Technology area: Semiconductors, Circuits & Optics
97 pending office actions • 55 art units • 93 examiners • 0 of 97 (0%) have an AI response strategy ready • 288 patents granted in the last 365 days
Emerson Electric Co. manages 96 pending office actions within the Semiconductors, Circuits & Optics technology area. These actions are distributed among 92 distinct examiners, showing that almost every case is assigned to a unique individual. KNIGHT, DEREK DOUGLAS is the busiest examiner for the portfolio, with 2 pending actions.
The prosecution activity spans 43 distinct art units. This is a significant number of units for the 96 pending office actions, indicating a very wide range of technical subjects. The ratio of 92 distinct examiners to the 96 pending office actions reflects a highly decentralized prosecution environment.
With 43 distinct art units involved, the company's innovations are being evaluated by many different specialized groups at the USPTO. The busiest examiner handles only 2 pending actions, which is a minimal concentration given the 96 total pending office actions. This broad distribution across 92 distinct examiners suggests that Emerson Electric Co. must adapt to many different examination styles and technical perspectives.
Based on the USPTO statutory response window for each pending office action. 20 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 20 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 2 (2%) |
| §101 + other | 11 (11%) |
| §103 only | 31 (32%) |
| §102 only | 8 (8%) |
| Double-patenting only | 1 (1%) |
| Double-patenting + other | 4 (4%) |
| Multi-statute (no §101) | 38 (39%) |
| No statute on record | 2 (2%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| KNIGHT, DEREK DOUGLAS | 2 | 85.2% | +3.3% |
| FERGUSON, MICHAEL P | 2 | 63.3% | +73.5% |
| NOVAK, PETER MICHAEL | 2 | 88.3% | +8.7% |
| THROWER, LARRY W | 2 | 65.9% | +12.6% |
| LARGI, MATTHEW THOMAS | 1 | 76.9% | +15.6% |
| TRAN, BINH Q | 1 | 88.2% | +6.6% |
| PERVIN, FARHANA | 1 | 81.4% | +7.0% |
| SINGH, DAPINDER | 1 | 82.4% | +18.4% |
| HASAN, SYED O | 1 | 78.2% | +18.6% |
| COMLEY, ALEXANDER BRYANT | 1 | 57.7% | +38.9% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 19247143 | Rocker Arm Assemblies for Engine Braking | SINGH, DAPINDER | 36d |
| 18937437 | POWER CONVERTERS AND UNINTERRUPTIBLE POWER SUPPY (UPS) INCLUDING THE SAME | NOVAK, PETER MICHAEL | — |
| 18863158 | A PINION AND A DIFFERENTIAL ASSEMBLY | KNIGHT, DEREK DOUGLAS | — |
| 18917200 | MITIGATION OF CIRCULATING CURRENTS IN PARALLELED POWER CONVERTERS HAVING INDEPENDENT DC LINKS | NOVAK, PETER MICHAEL | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18216667 | OVERLOAD CAPABILITY AND REMAINING LIFE OF AN ELECTRICAL ASSET | ZHANG, HAIDONG | 67d overdue |
| 18235554 | ACTUATION SYSTEM WITH A TEMPERATURE-CONTROLLED ACTUATION MATERIAL | CRUM, JACOB R | 59d overdue |
| 18749737 | BULK DISPENSING DEVICE FOR SEALING COMPOUNDS | CARROLL, JEREMY W | 49d overdue |
| 18786165 | SOLVATED ADHESIVE COMPOSITION AND METHOD | PATWARDHAN, ABHISHEK A | 46d overdue |
| 18370691 | COMPUTE FABRIC ENABLED PROCESS CONTROL | ORTIZ RODRIGUEZ, CARLOS R | 43d overdue |
| 18344925 | Ultra-Efficient And Self-Healing Solid State Circuit Breaker | CLARK, CHRISTOPHER JAY | 15d |
| 18686296 | SWITCHING DEVICE AND METHOD FOR OPERATING A SWITCHING DEVICE | CAROC, LHEIREN MAE ANGLO | 22d |
| 17999631 | CONTINGENCY FORECASTING SYSTEM | CHAVEZ, ANTHONY RAY | 33d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 17456978 | Thermally Conductive Thermoplastics for Fused Filament Fabrication | THROWER, LARRY W | 6d |
| 19230801 | REAR DRIVE EGR PUMP | COMLEY, ALEXANDER BRYANT | 12d |
| 19247143 | Rocker Arm Assemblies for Engine Braking | SINGH, DAPINDER | 36d |
| 19434617 | VALVETRAIN SYSTEMS FOR CYLINDER DEACTIVATION WITH RECHARGING AND METHODS THEREOF | LARGI, MATTHEW THOMAS | — |
| 19236836 | Advanced Valve Train Assembly for Engine Brake and Cylinder Deactivation | HASAN, SYED O | — |
| 18965854 | SPLICE PLATE WITH SPACING INDICIA FOR CABLE TRAY SECTION SPACING | FERGUSON, MICHAEL P | — |
| 18180699 | CABLE TRAY SPLICE PLATE ASSEMBLY | FERGUSON, MICHAEL P | — |
| 17538341 | Thermally Conductive Thermoplastics for Selective Laser Sintering | THROWER, LARRY W | — |
| Art Unit | Apps |
|---|---|
| 2838 | 9 |
| 3746 | 5 |
| 2831 | 5 |
| 3753 | 4 |
| 2117 | 4 |
| 3655 | 3 |
| 2841 | 3 |
| 2837 | 3 |
| 3619 | 3 |
| 2857 | 3 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 19434617 | VALVETRAIN SYSTEMS FOR CYLINDER DEACTIVATION WITH RECHARGING AND METHODS THEREOF | LARGI, MATTHEW THOMAS | 3746 | §103 | Non-Final OA | — | Pending | Dec 29, 2025 |
| 19478096 | VALVE BRIDGE ANTI-DISLODGEMENT STRUCTURES | TRAN, BINH Q | 3746 | §101§102 | Non-Final OA | — | Pending | Oct 23, 2025 |
| 19477190 | STATOR FOR ROTARY DEVICE | KNIGHT, DEREK DOUGLAS | 3655 | §102§103 | Non-Final OA | — | Pending | Oct 21, 2025 |
| 19160738 | INTEGRATED GEAR DIFFERENTIAL | PERVIN, FARHANA | 3655 | §102§103 | Non-Final OA | — | Pending | Aug 28, 2025 |
| 19247143 | Rocker Arm Assemblies for Engine Braking | SINGH, DAPINDER | 3746 | §102 | Final Rejection | 36d | Pending | Jun 24, 2025 |
| 19236836 | Advanced Valve Train Assembly for Engine Brake and Cylinder Deactivation | HASAN, SYED O | 3747 | §103 | Non-Final OA | — | Pending | Jun 12, 2025 |
| 19230801 | REAR DRIVE EGR PUMP | COMLEY, ALEXANDER BRYANT | 3746 | §103§112DP | Non-Final OA | 12d | Pending | Jun 06, 2025 |
| 19094084 | PRESSURE VESSEL | CASTELLANO, STEPHEN J | 3733 | §102§103§112 | Non-Final OA | — | Pending | Mar 28, 2025 |
| 19072163 | EXPENDABLE HEAT SINK SYSTEM AND CONTROL | MCKINNON, TERRELL L | 3632 | §103 | Non-Final OA | — | Pending | Mar 06, 2025 |
| 19061311 | MOTOR ARRANGEMENT WITH SOLENOID | SETZER, NICHOLAS LEE | 2834 | §102§103§112 | Non-Final OA | — | Pending | Feb 24, 2025 |
| 18998694 | BUS ARRANGEMENT AND METHOD FOR OPERATING A BUS ARRANGEMENT | LEWIS-TAYLOR, DAYTON A. | 2181 | §103 | Final Rejection | — | Pending | Jan 27, 2025 |
| 19032816 | VOLTAGE SENSING SYSTEM AND MICROGRID INTERCONNECT DEVICE INCLUDING THE SAME | AL-TAWEEL, MUAAMAR QAHTAN | 2838 | §102§103 | Non-Final OA | — | Pending | Jan 21, 2025 |
| 19016254 | SLEEVED ROCKER SHAFT FOR TYPE III HEAVY DUTY VALVE TRAIN | TRAVERS, MATTHEW P | 3726 | §103 | Final Rejection | — | Pending | Jan 10, 2025 |
| 19011975 | SEALS FOR POWER MODULES AND ELECTRIC ENERGY CONVERSION AND RELATED TRANSMISSION DEVICES | TRAN, BINH BACH THANH | 2847 | §103 | Non-Final OA | — | Pending | Jan 07, 2025 |
| 19007211 | CABLE GLAND WITH COMPRESSION LIMITING ASSEMBLY | NGUYEN, CHAU N | 2841 | §102§103DP | Non-Final OA | — | Pending | Dec 31, 2024 |
| 18990619 | Hot Pluggable Electrical Device Assembly | REISNER, NOAM S | 2852 | §102§103 | Non-Final OA | — | Pending | Dec 20, 2024 |
| 18877146 | DC BUS ACTIVE DISCHARGE | AGARED, GABRIEL T | 2837 | §102§103 | Non-Final OA | — | Pending | Dec 19, 2024 |
| 18984579 | OPTIMIZED START-UP SCHEME FOR ISOLATED CASCADED AC/DC POWER CONVERTERS | LEE, JYE-JUNE | 2838 | §103§112 | Non-Final OA | — | Pending | Dec 17, 2024 |
| 18982338 | MOTOR FAULT DETECTION AND REMAINING USEFUL LIFE PREDICTION | TISSOT, ADAM D | 3663 | §103 | Final Rejection | 34d | Pending | Dec 16, 2024 |
| 18874512 | HEAVY DUTY TRANSMISSION ARCHITECTURE DESIGN | TO, TOAN C | 3614 | §102§103 | Non-Final OA | — | Pending | Dec 12, 2024 |
| 18965854 | SPLICE PLATE WITH SPACING INDICIA FOR CABLE TRAY SECTION SPACING | FERGUSON, MICHAEL P | 3619 | §103 | Non-Final OA | — | Pending | Dec 02, 2024 |
| 18870165 | ROOTS-TYPE COMPRESSOR SYSTEM | PLAKKOOTTAM, DOMINICK L | 3746 | §102§103§112 | Non-Final OA | — | Pending | Nov 27, 2024 |
| 18959865 | GOLF CLUB GRIP REMOVAL TOOL | SENGUPTA, SONYA MAZUMDAR | 1745 | §102 | Non-Final OA | — | Pending | Nov 26, 2024 |
| 18959112 | POLYMER LUMINAIRE | TUMEBO, TSION M | 2875 | §103 | Non-Final OA | 72d | Pending | Nov 25, 2024 |
| 18865743 | PASSIVE COOLING APPARATUS FOR COOLING OF IMMERSION FLUID AND POWER CONVERSION EQUIPMENT AND RELATED SYSTEMS | MATEY, MICHAEL A | 2841 | §102§103 | Non-Final OA | — | Pending | Nov 14, 2024 |
| 18944944 | PRESS FIT CONDULET DEVICES, ASSEMBLIES SYSTEMS AND METHODS FOR ELECTRICAL RACEWAY FABRICATION | MCALLISTER, MICHAEL F | 2847 | §101§102§103 | Non-Final OA | — | Pending | Nov 12, 2024 |
| 18937437 | POWER CONVERTERS AND UNINTERRUPTIBLE POWER SUPPY (UPS) INCLUDING THE SAME | NOVAK, PETER MICHAEL | 2838 | §103DP | Non-Final OA | — | Pending | Nov 05, 2024 |
| 18863158 | A PINION AND A DIFFERENTIAL ASSEMBLY | KNIGHT, DEREK DOUGLAS | 3655 | §103 | Non-Final OA | — | Pending | Nov 05, 2024 |
| 18923255 | TRANSFORMER APPARATUS | TORRES-RIVERA, ALEX | 2838 | §102§103 | Non-Final OA | — | Pending | Oct 22, 2024 |
| 18917200 | MITIGATION OF CIRCULATING CURRENTS IN PARALLELED POWER CONVERTERS HAVING INDEPENDENT DC LINKS | NOVAK, PETER MICHAEL | 2838 | §103 | Non-Final OA | — | Pending | Oct 16, 2024 |
| 18896463 | Hard Anodized Aluminum Housing for Electric Fuses | VORTMAN, ANATOLY | 2841 | §103 | Non-Final OA | — | Pending | Sep 25, 2024 |
| 18813720 | OPTICALLY SUPPLIED POWER TO A POWER ELECTRONICS SUPPORTING CIRCUIT | O NEILL, PATRICK | 2842 | §102§103 | Non-Final OA | — | Pending | Aug 23, 2024 |
| 18838682 | THERMAL ANOMALY MANAGEMENT | WILLIAMS, JEFFERY A | 2488 | §103 | Non-Final OA | — | Pending | Aug 15, 2024 |
| 18805116 | YSZ CERAMIC SUBSTRATE PROTECTED FIREPROOF HOSE | DEAL, DAVID R | 3753 | §102§103§112 | Non-Final OA | — | Pending | Aug 14, 2024 |
| 18802242 | CAPACITOR PROTECTION IN A POWER CONVERTER | SREEVATSA, SREEYA | 2838 | §102§103 | Non-Final OA | — | Pending | Aug 13, 2024 |
| 18834676 | DETERMINING AN ELECTRICAL WIRING CONNECTION CONFIGURATION OF AN ELECTRICAL POWER SYSTEM | KIM, HYUN SOO | 2176 | §101§103 | Final Rejection | — | Pending | Jul 31, 2024 |
| 18834331 | DETERMINING AN INTERNAL BATTERY TEMPERATURE BASED ON A DETERMINED BATTERY TEMPERATURE CHANGE OVER TIME FROM AN INITIAL TEMPERATURE CONDITION | WILDER, ANDREW H | 3627 | §101§102§103 | Non-Final OA | — | Pending | Jul 30, 2024 |
| 18786165 | SOLVATED ADHESIVE COMPOSITION AND METHOD | PATWARDHAN, ABHISHEK A | 1746 | §103§112 | Non-Final OA | 46d overdue | Pending | Jul 26, 2024 |
| 18730375 | A METHOD OF CONTROLLING A SENSOR APPARATUS FOR AN ELECTRICAL CIRCUIT | EVERETT, CHRISTOPHER E | 2117 | §103 | Non-Final OA | — | Pending | Jul 19, 2024 |
| 18777384 | SINGLE STAGE HIGH EFFICIENCY VAPOR MANAGEMENT VALVE | MO, XIAO EN | 3747 | §102§103 | Non-Final OA | — | Pending | Jul 18, 2024 |
| 18729368 | FAULT DIAGNOSIS IN MULTI-COMPONENT SYSTEMS | EDWARDS, ETHAN WESLEY | 2857 | §101§103§112 | Non-Final OA | — | Pending | Jul 16, 2024 |
| 18764660 | PRE-CHARGE CIRCUIT AND CONTROL SYSTEM FOR A POWER CONVERTER | ZHANG, JUE | 2838 | §102 | Non-Final OA | — | Pending | Jul 05, 2024 |
| 18749737 | BULK DISPENSING DEVICE FOR SEALING COMPOUNDS | CARROLL, JEREMY W | 3754 | §102§103 | Final Rejection | 49d overdue | Pending | Jun 21, 2024 |
| 18748373 | CONVERTER FOR FORMING THE NEUTRAL IN AN ISLANDED SPLIT-PHASE POWER SYSTEM | SHIAO, DAVID A | 2836 | §103§112 | Non-Final OA | — | Pending | Jun 20, 2024 |
| 18711819 | BATTERY TERMINAL CLAMP ASSEMBLY WITH IMPROVED SECUREMENT AND METHOD OF FORMING THE SAME | MACCHIAROLO, LEAH SIMONE | 2831 | §102§103§112 | Non-Final OA | — | Pending | May 20, 2024 |
| 18710705 | SWITCHING DEVICE WITH A STOPPER AND METHOD FOR OPERATING A SWITCHING DEVICE | TALPALATSKI, ALEXANDER | 2837 | §102§103 | Non-Final OA | — | Pending | May 16, 2024 |
| 35524846 | Automotive inverter housing | TISDELL, SUZANNE E | 2962 | — | Non-Final OA | — | Pending | Apr 22, 2024 |
| 18697713 | ELECTRICAL SWITCH ARRANGEMENT FOR REDUCING ARC ENERGY AND EROSION IN A CONTACT SYSTEM | SAEED, AHMED M | 2831 | §102 | Non-Final OA | — | Pending | Apr 01, 2024 |
| 18618884 | Multi-Gang Mounting Bracket for Electrical or Communication Device | EPPS, TODD MICHAEL | 3632 | §102§103 | Non-Final OA | — | Pending | Mar 27, 2024 |
| 18694648 | DETERMINING ANOMALOUS EVENTS IN A SYSTEM USING A BLOOM FILTER | LEE, PAUL D | 2857 | §101 | Non-Final OA | — | Pending | Mar 22, 2024 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free TrialEmerson Electric Co. has 97 pending office actions as of October 2026, spread across 55 art units and 93 examiners.
Derek Douglas Knight has the most, with 2 of Emerson Electric Co.'s pending office actions.
Mostly Semiconductors, Circuits & Optics (USPTO Tech Center 2800), based on where its pending office actions are examined.