Technology areas: Transportation, E-Commerce & Mechanical Systems • Medical Devices & Mechanical Engineering
271 pending office actions • 127 clients • 247 examiners • 128 art units • 0 of 271 (0%) have an AI response strategy ready
HUSCH BLACKWELL LLP manages a very large-scale patent portfolio within the Medical Devices & Mechanical Engineering technology area. With 22676 career applications, the firm possesses extensive experience across a broad range of engineering and medical technologies. Its resolved allowance rate pct of 84.67 reflects a consistent ability to secure grants across this massive volume of filings. This track record indicates a stable prosecution strategy that scales effectively across large portfolios.
The firm's current workload includes 219 pending office actions, indicating a high level of ongoing prosecution activity. On average, the firm reaches an allowance after 3.22 avg office actions per allowance. This metric provides insight into the typical duration and complexity of the negotiation process with patent examiners. For practitioners, the 84.67 resolved allowance rate pct and 3.22 avg office actions per allowance represent the firm's established performance standards across its 22676 career applications. These figures help define the firm's operational capacity in Medical Devices & Mechanical Engineering.
Based on the USPTO statutory response window for each pending office action. 84 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 84 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 4 (1%) |
| §101 + other | 21 (8%) |
| §103 only | 90 (33%) |
| §102 only | 12 (4%) |
| §112 only | 11 (4%) |
| Double-patenting only | 2 (1%) |
| Double-patenting + other | 10 (4%) |
| Multi-statute (no §101) | 121 (45%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| SMITH, JASON CHRISTOPHER | 5 | 83.6% | +13.0% |
| KRISHNAN, GANAPATHY | 3 | 52.8% | +1.1% |
| LEGESSE, NINI F | 2 | 68.6% | +15.3% |
| NGUYEN, CUONG H | 2 | 78.7% | +8.9% |
| HANNAN, B M M | 2 | 82.2% | +18.0% |
| DEMEREE, CHRISTOPHER R | 2 | 68.9% | +14.1% |
| CHAI, RAYMOND REI-YANG | 2 | 74.7% | +16.2% |
| AKHAVANNIK, HADI | 2 | 85.9% | +13.1% |
| PEZZLO, BENJAMIN ALEXANDER | 2 | 45.5% | +27.3% |
| MILLER-CRUZ, EKANDRA S. | 2 | 65.8% | +51.9% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18751950 | SYSTEM AND METHOD FOR DYNAMICALLY ALTERING A DEVICE FOR MOVING ANIMALS | HANNAN, B M M | 43d |
| 19207760 | SYSTEM AND METHOD FOR AUTONOMOUSLY NAVIGATING AN ANIMAL ENVIRONMENT AND PERFORMING TASKS | HANNAN, B M M | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18264285 | HANDLE KNOB WITH NO FREE PLAY | ROGERS, ADAM D | 307d overdue |
| 18437787 | DISPENSER CAP GUARD | PANCHOLI, VISHAL J | 150d overdue |
| 18454025 | SUPPORT BRA SYSTEM AND METHOD | MARCHEWKA, MATTHEW R | 121d overdue |
| 18571127 | SYNTHETIC ECHO FROM ECG | NG, JONATHAN K | 119d overdue |
| 18547844 | SELF-EXTINGUISHING CANDLE | BASICHAS, ALFRED | 119d overdue |
| 19049467 | LATTICE STRUCTURE IMPLANT AND METHODS FOR MAKING THE SAME | BOLES, SAMEH RAAFAT | 113d overdue |
| 18873846 | Material Search Method, Material Search System, Program, And Recording Medium | MCQUITERY, DIEDRA M | 78d overdue |
| 18320886 | SYSTEM AND METHOD FOR IMAGE SEGMENTATION FOR DETECTING THE LOCATION OF A JOINT CENTER | AKHAVANNIK, HADI | 71d overdue |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18320886 | SYSTEM AND METHOD FOR IMAGE SEGMENTATION FOR DETECTING THE LOCATION OF A JOINT CENTER | AKHAVANNIK, HADI | 71d overdue |
| 17996916 | Cableway Station Having a Safety Barrier | SMITH, JASON CHRISTOPHER | 24d overdue |
| 18425539 | GAFF COVER | PEZZLO, BENJAMIN ALEXANDER | 8d overdue |
| 19182808 | BOUNCING TOY WITH PLUSH EXTERIOR | LEGESSE, NINI F | 16d |
| 19335167 | BOUNCING TOY WITH PLUSH EXTERIOR | LEGESSE, NINI F | 22d |
| 18751950 | SYSTEM AND METHOD FOR DYNAMICALLY ALTERING A DEVICE FOR MOVING ANIMALS | HANNAN, B M M | 43d |
| 18897224 | METHOD FOR OPERATING A LIGHT-BASED DRIVER ASSISTANCE SYSTEM OF A MOTOR VEHICLE | CHAI, RAYMOND REI-YANG | 62d |
| 19207760 | SYSTEM AND METHOD FOR AUTONOMOUSLY NAVIGATING AN ANIMAL ENVIRONMENT AND PERFORMING TASKS | HANNAN, B M M | — |
| Art Unit | Apps |
|---|---|
| 3762 | 7 |
| 1786 | 6 |
| 3791 | 5 |
| 3794 | 5 |
| 3732 | 4 |
| 3775 | 4 |
| 3654 | 4 |
| 3615 | 4 |
| 3783 | 4 |
| 3619 | 3 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19451978 | PARTIALLY CONDUCTIVE CHLOR-ALKALI DIAPHRAGMS | Olin Corporation | CHUNG, HOSUNG CHARLES | 1794 | §102§112 | Non-Final OA | — | Pending | Jan 16, 2026 |
| 19472863 | MINIMALLY INVASIVE COMPLIANT DEVICES FOR TOTAL LUMBAR DISC REPLACEMENT | 33 Medical, Inc. | COMSTOCK, DAVID C | 3773 | §101§102§103§112 | Non-Final OA | — | Pending | Oct 06, 2025 |
| 19335167 | BOUNCING TOY WITH PLUSH EXTERIOR | Ty Inc. | LEGESSE, NINI F | 3711 | §103 | Final Rejection | 22d | Pending | Sep 22, 2025 |
| 19318642 | EYE TRACKING KIT APPLICABLE TO EYE GLASSES | VIEWPOINTSYSTEM GMBH | BOYLAN, JAMES T | 2486 | §103§112 | Final Rejection | — | Pending | Sep 04, 2025 |
| 19148215 | REASSIGNING A DIGITAL REPRESENTATION OF A PHYSICAL ITEM | Authentic Vision GmbH | HUANG, JAY | 3619 | §101§103§112 | Non-Final OA | — | Pending | Jul 15, 2025 |
| 19258249 | Display Device and Electronic Device | Semiconductor Energy Laboratory Co., Ltd. | WU, ZHENZHEN | §103 | Non-Final OA | — | Pending | Jul 02, 2025 | |
| 19245839 | A PERISTALTIC PUMP AND A METHOD OF OPERATING THE SAME | Pentair Water Pool & Spa, Inc. | ZOLLINGER, NATHAN C | 3746 | §102§103 | Non-Final OA | — | Pending | Jun 23, 2025 |
| 19230539 | BATTERY TEMPERATURE MANAGEMENT SYSTEM AND METHOD | Toyota Material Handling, Inc. | NGUYEN, CUONG H | 3661 | §103§112 | Non-Final OA | — | Pending | Jun 06, 2025 |
| 19227230 | ARTIFICIAL INTELLIGENCE-ASSISTED ELECTRONIC HEALTH RECORD SYSTEMS AND METHODS | Carbon Health Technologies, Inc. | HIGGS, STELLA EUN | §101§102§103§112 | Non-Final OA | — | Pending | Jun 03, 2025 | |
| 19211113 | ANALYTICAL ADAPTIVE ALGORITHM FOR AUTONOMOUS RACE DRIVING | UNIVERSITY OF SOUTH FLORIDA | MIRZA, ADNAN M | §103 | Non-Final OA | — | Pending | May 16, 2025 | |
| 19207760 | SYSTEM AND METHOD FOR AUTONOMOUSLY NAVIGATING AN ANIMAL ENVIRONMENT AND PERFORMING TASKS | Bird'S Eye Robotics, Inc. | HANNAN, B M M | §103 | Non-Final OA | — | Pending | May 14, 2025 | |
| 19197125 | Display Device | Semiconductor Energy Laboratory Co., Ltd. | LEA EDMONDS, LISA S | 2841 | §101§102 | Non-Final OA | — | Pending | May 02, 2025 |
| 19196450 | DEVICE AUTHENTICATION VIA HIGH-ENTROPY TOKEN | Prove Identity, Inc. | BINCZAK, BRANDON MICHAEL | §103§112 | Non-Final OA | — | Pending | May 01, 2025 | |
| 19192024 | CENTRAL AND MIXED SLEEP APNEA DETECTION | Huxley Medical, Inc. | AGAHI, PUYA | 3791 | §101 | Non-Final OA | — | Pending | Apr 28, 2025 |
| 19182808 | BOUNCING TOY WITH PLUSH EXTERIOR | Ty Inc. | LEGESSE, NINI F | 3711 | §103§112 | Final Rejection | 16d | Pending | Apr 18, 2025 |
| 19182781 | MOISTURE MANAGEMENT UPPER TORSO GARMENTS | Hbi Branded Apparel Enterprises, LLC | NUNNERY, GRADY ALEXANDER | 3732 | §103 | Final Rejection | 7d | Pending | Apr 18, 2025 |
| 19182006 | MOTION ADJUSTMENT PREDICTION SYSTEM | Hultgren Dental Technologies, LLC | LUCCHESI, NICHOLAS D | 3772 | §102 | Non-Final OA | — | Pending | Apr 17, 2025 |
| 19178351 | METHOD AND SYSTEM FOR MANUFACTURING A MOULDED FIBER PACKAGING UNIT WITH A LAMINATED LAYER | Huhtamaki Molded Fiber Technology B.V. | MINSKEY, JACOB T | §102DP | Non-Final OA | — | Pending | Apr 14, 2025 | |
| 19175645 | COMPRESSOR SYSTEM FOR EVACUATING UTILITY PIPE | ULC Technologies LLC | FINK, THOMAS ANDREW | 3746 | §103 | Non-Final OA | — | Pending | Apr 10, 2025 |
| 18841155 | METHOD FOR LOADING A CHERRY PICKER ONTO A TRAILER OR A TRANSPORT PLATFORM, AND CHERRY PICKER ABLE TO CARRY OUT THE METHOD | Manitou Bf | DIAZ, THOMAS C | §103 | Non-Final OA | — | Pending | Apr 10, 2025 | |
| 19174031 | SCREW WITH AN IMPROVED SCREW HEAD | Primesource Building Products, Inc. | CHANG, OLIVIA C | §102 | Non-Final OA | — | Pending | Apr 09, 2025 | |
| 19171457 | CONNECTABLE POWER STATIONS | Champion Power Equipment, Inc. | DEBERADINIS, ROBERT L | 2836 | §103 | Non-Final OA | 40d | Pending | Apr 07, 2025 |
| 19087197 | KITCHEN SINK WITH INTERCHANGEABLE MODULAR COMPONENTS | Kohler Co. | KLOTZ, WILLIAM R | §102§103§112 | Non-Final OA | — | Pending | Mar 21, 2025 | |
| 19087380 | PERCENTAGE STENOSIS OF THE ARTERIES OF THE HEART: CAUSES, OPTIMIZATION, METHOD, AND PROBABILISTIC STRATEGIES | UNIVERSITY OF SOUTH FLORIDA | GOMES, SRISTI DIVINA | 3791 | §101§103§112 | Non-Final OA | — | Pending | Mar 21, 2025 |
| 19084434 | VESSEL SINK AND METHOD OF INSTALLING SAME | Kohler Co. | CHEYNEY, CHARLES | §101§102§103DP | Non-Final OA | — | Pending | Mar 19, 2025 | |
| 19079014 | HEADLAMP FOR VEHICLES AND ANTI-CONDENSATION PROCESS | Hella GmbH & Co. KGaA | GRAMLING, SEAN P | 2875 | §102§103 | Non-Final OA | — | Pending | Mar 13, 2025 |
| 19077134 | AT LEAST PARTIALLY TRANSPARENT OPTICAL COMPONENT FOR USE IN A MOTOR VEHICLE | Hella GmbH & Co. KGaA | JACKSON, MONIQUE R | §102§103§112 | Non-Final OA | — | Pending | Mar 12, 2025 | |
| 19071480 | CONTAINER AND BOTTOM END CONSTRUCTION THEREFOR | Huhtamaki, Inc. | DEMEREE, CHRISTOPHER R | §102Other | Non-Final OA | — | Pending | Mar 05, 2025 | |
| 19064906 | SYSTEM AND METHOD FOR VERIFYING PRIMARY SOURCE PET RECORDS USING COMMERCIALLY AVAILABLE DEVICES | Vetverifi Inc. | MACCAGNO, PIERRE L | 3687 | §101§102§103 | Non-Final OA | 28d overdue | Pending | Feb 27, 2025 |
| 19060947 | PERSONALIZED SOCIAL NETWORK SYSTEM | Cocreatex Inc. | MARI VALCARCEL, FERNANDO MARIANO | 2159 | §103 | Final Rejection | — | Pending | Feb 24, 2025 |
| 19061884 | VERTICAL PLANT GROWTH SYSTEM | Loom Gardens, Inc. | PETERSON, ALANNA KAY | 3642 | §102§103§112 | Non-Final OA | — | Pending | Feb 24, 2025 |
| 19049467 | LATTICE STRUCTURE IMPLANT AND METHODS FOR MAKING THE SAME | BFM Holdings, LLC | BOLES, SAMEH RAAFAT | 3775 | §102§112 | Final Rejection | 113d overdue | Pending | Feb 10, 2025 |
| 19049974 | SYSTEM AND METHOD FOR LONGITUDINAL APNEA MONITORING USING SPO2 SIGNALS | UNIVERSITY OF SOUTH FLORIDA | ROBERTS, ANNA L | §101§102§103 | Non-Final OA | — | Pending | Feb 10, 2025 | |
| 19043393 | ADAPTIVE SPEECH ELABORATION AND FEEDBACK FOR SPEECH THERAPY | UNIVERSITY OF SOUTH FLORIDA | LAM, PHILIP HUNG FAI | §101 | Non-Final OA | — | Pending | Jan 31, 2025 | |
| 19038669 | CUSTOM AI CO-PILOT FOR SOFTWARE SECURITY PEN-TESTING | UNIVERSITY OF SOUTH FLORIDA | PREM, SAIPRATAP | 4100 | §103 | Non-Final OA | — | Pending | Jan 27, 2025 |
| 18998867 | SYSTEM INCENTIVIZING AND ADJUSTING DRUG DELIVERY | Sonara Health, Inc. | NAJARIAN, LENA | 3687 | §101§103 | Final Rejection | — | Pending | Jan 27, 2025 |
| 19033075 | CARTRIDGE STABILIZATION SYSTEM AND METHOD | Brady Worldwide, Inc. | KIM, SANG K | §102§103 | Non-Final OA | — | Pending | Jan 21, 2025 | |
| 18996531 | MACHINE FOR HANDLING A LOAD AND/OR A PERSON | Manitou Bf | KECK, DANIEL M | 3614 | §102§103 | Non-Final OA | — | Pending | Jan 17, 2025 |
| 19016636 | INTEGRATED ROTARY SPRAYER | Kohler (China) Investment Co., Ltd. | GREENLUND, JOSEPH A | §102§112 | Non-Final OA | — | Pending | Jan 10, 2025 | |
| 19007095 | MINIMALLY INVASIVE LEADLESS NEUROSTIMULATION DEVICE | Medtronic, Inc. | KOWALKOWSKI, FIONA MARGARET | §102§103§112 | Non-Final OA | — | Pending | Dec 31, 2024 | |
| 19004081 | GUIDED RE-ENTRY CATHETER SYSTEM FOR CROSSING ARTERIAL CHRONIC OCCLUSIONS | Croce, Kevin | HUPCZEY, JR, RONALD JAMES | §102§103§112 | Non-Final OA | — | Pending | Dec 27, 2024 | |
| 18716847 | HANDLING MACHINE COMPRISING A HYDRAULIC STEERING SYSTEM | Manitou Bf | NGUYEN, CUONG H | §103 | Non-Final OA | — | Pending | Dec 23, 2024 | |
| 18981892 | TAILORED LIFT BRA CUP SYSTEM AND METHOD | Hbi Branded Apparel Enterprises, LLC | FERREIRA, CATHERINE M | 3732 | §103 | Non-Final OA | — | Pending | Dec 16, 2024 |
| 18981092 | SYSTEM AND METHOD FOR GROUND ENGAGEMENT TOOL | Joy Global Surface Mining Inc. | WOOD, DOUGLAS S | §102§103§112 | Non-Final OA | — | Pending | Dec 13, 2024 | |
| 18978901 | DYNAMIC TENSIONING DEVICES FOR ORTHOPEDIC COMPRESSION | Ossiscura, LLC | SHI, KATHERINE MENGLIN | §112DP | Non-Final OA | — | Pending | Dec 12, 2024 | |
| 18873846 | Material Search Method, Material Search System, Program, And Recording Medium | Semiconductor Energy Laboratory Co., Ltd. | MCQUITERY, DIEDRA M | 2166 | §101§112 | Final Rejection | 78d overdue | Pending | Dec 11, 2024 |
| 18971655 | BOTTLE FILLER FIXTURE FOR DRINKING FOUNTAIN | EMC Water LLC | LEE, CHEE-CHONG | §102§103§112 | Non-Final OA | — | Pending | Dec 06, 2024 | |
| 18969660 | Pour Spout | Phoenix Closure, Inc. | NICOLAS, FREDERICK C | §102§103§112 | Non-Final OA | — | Pending | Dec 05, 2024 | |
| 18967808 | FORCE MEDIATED MECHANICAL TESTING DEVICE FOR THE CHARACTERIZATION OF SOFT TISSUES | Cervalia, Inc. | MELHUS, BENJAMIN S | 3791 | §102 | Non-Final OA | 120d overdue | Pending | Dec 04, 2024 |
| 18967010 | GLADHAND LOCKOUT SYSTEM AND METHOD | Brady Worldwide, Inc. | LINFORD, JAMES ALBERT | 3679 | §102§103 | Non-Final OA | — | Pending | Dec 03, 2024 |
| 18689347 | AERIAL LIFT FOR WORKING AT HEIGHT, CONTROL METHOD AND ASSEMBLY COMPRISING SUCH AN AERIAL LIFT | Manitou Bf | CANFIELD, ROBERT | §103 | Non-Final OA | — | Pending | Dec 02, 2024 | |
| 18954090 | Display Device and Electronic Device | Semiconductor Energy Laboratory Co., Ltd. | VU, PHU | §103 | Non-Final OA | — | Pending | Nov 20, 2024 | |
| 18953795 | SYSTEM AND A METHOD FOR CONTROLLING POOL EQUIPMENT | Pentair, Inc. | BAKER, LORI LYNN | §103 | Non-Final OA | — | Pending | Nov 20, 2024 | |
| 18948384 | CONNECTED ECOSYSTEM COMMUNICATION FOR AQUATIC EQUIPMENT | Pentair Water Pool & Spa, Inc. | LITTLE, DALE L | §102§103 | Non-Final OA | — | Pending | Nov 14, 2024 | |
| 18944295 | CONTROL UNIT | Hella GmbH & Co. KGaA | CHAI, RAYMOND REI-YANG | §103 | Non-Final OA | — | Pending | Nov 12, 2024 | |
| 18941834 | ELECTRODE COATINGS CONTAINING NANOMATERIALS OR MICROFIBERS | Olin Corporation | JEBUTU, MOFOLUWASO SIMILOLUWA | 1795 | §102§103 | Final Rejection | — | Pending | Nov 08, 2024 |
| 18938426 | DISTRIBUTED ARCHITECTURE IGNITION SYSTEM | Altronic LLC | HASAN, SYED O | 3747 | §103 | Non-Final OA | — | Pending | Nov 06, 2024 |
| 18925331 | REFUSE CARTS WITH RETENTION CORRAL | Tbi Engineering And Design, LLC | JOHNS, HILARY LYNN | §103 | Non-Final OA | — | Pending | Oct 24, 2024 | |
| 18855996 | TREATMENT OF MUSCLE FIBROSIS | Fundació Institut De Recerca De L'Hospital De La Santa Creu I Sant Pau | SOROUSH, LAYLA | §101§102§103§112 | Non-Final OA | — | Pending | Oct 10, 2024 | |
| 18907524 | HOIST ROPE PROTECTION | Joy Global Surface Mining Inc. | TIGHE, BRENDAN P | §102§103§112 | Non-Final OA | — | Pending | Oct 05, 2024 | |
| 18906032 | CAM SYNCHRONIZATION DEVICE FOR ARCHERY BOW | Bowtech, LLC | NICONOVICH, ALEXANDER R | §102§103§112 | Non-Final OA | — | Pending | Oct 03, 2024 | |
| 18897224 | METHOD FOR OPERATING A LIGHT-BASED DRIVER ASSISTANCE SYSTEM OF A MOTOR VEHICLE | Hella GmbH & Co. KGaA | CHAI, RAYMOND REI-YANG | 2844 | §103§112 | Final Rejection | 62d | Pending | Sep 26, 2024 |
| 18850914 | METHOD FOR CORRECTING IMAGE BLURRING IN A CAPTURED DIGITAL IMAGE | Vexcel Imaging GmbH | AKHAVANNIK, HADI | §102§103 | Non-Final OA | — | Pending | Sep 25, 2024 | |
| 18890217 | TWIN AIR CURTAIN SYSTEM AND METHOD FOR USING SAME | Mriglobal | SEHN, MICHAEL L | §102§112 | Non-Final OA | — | Pending | Sep 19, 2024 | |
| 18889155 | CONTAINER HAVING UPPER RIM WITH IMPROVED SEAL | Huhtamaki, Inc. | DEMEREE, CHRISTOPHER R | 3734 | §102§103 | Non-Final OA | — | Pending | Sep 18, 2024 |
| 18882990 | POWERLINE COMMUNICATIONS FOR LIGHTING SYSTEM | Sealite Usa LLC | BLACK-CHILDRESS, RAJSHEED O | 2685 | §103Other | Final Rejection | — | Pending | Sep 12, 2024 |
| 18829628 | MODULAR FLOOR MACHINE | Amano Pioneer Eclipse Corporation | HAWKINS, JASON KHALIL | §102§103 | Non-Final OA | — | Pending | Sep 10, 2024 | |
| 18845418 | METHOD AND CAMERA FOR CORRECTING A GEOMETRIC IMAGING ABERRATION IN AN IMAGE RECORDING | Vexcel Imaging GmbH | TSAI, TSUNG YIN | §103 | Final Rejection | — | Pending | Sep 09, 2024 | |
| 18826799 | WRAPPER FOR DRINKING COOLER | EMC Water LLC | SCHWARTZ, KEVIN EDWARD | 3752 | §103 | Final Rejection | — | Pending | Sep 06, 2024 |
| 18825507 | Organic Compound, Light-Emitting Element, Light-Emitting Device, Electronic Device, and Lighting Device | Semiconductor Energy Laboratory Co., Ltd. | SEAMAN, D MARGARET M | DP | Non-Final OA | — | Pending | Sep 05, 2024 | |
| 18822719 | MATERIAL HANDLING VEHICLE MONITORING SYSTEM AND METHOD | Toyota Material Handling, Inc. | MOHL, PATRICK DANIEL | 3666 | §103Other | Non-Final OA | — | Pending | Sep 03, 2024 |
| 18842645 | HANDLING MACHINE COMPRISING A TANK INTENDED TO CONTAIN HYDROGEN | Manitou Bf | SHABARA, HOSAM | 3618 | §102§103 | Non-Final OA | — | Pending | Aug 29, 2024 |
| 18814065 | BULK RESIN INJECTION SYSTEM | Joy Global Underground Mining LLC | FIORELLO, BENJAMIN F | 3678 | §102 | Non-Final OA | — | Pending | Aug 23, 2024 |
| 18814035 | INDOOR AIR QUALITY APPLIANCE | Insight Restoration LLC | HE, QIANPING | §102§103§112 | Non-Final OA | — | Pending | Aug 23, 2024 | |
| 18840891 | LABEL ACCESS MECHANISMS FOR ROCKER SWITCH | Luemelit LLC | JIMENEZ, ANTHONY R | §103§112 | Non-Final OA | — | Pending | Aug 22, 2024 | |
| 18811687 | SYSTEM AND METHOD FOR TRAINING, TAGGING, RECOMMENDING, AND GENERATING DIGITAL CONTENT BASED ON BIOMETRIC DATA | StoryUp, Inc. | FURTADO, WINSTON RAHUL | 3687 | §101§103 | Final Rejection | 5d overdue | Pending | Aug 21, 2024 |
| 18798740 | ADIABATIC COOLER WITH CONTROL SYSTEM FOR WATER AND ENERGY USE REDUCTION | Spx Cooling Tech, LLC | BUSHEY, CHARLES S | 3763 | §103§112 | Non-Final OA | — | Pending | Aug 08, 2024 |
| 18795328 | DISENGAGING MECHANISM | Pure Fishing, Inc. | JEFFERSON, TIFFANY DOMONIQUE | 3654 | §103§112 | Non-Final OA | — | Pending | Aug 06, 2024 |
| 18795999 | Organic Compound, Light-Emitting Element, Light-Emitting Device, Electronic Device, and Lighting Device | Semiconductor Energy Laboratory Co., Ltd. | CHANDHOK, JENNA N | 1789 | §103 | Final Rejection | — | Pending | Aug 06, 2024 |
| 18791973 | Display Device | Semiconductor Energy Laboratory Co., Ltd. | MATTABONI, TIMOTHY JAMES | §103 | Non-Final OA | — | Pending | Aug 01, 2024 | |
| 18790106 | RIBBON CARTRIDGE AUTOMATIC CENTERING SYSTEM AND METHOD | Brady Worldwide, Inc. | RIVERA, WILLIAM ARAUZ | 3654 | §103 | Final Rejection | 30d | Pending | Jul 31, 2024 |
| 18834445 | Electronic Device | Semiconductor Energy Laboratory Co., Ltd. | JONES, JAMES | 2872 | §102§112 | Non-Final OA | — | Pending | Jul 30, 2024 |
| 18832322 | Storage Device | Semiconductor Energy Laboratory Co., Ltd. | LEBOEUF, JEROME LARRY | 2824 | §103 | Final Rejection | 21d | Pending | Jul 23, 2024 |
| 18779010 | HYBRID MOWER | Daye North America, Inc. | TORRES, ALICIA M | §103 | Non-Final OA | — | Pending | Jul 21, 2024 | |
| 18768304 | System And Method To Manage Privileges | Authentic Vision GmbH | LONG, EDWARD X | 2439 | §103 | Final Rejection | 120d overdue | Pending | Jul 10, 2024 |
| 18752108 | SWING AUTOMATION FOR ROPE SHOVEL | Joy Global Surface Mining Inc. | SHUDY, ANGELINA M | 3668 | §103§112 | Final Rejection | 41d | Pending | Jun 24, 2024 |
| 18751950 | SYSTEM AND METHOD FOR DYNAMICALLY ALTERING A DEVICE FOR MOVING ANIMALS | Bird'S Eye Robotics, Inc. | HANNAN, B M M | 3657 | §112 | Non-Final OA | 43d | Pending | Jun 24, 2024 |
| 18750384 | Electronic Device, Light-Emitting Device, Electronic Appliance, and Lighting Device | Semiconductor Energy Laboratory Co., Ltd. | LIU, MIKKA H | §103 | Non-Final OA | — | Pending | Jun 21, 2024 | |
| 18722110 | Display Device | Semiconductor Energy Laboratory Co., Ltd. | DINKE, BITEW A | §102§103Other | Non-Final OA | — | Pending | Jun 20, 2024 | |
| 18721164 | SYSTEMS, METHODS, AND MEDIA FOR FREQUENCY DOMAIN DIFFUSE CORRELATION SPECTROSCOPY | UNIVERSITY OF SOUTH FLORIDA | PADDA, ARI SINGH KANE | 3791 | §103§112 | Non-Final OA | — | Pending | Jun 17, 2024 |
| 18744616 | METHOD FOR PRODUCING A HOLOGRAM FOR A RETROREFLECTOR AND METHOD FOR PRODUCING A RETROREFLECTOR FOR A VEHICLE | Hella GmbH & Co. KGaA | EDENFIELD, KUEI-JEN L | 2872 | §103 | Final Rejection | — | Pending | Jun 15, 2024 |
| 18742556 | ORTHOPEDIC STAPLE | Conventus Orthopaedics, Inc. | WAGGLE, JR, LARRY E | 3775 | §102§103§112 | Non-Final OA | — | Pending | Jun 13, 2024 |
| 18738879 | CUTTING ASSEMBLY FOR LONGWALL MINING SYSTEM | Joy Global Underground Mining LLC | COY, NICOLE A | 3672 | §103 | Final Rejection | — | Pending | Jun 10, 2024 |
| 18737669 | HEMOSTATIC THERMAL SEALER | Medtronic Advanced Energy LLC | GIULIANI, THOMAS ANTHONY | 3794 | §102§103§112 | Final Rejection | 4d overdue | Pending | Jun 07, 2024 |
| 18735875 | INTERCHANGABLE FAUCET DESIGN ASSEMBLY | Kohler (China) Investment Co., Ltd. | LOEPPKE, JANIE MEREDITH | 3754 | §103§112 | Non-Final OA | 17d overdue | Pending | Jun 06, 2024 |
| 18733566 | LIFT CRANE ASSEMBLY FOR A WIND TURBINE NACELLE | The Carlson Company, Inc. | CAMPOS JR, JUAN J | 3654 | §102§103§112 | Non-Final OA | — | Pending | Jun 04, 2024 |
| 18676951 | PARKING STORAGE FACILITY FOR CABLEWAY VEHICLE | Innova Patent GmbH | SMITH, JASON CHRISTOPHER | §103§112 | Final Rejection | — | Pending | May 29, 2024 | |
| 18676435 | SYSTEM AND METHOD FOR INCREASED RESILIENCY OF MOBILE WIRELESS NETWORKS VIA DISTRIBUTED PUBLIC-KEY INFRASTRUCTURE (PKI) ALLIANCES | Oregon State University | SHAAWAT, MAYASA A. | 2433 | §103 | Final Rejection | 28d | Pending | May 28, 2024 |
| 18713153 | ELECTRONIC COMPONENT AUTHENTICITY IDENTIFICATION SYSTEM AND RELATED METHODS | UNIVERSITY OF SOUTH FLORIDA | QUIGLEY, KYLE ROBERT | §102§103§112 | Non-Final OA | — | Pending | May 23, 2024 | |
| 18673231 | SEQUENTIAL PACKETS IMAGE-BASED NETWORK INTRUSION DETECTION SYSTEM | UNIVERSITY OF SOUTH FLORIDA | KIM, EUI H | 2453 | §102§103 | Non-Final OA | 83d | Pending | May 23, 2024 |
| 18712398 | Semiconductor Device | Semiconductor Energy Laboratory Co., Ltd. | ANDERSON, ERIK ARTHUR | §103 | Non-Final OA | — | Pending | May 22, 2024 | |
| 18710601 | SYSTEMS AND METHODS FOR HIGH-EFFICIENCY NUTRIENT REMOVAL AND RECOVERY FROM WASTE STREAMS | UNIVERSITY OF SOUTH FLORIDA | ORME, PATRICK JAMES | §103§112 | Non-Final OA | — | Pending | May 15, 2024 | |
| 18659663 | Light-Emitting Device, Light-Emitting Apparatus, Electronic Device, and Lighting Device | Semiconductor Energy Laboratory Co., Ltd. | MUSE, ISMAIL A | 2812 | §103 | Non-Final OA | — | Pending | May 09, 2024 |
| 18645256 | PLANTING DEVICE FOR PLANTING ROOT CROPS | Grimme Landmaschinenfabrik GmbH & Co. Kg | MCGOWAN, JAMIE LOUISE | 3671 | §103 | Final Rejection | — | Pending | Apr 24, 2024 |
| 18704323 | SYSTEM AND A METHOD FOR REDUCING NITROGEN DIOXIDE (NO2) CONTENT IN FLUE GAS | Pentair, Inc. | PREGLER, SHARON | §102 | Non-Final OA | — | Pending | Apr 24, 2024 | |
| 18645102 | MONITOR MOUNT WITH SIDE-ACCESSIBLE HEIGHT-ADJUSTMENT MECHANISM | Bestqi Innovation Technology (Shenzhen) Co., Ltd. | WUJCIAK, ALFRED J | 3636 | §112 | Non-Final OA | 83d | Pending | Apr 24, 2024 |
| 18640254 | DEVICE FOR SAWING AND SPLITTING WOOD | Posch Gesellschaft M.B.H. | ISSA, JUEVARA SAOOD | 3725 | §103§112 | Non-Final OA | 56d | Pending | Apr 19, 2024 |
| 18638571 | VIRTUAL FIELD-BASED TRACK PROTECTION FOR A MINING MACHINE | Joy Global Surface Mining Inc. | LONSBERRY, HUNTER B | 3663 | §103 | Non-Final OA | — | Pending | Apr 17, 2024 |
| 18635760 | CANAL FLOATING SOLAR AND INSTALLATION PROCESSES FOR SAME | Emrgy Inc. | TRINH, THANH TRUC | 1726 | §103§112 | Final Rejection | — | Pending | Apr 15, 2024 |
| 18699760 | Light-Emitting Apparatus | Semiconductor Energy Labratory Co., Ltd. | QUINTO, KEVIN V | §102 | Non-Final OA | — | Pending | Apr 09, 2024 | |
| 18622058 | MONITORING THE LOCKING MECHANISM ON AN ELECTRICAL LOCKING UNIT | Memo Beteiligungs- Und Verwaltungs GmbH | MERLINO, ALYSON MARIE | 3675 | §102§103§112 | Non-Final OA | 78d | Pending | Mar 29, 2024 |
| 18696576 | HANDLING MACHINE | Manitou Bf | PEZZLO, BENJAMIN ALEXANDER | 3634 | §102§103 | Final Rejection | — | Pending | Mar 28, 2024 |
| 18696212 | Display Apparatus, Electronic Device, And Operation Method Of Light-Emitting Apparatus | Semiconductor Energy Laboratory Co., Ltd. | XIE, KWIN | §102 | Non-Final OA | — | Pending | Mar 27, 2024 | |
| 18694903 | METHOD OF MANUFACTURING A MEDICAL INJECTION DEVICE AND MEDICAL INJECTION DEVICE THUS OBTAINED | Stevanato Group S.p.A. | PATEL, SHEFALI DILIP | §103§112 | Non-Final OA | — | Pending | Mar 22, 2024 | |
| 18694402 | IMPROVEMENTS RELATING TO THE COLD-ALKALI PROCESS FOR THE PRODUCTION OF REGENERATED CELLULOSIC FIBERS | Treetotextile AB | CHO, DAVID H | §103 | Non-Final OA | — | Pending | Mar 21, 2024 | |
| 18691515 | OPERATING UNIT AND AGRICULTURAL WORKING MACHINE | Grimme Landmaschinenfabrik GmbH & Co. Kg | HAN, CHARLES J | 3665 | §103 | Non-Final OA | — | Pending | Mar 13, 2024 |
| 18690842 | NOSE PAD EYE/GAZE TRACKING MODULE APPLICABLE TO SMART GLASSES OR HEAD WEARABLE DEVICE | VIEWPOINTSYSTEM GMBH | SAHLE, MAHIDERE S | 2872 | §103§112 | Final Rejection | 15d overdue | Pending | Mar 11, 2024 |
| 18596243 | LIGHTING DEVICE AND METHOD FOR THE PRODUCTION THEREOF | Hella GmbH & Co. KGaA | LEE, NATHANIEL J. | 2875 | §103 | Non-Final OA | 44d overdue | Pending | Mar 05, 2024 |
| 18594431 | METHOD FOR IDENTIFYING CANDIDATE THERAPEUTICS FOR ALZHEIMER'S DISEASE | UNIVERSITY OF SOUTH FLORIDA | JONES-FOSTER, ERICA NICOLE | §103§112 | Non-Final OA | — | Pending | Mar 04, 2024 | |
| 18593708 | COMPOSITIONS AND METHODS FOR THE TREATMENT AND/OR PREVENTION OF ALZHEIMER'S DISEASE | UNIVERSITY OF SOUTH FLORIDA | BRAM, STANLEY | 1691 | §102§103§112 | Non-Final OA | — | Pending | Mar 01, 2024 |
| 18588185 | HANDHELD VACUUM SEALER DEVICE | Sunbeam Products, Inc. | IMAM, TANZIM | 3731 | §102§103 | Non-Final OA | — | Pending | Feb 27, 2024 |
| 18587676 | MONOLITHIC DRAIN, TOOLING, AND METHOD FOR MAKING SAME | Zurn Water, LLC | TOLAN, EDWARD THOMAS | 3725 | §102§103 | Non-Final OA | — | Pending | Feb 26, 2024 |
| 18686358 | SCREENING SYSTEM TO IDENTIFY PATHOGENS OR GENETIC DIFFERENCES | Avicena Systems Limited | HANEY, NOAH JAMES | 2877 | §112 | Final Rejection | — | Pending | Feb 23, 2024 |
| 18444097 | VACUUM EXCAVATION FOR LOCAL TRANSMISSION SYSTEM AND METHOD | ULC Technologies LLC | BUCK, MATTHEW R | 3672 | §102§103 | Final Rejection | 1d overdue | Pending | Feb 16, 2024 |
| 18443021 | SYSTEM AND PROCESS FOR MONITORING MEDICATION CONSUMPTION FOR PILL POUCH CONTAINERS | Medsense Health, Inc. | COLLINS, MICHAEL | 3655 | §103§112 | Final Rejection | — | Pending | Feb 15, 2024 |
| 18439139 | OPAQUE INK COMPOSITION | Sanford, L.P. | WANG, HAOPENG | §102§103 | Non-Final OA | — | Pending | Feb 12, 2024 | |
| 18437787 | DISPENSER CAP GUARD | TricorBraun Inc. | PANCHOLI, VISHAL J | 3754 | §102§103 | Non-Final OA | 150d overdue | Pending | Feb 09, 2024 |
| 18434503 | BURNER ACCESS HATCH | Weil-Mclain | WEINERT, WILLIAM C | 3762 | §102§103 | Final Rejection | — | Pending | Feb 06, 2024 |
| 18425539 | GAFF COVER | Hook Holster LLC | PEZZLO, BENJAMIN ALEXANDER | 3634 | §103 | Final Rejection | 8d overdue | Pending | Jan 29, 2024 |
| 18292610 | IMPROVEMENTS RELATING TO THE COLD-ALKALI PROCESS FOR THE PRODUCTION OF REGENERATED CELLULOSIC FIBERS | Treetotextile AB | EMRICH, LARISSA ROWE | 1789 | §102§103 | Non-Final OA | 4d overdue | Pending | Jan 26, 2024 |
| 18419362 | SIMULATED ANNEALING BASED INTEGERIZATION OF HIDDEN WEIGHTS FOR AREA-EFFICIENT IOT EDGE INTELLIGENCE | UNIVERSITY OF SOUTH FLORIDA | STANLEY, JEREMY L | §101§102§103§112 | Non-Final OA | — | Pending | Jan 22, 2024 | |
| 18580356 | VAPORIZER SYSTEM | Rite LLC | FULTON, MICHAEL TIMOTHY | §102§103 | Non-Final OA | — | Pending | Jan 18, 2024 | |
| 18578100 | Equipment For Manufacturing Light-Emitting Device | Semiconductor Energy Laboratory Co., Ltd. | KENDALL, BENJAMIN R | 2896 | §102 | Non-Final OA | — | Pending | Jan 10, 2024 |
| 18402634 | METHODS AND APPARATUS FOR OBJECT DETECTION AND IDENTIFICATION IN A MULTIPLE DETECTOR LIDAR ARRAY | Big Sky Financial Corporation | RATCLIFFE, LUKE D | DP | Non-Final OA | — | Pending | Jan 02, 2024 | |
| 18400135 | INTEGRATED POOL PAD EQUIPMENT | Pentair, Inc. | MILLER-CRUZ, EKANDRA S. | 1773 | §103 | Non-Final OA | — | Pending | Dec 29, 2023 |
| 18400763 | SYSTEM AND METHOD FOR FABRICATING A DENTAL RESTORATION | Hultgren Dental Technologies, LLC | ROSEN, ERIC J | 3772 | §101§112DP | Non-Final OA | — | Pending | Dec 29, 2023 |
| 18574996 | Method For Recovery of Chemically Absorbed CO2 With Low Energy Consumption | Value Group B.V | GITMAN, GABRIEL E | §112 | Non-Final OA | — | Pending | Dec 28, 2023 | |
| 18397346 | SYSTEM AND METHODS FOR DETECTING FAILURE OF HEAT EXCHANGERS | Pentair, Inc. | PLUMB, NIGEL H | 2855 | §103 | Non-Final OA | — | Pending | Dec 27, 2023 |
| 18394119 | HEATER CONDENSATE pH CONTROL SYSTEM AND METHOD | Pentair, Inc. | WILSON, GREGORY A | 3762 | §102 | Final Rejection | — | Pending | Dec 22, 2023 |
| 18394234 | HYBRID COMPONENT FOR AUTOMOTIVE APPLICATIONS AND METHOD OF MANUFACTURING A HYBRID COMPONENT | Hella GmbH & Co. KGaA | FLORES JR, DONALD M | 1781 | §103 | Non-Final OA | — | Pending | Dec 22, 2023 |
| 18394993 | SELF-MEDIATED SALTLESS WHOLE HOME WATER TREATMENT SYSTEMS AND METHODS | Pentair, Inc. | MILLER-CRUZ, EKANDRA S. | 1773 | §102§103Other | Non-Final OA | — | Pending | Dec 22, 2023 |
| 18394876 | AUTO-CONFIGURATION OF AQUATIC EQUIPMENT | Pentair, Inc. | PATEL, CHANDNI | 2118 | §102§103 | Non-Final OA | — | Pending | Dec 22, 2023 |
| 18573262 | CABLEWAY VEHICLE | Innova Patent GmbH | SMITH, JASON CHRISTOPHER | 3615 | §103§112 | Non-Final OA | — | Pending | Dec 21, 2023 |
| 18392522 | CIRCULATING CABLEWAY AND METHOD FOR OPERATING A CIRCULATING CABLEWAY | Innova Patent GmbH | SMITH, JASON CHRISTOPHER | 3615 | §103§112 | Final Rejection | — | Pending | Dec 21, 2023 |
| 18572353 | Method and Reactor System for Depolymerizing a Terephthalate-Polymer Into Reusable Raw Material | Ioniqa Technologies B.V. | RHOADES, DEREK JAMES | §102§103§112DP | Non-Final OA | — | Pending | Dec 20, 2023 | |
| 18390937 | Method For Manufacturing Display Device, Display Device, Display Module, and Electronic Device | Semiconductor Energy Laboratory Co., Ltd. | SYLVIA, CHRISTINA A | 2817 | §112 | Non-Final OA | — | Pending | Dec 20, 2023 |
| 18391455 | RANGE BASED HARDWARE OPTIMIZATION OF NEURAL NETWORK SYSTEM AND RELATED METHOD | UNIVERSITY OF SOUTH FLORIDA | KHAN, SHAHID K | §103 | Non-Final OA | — | Pending | Dec 20, 2023 | |
| 18545358 | Heated Work-Extraction Mechanism for a Cryogenic-Based Carbon Dioxide Capture System | Southwest Research Institute | MENGESHA, WEBESHET | 3763 | §102§103§112 | Final Rejection | 31d overdue | Pending | Dec 19, 2023 |
| 18545364 | Cryogenic-Based Carbon Dioxide Capture System | Southwest Research Institute | MENGESHA, WEBESHET | 3763 | §102§103§112 | Final Rejection | — | Pending | Dec 19, 2023 |
| 18541940 | KITCHEN ENVIRONMENT WITH ENHANCED USER EXPERIENCE AND ACCESSORIES | Kohler Co. | SANCHEZ-MEDINA, REINALDO | 3753 | §103 | Non-Final OA | 11d overdue | Pending | Dec 15, 2023 |
| 18571127 | SYNTHETIC ECHO FROM ECG | Rutgers, The State University Of New Jersey | NG, JONATHAN K | 3619 | §101§102§103 | Final Rejection | 119d overdue | Pending | Dec 15, 2023 |
| 18542290 | LAMINAR DEVICE TO CREATE WATER FEATURE/S | Pentair, Inc. | KIM, CHRISTOPHER S | 3752 | §102§112 | Final Rejection | 9d overdue | Pending | Dec 15, 2023 |
| 18569342 | Display Apparatus | Semiconductor Energy Laboratory Co., Ltd. | FOX, BRANDON C | 2818 | §102 | Final Rejection | 14d | Pending | Dec 12, 2023 |
| 18569536 | METHOD FOR SUPPORTING TRANSACTION OF UNLISTED STOCKS AND UNLISTED STOCK TRANSACTION SERVER USING SAME | Yun Hee Kim | DUCK, BRANDON M | 3693 | §101 | Non-Final OA | 21d | Pending | Dec 12, 2023 |
| 18527837 | Serial Peripheral Interface Control Method | Pctel, Inc. | BARTELS, CHRISTOPHER A. | 2184 | §103 | Non-Final OA | — | Pending | Dec 04, 2023 |
| 18513381 | METHOD FOR STACKED ELUTION OF MOTHER-DAUGHTER RADIONUCLIDES | Northstar Medical Technologies, LLC | LACLAIR, LOGAN EDWARD | 1736 | §102§112 | Non-Final OA | — | Pending | Nov 17, 2023 |
| 18513220 | System and Method For Fractional Elution of Mother-Daughter Radionuclides | Northstar Medical Technologies, LLC | KIM, SUN U | 1777 | §102§112DP | Non-Final OA | — | Pending | Nov 17, 2023 |
| 18560633 | PROCESSES AND METHODS FOR BIO-EXTRACTION OF TRACE METALS FROM METAL-OXIDE CONTAINING MATERIALS | Impossible Mining Inc. | SHAMS, NAZMUN NAHAR | 1738 | §103§112 | Non-Final OA | — | Pending | Nov 13, 2023 |
| 18506410 | VEHICLE BODY PANEL WITH INTEGRATED FUNCTIONAL COMPONENTS | Hella Saturnus Slovenija D.O.O. | FULLER, ROBERT EDWARD | 3676 | §103 | Non-Final OA | — | Pending | Nov 10, 2023 |
| 18504511 | SURGICAL ALIGNMENT GUIDE ASSEMBLY FOR TOTAL ANKLE REPLACEMENT AND METHOD OF USING THE SAME | Restor3D, Inc. | SIPP, AMY R. | 3775 | §102§103 | Final Rejection | 31d overdue | Pending | Nov 08, 2023 |
| 18559271 | CENTRIFUGAL SCREEN FILTER AND RELATED METHOD OF ASSEMBLY | Johnson Screens, Inc. | POPOVICS, ROBERT J | 1776 | §103§112 | Non-Final OA | — | Pending | Nov 06, 2023 |
| 18501778 | DEVICES AND METHODS UTILIZING CARBON NANOTUBE MEMBRANE FILTRATION | Kohler Co. | NORRIS, CLAIRE A | 1779 | §103§112 | Non-Final OA | 22d | Pending | Nov 03, 2023 |
| 18500809 | FLUID-ENHANCED ELECTROSURGERY WITH INTEGRATED IRRIGATION AND ASPIRATION | Medtronic Advanced Energy LLC | BORSCH, NICHOLAS S | 3794 | §103 | Non-Final OA | 14d | Pending | Nov 02, 2023 |
| 18380338 | Organometallic Complex and Light-Emitting Device | Semiconductor Energy Laboratory Co., Ltd. | WATSON, BRAELYN | §103 | Non-Final OA | — | Pending | Oct 16, 2023 | |
| 18555424 | DEVICE | Eazyiv Ltd. | RODRIGUEZ, WILLIAM H | 3741 | §112 | Non-Final OA | 9d | Pending | Oct 13, 2023 |
| 18480725 | LINKING MODULE FOR A POWER STATION ASSEMBLY | Champion Power Equipment, Inc. | SILVA, FRANK ALEXIS | 1729 | §103 | Non-Final OA | — | Pending | Oct 04, 2023 |
| 18481151 | STACKING BRACKET FOR AN EXPANSION BATTERY | Champion Power Equipment, Inc. | WILLIAMS, ARUN C | §102§103 | Non-Final OA | — | Pending | Oct 04, 2023 | |
| 18285492 | KAMADO AND METAL KETTLE ROTISSERIE ADAPTER | Linwood Resources, LLC | JONES, LOGAN P | 3762 | §103 | Non-Final OA | 36d overdue | Pending | Oct 03, 2023 |
| 18480234 | POWER STATION AND GAS INVERTER ASSEMBLY | Champion Power Equipment, Inc. | TAN, RICHARD | 2849 | §103§112 | Non-Final OA | — | Pending | Oct 03, 2023 |
| 18553231 | EFFICIENT BIOCOMPATIBLE CRYOPRESERVATION MEDIUM THAT ELIMINATES THE NEED FOR CELL PERMEATING CRYOPROTECTANTS | The Curators of the University of Missouri | KOSAR, AARON J | 1655 | §102§103 | Non-Final OA | — | Pending | Sep 29, 2023 |
| 18283079 | Semiconductor Device And Electronic Apparatus | Semiconductor Energy Laboratory Co., Ltd. | WHALEN, DANIEL B | 2893 | §103 | Non-Final OA | — | Pending | Sep 20, 2023 |
| 18369543 | High Molecular Compound, Light-Emitting Device, Light-Emitting Apparatus, Electronic Device, and Lighting Device | Semiconductor Energy Laboratory Co., Ltd. | NGUYEN, LUCAS QUOC | §102§103 | Non-Final OA | — | Pending | Sep 18, 2023 | |
| 18462150 | SERVICE TOOL | Joy Global Surface Mining Inc. | SHUM, KENT N | 3723 | §103§112 | Final Rejection | 29d overdue | Pending | Sep 06, 2023 |
| 18456444 | CONTROL OF MULTIAGENT NETWORKS WITH MISBEHAVING VEHICLES OVER DIRECTED NETWORK TOPOLOGIES | UNIVERSITY OF SOUTH FLORIDA | MCCLEARY, CAITLIN RENEE | 3669 | §103§112 | Non-Final OA | 35d | Pending | Aug 25, 2023 |
| 18547844 | SELF-EXTINGUISHING CANDLE | The Yankee Candle Company, Inc. | BASICHAS, ALFRED | 3762 | §102§103 | Non-Final OA | 119d overdue | Pending | Aug 24, 2023 |
| 18454769 | SYSTEM AND METHOD FOR CONVERTING BIOMASS ASH MATERIAL INTO FERTILIZER | Blue Reason, LLC | SMITH, JENNIFER A | 1731 | §102§112 | Non-Final OA | 8d | Pending | Aug 23, 2023 |
| 18453656 | STRAP CONTAINER | Mb Companies, LLC | MELIKA, ERMIA EMAD | 3654 | §102§103 | Non-Final OA | — | Pending | Aug 22, 2023 |
| 18454025 | SUPPORT BRA SYSTEM AND METHOD | Champion Europe S.r.l. | MARCHEWKA, MATTHEW R | 3732 | §102§103§112 | Final Rejection | 121d overdue | Pending | Aug 22, 2023 |
| 18277061 | MODULE FOR USE IN PREPARING A PREFABRICATED STRUCTURE, METHOD FOR MANUFACTURING SAME AND TRANSPORT FRAME | Lodestar Structures Inc. | SADLON, JOSEPH | 3635 | §103 | Final Rejection | 29d | Pending | Aug 11, 2023 |
| 18447380 | PUMP ASSEMBLY FOR THE TREATMENT OF INJECTION MEDICAL DEVICES | Nuova Ompi S.r.l. Unipersonale | FARRAR, LAUREN PENG | 3783 | §103 | Non-Final OA | — | Pending | Aug 10, 2023 |
| 18264620 | COOKING EXPANSION MODULE | Sunbeam Products, Inc. | KASZTEJNA, MATTHEW JOHN | 3993 | §102§103§112 | Final Rejection | — | Pending | Aug 08, 2023 |
| 18264285 | HANDLE KNOB WITH NO FREE PLAY | Pure Fishing, Inc. | ROGERS, ADAM D | 3617 | §103§112 | Final Rejection | 307d overdue | Pending | Aug 04, 2023 |
| 18229425 | SYSTEM AND METHOD FOR REDUCING ERROR CAUSED BY ROTATIONAL MOVEMENT DURING POSITION SENSING | Altronic, Llc. | AURORA, REENA | 2858 | §112 | Final Rejection | — | Pending | Aug 02, 2023 |
| 18263466 | ELECTRODE DEVICE AND RELATED METHODS | UNIVERSITY OF SOUTH FLORIDA | CHA, CASEY GEORGE | 3794 | §103§112 | Final Rejection | — | Pending | Jul 28, 2023 |
| 18262548 | ELECTROTRANSFER METHODS FOR TREATING TUMORS | UNIVERSITY OF SOUTH FLORIDA | ALLEN, MARIANNE P | 1647 | §112 | Final Rejection | 48d | Pending | Jul 21, 2023 |
| 18214796 | Light-Emitting Device, Light-Emitting Apparatus, Electronic Device, and Lighting Device | Semiconductor Energy Laboratory Co., Ltd. | DAHLBURG, ELIZABETH M | §103§112 | Non-Final OA | — | Pending | Jun 27, 2023 | |
| 18214844 | Light-Emitting Device | Semiconductor Energy Laboratory Co., Ltd. | SIMBANA, RACHEL A | §103§112 | Non-Final OA | — | Pending | Jun 27, 2023 | |
| 18338696 | ELECTROSURGICAL ENERGY HARVESTING | Medtronic, Inc. | PEFFLEY, MICHAEL F | 3794 | §103 | Final Rejection | — | Pending | Jun 21, 2023 |
| 18210953 | Light-Emitting Device, Display Apparatus, Display Module, And Electronic Device | Semiconductor Energy Laboratory Co., Ltd. | CHEEK, EDWARD RHETT | 2813 | §103 | Final Rejection | 60d | Pending | Jun 16, 2023 |
| 18256465 | SENSOR ARRANGEMENT | Light Science Technologies Limited | NIA, FATEMEH ESFANDIARI | 2855 | §103§112 | Non-Final OA | 70d overdue | Pending | Jun 08, 2023 |
| 18330156 | MONOCRYSTALLINE SILICON CARBIDE SUBSTRATE, METHOD FOR MANUFACTURING THE SAME, AND SEMICONDUCTOR DEVICE | Jiangsu Tankeblue Semiconductor Co., Ltd. | SONG, MATTHEW J | 1714 | §103 | Final Rejection | — | Pending | Jun 06, 2023 |
| 18256109 | INFUSION PUMP WITH OCCLUSION DETECTION | ICU Medical, Inc. | PRICE, NATHAN R | 3783 | §101§102§103§112 | Final Rejection | 22d | Pending | Jun 06, 2023 |
| 18265090 | Display Device, Method For Manufacturing Display Device, and Electronic Device | Semiconductor Energy Laboratory Co., Ltd. | CHA, GRACE YEH-EUN SAET | 2897 | §102§103 | Final Rejection | — | Pending | Jun 02, 2023 |
| 18320886 | SYSTEM AND METHOD FOR IMAGE SEGMENTATION FOR DETECTING THE LOCATION OF A JOINT CENTER | Dari Motion, Inc. | AKHAVANNIK, HADI | 2676 | §103§112 | Non-Final OA | 71d overdue | Pending | May 19, 2023 |
| 18036993 | Semiconductor Device, Display Device, Display Module, and Electronic Device | Semiconductor Energy Laboratory Co., Ltd. | JUNGE, BRYAN R. | 2897 | §103 | Non-Final OA | — | Pending | May 15, 2023 |
| 18315743 | CONCEALER SYSTEMS AND METHODS | Hbi Branded Apparel Enterprises, LLC | MARCHEWKA, MATTHEW R | 3732 | §103§112 | Non-Final OA | 15d | Pending | May 11, 2023 |
| 18251700 | Torque Indicator, Torque Limiter Utilizing Torsional Deflection And Methods Thereof | Conventus Orthopeadics, Inc. | THOMAS, DAVID B | 3723 | §103 | Non-Final OA | 9d overdue | Pending | May 03, 2023 |
| 18249326 | HIGH-THROUGHPUT SCREENING APPARATUS | Avicena Systems Limited | LE, AUSTIN Q | 1796 | §103 | Final Rejection | 147d overdue | Pending | Apr 17, 2023 |
| 18296601 | CIRCULAR CABLEWAY | Innova Patent GmbH | SMITH, JASON CHRISTOPHER | 3613 | §103§112 | Non-Final OA | — | Pending | Apr 06, 2023 |
| 18030196 | Information Retrieval System And Information Retrieval Method | Semiconductor Energy Laboratory Co., Ltd. | UBER, NATHAN C | 3600 | §101§103 | Non-Final OA | — | Pending | Apr 04, 2023 |
| 18247726 | LOW METHOXYL, HIGHLY CALCIUM-REACTIVE PECTIN AND PROCESS FOR ITS PREPARATION | Herbstreith & Fox GmbH & Co. KG Pektin-Fabriken | FRONDA, CHRISTIAN L | 1652 | §102§103DP | Non-Final OA | — | Pending | Apr 03, 2023 |
| 18194291 | GRILL PLATE FOR OVEN WITH SLIDE LOCKING FEATURES | Sunbeam Products, Inc. | LAUGHLIN, ELIZABETH ANN | 3762 | §103 | Final Rejection | 8d | Pending | Mar 31, 2023 |
| 18027576 | SHAPE OPTIMIZED PREPARATION AND RESTORATION DEVICES, SYSTEMS, AND METHODS FOR DENTAL AND OTHER APPLICATIONS | Regents Of The University Of Minnesota | PATEL, YOGESH P | 3772 | §102§112 | Non-Final OA | 33d | Pending | Mar 21, 2023 |
| 18187293 | LOW ENERGY SENSOR | Preddio Technologies Inc. | TORRES, MARCOS L | 2647 | §103 | Final Rejection | 78d overdue | Pending | Mar 21, 2023 |
| 18174724 | SURFACE MODIFICATION OF POLYMERIC MATERIALS | UNIVERSITY OF SOUTH FLORIDA | TAI, XIUYU | 1795 | §102 | Non-Final OA | — | Pending | Feb 27, 2023 |
| 18021088 | VEHICLE INTERIOR OR EXTERIOR MEMBER AND METHODS OF MANUFACTURING THEREOF | Howa Co., Ltd. | SWIER, WAYNE K. | 1748 | §102§103 | Final Rejection | 15d overdue | Pending | Feb 13, 2023 |
| 18021060 | Depolymerization Method Of A Waste Polymer Material and System Therefore | Ioniqa Technologies B.V. | RIETH, STEPHEN EDWARD | 1759 | §103§112 | Final Rejection | 15d | Pending | Feb 13, 2023 |
| 18020490 | Light-Emitting Device, Light-Emitting Apparatus, Electronic Device, and Lighting Device | Semiconductor Energy Laboratory Co., Ltd. | DOLLINGER, MICHAEL M | 1766 | §103§112 | Final Rejection | — | Pending | Feb 09, 2023 |
| 18106786 | Organic Compound, Light-Emitting Device, Display Device, Electronic Device, Light-Emitting Apparatus, and Lighting Device | Semiconductor Energy Laboratory Co., Ltd. | LOEWE, ROBERT S | 1766 | §103 | Final Rejection | — | Pending | Feb 07, 2023 |
| 18040429 | USE OF AN ACTIVATABLE, DE-ESTERIFIED, PECTIN-CONVERTED FRUIT FIBER FOR THE MANUFACTURING OF PRODUCTS | Herbstreith & Fox GmbH & Co. KG Pektin-Fabriken | KRISHNAN, GANAPATHY | 1693 | §103DP | Non-Final OA | — | Pending | Feb 03, 2023 |
| 18040421 | USE OF AN ACTIVATABLE, DE-ESTERIFIED FRUIT FIBER FOR THE MANUFACTURING OF PRODUCTS | Herbstreith & Fox GmbH & Co. KG Pektin-Fabriken | KRISHNAN, GANAPATHY | 1693 | §103DP | Non-Final OA | 84d | Pending | Feb 02, 2023 |
| 18101885 | THERAPEUTIC ELECTRODE LOCATION PREDICTION VISUALIZATION USING MACHINE LEARNING | Medtronic, Inc. | EDWARDS, PHILIP CHARLES | 3792 | §103 | Final Rejection | 14d | Pending | Jan 26, 2023 |
| 18016717 | Light-Emitting Device, Light-Emitting Apparatus, Electronic Device, and Lighting Device | Semiconductor Energy Laboratory Co., Ltd. | CLARK, GREGORY D | 1786 | §102§103§112 | Non-Final OA | — | Pending | Jan 18, 2023 |
| 18098057 | SYSTEMS, METHODS, AND MEDIA FOR PREDICTING A CONVERSION TIME OF MILD COGNITIVE IMPAIRMENT TO ALZHEIMER'S DISEASE IN PATIENTS | UNIVERSITY OF SOUTH FLORIDA | BAIG, RUMAISA RASHID | 3796 | §101§103 | Final Rejection | 67d overdue | Pending | Jan 17, 2023 |
| 18004476 | METHOD FOR ADAPTING A PROCESS MODEL FOR OPERATING ONE OF MULTIPLE WORKING MACHINES, IN PARTICULAR HARVESTING MACHINE FOR ROOT CROPS | Grimme Landmaschinenfabrik GmbH & Co. Kg | LINHARDT, LAURA E | 3663 | §103 | Non-Final OA | — | Pending | Jan 07, 2023 |
| 18004470 | METHOD FOR OPERATING ONE OF MULTIPLE WORKING MACHINES, IN PARTICULAR HARVESTING MACHINES FOR ROOT CROPS | Grimme Landmaschinenfabrik GmbH & Co. Kg | PHAM, CLINT V | 3663 | §103§112 | Final Rejection | 43d overdue | Pending | Jan 06, 2023 |
| 18013374 | Organic Compound, Light-Emitting Device, Light-Emitting Apparatus, Electronic Apparatus and Lighting Device | Semiconductor Energy Laboratory Co., Ltd. | DEGUIRE, SEAN M | 1786 | §103 | Final Rejection | 15d overdue | Pending | Dec 28, 2022 |
| 18089011 | PHOTODYNAMIC ANTI-GRAM-POSITIVE BACTERIAL ACTIVITY OF PHARMACEUTICAL-GRADE ROSE BENGAL | UNIVERSITY OF TENNESSEE RESEARCH FOUNDATION | BOATENG, AFUA BAMFOAA | 1617 | §103Other | Final Rejection | — | Pending | Dec 27, 2022 |
| 18086505 | IRRIGATED ULTRASONIC DEVICE WITH FEATURES FOR DISSECTING DENSE TISSUE | Medtronic Ps Medical, Inc. | LAWSON, MATTHEW JAMES | 3619 | §103§112 | Non-Final OA | 28d | Pending | Dec 21, 2022 |
| 18085221 | STEAM BOOST SYSTEM FOR A STEAM STERILIZER | Indeeco, LLC | TALBERT, ERIC MICHAEL | 1758 | §103 | Non-Final OA | — | Pending | Dec 20, 2022 |
| 18009133 | USE OF AN ACTIVATABLE PECTIN-CONTAINING APPLE FIBER FOR PRODUCING PRODUCTS | Herbstreith & Fox GmbH & Co. KG Pektin-Fabriken | LE, EMILY M | 1793 | §103 | Final Rejection | — | Pending | Dec 08, 2022 |
| 18009296 | USE OF AN ACTIVATED PECTIN-CONTAINING CITRUS FIBER FOR PRODUCING PRODUCTS | Herbstreith & Fox GmbH & Co. KG Pektin-Fabriken | KRISHNAN, GANAPATHY | 1693 | §103DP | Non-Final OA | — | Pending | Dec 08, 2022 |
| 18009301 | USE OF AN ACTIVATABLE PECTIN-CONTAINING CITRUS FIBER FOR PRODUCING PRODUCTS | Herbstreith & Fox GmbH & Co. KG Pektin-Fabriken | LE, EMILY M | 1793 | §103 | Final Rejection | — | Pending | Dec 08, 2022 |
| 18008868 | Light-Emitting Device, Display Panel, Light-Emitting Apparatus, Display Device, Electronic Device, and Lighting Device | Semiconductor Energy Laboratory Co., Ltd. | CLARK, GREGORY D | 1786 | §112 | Final Rejection | — | Pending | Dec 07, 2022 |
| 18076074 | IDENTITY VERIFICATION UTILIZING UPLOADED CONTENT AND TRUST SCORE | Prove Identity, Inc. | DHAKAD, RUPALI | 2437 | §101§103 | Non-Final OA | — | Pending | Dec 06, 2022 |
| 18075398 | RAPID METHOD OF PRODUCING NON-ALCOHOLIC AND ALCOHOLIC BEER | Ceria, Inc. | WANG, FRANKLIN JEFFERSON | 3761 | §103§112Other | Final Rejection | 9d overdue | Pending | Dec 05, 2022 |
| 17926517 | SIEVE PANEL HAVING VARIABLE TILT SCREEN ELEMENT | Aqseptence Group, Inc. | POPOVICS, ROBERT J | 1776 | §102§112 | Non-Final OA | 4d overdue | Pending | Nov 18, 2022 |
| 17996916 | Cableway Station Having a Safety Barrier | Innova Patent GmbH | SMITH, JASON CHRISTOPHER | 3615 | §102§103§112 | Non-Final OA | 24d overdue | Pending | Oct 21, 2022 |
| 17971478 | PROLONGED INGESTION APPARATUS AND METHOD AND SYSTEM FOR USE | Coolhouse Sourcing LLC | SCHMID, BROOK VICTORIA | 3642 | §102§103 | Final Rejection | 21d | Pending | Oct 21, 2022 |
| 17963585 | Display Device, Display Module, Electronic Device, And Method For Manufacturing Display Device | Semiconductor Energy Laboratory Co., Ltd. | NGUYEN, SOPHIA T | 2893 | §112 | Final Rejection | — | Pending | Oct 11, 2022 |
| 17934954 | HYBRID FILTER ASSEMBLY AND METHOD | Pentair, Inc. | GEISBERT, WILLIAM ADDISON | 1779 | §103§112 | Non-Final OA | — | Pending | Sep 23, 2022 |
| 17910675 | PRESSURE MODULATED MOTOR TORQUE FOR INFUSION PUMP | ICU Medical, Inc. | MARRISON, SAMUEL JOSEPH | 3783 | §103§112 | Non-Final OA | — | Pending | Sep 09, 2022 |
| 17930776 | FOLDING LANDING NET | Pure Fishing, Inc. | ARK, DARREN W | 3647 | §103 | Final Rejection | 26d | Pending | Sep 09, 2022 |
| 17902871 | Thermal Runaway Prevention System | Southwest Research Institute | FREEMAN, EMILY ELIZABETH | 1724 | §102§103 | Final Rejection | — | Pending | Sep 04, 2022 |
| 17905624 | Non-Invasive Successfulness Test of In Vitro Fertilization Process | UNIVERZITA KOMENSKÉHO V BRATISLAVE | HANEY, AMANDA MARIE | 1682 | §101§112 | Final Rejection | 29d | Pending | Sep 02, 2022 |
| 17888470 | METHODS OF SYNTHESIZING MULTI-METAL SALTS COMPOSITION | Onyx Lotus, LLC | SMITH, NICHOLAS A | 1752 | §103§112 | Non-Final OA | 42d overdue | Pending | Aug 15, 2022 |
| 17888473 | MULTI-METAL SALTS DISINFECTANT COMPOSITION | Onyx Lotus, LLC | JANOSKO, CHASITY PAIGE | 1613 | §103 | Non-Final OA | — | Pending | Aug 15, 2022 |
| 17888469 | LIGHT STABLE LIQUID DISINFECTANT COMPOSITIONS | Onyx Lotus, LLC | BROWE, DAVID | 1617 | §103§112 | Non-Final OA | — | Pending | Aug 15, 2022 |
| 17904206 | SLOW-RELEASE PHOSPHORUS AND SULFUR FERTILIZER AND METHODS FOR MAKING SAME | Ostara Nutrient Recovery Technologies Inc. | SILVA RAINBOW, HEATHER ELISE | 1731 | §103 | Final Rejection | 41d | Pending | Aug 12, 2022 |
| 17875838 | Light-Emitting Device, Light-Emitting Apparatus, Electronic Device, and Lighting Device | Semiconductor Energy Laboratory Co., Ltd. | DEGUIRE, SEAN M | 1786 | §103 | Non-Final OA | — | Pending | Jul 28, 2022 |
| 17872498 | Equipment For Manufacturing Light-Emitting Device and Light-Receiving Device | Semiconductor Energy Laboratory Co., Ltd. | FORD, NATHAN K | 1716 | §103 | Final Rejection | 2d overdue | Pending | Jul 25, 2022 |
| 17864692 | IMPEDANCE HEATED CONTINUOUS EMISSION MONITORING SYSTEM | Indeeco, LLC | LEE JR, WOODY A | 3761 | §103 | Final Rejection | 29d overdue | Pending | Jul 14, 2022 |
| 17849262 | PLASMA CORING TOOL WITH ENDPOINT DETECTION | Medtronic Advanced Energy LLC | BORSCH, NICHOLAS S | 3794 | §103§112 | Final Rejection | — | Pending | Jun 24, 2022 |
| 17781303 | CLINICAL MONITORING OF PATIENT DATA | Opum Technologies Limited | BAKER, IRENE H | 2152 | §101§103§112 | Final Rejection | — | Pending | May 31, 2022 |
| 17749574 | Trivalent Radioisotope Bio-Targeted Radiopharmaceutical, Methods Of Preparation And Use | Monopar Therapeutics Inc. | SCHLIENTZ, LEAH H | 1618 | §103Other | Final Rejection | — | Pending | May 20, 2022 |
| 17755557 | Water Sports Device | Rosen Swiss AG | POLAY, ANDREW | 3615 | §112 | Non-Final OA | — | Pending | May 02, 2022 |
| 17733265 | DNA CAPTURE-BASED GRAVITATIONAL FLOW-THROUGH ASSAY FOR ANTIGEN DETECTION | UNIVERSITY OF SOUTH FLORIDA | LIPPOLIS, ALEXANDRA ROSE | 1637 | §103 | Non-Final OA | — | Pending | Apr 29, 2022 |
| 17727519 | Method of Treating Colorectal Cancers Using a PKC Inhibitor | UNIVERSITY OF FLORIDA RESEARCH FOUNDATION, INC. | LEE, WILLIAM Y | 1623 | §103 | Final Rejection | 29d | Pending | Apr 22, 2022 |
| 17721986 | VERSATILE WATER DELIVERY SYSTEM | Elkay Manufacturing Company | PATTERSON, MICHAEL CHRISTOPHER | 3754 | §103§112 | Non-Final OA | — | Pending | Apr 15, 2022 |
| 17655539 | DYNAMIC COMPRESSION FIXATION DEVICES | Flower Orthopedics Corporation | WOODALL, NICHOLAS W | 3775 | §103 | Final Rejection | 5d overdue | Pending | Mar 18, 2022 |
| 17642871 | Fluid for Stabilising Solids | Vitritech Ltd. | KUMAR, PREETI | 1761 | §103 | Non-Final OA | 15d overdue | Pending | Mar 14, 2022 |
| 17638459 | SYSTEMS AND METHODS FOR POST-OCCLUSION BOLUS REDUCTION | ICU Medical, Inc. | RADOMSKI, MARTIN ADAM | 3783 | §103 | Final Rejection | — | Pending | Feb 25, 2022 |
| 17650180 | DEVICE FOR ATTACHMENT TO AN OPENING OF A VEHICLE AND FOR COVERING AN EMITTER AND/OR A RECEIVER | Hella GmbH & Co. KGaA | IMMANUEL, BAMIDELE ADEFOLARIN | 2845 | §102§103 | Non-Final OA | — | Pending | Feb 07, 2022 |
| 17632340 | Display Device and Electronic Device | Semiconductor Energy Laboratory Co., Ltd. | PETERSON, ERIK T | 2898 | §103 | Final Rejection | 38d overdue | Pending | Feb 02, 2022 |
| 17591444 | LINKING OF COMMUNICATIONS DEVICE SUBSCRIBER IDENTIFIERS FOR FRAUD DETECTION | Prove Identity, Inc. | DHAKAD, RUPALI | 2437 | §102§103 | Non-Final OA | — | Pending | Feb 02, 2022 |
| 17566925 | BRACKET USABLE FOR SOLAR PANEL MODULE INSTALLATION | ULC Technologies LLC | BARLOW, ADAM G | 3633 | §102§103§112 | Final Rejection | — | Pending | Dec 31, 2021 |
| 17511332 | GAIT TRAINING USING A COMBINATION OF REHABILITATION THERAPIES AND FEEDBACK | UNIVERSITY OF SOUTH FLORIDA | BALAJI, KAVYA SHOBANA | 3791 | §102§103 | Non-Final OA | — | Pending | Oct 26, 2021 |
| 17485802 | Light-Emitting Device, Energy Donor Material, Light-Emitting Apparatus, Display Device, Lighting Device, and Electronic Device | Semiconductor Energy Laboratory Co., Ltd. | SIMBANA, RACHEL A | 1786 | §103 | Non-Final OA | 29d overdue | Pending | Sep 27, 2021 |
| 17392047 | SYSTEMS AND METHODS UTILIZING REAL DATA-DRIVEN MODELS FOR PREDICTING AND OPTIMIZING CROP PRODUCTION | UNIVERSITY OF SOUTH FLORIDA | HATCHER, DEIRDRE D | 3625 | §101 | Final Rejection | — | Pending | Aug 02, 2021 |
| 17380623 | CLEANING MACHINE EXTRACTOR HEAD | Harris Research, Inc. | FULL, SIDNEY DANIELLE | 3723 | §103§112 | Final Rejection | — | Pending | Jul 20, 2021 |
| 17334055 | MINIMAL PEPTIDE FUSIONS FOR TARGETED INTRACELLULAR PROTEIN DEGRADATION | Massachusetts Institute Of Technology | STEADMAN, DAVID J | 1656 | §103 | Non-Final OA | — | Pending | May 28, 2021 |
| 17327389 | Methodology of Instantaneous Hot Water Production in Suboptimal Operations | The Marley Company LLC | BARGERO, JOHN E | 3762 | §103 | Non-Final OA | 44d overdue | Pending | May 21, 2021 |
| 17327392 | Systems and Methods for Instantaneous Hot Water Demand Startup | The Marley Company LLC | BARGERO, JOHN E | 3762 | §102§103 | Final Rejection | — | Pending | May 21, 2021 |
| 17230023 | COMPOSITIONS AND METHODS FOR ENHANCING HEALING AND REGENERATION OF BONE AND SOFT TISSUE | The University of Memphis | LEE, JIA-HAI | 1658 | §102§103DP | Non-Final OA | — | Pending | Apr 14, 2021 |
| 17055958 | TREATMENT OF PHOSPHATE-CONTAINING WASTEWATER AND METHODS FOR FINES CONTROL | Ostara Nutrient Recovery Technologies Inc. | PEO, JONATHAN M | 1779 | §103 | Non-Final OA | — | Pending | Nov 16, 2020 |
| 17091990 | UNDERDRAIN ASSEMBLY | Aqseptence Group, Inc. | MCGANN, BERNADETTE KAREN | 1773 | §103§112 | Final Rejection | 21d | Pending | Nov 06, 2020 |
| 16975693 | METHODS FOR DETECTING TARGET POLYNUCLEOTIDES | NunaBio Limited | CHUNDURU, SURYAPRABHA | 1681 | §103§112 | Non-Final OA | — | Pending | Aug 25, 2020 |
| 16730878 | SYSTEM AND METHOD FOR AUTHENTICATION OF A MOBILE DEVICE | Prove Identity, Inc. | WONG, ERIC TAK WAI | 3693 | §103 | Final Rejection | 12d | Pending | Dec 30, 2019 |
| 16248113 | FIRE PROTECTION SYSTEMS HAVING REDUCED CORROSION | Engineered Corrosion Solutions, LLC | BOECKMANN, JASON J | 3752 | §112DP | Non-Final OA | — | Pending | Jan 15, 2019 |
| 16020242 | Light-Emitting Element, Light-Emitting Device, Electronic Device, and Lighting Device | Semiconductor Energy Laboratory Co., Ltd. | YANG, JAY LEE | 1786 | §103 | Final Rejection | 31d overdue | Pending | Jun 27, 2018 |
| 15654119 | ABSORBENT ARTICLES HAVING VARIABLE DATA THEREON AND SYSTEMS AND METHODS FOR PRINTING SUCH ARTICLES | Taylor Corporation | VALENCIA, ALEJANDRO | 2853 | §103 | Final Rejection | — | Pending | Jul 19, 2017 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial