUZO, ALVARO SALIM | 2146 | §103 | Final Rejection | — | Pending | Oct 13, 2023 |
| 18485632 | FIXED BASE STATION ANTENNA SYSTEM USING DIRECTIONAL AND OMNIDIRECTIONAL ANTENNA ELEMENTS IN A MIMO CONFIGURATION | Beamlink, Inc. | ODOM, CURTIS B | 2631 | §102 | Final Rejection | — | Pending | Oct 12, 2023 |
| 18378938 | SOLVING OPTIMIZATION PROBLEM ON HYBRID QUANTUM-CLASSICAL COMPUTING SYSTEM | IonQ, Inc. | MAHARAJ, DEVIKA S | 2123 | §103Other | Final Rejection | — | Pending | Oct 11, 2023 |
| 18554718 | GOLF CAMERA ASSEMBLIES | Evz Golf Group LLC | WOLCOTT, BRIAN P | 3711 | §103§112 | Non-Final OA | — | Pending | Oct 10, 2023 |
| 18483335 | PHYSICAL RANDOM ACCESS CHANNEL (PRACH) RACH OCCASION (RO) SELECTION FOR AMBIENT INTERNET OF THINGS (IOT) SYSTEM WITH ASSISTING NODE | Qualcomm Incorporated | SIVJI, NIZAR N | 2647 | §101§102§103 | Final Rejection | 84d | Pending | Oct 09, 2023 |
| 18285933 | COMPRESSION APPARATUS | Mas Innovation (Private) Limited | MCGRATH, ERIN E | 3771 | §102§103 | Non-Final OA | 77d overdue | Pending | Oct 06, 2023 |
| 18482196 | OUTLIER ATTENUATION IN TRANSFORMER NEURAL NETWORKS | Qualcomm Incorporated | YORKS, ANDREW CHARLES | 4100 | §101§103 | Non-Final OA | — | Pending | Oct 06, 2023 |
| 18480864 | AD-HOC TRACKER NETWORK | Qualcomm Incorporated | CASCA, FRED A | 2644 | §103 | Non-Final OA | — | Pending | Oct 04, 2023 |
| 18480846 | AD-HOC TRACKER NETWORK | Qualcomm Incorporated | VANGAPATY, SRIHARSHA REDDY | 2475 | §102§103 | Final Rejection | 14d | AI Ready | Oct 04, 2023 |
| 18479659 | SPECULATIVE DECODING IN AUTOREGRESSIVE GENERATIVE ARTIFICIAL INTELLIGENCE MODELS | Qualcomm Incorporated | VOGT, JACOB BUI | 4100 | §101§102§103Other | Non-Final OA | — | Pending | Oct 02, 2023 |
| 18553682 | SEMI-STATIC SLOT FORMAT CONFIGURATION FOR HALF DUPLEX FREQUENCY DIVISION DUPLEXING IN NEW RADIO | Qualcomm Incorporated | MIAN, OMER S | 2462 | §103 | Non-Final OA | — | Pending | Oct 02, 2023 |
| 18553125 | INTER-UE COORDINATION WITH DISTANCE-BASED COLLISION INDICATION | Qualcomm Incorporated | NGUYEN, BAO G | 2461 | §103 | Non-Final OA | — | Pending | Sep 28, 2023 |
| 18477043 | ENERGY MANAGEMENT IN WIRELESS NETWORKS | Qualcomm Incorporated | RANDHAWA, MANDISH K | 2477 | §103 | Non-Final OA | — | AI Ready | Sep 28, 2023 |
| 18477463 | APPLYING A TRANSPARENT CONDUCTIVE FILM TO FLUORINE-DOPED TIN OXIDE | Tandem Pv | MILLER, JR, JOSEPH ALBERT | 1712 | §103 | Final Rejection | 6d | Pending | Sep 28, 2023 |
| 18475995 | ADAPTIVE ACQUISITION FOR COMPRESSED SENSING | Qualcomm Incorporated | NILSSON, ERIC | 2151 | §101§103 | Non-Final OA | — | Pending | Sep 27, 2023 |
| 18551842 | CAPABILITY OR SERVICE INDICATION OVER RANDOM ACCESS CHANNEL | Qualcomm Incorporated | AUNG, SAI | 2416 | §103 | Non-Final OA | — | AI Ready | Sep 21, 2023 |
| 18471275 | UPDATES FOR UNASSOCIATED STATIONS | Qualcomm Incorporated | NG, CHRISTINE Y | 2464 | §103 | Final Rejection | — | Pending | Sep 20, 2023 |
| 18468481 | MULTI-BRANCH MACHINE LEARNING MODELS FOR MULTI-DOMAIN AND MULTI-TASK PROCESSING | Qualcomm Incorporated | CHIUSANO, ANDREW TSUTOMU | 2144 | §102§103 | Non-Final OA | — | Pending | Sep 15, 2023 |
| 18468491 | FULL DUPLEX OPERATION UNDER CELL DISCONTINUOUS TRANSMISSION AND DISCONTINUOUS RECEPTION | Qualcomm Incorporated | BEDNASH, JOSEPH A | 2461 | §102§103 | Final Rejection | 19d | AI Ready | Sep 15, 2023 |
| 18550584 | AIR-TO-GROUND COMMUNICATIONS | Qualcomm Incorporated | WELTE, BENJAMIN PETER | 2477 | §102§103 | Non-Final OA | — | AI Ready | Sep 14, 2023 |
| 18367336 | DAMPER SYSTEM | Great Southern Technologies, LLC | ANDERSON II, STEVEN S | 3762 | §102§103 | Final Rejection | 30d overdue | Pending | Sep 12, 2023 |
| 18462872 | ACCELERATING COMPLEX WORKLOADS USING SPARSE FAST CHEBYSHEV INTERPOLATION | Qualcomm Incorporated | CHIUSANO, ANDREW TSUTOMU | 2144 | §101§112 | Final Rejection | — | Pending | Sep 07, 2023 |
| 18462914 | LEARNABLE DEGREES OF EQUIVARIANCE FOR MACHINE LEARNING MODELS | Qualcomm Technologies, Inc. | CHIUSANO, ANDREW TSUTOMU | 2144 | §101§102§103 | Non-Final OA | — | Pending | Sep 07, 2023 |
| 18456218 | PERCEIVING AND ASSOCIATING STATIC AND DYNAMIC OBJECTS USING GRAPH MACHINE LEARNING MODELS | Qualcomm Incorporated | GENTILE, ALEXANDER VINCENT | 3664 | §103 | Final Rejection | — | AI Ready | Aug 25, 2023 |
| 18456000 | DYNAMIC SIGNALING TO RELEASE CONFIGURED CELL GROUPS FOR LAYER 1 AND LAYER 2 INTER-CELL MOBILITY | Qualcomm Incorporated | ULYSSE, JAEL M | 2477 | §103 | Non-Final OA | — | AI Ready | Aug 25, 2023 |
| 18275877 | FOIL FOR USE WITH A DOUBLE CURVED SOLAR PANEL | Lightyear Layer Ipco B.V. | TRIVISONNO, ANGELO | 1722 | §112 | Final Rejection | 35d overdue | Pending | Aug 04, 2023 |
| 18261658 | ENCRYPTION KEY EXTRACTION USING A RECONFIGURABLE INTELLIGENT SURFACE | Qualcomm Incorporated | KIM, ANDREW CHANUL | 2471 | §103 | Non-Final OA | — | Pending | Jul 14, 2023 |
| 18351672 | QUICK BAIL SYSTEM | Frank'S International, LLC | QURESHI, REHMAN AHMED | 4100 | §102§103 | Non-Final OA | — | Pending | Jul 13, 2023 |
| 18346374 | MULTITASK MACHINE LEARNING USING DISJOINT DATASETS | Qualcomm Incorporated | ACOSTA, RILEY SULLIVAN | 2143 | §103 | Final Rejection | 82d | Pending | Jul 03, 2023 |
| 18340780 | RADIO FREQUENCY EXPOSURE DISTRIBUTION FOR MULTI-LINK SERVICE | Qualcomm Incorporated | NG, CHRISTINE Y | 2464 | §103§112 | Final Rejection | 7d | AI Ready | Jun 23, 2023 |
| 18340769 | TRANSMIT-POWER-AWARE RATE ADAPTATION | Qualcomm Incorporated | RACHEDINE, MOHAMMED | 2646 | §103 | Non-Final OA | 8d | AI Ready | Jun 23, 2023 |
| 18339111 | OPERATIONAL TRANSCONDUCTANCE AMPLIFIER WITH BOOSTED TRANSCONDUCTANCE | Qualcomm Incorporated | LIENG, MALANE | 2843 | §102§103 | Non-Final OA | — | Pending | Jun 21, 2023 |
| 18335685 | PROPAGATING ATTENTION INFORMATION IN EFFICIENT MACHINE LEARNING MODELS | Qualcomm Incorporated | KIM, SEHWAN | 2129 | §102§103 | Non-Final OA | 70d | AI Ready | Jun 15, 2023 |
| 18207981 | SOLAR ELECTRICAL GENERATOR | Solivus Limited | DINH, BACH T | 1726 | §102§103 | Final Rejection | 46d | Pending | Jun 09, 2023 |
| 18330277 | COSMETIC COMPACT WITH REMOVABLE PLATE | Rq Innovasion Inc. | TO, HOLLY T | 3772 | §103 | Final Rejection | 19d | Pending | Jun 06, 2023 |
| 18326437 | INSTANCE SEGMENTATION WITH DEPTH AND BOUNDARY LOSSES | Qualcomm Incorporated | ROZ, MARK | 2675 | §102§103 | Final Rejection | 4d overdue | AI Ready | May 31, 2023 |
| 18038109 | SOLAR PANEL WITH A COMPOSITE LAMINATE | Lightyear Layer Ipco B.V. | TRINH, THANH TRUC | 1726 | §103§112 | Non-Final OA | 22d overdue | Pending | May 22, 2023 |
| 18320641 | THROUGHPUT ENHANCEMENTS FOR MULTI-LINK OPERATIONS | Qualcomm Incorporated | CLAWSON, STEPHEN J | 2461 | §103§112 | Non-Final OA | — | Pending | May 19, 2023 |
| 18319695 | REDUCED CANCELATION INDICATION MONITORING | Qualcomm Incorporated | BLANTON, JOHN D | 2466 | §103 | Final Rejection | — | Pending | May 18, 2023 |
| 18252741 | IMPROVED USE OF CANNABINOIDS IN THE TREATMENT OF EPILEPSY | Orcosa Inc. | BELL, SARA ELIZABETH | 1625 | §103§112 | Final Rejection | 89d overdue | Pending | May 12, 2023 |
| 18252790 | DESIGN OF OPTIMIZED UNIVERSAL INFLUENZA VACCINES, THEIR DESIGNS AND USES | Greffex, Inc. | LI, BAO Q | 1671 | §102 | Final Rejection | 84d overdue | Pending | May 12, 2023 |
| 18252681 | RAPIDLY INFUSING COMPOSITIONS WITH SUPPLEMENTS AND TREATMENT METHODS | Orcosa Inc. | GONZALEZ, LUISALBERTO | 1624 | §103DP | Final Rejection | — | Pending | May 11, 2023 |
| 18252694 | IMPROVED USE OF CANNABINOIDS IN THE TREATMENT OF ALZHEIMER'S DISEASE | Orcosa Inc. | ROBINSON, MIKHAIL O'DONNEL | 1627 | §112 | Non-Final OA | 23d overdue | Pending | May 11, 2023 |
| 18252693 | METHODS OF TREATING AUTOIMMUNE OR INFLAMMATORY CONDITIONS WITH CANNABIDIOL OR ITS DERIVATIVES/ANALOGS | Orcosa Inc. | DAHLIN, HEATHER RAQUEL | 1629 | §103Other | Final Rejection | — | Pending | May 11, 2023 |
| 18252707 | RAPIDLY INFUSING CANNABINOID COMPOSITIONS, PROCESSES OF MANUFACTURE, AND METHODS OF USE | Orcosa Inc. | KETCHAM, KAREN A | 1614 | §103 | Final Rejection | — | Pending | May 11, 2023 |
| 18252676 | RAPIDLY INFUSING COMPOSITIONS FOR ORAL MUCOSAL DELIVERY AND METHODS | Orcosa Inc. | GONZALEZ, LUISALBERTO | 1624 | §103§112Other | Final Rejection | — | Pending | May 11, 2023 |
| 18252688 | RAPIDLY DISINTERGRATING COMPOSITIONS AND METHODS (Nicotine) | Orcosa Inc. | GONZALEZ, LUISALBERTO | 1624 | §103DP | Final Rejection | 60d overdue | Pending | May 11, 2023 |
| 18252668 | CANNABINOIDS IN THE TREATMENT OF AUTISM SPECTRUM DISORDER | Orcosa Inc. | DAHLIN, HEATHER RAQUEL | 1629 | §103§112Other | Non-Final OA | 10d overdue | Pending | May 11, 2023 |
| 18314804 | SCHEDULING ENHANCEMENTS FOR TRANSMIT OPPORTUNITY SHARING | Qualcomm Incorporated | CHRISS, ANDREW W | 2472 | §102§103 | Non-Final OA | 15d | AI Ready | May 09, 2023 |
| 18251173 | MAGNETIC NANOCOMPOSITE MATERIALS SUITABLE FOR MAGNETIC LOCALIZED POLYMERISATION OF AN ANAEROBIC ADHESIVE | Nanyang Technological University | EDMONDSON, LYNNE RENEE | 1734 | §103 | Non-Final OA | — | Pending | Apr 28, 2023 |
| 18140335 | EPOXY RESIN COMPOSITIONS, COMPOSITE MATERIALS, AND METHODS OF COATING SUBSTRATES | Westlake Epoxy Inc. | SLOAN, LILY KAYOKO | 1762 | §103 | Final Rejection | 31d overdue | Pending | Apr 27, 2023 |
| 18139436 | SYSTEM AND METHOD FOR TRANSCRIBING AUDIBLE INFORMATION | Logitech Europe S.A. | ORTIZ SANCHEZ, MICHAEL | 2656 | §103 | Final Rejection | — | Pending | Apr 26, 2023 |
| 18307228 | RAPIDLY INFUSING PLATFORM AND COMPOSITIONS FOR THERAPEUTIC TREATMENT IN HUMANS | Orcosa Inc. | HOERNER, PAUL ELLSWORTH | 1611 | §103Other | Final Rejection | — | Pending | Apr 26, 2023 |
| 18033580 | PROCESSES FOR FORMING FUNCTIONALIZED MEMBRANES | Apex Water Solutions W.L.L | ROLLAND, ALEX A | 1715 | §102§103 | Non-Final OA | — | Pending | Apr 25, 2023 |
| 18303514 | OPERATION EXPANSION POLICY FRAMEWORK FOR ACCESS POINTS | Qualcomm Incorporated | HUA, QUAN M | 2645 | §103 | Final Rejection | — | Pending | Apr 19, 2023 |
| 18135551 | Electrically Functional Circuit Board Core Material | Kemet Electronics Corporation | TSO, STANLEY | 2847 | §103 | Final Rejection | 72d | Pending | Apr 17, 2023 |
| 18297364 | STICK COMPOSITION CONTAINING CANNABINOIDS | Orcosa Inc. | WORSHAM, JESSICA N | 1615 | §103§112 | Non-Final OA | — | Pending | Apr 07, 2023 |
| 18029062 | SGLT-2 INHIBITOR SARCOSINE CO-CRYSTAL, PREPARATION METHOD THEREFOR AND USE THEREOF | Beijing Creatron Institute Of Pharmaceutical Research Co. Ltd. | CHO, DAVID H | 1693 | §103 | Final Rejection | 9d | Pending | Mar 28, 2023 |
| 18188891 | LOW QUIESCENT CURRENT AND FAST TRANSIENT VOLTAGE REGULATOR WITH TRANSCONDUCTANCE BOOSTER | Qualcomm Incorporated | TRAN, NGUYEN | 2838 | §103 | Final Rejection | 14d | AI Ready | Mar 23, 2023 |
| 18189120 | POWER SUPPLY CIRCUIT WITH MULTIPLE MODES | Qualcomm Incorporated | COMAS TORRES, YAHVEH | 2838 | §103 | Non-Final OA | — | AI Ready | Mar 23, 2023 |
| 18186595 | USER EQUIPMENT BEAM MANAGEMENT CAPABILITY REPORTING | Qualcomm Incorporated | SUGDEN, NOAH JAMES | 2475 | §103 | Non-Final OA | 27d | AI Ready | Mar 20, 2023 |
| 18025684 | ANTIBODY CONSTRUCTS TO TARGET T CELL RESPONSES TO SARS-COV PROTEIN EXPRESSING CELLS, THEIR DESIGN AND USES | Greffex, Inc. | XIAO, YAN | 1642 | §102§103§112DP | Non-Final OA | — | Pending | Mar 10, 2023 |
| 18179953 | FRAMEWORK FOR SEMANTIC ENCODING AND DECODING IN A WIRELESS COMMUNICATION NETWORK | Qualcomm Incorporated | VANGAPATY, SRIHARSHA REDDY | 2475 | §112 | Non-Final OA | — | Pending | Mar 07, 2023 |
| 18168900 | ENCLOSURE FOR A GENERATOR SET SYSTEM | NexTier Completion Solutions Inc. | RODRIGUEZ, JOSHUA KIEL MIGUEL | 2834 | §103 | Non-Final OA | 60d overdue | Pending | Feb 14, 2023 |
| 18108460 | EPOXY RESIN COMPOSITIONS AND METHODS OF MAKING | Westlake Epoxy Inc. | BERRO, ADAM JOSEPH | 1765 | §103 | Non-Final OA | 35d overdue | Pending | Feb 10, 2023 |
| 18041201 | COMPONENT CARRIER SWITCHING FOR WIRELESS COMMUNICATION DEVICES | Qualcomm Incorporated | BAIG, ADNAN | 2461 | §103 | Final Rejection | — | AI Ready | Feb 09, 2023 |
| 18165802 | CONFIGURABLE NONLINEAR ACTIVATION FUNCTION CIRCUITS | Qualcomm Incorporated | DE LA GARZA, CARLOS HEBERTO | 2182 | §101§103§112 | Non-Final OA | — | Pending | Feb 07, 2023 |
| 18159614 | COATING REMOVAL SYSTEM AND METHODS OF OPERATING SAME | ULTRA CLEAN HOLDINGS, INC. | COLEMAN, RYAN L | 1714 | §103§112 | Final Rejection | 190d overdue | Pending | Jan 25, 2023 |
| 18016763 | PROGRESSIVE STEERING GEAR, SERRATED COMPONENT, AND MANUFACTURING METHODS | Werner Bless | KNUTSON, JACOB D | 3611 | §103 | Non-Final OA | 4d overdue | Pending | Jan 18, 2023 |
| 18154429 | MACHINE LEARNING MODEL ARCHITECTURE COMBINING MIXTURE OF EXPERTS AND MODEL ENSEMBLING | Qualcomm Incorporated | SUSSMAN MOSS, JACOB ZACHARY | 2122 | §101 | Non-Final OA | — | Pending | Jan 13, 2023 |
| 18153687 | FEDERATED LEARNING WITH TRAINING METADATA | Qualcomm Incorporated | TRAN, DANIEL DUC | 2147 | §101§103 | Final Rejection | — | Pending | Jan 12, 2023 |
| 18003890 | RADIO LINK FAILURE IN SIDELINK RELAY | Qualcomm Incorporated | LIN, KENNY S | 2416 | §103 | Final Rejection | 24d overdue | AI Ready | Dec 29, 2022 |
| 18002597 | RESOURCE CONFIGURATION FOR RECIPROCAL CROSS-LINK INTERFERENCE MEASUREMENT | Qualcomm Incorporated | RIVAS, RAUL | 2471 | §103 | Final Rejection | — | AI Ready | Dec 20, 2022 |
| 18068987 | EFFICIENT MACHINE LEARNING MODEL ARCHITECTURES FOR TRAINING AND INFERENCE | Qualcomm Incorporated | BOSTWICK, SIDNEY VINCENT | 2124 | §101§103 | Final Rejection | 28d overdue | Pending | Dec 20, 2022 |
| 18001029 | ELECTRICAL CHARGING STRUCTURE | Jolt Charge Pty Ltd. | PELTON, NATHANIEL R | 2859 | §103 | Final Rejection | — | Pending | Dec 07, 2022 |
| 18001017 | SYSTEM ACQUISITION DESIGN IN SIDELINK RELAY SYSTEMS | Qualcomm Incorporated | SMITH, MARCUS | 2465 | §103 | Final Rejection | 8d | AI Ready | Dec 07, 2022 |
| 18061324 | TECHNIQUES FOR THREAD REDUCTION IN PROCESSING TENSORS UTILIZING SPARSITY DETECTION | Qualcomm Incorporated | WAJE, CARLO C | 2151 | §103 | Final Rejection | — | Pending | Dec 02, 2022 |
| 18000483 | TIME-DIVISION MULTIPLE ACCESS (TDMA)-BASED BAND RESERVATION | Qualcomm Incorporated | HO, CHUONG T | 2412 | §112 | Non-Final OA | — | Pending | Dec 01, 2022 |
| 18057432 | CONTROL CHANNEL RESOURCE GROUPING AND SPATIAL RELATION CONFIGURATION | Qualcomm Incorporated | SMITH, JOSHUA Y | 2477 | §103 | Non-Final OA | 27d | AI Ready | Nov 21, 2022 |
| 18054896 | GENERATIVE WIRELESS CHANNEL MODELING | Qualcomm Incorporated | OHRI, ROMANI | 2413 | §103 | Non-Final OA | — | AI Ready | Nov 12, 2022 |
| 17997400 | TRAINING USER AUTHENTICATION MODELS WITH FEDERATED LEARNING | Qualcomm Incorporated | BIRKHIMER, CHRISTOPHER D | 2136 | §103 | Final Rejection | — | AI Ready | Oct 28, 2022 |
| 17996727 | ENGINEERING BROADLY REACTIVE CORONAVIRUS VACCINES AND RELATED DESIGNS AND USES | Greffex, Inc. | SALVOZA, M FRANCO G | 1672 | §101§102§103§112Other | Final Rejection | — | Pending | Oct 20, 2022 |
| 17964639 | NON-NUMERIC FEEDBACK TIMING INDICATORS FOR HARQ-ACK | Qualcomm Incorporated | POKRZYWA, JOSEPH R | 3992 | §103§112Other | Non-Final OA | 261d overdue | Pending | Oct 12, 2022 |
| 18046135 | BEAM-SPECIFIC LAYER ONE RECEIVED SIGNAL STRENGTH INDICATOR MEASUREMENT AND REPORTING | Qualcomm Incorporated | SCIACCA, SCOTT M | 2478 | §103 | Non-Final OA | — | Pending | Oct 12, 2022 |
| 17917856 | FIELD MAPPING ORDER PER PHYSICAL LAYER CSI REPORT ON PUSCH | Qualcomm Incorporated | CHENG, CHI TANG P | 2463 | §103 | Non-Final OA | 22d | AI Ready | Oct 07, 2022 |
| 17917517 | MULTIPLE TCI STATE ACTIVATION FOR PDCCH AND PDSCH | Qualcomm Incorporated | CLAWSON, STEPHEN J | 2461 | §102§103 | Non-Final OA | — | Pending | Oct 06, 2022 |
| 17917218 | POSITIONING A FIRST AND SECOND METAL PLATE IN A LASER BEAM WELDING POSITION | BORIT N.V. | RHUE, ABIGAIL H | 3761 | §103§112 | Non-Final OA | 183d overdue | Pending | Oct 05, 2022 |
| 17907571 | MAINTAINING DNA FRAGMENTS IN EUKARYOTIC CELLS, APPROACHES AND USES | Greffex, Inc. | GU, QINHUA | 1633 | §103 | Final Rejection | — | Pending | Sep 28, 2022 |
| 17907596 | NR SIDELINK DRX DESIGN FOR RELAY RESELECTION | Qualcomm Incorporated | GUADALUPE CRUZ, AIXA AMYR | 2466 | §102§103 | Non-Final OA | 3d overdue | AI Ready | Sep 28, 2022 |
| 17935046 | MULTI-DIMENSIONAL GEOMETRIC WIRELESS CHANNEL RENDERING USING MACHINE LEARNING MODELS | Qualcomm Incorporated | HOOVER, BRENT JOHNSTON | 2127 | §101§103 | Non-Final OA | — | AI Ready | Sep 23, 2022 |
| 17934833 | SEAMLESS CUSTOMIZATION OF MACHINE LEARNING MODELS | Qualcomm Incorporated | SHAH, PARAS D | 2655 | §101§103 | Non-Final OA | — | Pending | Sep 23, 2022 |
| 17934178 | MEMORY MANAGEMENT FOR MATHEMATICAL OPERATIONS IN COMPUTING SYSTEMS WITH HETEROGENEOUS MEMORY ARCHITECTURES | Qualcomm Incorporated | ALCANTARA-RAMOS, EMILIO | 2183 | §101§102§103§112 | Non-Final OA | 22d overdue | AI Ready | Sep 21, 2022 |
| 17906159 | MOBILITY HANDLING BETWEEN UU PATH AND PC5 RELAY PATH | Qualcomm Incorporated | CHAKRAVARTHY, LATHA | 2461 | §103 | Non-Final OA | — | AI Ready | Sep 12, 2022 |
| 17905397 | EFFICIENT SCG ACTIVATION AND DEACTIVATION AND MAINTAINING UPLINK TIMING ALIGNMENT WITH A SECONDARY NODE | Qualcomm Incorporated | YANG, ZHAOHUI | 2468 | §102§103 | Non-Final OA | — | Pending | Aug 31, 2022 |
| 17897114 | TRANSMITTED BASIC SERVICE SET IDENTIFIER REASSIGNMENT | Qualcomm Incorporated | KELLEY, STEVEN SHAUN | 2646 | §103 | Final Rejection | — | Pending | Aug 26, 2022 |
| 17905014 | WIRELESS COMMUNICATION DEVICE SYNCHRONIZATION | Qualcomm Incorporated | NGO, NGUYEN HOANG | 2473 | §112 | Non-Final OA | — | Pending | Aug 25, 2022 |
| 17887398 | INDICATING SUBBAND CONFIGURATIONS BETWEEN NETWORK ENTITIES | Qualcomm Incorporated | SAMLUK, JESSE PAUL | 2411 | §103 | Final Rejection | 3d overdue | AI Ready | Aug 12, 2022 |
| 17885144 | MACHINE LEARNING (ML) DATA INPUT CONFIGURATION AND REPORTING | Qualcomm Incorporated | CHEN, JUNPENG | 2645 | §103 | Final Rejection | — | Pending | Aug 10, 2022 |
| 17816485 | TIMING ADVANCES FOR RANDOM ACCESS | Qualcomm Incorporated | KIM, ANDREW CHANUL | 2471 | §103 | Non-Final OA | — | AI Ready | Aug 01, 2022 |
| 17758214 | DYNAMIC GAMMA CURVE USE FOR DISPLAY | Qualcomm Incorporated | FLORES, ROBERTO W | 2621 | §103 | Non-Final OA | — | AI Ready | Jun 29, 2022 |
| 17758077 | CULTURE SYSTEMS FOR THE EFFICIENT PRODUCTION OF GENE TRANSFER VECTORS | Greffex, Inc. | SPENCER, ANDREA LYNNE MORRIS | 1631 | §103§112 | Final Rejection | — | Pending | Jun 28, 2022 |
| 17828613 | FEDERATED LEARNING USING SECURE CENTERS OF CLIENT DEVICE EMBEDDINGS | Qualcomm Incorporated | ROY, SANCHITA | 2146 | §112 | Final Rejection | 14d | AI Ready | May 31, 2022 |
| 17664583 | UPLINK EXTENDED REALITY SCHEDULING | Qualcomm Incorporated | DEFAUW, THAD N | 2412 | §103 | Non-Final OA | — | Pending | May 23, 2022 |
| 17771694 | ROBUSTNESS CONSIDERATIONS FOR 2-STAGE DCI FOR FREQUENCY DOMAIN COMPRESSED UPLINK SUBBAND PRECODING | Qualcomm Incorporated | ASRES, HERMON | 2449 | §103 | Final Rejection | 28d | AI Ready | Apr 25, 2022 |
| 17726250 | SYSTEM AND METHOD FOR GENE EDITING CASSETTE DESIGN | Inscripta, Inc. | MINCHELLA, KAITLYN L | 1685 | §101§103§112 | Non-Final OA | — | Pending | Apr 21, 2022 |
| 17754864 | APPARATUSES FOR TRANSMISSION CONFIGURATION INDICATOR STATE UPDATES FOR MULTIPLE COMPONENT CARRIERS | Qualcomm Incorporated | CERLANEK, ADAM JOEL | 2478 | §103 | Non-Final OA | — | Pending | Apr 14, 2022 |
| 17709130 | CATALYST COMPOSITIONS, PROCESSES FOR FORMING THE CATALYST COMPOSITIONS, AND USES THEREOF | Honda Motor Co., Ltd. | CONTRERAS, CIEL P | 1794 | §103 | Final Rejection | 21d | Pending | Mar 30, 2022 |
| 17709155 | GUIDEWIRE CONTROLLER CASSETTE AND USING METHOD THEREOF | The Board Of Regents Of The University Of Texas System | HENSON, DEVIN B | 3791 | §103§112 | Non-Final OA | 29d | Pending | Mar 30, 2022 |
| 17709163 | GUIDEWIRE CONTROLLER CASSETTE AND USING METHOD THEREOF | Xcath, Inc. | DOAN, HY KHANH | 3791 | §103§112 | Final Rejection | — | Pending | Mar 30, 2022 |
| 17591585 | ENABLING OFF-CHANNEL TRANSMISSIONS FOR WIRELESS NETWORKS | Qualcomm Incorporated | CELANI, NICHOLAS P | 2449 | §103§112 | Non-Final OA | 28d | AI Ready | Feb 02, 2022 |
| 17584053 | SYSTEMS AND METHOD FOR TARGETED MOLECULAR DESIGN | Phronesis Artificial Intelligence, Inc. | ANDERSON-FEARS, KEENAN NEIL | 1687 | §101§103§112DP | Final Rejection | — | Pending | Jan 25, 2022 |
| 17584073 | SYSTEMS AND METHODS FOR TARGETED INTENTIONAL MOLECULAR DESIGN | Phronesis Artificial Intelligence, Inc. | ANDERSON-FEARS, KEENAN NEIL | 1687 | §101§103§112 | Final Rejection | 71d | Pending | Jan 25, 2022 |
| 17584087 | SYSTEMS AND METHODS FOR APPLYING A TRANSFORMER NETWORK TO SPATIAL DATA | Phronesis Artificial Intelligence, Inc. | WOITACH, JOSEPH T | 1687 | §103 | Final Rejection | — | Pending | Jan 25, 2022 |
| 17648415 | CROSS-DOMAIN ADAPTIVE LEARNING | Qualcomm Incorporated | GIROUX, GEORGE | 2128 | §101§102§103 | Non-Final OA | 46d overdue | Pending | Jan 19, 2022 |
| 17527076 | AUTOMATIC EARLY-EXITING MACHINE LEARNING MODELS | Qualcomm Incorporated | MAC, GARY | 2127 | §101§102§103§112 | Final Rejection | 26d | AI Ready | Nov 15, 2021 |
| 17607509 | DOWNLINK AND UPLINK BEAM MANAGEMENT ENHANCEMENTS FOR FULL DUPLEX | Qualcomm Incorporated | RAHMAN, M MOSTAZIR | 2411 | §103 | Non-Final OA | — | AI Ready | Oct 29, 2021 |
| 17451369 | AVOIDING OUT OF ORDER UPLINK DATA RECEPTION UPON DATA RADIO BEARER RELEASE, HANDOVER TO ANOTHER DATA RADIO BEARER, OR QUALITY OF SERVICE FLOW ADDITION | Qualcomm Incorporated | MADANI, FARIDEH | 2643 | §103 | Non-Final OA | — | AI Ready | Oct 19, 2021 |
| 17451068 | RESOURCE ALLOCATION AND HYBRID AUTOMATIC REPEAT REQUEST (HARQ) ACKNOWLEDGEMENT (ACK) FEEDBACK FOR MULTI-CELL SCHEDULING | Qualcomm Incorporated | LI, GUANG W | 2478 | §103 | Final Rejection | 22d | AI Ready | Oct 15, 2021 |
| 17482176 | SHAPED CONVOLUTION KERNELS | Qualcomm Incorporated | FIGUEROA, KEVIN W | 2124 | §103 | Non-Final OA | 79d | Pending | Sep 22, 2021 |
| 17478609 | ELIMINATING MEMORY BOTTLENECKS FOR DEPTHWISE CONVOLUTIONS | Qualcomm Incorporated | LE, PHAT NGOC | 2182 | §103 | Non-Final OA | — | Pending | Sep 17, 2021 |
| 17467079 | CONFIGURABLE NONLINEAR ACTIVATION FUNCTION CIRCUITS | Qualcomm Incorporated | MAC, GARY | 2127 | §103Other | Final Rejection | 71d | Pending | Sep 03, 2021 |
| 17350384 | BILAYER METAL DICHALCOGENIDES, SYNTHESES THEREOF, AND USES THEREOF | Honda Motor Co., Ltd. | GUPTA, RAJ R | 2893 | §103 | Non-Final OA | — | Pending | Jun 17, 2021 |
| 17233022 | BULLFROG SKIN-DERIVED COLLAGEN, MATERIALS COMPRISING THEREOF, AND APPLICATIONS IN WOUND HEALING | Nanyang Technological University | LEE, JIA-HAI | 1658 | §103§112 | Final Rejection | 80d overdue | Pending | Apr 16, 2021 |
| 17267690 | ONTOLOGICALLY-DRIVEN BUSINESS MODEL SYSTEM AND METHOD | Watt Ip Holdings Limited | SENSENIG, SHAUN D | 3629 | §101 | Non-Final OA | 53d | Pending | Feb 10, 2021 |
| 16356095 | PHYSICAL DOWNLINK CONTROL CHANNEL (PDCCH) RELIABILITY FOR ULTRA-RELIABILITY LOW LATENCY COMMUNICATION (URLLC) | Qualcomm Incorporated | PEREZ, JOSE L | 2474 | §103 | Non-Final OA | 7d | AI Ready | Mar 18, 2019 |