53 pending office actions • 37 art units • 51 examiners • 0 of 53 (0%) have an AI response strategy ready • 93 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 53 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 53 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 48 (91%) |
| §102 only | 1 (2%) |
| §112 only | 3 (6%) |
| No statute on record | 1 (2%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| BALLOWE, CALEB JAMES | 2 | 20.0% | +37.3% |
| CUNNINGHAM, KEVIN M | 2 | 71.8% | +11.9% |
| YU, HENRY W | 1 | 69.0% | +29.1% |
| LU, WILLIAM | 1 | 71.5% | +7.4% |
| FEREJA, SAMUEL D | 1 | 74.9% | +11.6% |
| TAYONG, HELENE E | 1 | 89.3% | +14.9% |
| KIR, ALBERT | 1 | 67.6% | +16.6% |
| RASHID, MOMINUR | 1 | — | — |
| FOTAKIS, ARISTOCRATIS | 1 | 71.4% | +30.9% |
| TRAN, PHUC H | 1 | 91.6% | +2.4% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18592835 | TIMING ALIGNMENT FOR INTER-UE CROSS-LINK INTERFERENCE MITIGATION IN SUB-BAND FULL-DUPLEX CELLULAR SYSTEMS | TRAN, PHUC H | 3d overdue |
| 18665540 | Method And Apparatus For Measuring Correlation Between MIMO Antennas In Mobile Communications | TAYONG, HELENE E | 57d |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18655371 | Method And Apparatus For Radio Link Problem Prediction And Early Recovery In Mobile Communications | BALLOWE, CALEB JAMES | 29d overdue |
| 18059363 | RELIABLE MULTICAST TRANSMISSION WITH UPLINK FEEDBACK | BALLOWE, CALEB JAMES | 20d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18655371 | Method And Apparatus For Radio Link Problem Prediction And Early Recovery In Mobile Communications | BALLOWE, CALEB JAMES | 29d overdue |
| 18767241 | HOST DEVICE AND DRIVING METHOD | YU, HENRY W | 10d overdue |
| 18703974 | SIGNALING CROSS COMPONENT LINEAR MODEL | KIR, ALBERT | 4d overdue |
| 18691116 | METHOD AND APPARATUS FOR MULTIPLE-INPUT AND MULTIPLE-OUTPUT (MIMO) CHANNEL STATE INFORMATION (CSI) FEEDBACK | FOTAKIS, ARISTOCRATIS | 13d |
| 18059363 | RELIABLE MULTICAST TRANSMISSION WITH UPLINK FEEDBACK | BALLOWE, CALEB JAMES | 20d |
| 18712014 | LOCAL ILLUMINATION COMPENSATION WITH CODED PARAMETERS | FEREJA, SAMUEL D | 35d |
| 18665540 | Method And Apparatus For Measuring Correlation Between MIMO Antennas In Mobile Communications | TAYONG, HELENE E | 57d |
| 18035043 | Methods For Signaling Of UE-Initiated COT In Mobile Communications | CUNNINGHAM, KEVIN M | 76d |
| Art Unit | Apps |
|---|---|
| 2419 | 4 |
| 2479 | 4 |
| 2476 | 3 |
| 2414 | 3 |
| 2631 | 2 |
| 2469 | 2 |
| 2465 | 2 |
| 2472 | 2 |
| 2477 | 2 |
| 2461 | 2 |
| App # | Title | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|
| 18767241 | HOST DEVICE AND DRIVING METHOD | YU, HENRY W | 2181 | §103 | Final Rejection | 10d overdue | Pending | Jul 09, 2024 |
| 18764832 | MAP IMAGE PROCESSING DEVICE, MAP IMAGE PROCESSING METHOD AND COMPUTER-READABLE STORAGE MEDIUM | LU, WILLIAM | 2624 | §103 | Final Rejection | 71d | Pending | Jul 05, 2024 |
| 18712014 | LOCAL ILLUMINATION COMPENSATION WITH CODED PARAMETERS | FEREJA, SAMUEL D | 2487 | §103 | Non-Final OA | 35d | Pending | May 21, 2024 |
| 18665540 | Method And Apparatus For Measuring Correlation Between MIMO Antennas In Mobile Communications | TAYONG, HELENE E | 2631 | §112 | Non-Final OA | 57d | Pending | May 15, 2024 |
| 18655371 | Method And Apparatus For Radio Link Problem Prediction And Early Recovery In Mobile Communications | BALLOWE, CALEB JAMES | 2419 | §103 | Final Rejection | 29d overdue | Pending | May 06, 2024 |
| 18703974 | SIGNALING CROSS COMPONENT LINEAR MODEL | KIR, ALBERT | 2485 | §103 | Non-Final OA | 4d overdue | Pending | Apr 23, 2024 |
| 18616341 | BEAM MANAGEMENT OF SL FR2 | RASHID, MOMINUR | 2469 | §103 | Non-Final OA | 24d overdue | Pending | Mar 26, 2024 |
| 18691116 | METHOD AND APPARATUS FOR MULTIPLE-INPUT AND MULTIPLE-OUTPUT (MIMO) CHANNEL STATE INFORMATION (CSI) FEEDBACK | FOTAKIS, ARISTOCRATIS | 2633 | §103 | Final Rejection | 13d | Pending | Mar 12, 2024 |
| 18592835 | TIMING ALIGNMENT FOR INTER-UE CROSS-LINK INTERFERENCE MITIGATION IN SUB-BAND FULL-DUPLEX CELLULAR SYSTEMS | TRAN, PHUC H | 2471 | §112 | Non-Final OA | 3d overdue | Pending | Mar 01, 2024 |
| 18684798 | TEMPLATE MATCHING BASED MOTION VECTOR REFINEMENT IN VIDEO CODING SYSTEM | FINDLEY, CHRISTOPHER G | 2482 | §102 | Non-Final OA | 29d overdue | Pending | Feb 19, 2024 |
| 18437129 | METHODS AND APPARATUS OF MAC PARTIAL RESET DURING INTRA-DU LTM | FOLLANSBEE, KEITH TRAN-DANH | 2411 | §103 | Non-Final OA | 21d | Pending | Feb 08, 2024 |
| 18432249 | PRE-MG ACTIVATION/DEACTIVATION PROCEDURE OVERLAPPING WITH AN OCCASION OF CONCURRENT MG | LEE, CHI HO A | 2475 | §103 | Non-Final OA | 30d | Pending | Feb 05, 2024 |
| 18432144 | Selective BWP Interruptions for L1 Measurements | ABAZA, AYMAN A | 2465 | §103 | Final Rejection | 15d overdue | Pending | Feb 05, 2024 |
| 18405172 | SEMICONDUCTOR PACKAGE STRUCTURE | ENAD, CHRISTINE A | 2811 | §103 | Non-Final OA | 12d | Pending | Jan 05, 2024 |
| 18393481 | Method And Apparatus For Global Navigation Satellite System Operations | PATEL, DHAVAL V | 2631 | §103 | Non-Final OA | 19d | Pending | Dec 21, 2023 |
| 18544603 | CROSS-LINK INTERFERENCE (CLI) MEASUREMENT AND REPORTING | MOUTAOUAKIL, MOUNIR | 2476 | §103 | Non-Final OA | 16d overdue | Pending | Dec 19, 2023 |
| 18512266 | METHOD OF DEMODULATION REFERENCE SIGNAL INSERTION INTO TX IN-BAND EMISSION | LE, BRIAN T | 2479 | §112 | Non-Final OA | 84d | Pending | Nov 17, 2023 |
| 18561453 | METHOD AND APPARATUS FOR SCHEDULING OF PHYSICAL UPLINK CONTROL CNANNEL (PUCCH) CARRIER SWITCHING IN MOBILE COMMUNICATIONS | JAVAID, JAMAL | 2412 | §103 | Non-Final OA | 5d | Pending | Nov 16, 2023 |
| 18508169 | METHODS OF TWO DOWNLINK CHANNEL STATE INFORMATION AND TWO UPLINK CHANNEL STATE INFORMATION FOR FULL DUPLEX SYSTEM | KO, SITHU | 2414 | §103 | Non-Final OA | 11d overdue | Pending | Nov 13, 2023 |
| 18507376 | ELECTRONIC DEVICE TO MONITOR WIRELESS NETWORK ENVIRONMENT WITH LOW POWER CONSUMPTION AND METHOD THEREOF | NGUYEN, STEVEN H D | 2414 | §103 | Non-Final OA | 27d | Pending | Nov 13, 2023 |
| 18386276 | REPETITION INDICATION FOR PUCCH HACK-ACK FOR MSG4 | COBY, FRANTZ | 2459 | §103 | Non-Final OA | 9d overdue | Pending | Nov 02, 2023 |
| 18378699 | MCS SELECTION IN SBFD | ZHAO, WEI | 2479 | §103 | Non-Final OA | 1d overdue | Pending | Oct 11, 2023 |
| 18554834 | BEAM SWITCHING RESTRICTION AND CAPABILITY | CHRISS, ANDREW W | 2472 | §103 | Final Rejection | 15d overdue | Pending | Oct 11, 2023 |
| 18284852 | Method And Apparatus For Physical Uplink Control Channel (PUCCH) Carrier Switching In Mobile Communications | HOLLAND, JENEE LAUREN | 2469 | §103 | Final Rejection | 87d overdue | Pending | Sep 28, 2023 |
| 18475350 | CELL SWITCHING METHOD AND USER EQUIPMENT | SEFCHECK, GREGORY B | 2477 | §103 | Final Rejection | 56d overdue | Pending | Sep 27, 2023 |
| 18373863 | Method And Apparatus For Enhancements On Integer Cycle Report For Carrier Phase Positioning | LEE, SIU M | 2632 | §103 | Final Rejection | 20d | Pending | Sep 27, 2023 |
| 18465639 | CHANNEL STATE INFORMATION (CSI) ENHANCEMENTS IN SUBBAND FULL DUPLEX (SBFD) | JOHNSON, AMY COHEN | 2400 | — | Non-Final OA | 168d overdue | Pending | Sep 12, 2023 |
| 18464094 | TRANSMISSION METHODS OF SIDELINK ON UNLICENSED SPECTRUM | AYAD, SALMA ABDELMONEM | 2462 | §103 | Non-Final OA | 6d | Pending | Sep 08, 2023 |
| 18463275 | SYNCHRONIZATION SIGNAL PATTERN FOR SIDELINK IN UNLICENSED BANDS (SL-U) | THOMAS, WILFRED | 2416 | §103 | Final Rejection | 43d | Pending | Sep 07, 2023 |
| 18242626 | Methods And Apparatus For SBFD-Aware UE Configuration In Mobile Communications | TON, DANG T | 2476 | §103 | Non-Final OA | 3d overdue | Pending | Sep 06, 2023 |
| 18355988 | METHOD FOR ADAPTIVELY SWITCHING THE NETWORK CONNECTION OF SLAVE DEVICES BY SCENARIO DETECTION | SIXTO, NANCY | 2465 | §103 | Final Rejection | 40d | Pending | Jul 20, 2023 |
| 18273113 | Soft HARQ Feedback Reporting Density, Enabling Mechanism, Processing Timeline And Codebook Construction In Mobile Communications | WANG, YAOTANG | 2409 | §103 | Final Rejection | 51d overdue | Pending | Jul 19, 2023 |
| 18272191 | Procedures For PUSCH Scheduling In Mobile Communications | HAN, CLEMENCE S | 2414 | §103 | Non-Final OA | 41d | Pending | Jul 13, 2023 |
| 18219177 | Methods And Apparatus For Disabling And Enabling HARQ Feedback For Multi-TB In IoT NTN | LIU, SHU | 2417 | §103 | Final Rejection | 5d overdue | Pending | Jul 07, 2023 |
| 18208750 | Flexible Interruption For L1 Measurement In Mobile Communications | WEIDNER, TIMOTHY J | 2476 | §103 | Final Rejection | 3d overdue | Pending | Jun 12, 2023 |
| 18332595 | METHODS AND APPARATUS TO SUPPORT CONTROL PLANE LAYER-1/LAYER-2 INTER-CELL BEAM MANAGEMENT WITH MOBILITY | LAM, DUNG LE | 2646 | §103 | Non-Final OA | 22d | Pending | Jun 09, 2023 |
| 18254395 | SPECTRUM SHARING IN NTN-TN COORDINATION | REYES ORTIZ, HECTOR E | 2472 | §103 | Final Rejection | 45d overdue | Pending | May 25, 2023 |
| 18035043 | Methods For Signaling Of UE-Initiated COT In Mobile Communications | CUNNINGHAM, KEVIN M | 2461 | §103 | Final Rejection | 76d | Pending | May 02, 2023 |
| 18295260 | METHODS AND APPARATUS OF TA MAINTENANCE AND ACQUISITION FOR MOBILITY WITH INTER-CELL BEAM MANAGEMENT | MADDOX, MICHAEL WAYNE | 2463 | §103 | Final Rejection | 16d overdue | Pending | Apr 03, 2023 |
| 18115893 | Method And Apparatus For Lean Protocol Stack In Mobile Communications | CUNNINGHAM, KEVIN M | 2461 | §103 | Final Rejection | 85d | Pending | Mar 01, 2023 |
| 18171876 | METHODS AND APPARATUS FOR DATA TRANSMISSION IN NEW RADIO (NR) INACTIVE STATE | STEINER, STEPHEN NICHOLAS | 2464 | §103 | Non-Final OA | 22d | Pending | Feb 21, 2023 |
| 18165892 | HANDLING HARQ FEEDBACK IN INTERNET OF THINGS (IoT) | SEYMOUR, JAMES PAUL | 2419 | §103 | Non-Final OA | 12d | Pending | Feb 07, 2023 |
| 18092203 | Selection Of A Current Tracking Area Identifier Among Multiple Current Tracking Area Identifiers | LOUIS-FILS, NICOLE M | 2641 | §103 | Final Rejection | 44d overdue | Pending | Dec 30, 2022 |
| 18073010 | MULTI-LINK TIME SYNCHRONIZATION IN A WIRELSS NETWORK | GEORGE, AYANAH S | 2467 | §103 | Final Rejection | 9d | Pending | Dec 01, 2022 |
| 18059363 | RELIABLE MULTICAST TRANSMISSION WITH UPLINK FEEDBACK | BALLOWE, CALEB JAMES | 2419 | §103 | Final Rejection | 20d | Pending | Nov 28, 2022 |
| 17922106 | System Information Design For Synchronization In Non-Terrestrial Network Communications | WELTE, BENJAMIN PETER | 2477 | §103 | Non-Final OA | 22d | Pending | Oct 28, 2022 |
| 18046113 | APPARATUS AND METHODS TO PERFORM UPLINK DATA COMPRESSION IN NR | LANGER, PAUL ANTHONY | 2419 | §103 | Non-Final OA | 8d overdue | Pending | Oct 12, 2022 |
| 17948451 | Link Availability Indication For Non-Primary Link In Wireless Communications | CHOI, HAESHIL JESSICA | 2479 | §103 | Non-Final OA | 6d | Pending | Sep 20, 2022 |
| 17905701 | BEAM UTILIZATION MANAGEMENT IN NON-TERRESTRIAL NETWORK COMMUNICATIONS | LE, LANA N | 2648 | §103 | Final Rejection | 71d overdue | Pending | Sep 06, 2022 |
| 17794616 | Communications Method and Communications System for Determining a Transmission Scheme According to at Least One Temporal Parameter | AHMED, SYED MUZAKKIR | 2466 | §103 | Final Rejection | 32d overdue | Pending | Jul 22, 2022 |
| 17862603 | MULTI-SLOT PDCCH MONITORING CONFIGURATION ENHANCEMENTS | WHITAKER, JUSTIN MICHAEL | 2415 | §103 | Final Rejection | 29d overdue | Pending | Jul 12, 2022 |
| 17752003 | CAPACITOR STRUCTURE | CHIU, TSZ K | 2898 | §103 | Non-Final OA | 56d overdue | Pending | May 24, 2022 |
| 17585510 | Signaling For UL TB PPDU With Distributed-Tone Resource Units In 6GHz Low-Power Indoor Systems | PATEL, PARTHKUMAR | 2479 | §103 | Final Rejection | 13d | Pending | Jan 26, 2022 |
IP Author helps IP teams respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial