50 pending office actions • 19 clients • 48 examiners • 37 art units • 0 of 50 (0%) have an AI response strategy ready • 218 patents granted in the last 365 days
Based on the USPTO statutory response window for each pending office action. 50 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 50 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 7 (14%) |
| §103 only | 32 (64%) |
| §102 only | 5 (10%) |
| §112 only | 6 (12%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| JARIWALA, CHIRAG | 2 | 61.5% | +26.8% |
| THOMAS, BINU | 2 | 72.5% | +26.4% |
| ARJOMANDI, NOOSHA | 1 | 86.2% | +9.9% |
| QUIGLEY, THOMAS K | 1 | 73.0% | +21.2% |
| JAHNIGE, CAROLINE H | 1 | 70.1% | +22.5% |
| GIBSON, JONATHAN D | 1 | 84.8% | +12.4% |
| MANEJWALA, ISMAIL A | 1 | 47.4% | +48.9% |
| SIDDO, IBRAHIM | 1 | 83.9% | +13.1% |
| HALM, KWEKU WILLIAM | 1 | 80.2% | +12.6% |
| BURKE, THOMAS P | 1 | 43.2% | +22.3% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 4 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18771552 | CACHING PATTERN FOR LARGE LANGUAGE MODEL INTERFACE | HALM, KWEKU WILLIAM | 46d overdue |
| 19044212 | GENERATIVE ARTIFICIAL INTELLIGENCE FRAMEWORK WITH SPECIALIZATION VIA SIMULATED HISTORY GENERATION | ARJOMANDI, NOOSHA | 31d overdue |
| 18911827 | AUTOMATED DIAGNOSTIC PLAN GENERATION FOR TECHNICAL SUPPORT | GIBSON, JONATHAN D | 26d overdue |
| 18790398 | LANGUAGE AND SENTIMENT ANALYSIS FOR GENERATING SUPPORT SUMMARIES | SIDDO, IBRAHIM | 16d |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 7 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18113892 | PHOTO & VIDEO CAPTURE FOR PHYSICAL GAME PLAYING | HALL, SHAUNA-KAY N | 3d overdue |
| 18647540 | PREDICTIVE HEALTHCARE SCHEDULING TO ADJUST PATIENT OUTCOMES | KANAAN, MAROUN P | 1d overdue |
| 18603677 | AUTOMATED CREATION OF SOFTWARE PROGRAM STRUCTURE HAVING RUNNABLE SOFTWARE CODE | RAMPURIA, SATISH | 9d |
| 18821087 | SYSTEMS AND METHODS FOR ELECTRONIC DEVICE TRACKING AND STATUS ANALYSIS | MANEJWALA, ISMAIL A | 28d |
| 18647579 | DATA-DRIVEN WORKPLACE TO IMPROVE HEALTHCARE STAFF RETENTION | LOFTIS, JOHNNA RONEE | 28d |
| 18436811 | AUTOMATED STAFFING ALLOCATION AND SCHEDULING | STEWART, CRYSTOL | 30d |
| 18376278 | APPLICATION RATIONALIZATION AUTOMATION METHODOLOGY | GURSKI, AMANDA KAREN | 35d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18771552 | CACHING PATTERN FOR LARGE LANGUAGE MODEL INTERFACE | HALM, KWEKU WILLIAM | 46d overdue |
| 17782412 | ACTIVE SPRAY ADJUSTMENT FOR AN AUTOMATED MOBILE SPRAYER | THOMAS, BINU | 44d overdue |
| 18911827 | AUTOMATED DIAGNOSTIC PLAN GENERATION FOR TECHNICAL SUPPORT | GIBSON, JONATHAN D | 26d overdue |
| 18733571 | EFFUSION COOLED FUEL NOZZLE TIP | BURKE, THOMAS P | 25d overdue |
| 18938706 | NETWORK PROTOCOL-BASED INTERROGATION FOR NETWORK DEVICE CHARACTERIZATION | JAHNIGE, CAROLINE H | 13d |
| 18790398 | LANGUAGE AND SENTIMENT ANALYSIS FOR GENERATING SUPPORT SUMMARIES | SIDDO, IBRAHIM | 16d |
| 19039762 | WIND TURBINE NACELLE | QUIGLEY, THOMAS K | 28d |
| 18821087 | SYSTEMS AND METHODS FOR ELECTRONIC DEVICE TRACKING AND STATUS ANALYSIS | MANEJWALA, ISMAIL A | 28d |
| Art Unit | Apps |
|---|---|
| 2834 | 3 |
| 3746 | 3 |
| 3752 | 3 |
| 1717 | 3 |
| 2166 | 2 |
| 3625 | 2 |
| 2897 | 2 |
| 2812 | 2 |
| 3715 | 2 |
| 2451 | 1 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19044212 | GENERATIVE ARTIFICIAL INTELLIGENCE FRAMEWORK WITH SPECIALIZATION VIA SIMULATED HISTORY GENERATION | Insight Direct Usa, Inc. | ARJOMANDI, NOOSHA | 2166 | §102 | Non-Final OA | 31d overdue | Pending | Feb 03, 2025 |
| 19039762 | WIND TURBINE NACELLE | Kodair Wind Designs Limited | QUIGLEY, THOMAS K | 2834 | §103 | Non-Final OA | 28d | Pending | Jan 28, 2025 |
| 18938706 | NETWORK PROTOCOL-BASED INTERROGATION FOR NETWORK DEVICE CHARACTERIZATION | Insight Direct Usa, Inc. | JAHNIGE, CAROLINE H | 2451 | §103 | Non-Final OA | 13d | Pending | Nov 06, 2024 |
| 18911827 | AUTOMATED DIAGNOSTIC PLAN GENERATION FOR TECHNICAL SUPPORT | Insight Direct Usa, Inc. | GIBSON, JONATHAN D | 2113 | §103 | Non-Final OA | 26d overdue | Pending | Oct 10, 2024 |
| 18821087 | SYSTEMS AND METHODS FOR ELECTRONIC DEVICE TRACKING AND STATUS ANALYSIS | Insight Direct Usa, Inc. | MANEJWALA, ISMAIL A | 3628 | §101 | Non-Final OA | 28d | Pending | Aug 30, 2024 |
| 18839641 | PUMP MOTOR HANDLE | Graco Minnesota Inc. | JARIWALA, CHIRAG | 3746 | §103 | Non-Final OA | 40d | Pending | Aug 19, 2024 |
| 18790398 | LANGUAGE AND SENTIMENT ANALYSIS FOR GENERATING SUPPORT SUMMARIES | Insight Direct Usa, Inc. | SIDDO, IBRAHIM | 2681 | §103 | Non-Final OA | 16d | Pending | Jul 31, 2024 |
| 18771552 | CACHING PATTERN FOR LARGE LANGUAGE MODEL INTERFACE | Insight Direct Usa, Inc. | HALM, KWEKU WILLIAM | 2166 | §103 | Non-Final OA | 46d overdue | Pending | Jul 12, 2024 |
| 18733571 | EFFUSION COOLED FUEL NOZZLE TIP | Pratt & Whitney Canada Corp. | BURKE, THOMAS P | 3741 | §103 | Non-Final OA | 25d overdue | Pending | Jun 04, 2024 |
| 18712040 | ELECTRIC MOTOR END CAP HAVING DUST PASSAGE | Graco Minnesota Inc. | ELNAKIB, AHMED | 2834 | §112 | Non-Final OA | 84d | Pending | May 21, 2024 |
| 18711566 | HAIR STYLING APPARATUS | The House Of Curls Ltd. | STEITZ, RACHEL RUNNING | 3772 | §103 | Non-Final OA | 113d overdue | Pending | May 17, 2024 |
| 18710356 | TRAINING CUTLERY HAVING FINGER PLACEMENT RECEPTACLES | Kinder Cutlery LLC | FLORES SANCHEZ, OMAR | 3724 | §103 | Non-Final OA | 17d overdue | Pending | May 15, 2024 |
| 18657022 | GENERATING INTERDEPENDENT DOCUMENT CHUNKS USING LARGE LANGUAGE MODELS | Insight Direct Usa, Inc. | SHIBEROU, MAHELET | 2171 | §103 | Non-Final OA | 7d | Pending | May 07, 2024 |
| 18647579 | DATA-DRIVEN WORKPLACE TO IMPROVE HEALTHCARE STAFF RETENTION | Insight Direct Usa, Inc. | LOFTIS, JOHNNA RONEE | 3625 | §101 | Final Rejection | 28d | Pending | Apr 26, 2024 |
| 18647540 | PREDICTIVE HEALTHCARE SCHEDULING TO ADJUST PATIENT OUTCOMES | Insight Direct Usa, Inc. | KANAAN, MAROUN P | 3687 | §101 | Non-Final OA | 1d overdue | Pending | Apr 26, 2024 |
| 18643810 | SPECIALIST LANGUAGE MODEL SET MAPPING AND SELECTION FOR PROMPT DELEGATION | Insight Direct Usa, Inc. | LERNER, MARTIN | 2658 | §103 | Non-Final OA | 34d | Pending | Apr 23, 2024 |
| 18622197 | SYSTEM FOR DISPENSING ABRASIVE MATERIAL | Graco Minnesota Inc. | PANCHOLI, VISHAL J | 3754 | §103 | Non-Final OA | 1d overdue | Pending | Mar 29, 2024 |
| 18622187 | ELECTRICALLY OPERATED DISPLACEMENT PUMP CONTROL SYSTEM AND METHOD | Graco Minnesota Inc. | COMLEY, ALEXANDER BRYANT | 3746 | §112 | Non-Final OA | 85d | Pending | Mar 29, 2024 |
| 18692151 | ELECTRIC MOTOR | Electric Torque Machines, Inc. | STOUT, RILEY OWEN | 2834 | §103 | Non-Final OA | 27d | Pending | Mar 14, 2024 |
| 18603677 | AUTOMATED CREATION OF SOFTWARE PROGRAM STRUCTURE HAVING RUNNABLE SOFTWARE CODE | Insight Direct Usa, Inc. | RAMPURIA, SATISH | 2193 | §101 | Non-Final OA | 9d | Pending | Mar 13, 2024 |
| 18436811 | AUTOMATED STAFFING ALLOCATION AND SCHEDULING | Insight Direct Usa, Inc. | STEWART, CRYSTOL | 3624 | §101 | Non-Final OA | 30d | Pending | Feb 08, 2024 |
| 35523634 | Base for earphones charging case | Dongguan Edifier Esports Technology Co., Ltd. | CHRISTENSEN, AMANDA | 2972 | §112 | Non-Final OA | 60d overdue | Pending | Jan 11, 2024 |
| 18564923 | SOLVENT DOSING FOR A SPRAY APPLICATOR | Graco Minnesota Inc. | LIEUWEN, CODY J | 3752 | §112 | Non-Final OA | 9d overdue | Pending | Nov 28, 2023 |
| 18505588 | ADJUSTABLE BUOYANCY BALL AND SWIMMING POOL GAME | Jcc Splash, LLC | CHIU, RALEIGH W | 3711 | §103 | Non-Final OA | 62d | Pending | Nov 09, 2023 |
| 18289471 | MIXER, AIR CAP, AND MIX CHAMBER ASSEMBLY FOR A PLURAL COMPONENT SPRAYER | Graco Minnesota Inc. | KIM, CHRISTOPHER S | 3752 | §102 | Non-Final OA | 15d | Pending | Nov 03, 2023 |
| 18376278 | APPLICATION RATIONALIZATION AUTOMATION METHODOLOGY | Insight Direct Usa, Inc. | GURSKI, AMANDA KAREN | 3625 | §101 | Final Rejection | 35d | Pending | Oct 03, 2023 |
| 18470849 | INTERMITTENT SYNCHRONIZATION FOR NETWORK MANAGEMENT DATA | Insight Direct Usa, Inc. | DU, ZONGHUA A | 2444 | §103 | Final Rejection | 30d | Pending | Sep 20, 2023 |
| 18367543 | DOUBLE-TUMBLE MIXER | Radia | INSLER, ELIZABETH | 1774 | §103 | Non-Final OA | 34d | Pending | Sep 13, 2023 |
| 18550267 | METHOD OF PROCESSING MEDICAL DATA, METHOD OF ANALYZING MEDICAL DATA, ELECTRONIC DEVICE, AND MEDIUM | BOE TECHNOLOGY GROUP CO., LTD. | ZAK, JACQUELINE ROSE | 2666 | §103 | Non-Final OA | 11d overdue | Pending | Sep 12, 2023 |
| 18548328 | DISPLAY PANEL AND DISPLAY APPARATUS | BOE TECHNOLOGY GROUP CO., LTD. | BLACKWELL, ASHLEY NICOLE | 2897 | §103 | Non-Final OA | 44d overdue | Pending | Aug 29, 2023 |
| 18261462 | COMPUTER-IMPLEMENTED METHOD, METHOD OF TRAINING DEEP LEARNING MODEL, ELECTRONIC DEVICE, AND MEDIUM | BOE TECHNOLOGY GROUP CO., LTD. | HWANG, JINSU | 2667 | §103 | Non-Final OA | 24d overdue | Pending | Jul 13, 2023 |
| 18337343 | POSITIVE ELECTRODE FOR ALKALINE SECONDARY BATTERY AND ALKALINE SECONDARY BATTERY HAVING THE SAME | Fdk Corporation | ARCIERO, ADAM A | 1727 | §102 | Non-Final OA | 43d overdue | Pending | Jun 19, 2023 |
| 18257825 | SYSTEM FOR COATING OBJECTS WITH COATING MATERIAL, AND METHOD FOR COATING OBJECTS WITH COATING MATERIAL | Gema Switzerland GmbH | KURPLE, KARL | 1717 | §103 | Non-Final OA | 27d | Pending | Jun 15, 2023 |
| 18202070 | ALIGNMENT TOOL FOR A SPRAY GUN | Graco Minnesota Inc. | MARTIN, LAURA E | 2855 | §103 | Final Rejection | 15d overdue | Pending | May 25, 2023 |
| 18298352 | APPARATUS AND METHODS FOR THE MANUFACTURE OF SYNTHETIC DIAMONDS AND CUBIC BORON NITRIDE | Gull Corporation Ltd. | BRATLAND JR, KENNETH A | 1714 | §103 | Non-Final OA | 97d overdue | Pending | Apr 10, 2023 |
| 18295247 | METHYLCOBALAMIN OPHTHALMIC PREPARATION AND USE THEREOF | Eye Institute Of Shandong First Medical University | CREWS, JARET JAMES | 1691 | §103 | Non-Final OA | 53d overdue | Pending | Apr 03, 2023 |
| 18246452 | DISPLAY SUBSTRATE, METHOD FOR MANUFACTURING DISPLAY SUBSTRATE, AND DISPLAY DEVICE | BOE TECHNOLOGY GROUP CO., LTD. | SRINIVASAN, SESHA SAIRAMAN | 2812 | §103 | Non-Final OA | 22d | Pending | Mar 23, 2023 |
| 18025288 | FAN AIR LEVER FOR A SPRAY GUN | Graco Minnesota Inc. | BOECKMANN, JASON J | 3752 | §102 | Non-Final OA | 12d | Pending | Mar 08, 2023 |
| 18113892 | PHOTO & VIDEO CAPTURE FOR PHYSICAL GAME PLAYING | Slap Inc. | HALL, SHAUNA-KAY N | 3715 | §101 | Non-Final OA | 3d overdue | Pending | Feb 24, 2023 |
| 18113884 | MULTI-SENSOR SERVER-MEDIATED INTER-PLAYER PROXIMITY LEASH IN MULTIPLAYER GAMES | Slap Inc. | LIM, SENG HENG | 3715 | §103 | Final Rejection | 43d overdue | Pending | Feb 24, 2023 |
| 18042754 | NOR-TYPE MEMORY DEVICE, METHOD OF MANUFACTURING NOR-TYPE MEMORY DEVICE, AND ELECTRONIC APPARATUS INCLUDING MEMORY DEVICE | Institute Of Microelectronics, Chinese Academy Of Sciences | RAMALLO, GUSTAVO G | 2812 | §103 | Final Rejection | 50d | Pending | Feb 23, 2023 |
| 18042297 | DISPLAY SUBSTRATE AND METHOD OF MANUFACTURING THE SAME, AND DISPLAY DEVICE | BOE TECHNOLOGY GROUP CO., LTD. | ABEL, GARY ROBERT | 2897 | §103 | Non-Final OA | 76d | Pending | Feb 20, 2023 |
| 17924198 | USE OF SYMPATHETIC ACTIVATION INHIBITOR AND/OR ALPHA 1-ADRENERGIC RECEPTOR INHIBITOR IN PREPARING MEDICINE FOR TREATING DRY EYES | Eye Institute Of Shandong First Medical University | HUANG, GIGI GEORGIANA | 1613 | §112 | Non-Final OA | 155d overdue | Pending | Nov 09, 2022 |
| 17969459 | GROUND MARKING BEAD FLOW SENSOR | Graco Minnesota Inc. | THOMAS, BINU | 1717 | §103 | Non-Final OA | 61d | Pending | Oct 19, 2022 |
| 17951967 | ADJUSTING MENTAL STATE TO IMPROVE TASK PERFORMANCE | Insight Direct Usa, Inc. | ABOU EL SEOUD, MOHAMED | 2148 | §112 | Final Rejection | 50d | Pending | Sep 23, 2022 |
| 17813566 | CATALYST FOR AIR SECONDARY BATTERY, AIR ELECTRODE, AND AIR SECONDARY BATTERY | Fdk Corporation | REDDY, SATHAVARAM I | 1785 | §103 | Final Rejection | 91d overdue | Pending | Jul 19, 2022 |
| 17782412 | ACTIVE SPRAY ADJUSTMENT FOR AN AUTOMATED MOBILE SPRAYER | Graco Minnesota Inc. | THOMAS, BINU | 1717 | §102 | Non-Final OA | 44d overdue | Pending | Jun 03, 2022 |
| 17332209 | TRANSFER PUMP ASSEMBLY | Graco Minnesota Inc. | JARIWALA, CHIRAG | 3746 | §103 | Final Rejection | 34d | Pending | May 27, 2021 |
| 17125465 | BRIDGE/SPLITTER CONNECTOR FOR CONFIGURING ELECTRICAL SIGNAL DISTRIBUTION NETWORK | Seasons 4, Inc. | FIGUEROA, FELIX O | 2831 | §103 | Final Rejection | 52d overdue | Pending | Dec 17, 2020 |
| 17105439 | ANTENNAS FOR A SUBCUTANEOUS DEVICE | Calyan Technologies, Inc. | KREMER, MATTHEW | 3791 | §103 | Final Rejection | 127d overdue | Pending | Nov 25, 2020 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial