26 pending office actions • 1 client • 21 examiners • 10 art units • 0 of 26 (0%) have an AI response strategy ready • 123 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 26 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 26 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §103 only | 22 (85%) |
| §102 only | 3 (12%) |
| No statute on record | 1 (4%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| NGUYEN, ANDREW H | 2 | 75.1% | +42.5% |
| KIM, TAE JUN | 2 | 64.0% | +26.2% |
| NG, HENRY | 2 | 63.1% | +57.8% |
| KANG, EDWIN G | 2 | 64.7% | +69.0% |
| RUPPERT, ERIC S | 2 | 59.0% | +24.7% |
| TRAVERS, MATTHEW P | 1 | 63.1% | +44.1% |
| PANG, ROGER L | 1 | 89.6% | +6.6% |
| MARIEN, ANDREW JAMES | 1 | 79.7% | +15.3% |
| STANEK, KELSEY L | 1 | 80.6% | +15.8% |
| LONG, ROBERT FRANKLIN | 1 | 72.0% | +20.9% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18973929 | INTER-ROTATING ASSEMBLY POWER COUPLING SYSTEM FOR TURBINE ENGINE | PANG, ROGER L | 9d overdue |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18639359 | GAS TURBINE ENGINE CONFIGURED FOR DECREASED DIFFUSER WINDAGE AND METHOD OF ASSEMBLING THE SAME | NG, HENRY | 52d overdue |
| 18640938 | MONITORING FUEL PHASE IN AIRCRAFT POWERPLANT FUEL SYSTEM | KIM, TAE JUN | 46d overdue |
| 18196662 | MODULAR HEAT EXCHANGER FOR AN AIRCRAFT POWERPLANT | RUPPERT, ERIC S | 45d overdue |
| 18114691 | FUEL INJECTOR AIR SWIRLER STRUCTURE WITH CANTED FLOW GUIDE SURFACE | KANG, EDWIN G | 42d overdue |
| 19049484 | THERMAL CONDITIONING ASSEMBLY FOR A GAS TURBINE ENGINE | NGUYEN, ANDREW H | 16d overdue |
| 18643622 | THERMAL MANAGEMENT ASSEMBLY FOR A HYBRID-ELECTRIC AIRCRAFT PROPULSION SYSTEM | STANEK, KELSEY L | 8d overdue |
| 19081842 | SUPPORT STRUCTURE FOR FORMING TURBINE ENGINE ROTATING STRUCTURE | TRAVERS, MATTHEW P | 1d overdue |
| 18389096 | AIRCRAFT ENGINE ENTRAINED PARTICLE SEPARATION SYSTEM AND METHOD | NGUYEN, ANDREW H | 9d |
| Client (Assignee) | Pending OAs |
|---|---|
| RTX | 26 |
| Art Unit | Apps |
|---|---|
| 3741 | 12 |
| 3745 | 4 |
| 3799 | 2 |
| 3763 | 2 |
| 3726 | 1 |
| 3655 | 1 |
| 3731 | 1 |
| 3753 | 1 |
| 2874 | 1 |
| 3761 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19081842 | SUPPORT STRUCTURE FOR FORMING TURBINE ENGINE ROTATING STRUCTURE | Rtx Corporation | TRAVERS, MATTHEW P | 3726 | §103 | Final Rejection | 1d overdue | Pending | Mar 17, 2025 |
| 19049484 | THERMAL CONDITIONING ASSEMBLY FOR A GAS TURBINE ENGINE | Rtx Corporation | NGUYEN, ANDREW H | 3741 | §103 | Non-Final OA | 16d overdue | Pending | Feb 10, 2025 |
| 18973929 | INTER-ROTATING ASSEMBLY POWER COUPLING SYSTEM FOR TURBINE ENGINE | Rtx Corporation | PANG, ROGER L | 3655 | §102 | Non-Final OA | 9d overdue | Pending | Dec 09, 2024 |
| 18794374 | TURBINE BLADE FOR A GAS TURBINE ENGINE | Rtx Corporation | MARIEN, ANDREW JAMES | 3745 | §103 | Non-Final OA | 21d | Pending | Aug 05, 2024 |
| 18643622 | THERMAL MANAGEMENT ASSEMBLY FOR A HYBRID-ELECTRIC AIRCRAFT PROPULSION SYSTEM | Rtx Corporation | STANEK, KELSEY L | 3741 | Other | Non-Final OA | 8d overdue | Pending | Apr 23, 2024 |
| 18640938 | MONITORING FUEL PHASE IN AIRCRAFT POWERPLANT FUEL SYSTEM | Rtx Corporation | KIM, TAE JUN | 3799 | §103 | Non-Final OA | 46d overdue | Pending | Apr 19, 2024 |
| 18639359 | GAS TURBINE ENGINE CONFIGURED FOR DECREASED DIFFUSER WINDAGE AND METHOD OF ASSEMBLING THE SAME | Rtx Corporation | NG, HENRY | 3741 | §103 | Non-Final OA | 52d overdue | Pending | Apr 18, 2024 |
| 18591945 | CUTTING TOOL SUPPORT FOR IN-SITU HOLE MANUFACTURING | Rtx Corporation | LONG, ROBERT FRANKLIN | 3731 | §103 | Final Rejection | 29d | Pending | Feb 29, 2024 |
| 18422343 | INTERMEDIATE CASE FOR AIRCRAFT PROPULSION SYSTEM HOUSING | Rtx Corporation | KIM, TAE JUN | 3799 | §103 | Final Rejection | 27d | Pending | Jan 25, 2024 |
| 18542071 | VENTILATION SYSTEM FOR AIRCRAFT PROPULSION SYSTEM | Rtx Corporation | HARRINGTON, ALYSON JOAN | 3741 | §103 | Final Rejection | 69d | Pending | Dec 15, 2023 |
| 18538300 | OPEN ROTOR AIRCRAFT PROPULSION SYSTEM WITH ANTI-ICING SYSTEM | Rtx Corporation | IGUE, ROBERTO TOSHIHARU | 3741 | §103 | Final Rejection | 5d overdue | Pending | Dec 13, 2023 |
| 18389096 | AIRCRAFT ENGINE ENTRAINED PARTICLE SEPARATION SYSTEM AND METHOD | Rtx Corporation | NGUYEN, ANDREW H | 3741 | §103 | Final Rejection | 9d | Pending | Nov 13, 2023 |
| 18389208 | COOLING NOZZLE VANES OF A TURBINE ENGINE | Rtx Corporation | KANG, EDWIN G | 3741 | §103 | Final Rejection | 41d | Pending | Nov 13, 2023 |
| 18383362 | DAMPED FLUID LINE FOR AIRCRAFT ENGINE | Rtx Corporation | LEARY, JOSHUA DENNIS | 3753 | §103 | Non-Final OA | 41d | Pending | Oct 24, 2023 |
| 18238197 | MONITORING BREAKTHROUGH OF ELECTRICAL DISCHARGE MACHINING ELECTRODE THROUGH A WORKPIECE | Rtx Corporation | LISOWSKI, JACEK | 3741 | §103 | Non-Final OA | 3d overdue | Pending | Aug 25, 2023 |
| 18224938 | TURBINE ENGINE VANE ARRAY STRUCTURE WITH AIR PARTICLE SEPARATOR | Raytheon Technologies Corporation | NG, HENRY | 3741 | §103 | Final Rejection | 26d | Pending | Jul 21, 2023 |
| 18202733 | AIRCRAFT PROPULSION SYSTEM WITH ADJUSTABLE THRUST PROPULSOR | Raytheon Technologies Corporation | MEILLER, SEAN V | 3741 | §103 | Non-Final OA | 32d overdue | Pending | May 26, 2023 |
| 18196662 | MODULAR HEAT EXCHANGER FOR AN AIRCRAFT POWERPLANT | Raytheon Technologies Corporation | RUPPERT, ERIC S | 3763 | §103 | Non-Final OA | 45d overdue | Pending | May 12, 2023 |
| 18137871 | MAGNETIC-FOIL BEARING WITH ROTATING STRUCTURE HEALTH MONITORING | Raytheon Technologies Corporation | HTAY, AYE SU MON | 3745 | §102 | Non-Final OA | 29d | Pending | Apr 21, 2023 |
| 18126774 | SPLIT CASE STRUCTURE FOR A GAS TURBINE ENGINE | Rtx Corporation | LAMBERT, WAYNE A | 3745 | §103 | Final Rejection | 19d | Pending | Mar 27, 2023 |
| 18123260 | SYSTEMS AND METHODS FOR STARTING A GAS TURBINE ENGINE | Raytheon Technologies Corporation | MALATEK, KATHERYN A | 3741 | §103 | Non-Final OA | 52d overdue | Pending | Mar 18, 2023 |
| 18121424 | COUPLING OPTICAL FIBERS AND FLUID PASSAGES | Raytheon Technologies Corporation | HAYES, MARY A | 2874 | §103 | Final Rejection | 19d overdue | Pending | Mar 14, 2023 |
| 18119130 | HEAT EXCHANGER WITH CROSSING HEAT EXCHANGE TUBES | Raytheon Technologies Corporation | RUPPERT, ERIC S | 3763 | §103 | Non-Final OA | 22d | Pending | Mar 08, 2023 |
| 18114691 | FUEL INJECTOR AIR SWIRLER STRUCTURE WITH CANTED FLOW GUIDE SURFACE | Raytheon Technologies Corporation | KANG, EDWIN G | 3741 | §103 | Final Rejection | 42d overdue | Pending | Feb 27, 2023 |
| 17401886 | FORMING COOLING APERTURE(S) IN A TURBINE ENGINE COMPONENT | Raytheon Technologies Corporation | LIU, CHRIS Q | 3761 | §102 | Non-Final OA | 1d overdue | Pending | Aug 13, 2021 |
| 16796227 | ROTOR BLADE AND METHOD FOR FORMING A ROTOR BLADE | UNITED TECHNOLOGIES CORPORATION | PRUITT, JUSTIN A | 3745 | §103 | Non-Final OA | 49d overdue | Pending | Feb 20, 2020 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial