178 pending office actions • 75 clients • 166 examiners • 94 art units • 0 of 178 (0%) have an AI response strategy ready
Based on the USPTO statutory response window for each pending office action. 77 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 77 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 8 (4%) |
| §101 + other | 17 (10%) |
| §103 only | 66 (37%) |
| §102 only | 9 (5%) |
| §112 only | 6 (3%) |
| Double-patenting only | 4 (2%) |
| Double-patenting + other | 5 (3%) |
| Multi-statute (no §101) | 62 (35%) |
| No statute on record | 1 (1%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| SHAKERI, HADI | 4 | 62.1% | +37.2% |
| DEMEREE, CHRISTOPHER R | 3 | 69.0% | +13.9% |
| WRIGHT, GIOVANNA COLLINS | 2 | 85.9% | +9.6% |
| CHERN, CHRISTINA | 2 | 38.6% | +41.7% |
| HUTCHINS, CATHLEEN R | 2 | 83.9% | +7.9% |
| MITCHELL, JOEL F | 2 | 61.1% | +16.2% |
| MARLEN, TAMMIE K | 2 | 75.1% | +21.2% |
| LIEUWEN, CODY J | 2 | 59.5% | +45.9% |
| ARMSTRONG, KAREN JOYCE | 2 | 66.7% | +13.3% |
| CHOI, JISUN | 1 | 68.6% | +61.7% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 1 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18911940 | Powered Cutting Head System and Method | HUTCHINS, CATHLEEN R | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18087188 | SYSTEM FOR LOWERING COSTS AND IMPROVING ACCESS TO DRIVER EDUCATION USING TELEMATICS | NGUYEN, TIEN C | 121d overdue |
| 18503587 | WOOD BUILDING STUDS WITH AN OUTBOARD FOAM INSULATION THERMAL BARRIER AND METHOD OF MANUFACTURE | FORD, GISELE D | 84d overdue |
| 17483909 | WORK MACHINE WITH AUTOMATIC PITCH CONTROL OF IMPLEMENT | MITCHELL, JOEL F | 84d overdue |
| 18506550 | SYSTEMS AND METHODS FOR CAB NOISE LEVEL REDUCTION USING OBJECT INTELLIGENCE DETECTION | ALKIRSH, AHMED | 60d overdue |
| 18118806 | MODIFIED PONTOON ASSEMBLY FOR IMPROVED FLOTATION AND METHOD OF ASSEMBLY THEREOF | BURGESS, MARC R | 46d overdue |
| 18086535 | WIRELESS CHARGING AND POWERING OF TOOLS | WILLIAMS, ARUN C | 46d overdue |
| 18414276 | AUTOMATIC ITEM RECOGNITION FROM CAPTURED IMAGES DURING ASSISTED CHECKOUT | ALAVI, AMIR | 45d overdue |
| 18772975 | METHOD OF BRAKING A POWER TOOL | GLASS, ERICK DAVID | 36d overdue |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18537151 | Neuromodulation Device | MARLEN, TAMMIE K | 120d overdue |
| 17483909 | WORK MACHINE WITH AUTOMATIC PITCH CONTROL OF IMPLEMENT | MITCHELL, JOEL F | 84d overdue |
| 18289456 | NOZZLE FOR THE PRODUCTION OF A PULSATILE JET OF FLUID | LIEUWEN, CODY J | 30d overdue |
| 18922923 | SOLAR CELL AND METHOD FOR MANUFACTURING THE SAME | CHERN, CHRISTINA | 22d overdue |
| 18015140 | BEARING SYSTEM FOR A ROTARY ATOMIZER | LIEUWEN, CODY J | 2d overdue |
| 18682265 | Neuromodulation Device | MARLEN, TAMMIE K | 63d |
| 18924495 | Untitled | DEMEREE, CHRISTOPHER R | — |
| 18909659 | Untitled | CHOI, JISUN | — |
| Art Unit | Apps |
|---|---|
| 3723 | 9 |
| 3752 | 5 |
| 3671 | 4 |
| 1721 | 3 |
| 1726 | 3 |
| 3672 | 3 |
| 3663 | 3 |
| 3627 | 3 |
| 3734 | 3 |
| 3615 | 3 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 18924495 | Untitled | Deere & Company | DEMEREE, CHRISTOPHER R | §102 | Non-Final OA | — | Pending | ||
| 18909659 | Untitled | Deere & Company | CHOI, JISUN | 3666 | §103§112 | Non-Final OA | — | Pending | |
| 18763168 | Untitled | Deere & Company | WRIGHT, GIOVANNA COLLINS | §101§102§103 | Non-Final OA | — | Pending | ||
| 19314955 | Untitled | Deere & Company | HOANG, JOHNNY H | 3747 | — | Non-Final OA | — | Pending | |
| 18765974 | Untitled | Deere & Company | JORGENSEN, ABBY A | §102 | Non-Final OA | — | Pending | ||
| 19345186 | SOLAR CELL, METHOD FOR MANUFACTURING THE SAME, PHOTOVOLTAIC MODULE, AND PHOTOVOLTAIC SYSTEM | Trina Solar Co., Ltd. | CHERN, CHRISTINA | 1722 | §103§112 | Non-Final OA | — | Pending | Sep 30, 2025 |
| 19262977 | GENERATION OF THREE-DIMENSIONAL IMAGES WITH DIGITAL MAGNIFICATION | Unify Medical, Inc. | NASRI, MARYAM A | 2483 | §101Other | Final Rejection | 23d | Pending | Jul 08, 2025 |
| 19262543 | PROTECTIVE COVERING FOR A ROBOT HAND AXIS | Dürr Systems AG | COOK, WILLIAM J | 3618 | DP | Non-Final OA | — | Pending | Jul 08, 2025 |
| 19248147 | PACKAGE DELIVERY BY MEANS OF AN AUTOMATED MULTI-COPTER UAS/UAV DISPATCHED FROM A CONVENTIONAL DELIVERY VEHICLE | Aero Velocity Inc. | DAVIS, RICHARD G | 3644 | §101 | Non-Final OA | 7d | Pending | Jun 24, 2025 |
| 19214387 | ULTRAVIOLET CLEANING OF CARRIERS IN A DRIVE-UP BANKING SYSTEM | Hamilton Safe | HUSSEIN, ALAA WADIE | §103 | Non-Final OA | — | Pending | Jun 04, 2025 | |
| 19218758 | METHOD FOR GENERATING ACOUSTIC DRIVING STATUS NOTIFICATION FOR AGRICULTURAL TRACTOR | Deere & Company | AFRIN, NAZIA | §101§102§103 | Non-Final OA | — | Pending | May 27, 2025 | |
| 19205267 | DYNAMIC MESSAGE BOARD AND LIGHT BAR CONTROLLER AND METHOD FOR CONTROL | Actus Manufacturing Inc. | MUNION, JAMES E | 2688 | §103 | Non-Final OA | — | Pending | May 12, 2025 |
| 19112116 | RETURN DEVICE FOR RETURNING AT LEAST ONE LINE | Dürr Systems AG | ELAHMADI, ZAKARIA | 3618 | §103 | Non-Final OA | 55d | Pending | Mar 17, 2025 |
| 19079556 | SEAL ASSEMBLY OF A SLIDE-OUT FOR A RECREATIONAL VEHICLE AND SYSTEM THEREOF | Forest River, Inc. | ZHUO, WENWEI | §103 | Non-Final OA | — | Pending | Mar 14, 2025 | |
| 19075668 | CATTLE PERFORMANCE INDEX METHOD AND APPARATUS | Patterson Companies, Inc. | BOSWELL, BETH V | 3625 | §101§103 | Non-Final OA | — | Pending | Mar 10, 2025 |
| 19103223 | NON-ORIENTED ELECTRICAL STEEL FOR ELECTRIC VEHICLE DRIVE MOTOR AND MANUFACTURING METHOD THEREOF | BAOSHAN IRON & STEEL CO., LTD. | WANG, XIAOBEI | §102§103§112 | Non-Final OA | — | Pending | Feb 11, 2025 | |
| 18996127 | SOLAR CELL | Trina Solar Co., Ltd. | MOWLA, GOLAM | 1721 | §102§103 | Non-Final OA | — | Pending | Jan 17, 2025 |
| 19028774 | SOLAR CELL, PHOTOVOLTAIC MODULE, AND PHOTOVOLTAIC SYSTEM | Trina Solar Co., Ltd. | MERSHON, JAYNE L | 1721 | §103 | Non-Final OA | — | Pending | Jan 17, 2025 |
| 18878349 | A TASK MANAGEMENT APPLIANCE | Active Healthcare Solutions Ltd. | CASILLASHERNANDEZ, OMAR | 2689 | §103 | Final Rejection | — | Pending | Dec 23, 2024 |
| 18985738 | AGRICULTURAL SEED FURROW | Deere & Company | CHOU, SHIEN MING | 3667 | §103§112 | Non-Final OA | — | Pending | Dec 18, 2024 |
| 18982364 | RECREATIONAL VEHICLE AND ROOFING ASSEMBLY THEREOF | Forest River, Inc. | BUTCHER, CAROLINE N | §103§112Other | Non-Final OA | — | Pending | Dec 16, 2024 | |
| 18976687 | FLANGED CLAMP UNION AND METHOD OF ASSEMBLY | Deere & Company | DRAGICEVICH, ZACHARY T | 3679 | §103 | Final Rejection | — | Pending | Dec 11, 2024 |
| 18864877 | SHEET-LIKE COMPOSITE FOR DIMENSIONALLY STABLE FOOD OR DRINK PRODUCT CONTAINERS WITH AN INNER POLYMER LAYER COMPRISING A METALLOCENE POLYETHYLENE | Sig Services AG | SHUKLA, KRUPA | 1787 | §103§112 | Non-Final OA | — | Pending | Nov 11, 2024 |
| 18930609 | Treatment of Disorders Associated with Inflammation | Galvani Bioelectronics Limited | LEE, ERICA SHENGKAI | §112Other | Non-Final OA | — | Pending | Oct 29, 2024 | |
| 18925822 | SOLAR CELL, PREPARATION METHOD THEREOF, AND PHOTOVOLTAIC MODULE | Trina Solar Co., Ltd. | AYAD, TAMIR | 1726 | §103 | Non-Final OA | 16d | Pending | Oct 24, 2024 |
| 18924183 | Neuromodulation of Ganglia | Galvani Bioelectronics Limited | ALTER MORSCHAUSER, ALYSSA MARGO | §102Other | Non-Final OA | — | Pending | Oct 23, 2024 | |
| 18922923 | SOLAR CELL AND METHOD FOR MANUFACTURING THE SAME | Trina Solar Co., Ltd. | CHERN, CHRISTINA | 1722 | §103DP | Non-Final OA | 22d overdue | Pending | Oct 22, 2024 |
| 18920067 | ROTARY ATOMIZER | Dürr Systems AG | SCHWARTZ, KEVIN EDWARD | §103Other | Non-Final OA | — | Pending | Oct 18, 2024 | |
| 18918682 | SOLAR CELL AND MANUFACTURING METHOD THEREFOR | Trina Solar Co., Ltd. | DAM, DUSTIN Q | 1721 | §103§112 | Non-Final OA | 83d | Pending | Oct 17, 2024 |
| 18911971 | Powered Cutting Head Steering System and Method | Deere & Company | STAUBACH, CARL C | 3747 | §112 | Non-Final OA | — | Pending | Oct 10, 2024 |
| 18911940 | Powered Cutting Head System and Method | Deere & Company | HUTCHINS, CATHLEEN R | 3672 | §103Other | Non-Final OA | — | Pending | Oct 10, 2024 |
| 18909288 | ELECTRIC DELIVERY TRUCK CONTROL SYSTEM FOR HUB MOTOR CONTROL | Workhorse Group Inc. | KINGSLAND, KYLE J | 3663 | §103 | Non-Final OA | 113d overdue | Pending | Oct 08, 2024 |
| 18906556 | AUTOMATIC ITEM IDENTIFICATION DURING ASSISTED CHECKOUT | Radiusai, Inc. | WERONSKI, MATTHEW S | 3627 | §103 | Final Rejection | 30d overdue | Pending | Oct 04, 2024 |
| 18906996 | AUGMENTED REALITY OF ITEM IDENTIFICATION DURING ASSISTED CHECKOUT | Radiusai, Inc. | CHEIN, ALLEN C | 3627 | §102Other | Non-Final OA | 25d overdue | Pending | Oct 04, 2024 |
| 18894264 | MOTOR CONTROLLER FOR A TOOL | Snap-On Incorporated | MULLINS, BURTON S | §103 | Non-Final OA | — | Pending | Sep 24, 2024 | |
| 18850046 | LIQUID-TIGHT CONTAINER, METHODS FOR THE PRODUCTION THEREOF, AND USES | Sig Services AG | DEMEREE, CHRISTOPHER R | 3734 | §103 | Non-Final OA | — | Pending | Sep 23, 2024 |
| 18850047 | LIQUID-TIGHT CONTAINER, PREFORM, METHOD FOR PRODUCING SAME, AND USES | Sig Services AG | DEMEREE, CHRISTOPHER R | 3734 | §102 | Non-Final OA | — | Pending | Sep 23, 2024 |
| 18888749 | PISTOL-GRIP STYLE ELECTRIC AIR PUMP TOOLS | Snap-On Incorporated | BOBISH, CHRISTOPHER S | 3746 | §102§103 | Final Rejection | — | Pending | Sep 18, 2024 |
| 18846201 | PLANAR COMPOSITE WITH GROOVES FOR DIMENSIONALLY STABLE FOODSTUFF CONTAINERS WITH STEEP EDGES RUNNING AT AN ANGLE TO EACH OTHER | Sig Services AG | ATTEL, NINA KAY | 3734 | §103§112 | Non-Final OA | — | Pending | Sep 11, 2024 |
| 18822726 | BLOWER ASSEMBLY FOR A CLEANING DEVICE OF A COMBINE HARVESTER | Deere & Company | WEBB, SUNNY DANIELLE | §102§103 | Non-Final OA | — | Pending | Sep 03, 2024 | |
| 18842312 | SERVER CONFIGURATION DEBUGGING METHOD, SYSTEM AND DEVICE, MEDIUM AND COMPUTER PROGRAM PRODUCT | Shanghai Lilith Technology Corporation | NGUYEN, DUY KHUONG THANH | §101§103 | Non-Final OA | — | Pending | Aug 28, 2024 | |
| 18795666 | SYSTEM AND METHOD FOR VISUALLY TRACKING PERSONS AND IMPUTING DEMOGRAPHIC AND SENTIMENT DATA | Radiusai, Inc. | PHAM, NAM D | 2487 | DP | Final Rejection | 120d overdue | Pending | Aug 06, 2024 |
| 18789892 | CONTROLLING A BRUSHLESS MOTOR | Snap-On Incorporated | AGARED, GABRIEL T | 2846 | §102 | Non-Final OA | — | Pending | Jul 31, 2024 |
| 18833212 | MULTISPECTRAL IMAGE RECOGNITION METHOD AND APPARATUS, STORAGE MEDIUM, ELECTRONIC DEVICE AND PROGRAM | Beijingkeeyootechnologiesco.,Ltd | ROSARIO, DENNIS | 2676 | §101§102§103 | Non-Final OA | — | Pending | Jul 25, 2024 |
| 18832745 | WATER FILLING AND DRAINAGE TEST METHOD AND DEVICE FOR PREFABRICATED CRACK-CONTAINING REINFORCED CONCRETE LINING PRESSURE TUNNEL | Guangxi University | HINZE, LEO T | §112 | Non-Final OA | — | Pending | Jul 24, 2024 | |
| 18776519 | MESSAGING PROTOCOL FOR NEAR-REAL TIME TRANSACTION IDENTIFICATION | Involute Inc. (Doing Business AS Xuno) | SHARON, AYAL I | 3695 | §101 | Final Rejection | — | Pending | Jul 18, 2024 |
| 18775738 | SYSTEMS AND METHODS FOR ACTIVE TERRAIN COMPENSATION | Deere & Company | WRIGHT, GIOVANNA COLLINS | 3672 | §101§102§112Other | Non-Final OA | — | Pending | Jul 17, 2024 |
| 18772975 | METHOD OF BRAKING A POWER TOOL | Snap-On Incorporated | GLASS, ERICK DAVID | 2846 | §102§103 | Final Rejection | 36d overdue | Pending | Jul 15, 2024 |
| 18767954 | CENTRIFUGAL IMPELLER COMPRISING VANES FORMED BY SHEET METAL STAMPING | Zhongshan Yibisi Technology Co., Ltd. | PRUITT, JUSTIN A | 3745 | §103 | Final Rejection | 58d overdue | Pending | Jul 09, 2024 |
| 18727625 | METAL VAPOUR PRESSURE DETECTION APPARATUS AND DETECTION METHOD | BAOSHAN IRON & STEEL CO., LTD. | EYASSU, MARRIT | §103§112 | Non-Final OA | — | Pending | Jul 09, 2024 | |
| 18727280 | A HIGH-STRENGTH TUBE RESISTANT TO ALUMINUM SULFATE CORROSION AND MANUFACTURING METHOD THEREFOR | BAOSHAN IRON & STEEL CO., LTD. | DEAL, DAVID R | §112 | Non-Final OA | — | Pending | Jul 08, 2024 | |
| 18726098 | METHOD AND DEVICE FOR CROSS-PROCESS USE OF COLD/HOT-ROLLED EXCESS MATERIAL, MEDIUM, AND PROGRAM PRODUCT | BAOSHAN IRON & STEEL CO., LTD. | WILDER, ANDREW H | 3627 | §101 | Final Rejection | 42d | Pending | Jul 01, 2024 |
| 18754260 | Adaptive Spin Control System and Method for Construction Machine | Deere & Company | REIDY, SEAN PATRICK | 3663 | §103 | Non-Final OA | — | Pending | Jun 26, 2024 |
| 18741590 | LAND VEHICLES INCORPORATING MONOCOQUES AND MODULAR MOLD SYSTEMS FOR MAKING THE SAME | Workhorse Group Inc. | MORROW, JASON S | 3612 | §102§103 | Final Rejection | — | Pending | Jun 12, 2024 |
| 18718709 | PIPELINE STRUCTURE AND POOL BODY | Oriental Recreational Products (Shanghai) Co., Ltd. | SKUBINNA, CHRISTINE J | 3754 | §103 | Final Rejection | — | Pending | Jun 11, 2024 |
| 18716162 | APPLICATION SYSTEM AND ASSOCIATED MONITORING METHOD | Dürr Systems AG | JELLETT, MATTHEW WILLIAM | 3753 | §103 | Non-Final OA | 71d | Pending | Jun 04, 2024 |
| 18669661 | COUPLING ASSEMBLY FOR A THREE-POINT HITCH OF AN AGRICULTURAL TRACTOR | Deere & Company | MITCHELL, JOEL F | 3671 | §102§103§112 | Non-Final OA | — | Pending | May 21, 2024 |
| 18705623 | METHOD AND DEVICE FOR LOAD REJECTION TEST FOR PUMPED STORAGE GROUP, APPARATUS AND MEDIUM | Csg Power Generation Co., Ltd. Maint. And Test Co. | KAY, DOUGLAS | §101 | Non-Final OA | — | Pending | Apr 29, 2024 | |
| 18702138 | BELL CUP, AND ROTARY ATOMIZER COMPRISING SUCH A BELL CUP | Dürr Systems AG | GANEY, STEVEN J | 3752 | §103§112Other | Final Rejection | — | Pending | Apr 17, 2024 |
| 18636987 | DYNAMIC GENERATION AND ORGANIZATION OF DIGITAL CIRCULARS | Design House, Inc. | SPAR, ILANA L | 3622 | §101§103§112Other | Final Rejection | 16d overdue | Pending | Apr 16, 2024 |
| 18700033 | CHROMIUM-FREE PASSIVATED FILM-COVERED TINNED PLATE AND PREPARATION METHOD THEREFOR | BAOSHAN IRON & STEEL CO., LTD. | CHEN, VIVIAN | 1787 | §103 | Non-Final OA | — | Pending | Apr 10, 2024 |
| 18623665 | LAND VEHICLES INCORPORATING IMPACT MANAGEMENT SYSTEMS | Workhorse Group Inc. | SHRIVER II, JAMES A | 3615 | DP | Non-Final OA | — | Pending | Apr 01, 2024 |
| 18621405 | METHODS OF MAKING MONOCOQUES OF LAND VEHICLES USING MODULAR MOLD SYSTEMS | Workhorse Group Inc. | BEHRENS JR., ANDRES E | 1741 | §103§112 | Final Rejection | — | Pending | Mar 29, 2024 |
| 18613452 | SYSTEMS FOR ULTRASONIC CONSOLIDATION OF MATERIALS | Agile Ultrasonics Corp. | TAUFIQ, FARAH N | 1754 | §103 | Final Rejection | 60d overdue | Pending | Mar 22, 2024 |
| 18692301 | SAMPLING INTERVAL ADJUSTED CLASSIFICATION TOOL | UNIVERSITAT HEIDELBERG | SANGHERA, STEVEN G.S. | 3684 | §101 | Non-Final OA | — | Pending | Mar 14, 2024 |
| 18691931 | PROCESS OF SIGNING DOCUMENTS | Freshape SA | HUNTSINGER, PETER K | 2682 | §103 | Non-Final OA | 89d overdue | Pending | Mar 14, 2024 |
| 18601176 | PLANT GROWING APPARATUS AND METHOD | Heliponix, LLC | CONLON, MARISA V | 3643 | §103 | Non-Final OA | 4d overdue | Pending | Mar 11, 2024 |
| 18593384 | FILL PROFILE CALCULATION AND OPTIMIZATION | Deere & Company | BHAT, ADITYA S | §101§102 | Non-Final OA | — | Pending | Mar 01, 2024 | |
| 18688104 | DEVICE AND METHOD FOR CONTROLLING OPERATIONAL VIBRATIONS OF A PUMP OR PUMP ASSEMBLY | Grundfos Holding A/S | FREAY, CHARLES GRANT | 3746 | §103 | Non-Final OA | 9d overdue | Pending | Feb 29, 2024 |
| 18587027 | GREYBOARD RACK FOR SAMPLE TUBE PREPARATION, TRANSFER, PROCESSING, AND STORAGE | Scilutions, LLC | JARRETT, LORE RAMILLANO | §103§112 | Non-Final OA | — | Pending | Feb 26, 2024 | |
| 18584374 | Harvesting Loss Detection Location and Improvement System and Method | Deere & Company | ISMAIL, MAHMOUD S | 3662 | §103 | Final Rejection | — | Pending | Feb 22, 2024 |
| 18581036 | METHOD FOR CLASSIFYING QUALITY OF BIOLOGICAL SENSOR DATA | Hoffmann-La Roche, Inc. | DUONG, HIEN LUONGVAN | §103 | Non-Final OA | — | Pending | Feb 19, 2024 | |
| 18442272 | MULTI-PURPOSE CUTTING TOOL | Snap-On Incorporated | ZAWORSKI, JONATHAN R | 3723 | §102§103 | Non-Final OA | 11d overdue | Pending | Feb 15, 2024 |
| 18683784 | OPERATING METHOD FOR AN ATOMIZER, AND CORRESPONDING COATING SYSTEM | Dürr Systems AG | ROLLAND, ALEX A | §102§103§112 | Non-Final OA | — | Pending | Feb 15, 2024 | |
| 18683785 | CLEANING DEVICE FOR AN ELECTRODE ASSEMBLY OF AN ATOMIZER | Dürr Systems AG | TATE-SIMS, CRISTI J | 1711 | §102§103§112 | Non-Final OA | — | Pending | Feb 15, 2024 |
| 18682265 | Neuromodulation Device | Galvani Bioelectronics Limited | MARLEN, TAMMIE K | 3796 | §101§102§103§112 | Non-Final OA | 63d | Pending | Feb 08, 2024 |
| 18433671 | Detecting Multiple Specific Issues From A Single User Input | Deere & Company | HUYNH, CHRISTINE NGUYEN | 3662 | §103 | Final Rejection | 7d | Pending | Feb 06, 2024 |
| 18432356 | AUTONOMOUS SEISMIC NODE FOR THE SEABED | Pxgeo UK Limited | ABULABAN, ABDALLAH | 3645 | §103 | Non-Final OA | 75d | Pending | Feb 05, 2024 |
| 18430183 | AXIAL PLIERS | Snap-On Incorporated | SHAKERI, HADI | 3723 | §103DP | Non-Final OA | — | Pending | Feb 01, 2024 |
| 18429886 | ADDITIVE MANUFACTURING PROCESS MONITORING AND CALIBRATION | Applied Optimization, Inc. | LUU, THANH X | 2878 | §102§103 | Non-Final OA | 14d | Pending | Feb 01, 2024 |
| 18428032 | Agricultural Harvester Header Compatibility Control | Deere & Company | AN, IG TAI | 3662 | §102§103§112 | Non-Final OA | 14d | Pending | Jan 31, 2024 |
| 18427250 | PORTABLE AND MODULAR PRODUCTION ELECTROPLATING SYSTEM | Snap-On Incorporated | CHUNG, HOSUNG CHARLES | 1794 | §112DPOther | Non-Final OA | — | Pending | Jan 30, 2024 |
| 18291852 | DIGITAL CONTENT PROCESSING METHOD AND APPARATUS, ELECTRONIC DEVICE, STORAGE MEDIUM AND PRODUCT | Aishu Technology Corp. | HUARACHA, WILLY W | 2197 | §101§103 | Non-Final OA | — | Pending | Jan 24, 2024 |
| 18420742 | MULTI-RESISTOR UNIT CELL CONFIGURATION FOR IMPEMENTAITON IN ANALOG NEUROMORPHIC CIRCUITS | Brisk Computing LLC | KNIGHT, PAUL M | §101§102§112Other | Non-Final OA | — | Pending | Jan 23, 2024 | |
| 18420089 | METHOD FOR SWITCHING BETWEEN OPERATIONAL MODES IN TELE-MANUFACTURING SYSTEMS | Edison Welding Institute, Inc. | CARTER, CHRISTOPHER W | 2117 | §101§103 | Non-Final OA | — | Pending | Jan 23, 2024 |
| 18417355 | HARVESTING HEADER FOR A COMBINE HARVESTER FOR HARVESTING CROPS WITH GRAINS GROWING ON STALKS | Deere & Company | HUTCHINS, CATHLEEN R | 3672 | §103§112 | Non-Final OA | — | Pending | Jan 19, 2024 |
| 18414276 | AUTOMATIC ITEM RECOGNITION FROM CAPTURED IMAGES DURING ASSISTED CHECKOUT | Radiusai, Inc. | ALAVI, AMIR | 2668 | §101Other | Non-Final OA | 45d overdue | Pending | Jan 16, 2024 |
| 18576209 | DEVICE FOR HANDLING A MOTOR VEHICLE BODY COMPONENT | Dürr Systems AG | MCCLAIN, GERALD | 3652 | §102§103 | Non-Final OA | — | Pending | Jan 03, 2024 |
| 18402072 | HOT WATER PRESSURE WASHER | Northern Tool & Equipment Company, Inc. | ORTA, LAUREN GRACE | 1711 | §103§112 | Non-Final OA | — | Pending | Jan 02, 2024 |
| 18543077 | ROW UNIT LINKAGE ASSEMBLY AND METHOD | Deere & Company | MAYO, TARA LEIGH | 3671 | §103 | Final Rejection | 10d overdue | Pending | Dec 18, 2023 |
| 18537151 | Neuromodulation Device | Galvani Bioelectronics Limited | MARLEN, TAMMIE K | 3796 | §103 | Final Rejection | 120d overdue | Pending | Dec 12, 2023 |
| 18529045 | SLIDE HAMMER PLIERS | Snap-On Incorporated | SHAKERI, HADI | 3723 | §102 | Non-Final OA | — | Pending | Dec 05, 2023 |
| 18522733 | SYSTEM FOR IMAGE-BASED IDENTIFICATION OF THE POSITION OF A CARGO CONTAINER | Deere & Company | SCHWARTZ, RAPHAEL M | 2671 | §103Other | Final Rejection | — | Pending | Nov 29, 2023 |
| 18515678 | AIR TREATMENT UNIT FOR RECREATIONAL VEHICLES | Future Air Solutions Tech LLC | ZERPHEY, CHRISTOPHER R | 3799 | §103 | Non-Final OA | 89d overdue | Pending | Nov 21, 2023 |
| 18512959 | SILICONE OIL-BASED IMMERSION COOLANT FOR ELECTRONIC COMPONENTS | Csg Pwr Gen. (Guangdong) Enrgy. Str. Tch. Co. Ltd. | HOANG, NATHAN NGOC-NGOC | §103 | Non-Final OA | — | Pending | Nov 17, 2023 | |
| 18506550 | SYSTEMS AND METHODS FOR CAB NOISE LEVEL REDUCTION USING OBJECT INTELLIGENCE DETECTION | Deere & Company | ALKIRSH, AHMED | 3668 | §102§103 | Non-Final OA | 60d overdue | Pending | Nov 10, 2023 |
| 18503587 | WOOD BUILDING STUDS WITH AN OUTBOARD FOAM INSULATION THERMAL BARRIER AND METHOD OF MANUFACTURE | Envirobon, Inc. | FORD, GISELE D | 3633 | §103§112 | Final Rejection | 84d overdue | Pending | Nov 07, 2023 |
| 18289800 | EMITTER, SELECTIVE EMITTER CELL PREPARATION METHOD AND SELECTIVE EMITTER CELL | Trina Solar Co., Ltd. | AHMED, MEHEK | 2817 | §103§112 | Non-Final OA | 28d overdue | Pending | Nov 07, 2023 |
| 18502342 | BATTERY SYSTEM | Deere & Company | CORNO JR, JAMES ANTHONY JOHN | §103 | Non-Final OA | — | Pending | Nov 06, 2023 | |
| 18502520 | HEATER FOR BATTERY | Deere & Company | DARBY, BRENDON CHARLES | §102§103 | Non-Final OA | — | Pending | Nov 06, 2023 | |
| 18289456 | NOZZLE FOR THE PRODUCTION OF A PULSATILE JET OF FLUID | Carvamed SA | LIEUWEN, CODY J | 3752 | §102§103 | Final Rejection | 30d overdue | Pending | Nov 03, 2023 |
| 18385626 | HAMMER BIT | Snap-On Incorporated | CHANG, SUKWOO JAMES | 3723 | §103 | Final Rejection | 1d overdue | Pending | Oct 31, 2023 |
| 18494682 | MEANS AND METHODS FOR THE TREATMENT OF ANGIOGENESIS-, FIBROSIS- AND CANCER-RELATED DISEASES WITH PROTEIN OLIGOMERS COMPRISING NC-1-FC | Heidelberg Biotech GmbH | MIKNIS, ZACHARY J | 1658 | §103§112 | Non-Final OA | 35d | Pending | Oct 25, 2023 |
| 18492744 | SEEDING MACHINE WITH SEED DELIVERY SYSTEM | Deere & Company | ROCCA, JOSEPH M | 3600 | DP | Final Rejection | — | Pending | Oct 23, 2023 |
| 18492555 | MICROCRACKING AND PERMEABILITY RESISTANT COMPOSITE MATERIALS, ARTICLES, AND METHODS | University Of Dayton | MATZEK, MATTHEW D | 1786 | §103 | Final Rejection | — | Pending | Oct 23, 2023 |
| 18553732 | FIBRIL PEPTIDES | UNIVERSITAET ULM | HA, JULIE | 1654 | §102§103 | Non-Final OA | — | Pending | Oct 02, 2023 |
| 18470533 | ENERGY STORAGE DEVICE HAVING CELL WITH COATING | Deere & Company | ARMSTRONG, KAREN JOYCE | 1726 | §102§103§112 | Non-Final OA | — | Pending | Sep 20, 2023 |
| 18470596 | ENERGY STORAGE DEVICE HAVING CELL WITH SLEEVE | Deere & Company | ARMSTRONG, KAREN JOYCE | 1726 | §102§103 | Non-Final OA | — | Pending | Sep 20, 2023 |
| 18551180 | NITROGEN-CONTAINING HETEROCYCLIC POLYCYCLIC COMPOUND, PREPARATION METHOD THEREFOR, AND APPLICATION THEREOF | Jiangsu Hansoh Pharmaceutical Group Co., Ltd. | SEAMAN, D MARGARET M | 1625 | §102 | Non-Final OA | — | Pending | Sep 18, 2023 |
| 18550895 | CANCER VACCINE AND METHOD OF USE THEREOF | United States Department Of Health And Human Services And The National Institute Of Health | GRIZER, CASSANDRA SENN | 1672 | §102§103 | Non-Final OA | 75d | Pending | Sep 15, 2023 |
| 18282366 | METHOD FOR PREDICTING RELIABILITY OF CROSS-LINKED POLYETHYLENE CABLE INSULATION MATERIAL | Electric Pwr. Res. Inst., China South. Pwr. Grid | MUI, CHRISTINE T | 1797 | §101§103 | Final Rejection | 20d | Pending | Sep 15, 2023 |
| 18461964 | SYSTEMS AND METHODS FOR GRADE CONTROL WINDOW ACTIVATION | Deere & Company | THOMPSON, JOSEPH LEIGH | 3665 | §102§112 | Non-Final OA | — | Pending | Sep 06, 2023 |
| 18461083 | ADJUSTABLE HEIGHT UPPER DECK SYSTEM AND METHOD | Forest River, Inc. | OLSON, LARS A | 3615 | §102§103 | Non-Final OA | 8d overdue | Pending | Sep 05, 2023 |
| 18242352 | ON-CHIP TRAINING OF MEMRISTOR CROSSBAR NEUROMORPHIC PROCESSING SYSTEMS | University Of Dayton | SMITH, BRIAN M | 2122 | §102§112Other | Non-Final OA | 50d | Pending | Sep 05, 2023 |
| 18457604 | MOP SYSTEM | The Tranzonic Companies | OLIVER, BRADLEY S | 3754 | §103 | Final Rejection | 117d overdue | Pending | Aug 29, 2023 |
| 18457060 | WINDROW MATERIAL THROUGHPUT ESTIMATION SYSTEM | Deere & Company | RHEE, ROY B | 3664 | §101§102§103§112 | Non-Final OA | 11d overdue | Pending | Aug 28, 2023 |
| 18451543 | BALER THERMAL SCANNING | Deere & Company | KNUDSON, ELLE ROSE | 3667 | §103 | Non-Final OA | — | Pending | Aug 17, 2023 |
| 18451063 | METHOD FOR SEPARATING SPERMATOGONIAL STEM CELLS (SSCs) FROM FROZEN TESTICULAR TISSUE | Northwest Institute Of Plateau Biology, Cas | POPA, ILEANA | 1633 | §103 | Non-Final OA | — | Pending | Aug 16, 2023 |
| 18365722 | DEPLETION AND INHIBITION OF PLASMACYTOID DENDRITIC CELLS | New Paradigm Biosciences Usa, Inc. | METCALF, MATTHEW CURRAN | 1647 | §112 | Non-Final OA | — | Pending | Aug 04, 2023 |
| 18261959 | IMPROVED TREATMENT FOR GLOBOID CELL LEUKODSYTROPHY OR KRABBE DISEASE | Rush University Medical Center | MOU, LIYUAN | 1628 | §103DP | Final Rejection | 38d overdue | Pending | Jul 18, 2023 |
| 18261496 | COATING DEVICE, IN PARTICULAR ROTARY ATOMIZER | Dürr Systems AG | PENCE, JETHRO M | 1717 | §103§112 | Non-Final OA | — | Pending | Jul 14, 2023 |
| 18219407 | TOOL STORAGE UNITS WITH INTEGRATED POWER | Snap-On Incorporated | ISLAM, SANJIDUL | 3736 | §103 | Non-Final OA | — | Pending | Jul 07, 2023 |
| 18260309 | HUMAN PAPILLOMAVIRUS TYPE 31 CHIMERIC PROTEIN AND USE THEREOF | Institute Of Basic Medical Sciences, Chinese Academy Of Medical Sciences | BARRERA, IMMACULADA | 1671 | §103§112 | Non-Final OA | — | Pending | Jul 03, 2023 |
| 18216831 | CORN EAR SIZE DETECTION | Deere & Company | FOLLMAN, BRODIE J | 3669 | §102§103 | Non-Final OA | 35d overdue | Pending | Jun 30, 2023 |
| 18144455 | BEAM QUALITY MONITORING AND MULTIPLE LASER BEAM LOCATION REGISTRATION FOR HIGH-SPEED LASER MOTION SYSTEMS | Edison Welding Institute, Inc. | TEKA, ABIY | 3745 | §103 | Non-Final OA | — | Pending | May 08, 2023 |
| 18143966 | FLUID POWER SYSTEM MONITORING BASED ON FLUID PARAMETERS | Iot Diagnostics | KURTZ, BENJAMIN M | 1779 | §101§112 | Final Rejection | 42d | Pending | May 05, 2023 |
| 18250890 | INTRANASAL IMMUNOTHERAPT FOR THE TREATMENT OF ALZHEIMER'S DISEASE | Rush University Medical Center | BERHANE, SELAM | 1675 | §103 | Final Rejection | — | Pending | Apr 27, 2023 |
| 18140272 | CIRCUIT BOARD WITH SENSOR CONTROLLED LIGHTS AND END-TO-END CONNECTION | Snap-On Incorporated | LUONG, HENRY T | 2844 | §103Other | Non-Final OA | 19d | Pending | Apr 27, 2023 |
| 18134273 | DUAL GRIND ADAPTER KIT | Lem Products Holdings, LLC | NORTON, JOHN J | 3761 | §102§103§112 | Non-Final OA | — | Pending | Apr 13, 2023 |
| 18298507 | ENDOTRACHEAL TUBE WITH RESISTANT MEMBER, SLEEVE AND EXPANDABLE CUFF | Bryan Medical, Inc. | DITMER, KATHRYN ELIZABETH | 3785 | §103§112Other | Non-Final OA | 25d overdue | Pending | Apr 11, 2023 |
| 18298485 | SYSTEMS AND METHODS FOR CROP RESIDUE MONITORING | Deere & Company | HERNANDEZ, ALEJANDRO | 2661 | §103 | Non-Final OA | 11d overdue | Pending | Apr 11, 2023 |
| 18030640 | METHOD AND DEVICE FOR PREPARING UNIVERSAL PLASMA | Universitätsmedizin Greifswald | STAVROU, CONSTANTINA E | 1632 | §103§112 | Final Rejection | — | Pending | Apr 06, 2023 |
| 18028834 | ARRAY COHERENT RANGING CHIP AND SYSTEM THEREOF | China Science Photon Chip (Haining) Technology Co., Ltd. | NGUYEN, RACHEL NICOLE | 3645 | §103§112 | Final Rejection | 17d overdue | Pending | Mar 28, 2023 |
| 18124854 | CROP RESIDUE PERFORMANCE MONITORING SYSTEM AND METHOD OF MONITORING CROP RESIDUE | Deere & Company | FABER, DAVID | 2172 | §103 | Final Rejection | 19d overdue | Pending | Mar 22, 2023 |
| 18124270 | SOFT-FACED DEAD BLOW HAMMER | Snap-On Incorporated | SCRUGGS, ROBERT J | 3723 | §103 | Non-Final OA | — | Pending | Mar 21, 2023 |
| 18118806 | MODIFIED PONTOON ASSEMBLY FOR IMPROVED FLOTATION AND METHOD OF ASSEMBLY THEREOF | Forest River, Inc. | BURGESS, MARC R | 3615 | §102§103§112 | Non-Final OA | 46d overdue | Pending | Mar 08, 2023 |
| 18116392 | Threshing and Chopper Power Relationships Identification System and Method | Deere & Company | BROWNE, SCOTT A | 3666 | §103§112 | Final Rejection | — | Pending | Mar 02, 2023 |
| 18116384 | Indirect Power and Torque Determination System and Method | Deere & Company | HORNER, MINATO LEE | 3665 | §103 | Final Rejection | 6d | Pending | Mar 02, 2023 |
| 18113877 | SPRING DAMPENING FOR ACCUMULATOR SYSTEM | Deere & Company | DURDEN, RICHARD KYLE | 3753 | §103Other | Non-Final OA | — | Pending | Feb 24, 2023 |
| 18164825 | SYSTEMS AND METHODS FOR STATE-OF-CHARGE REMAPPING | Deere & Company | BECKER, BRANDON J | 2857 | §103 | Final Rejection | — | Pending | Feb 06, 2023 |
| 18163779 | RUGGEDIZED SENSOR DEVICES WITH DECREASED LIGHT SCATTER AND ASSOCIATED SYSTEMS AND METHODS | Minesense Technologies Ltd. | RATCLIFFE, LUKE D | 3645 | §103 | Non-Final OA | 59d overdue | Pending | Feb 02, 2023 |
| 18017636 | 5' S/MAR APPLICATIONS | Deutsches Krebsforschungszentrum | BURKHART, MICHAEL D | 1638 | §102§103 | Non-Final OA | — | Pending | Jan 23, 2023 |
| 18156474 | LASER SHOCK PEENING APPARATUS | Sunrise International, Inc. | LIU, CHRIS Q | 3761 | §102§103§112 | Non-Final OA | 15d | Pending | Jan 19, 2023 |
| 18015140 | BEARING SYSTEM FOR A ROTARY ATOMIZER | Dürr Systems AG | LIEUWEN, CODY J | 3752 | §103 | Final Rejection | 2d overdue | Pending | Jan 09, 2023 |
| 18150009 | SEEDING ROW UNIT PAIRS FOR IMPROVED GROUND FOLLOWING AND NARROWER ROW SPACING | Deere & Company | TORRES, ALICIA M | 3671 | §102§103 | Non-Final OA | — | Pending | Jan 04, 2023 |
| 18087188 | SYSTEM FOR LOWERING COSTS AND IMPROVING ACCESS TO DRIVER EDUCATION USING TELEMATICS | Grange Holdings Inc. | NGUYEN, TIEN C | 3694 | §101 | Final Rejection | 121d overdue | Pending | Dec 22, 2022 |
| 18086535 | WIRELESS CHARGING AND POWERING OF TOOLS | Snap-On Incorporated | WILLIAMS, ARUN C | 2859 | §102§103 | Final Rejection | 46d overdue | Pending | Dec 21, 2022 |
| 17987528 | SATELLITE HAVING ACTIVELY COOLED ELECTRIC THRUSTER | Earth Observant Inc. | WOLDEMARYAM, ASSRES H | 3642 | §112 | Final Rejection | 27d | Pending | Nov 15, 2022 |
| 17921922 | ANTISENSE OLIGONUCLEOTIDES FOR INCREASING SHANK3 EXPRESSION | UNIVERSITAET ULM | CHONG, KIMBERLY | 1636 | §103§112 | Non-Final OA | — | Pending | Oct 27, 2022 |
| 17969738 | FLUID LINE CONNECTOR DEVICE | Medical Device Creations Limited | DANIEL, ANTARIUS S | 3783 | §103 | Non-Final OA | 5d overdue | Pending | Oct 20, 2022 |
| 17913737 | A SPRAY UNIT FOR A REMOTELY OPERABLE SPRAY APPARATUS AND APPARATUS FOR SPRAYING THERMALLY INSULATIVE MATERIAL | Q-Bot Limited | ONDREJCAK, ANDREW DOMENIC | 3752 | §103 | Final Rejection | 18d overdue | Pending | Sep 22, 2022 |
| 17932859 | Bearing for a sand/salt spreader | Brian Capone Land Services, LLC | GORMAN, DARREN W | 3752 | §103 | Non-Final OA | — | Pending | Sep 16, 2022 |
| 17941693 | STAFFING FORECASTING AND REALLOCATION SYSTEM | Nationwide Mutual Insurance Company | SWARTZ, STEPHEN S | 3625 | §101§103§112 | Non-Final OA | — | Pending | Sep 09, 2022 |
| 17796367 | PERISTALTIC PUMP | Aspen Pumps Limited | STIMPERT, PHILIP EARL | 3783 | §103§112 | Final Rejection | 19d | Pending | Jul 29, 2022 |
| 17790275 | SEED POD ASSEMBLY AND ROTARY AEROPONIC APPARATUS AND METHOD | Heliponix, LLC | NGUYEN, TRINH T | 3644 | §103§112 | Non-Final OA | — | Pending | Jun 30, 2022 |
| 17787855 | LEUKEMIA TREATMENT | Deutsches Krebsforschungszentrum | AEDER, SEAN E | 1642 | §103 | Final Rejection | — | Pending | Jun 21, 2022 |
| 17842269 | METHOD FOR MAKING TAMPER RESISTANT CONTAINERS | Allen Yambao | TAWFIK, SAMEH | 3731 | §103 | Final Rejection | 3d overdue | Pending | Jun 16, 2022 |
| 17782539 | Method for Selective Modulation | Amber Therapeutics Holdings Limited | HADDAD, MOUSSA MAHER | 3796 | §103 | Non-Final OA | 124d overdue | Pending | Jun 03, 2022 |
| 17830079 | SYSTEM AND METHOD FOR FIELD OBJECT DETECTION, MAPPING, AND AVOIDANCE | Deere & Company | MARUNDA II, TORRENCE S | 3663 | §103 | Non-Final OA | 72d | Pending | Jun 01, 2022 |
| 17781640 | A METHOD OF MANUFACTURING A COMPOSITE COMPONENT WITH VARYING ELECTRIC RESISTIVITY ALONG A LONGITUDINAL DIRECTION | Grundfos Holding A/S | POLLOCK, AUSTIN M | 1738 | §102§103§112 | Final Rejection | 28d overdue | Pending | Jun 01, 2022 |
| 17781648 | A HEATING SYSTEM AND METHOD OF MANUFACTURING A HEATING SYSTEM | Grundfos Holding A/S | MILLS JR., JOE E | 3761 | §103 | Final Rejection | 42d overdue | Pending | Jun 01, 2022 |
| 17748801 | GAITER WITH COUPLING | Snap-On Incorporated | SHAKERI, HADI | 3723 | §103 | Final Rejection | — | Pending | May 19, 2022 |
| 17777975 | ANTIBODIES TARGETING, AND OTHER MODULATORS OF, THE CD276 ANTIGEN, AND USES THEREOF | EBERHARD KARLS UNIVERSITÄT TÜBINGEN | MIDDLETON, DANAYA L | 1674 | §102§112 | Final Rejection | 70d | Pending | May 18, 2022 |
| 17769494 | HEARING PROTECTION DEVICES | Minuendo AS | DABNEY, PHYLESHA LARVINIA | 2694 | §102 | Non-Final OA | 147d overdue | Pending | Apr 15, 2022 |
| 17766943 | FREE PROSTATE SPECIFIC ANTIGEN MEASUREMENT KIT AND PREPARATION METHOD THEREFOR | Beijing Strong Biotechnologies, Inc. | MACFARLANE, STACEY NEE | 1675 | §103 | Non-Final OA | — | Pending | Apr 06, 2022 |
| 17519627 | MIXING SYRINGE ASSEMBLY | Consort Medical PLC | TRINH, HONG-VAN N | 3783 | §103 | Final Rejection | 267d overdue | Pending | Nov 05, 2021 |
| 17483909 | WORK MACHINE WITH AUTOMATIC PITCH CONTROL OF IMPLEMENT | Deere & Company | MITCHELL, JOEL F | 3671 | §102§103§112 | Non-Final OA | 84d overdue | Pending | Sep 24, 2021 |
| 17441029 | METHOD OF TREATING DISEASE USING A VECTOR ENCODING TPP1 | Rush University Medical Center | WILSON, MICHAEL C | 1638 | §103§112 | Final Rejection | 61d | Pending | Sep 20, 2021 |
| 17391206 | GEARING AND CRANKSHAFT ASSEMBLY FOR POWER TOOLS | Snap-On Incorporated | POON, DANA LEE | 3723 | §103 | Final Rejection | — | Pending | Aug 02, 2021 |
| 17413262 | MACROCYCLIC COMPOUND AS CDK INHIBITOR, PREPARATION METHOD THEREFOR, AND USE THEREOF IN MEDICINE | Keythera (Suzhou) Pharmaceuticals Co. Ltd. | MCMILLIAN, KARA RENITA | 1623 | §103 | Non-Final OA | 352d overdue | Pending | Jun 11, 2021 |
| 17192528 | Holding Tool | Snap-On Incorporated | SHAKERI, HADI | 3723 | §103 | Non-Final OA | — | Pending | Mar 04, 2021 |
| 17269901 | ROTARY AEROPONIC APPARATUS AND METHOD | Heliponix, LLC | KLOECKER, KATHERINE ANNE | 3642 | §103 | Non-Final OA | 92d overdue | Pending | Feb 19, 2021 |
| 17158551 | TOOL WITH SURFACES WITH A COMPRESSIVE SURFACE STRESS LAYER | Snap-On Incorporated | HAWKINS, JASON KHALIL | 3723 | §102§103 | Final Rejection | 31d overdue | Pending | Jan 26, 2021 |
| 16648768 | NON-INTEGRATING DNA VECTORS FOR THE GENETIC MODIFICATION OF CELLS | Deutsches Krebsforschungszentrum | MEYERING, SHABANA SHABBEER | 1635 | §103DP | Non-Final OA | — | Pending | Mar 19, 2020 |
| 16643000 | ROBOTIC VEHICLE FOR SPRAYING | Q-Bot Limited | BRITTMAN-ALABI, FELICIA LUCILLE | 3611 | §102§103§112 | Final Rejection | 22d overdue | Pending | Feb 28, 2020 |
| 16553596 | BALLOON DILATION CATHETER | Bryan Medical, Inc. | RODJOM, KATHERINE MARIE | 3771 | §103 | Final Rejection | 28d overdue | Pending | Aug 28, 2019 |
| 16464030 | METHOD, DEVICE AND KIT FOR DETERMINING CARDIAC CONDUCTION | UNIVERSITÄT ROSTOCK | GONZALES, JOSEPHINE MARIA | 1631 | §101§103§112 | Final Rejection | 25d overdue | Pending | May 24, 2019 |
| 15917086 | Handle Support Module | Snap-On Incorporated | TECCO, ANDREW M | 3731 | §103§112Other | Final Rejection | 9d overdue | Pending | Mar 09, 2018 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial