Technology area: Semiconductors, Circuits & Optics
145 pending office actions • 46 clients • 130 examiners • 68 art units • 0 of 145 (0%) have an AI response strategy ready
Ruggiero McAllister & McMahon LLC manages 2983 career applications in Semiconductors, Circuits & Optics. The firm has a resolved allowance rate of 94.28 percent. It averages 3.6 office actions per allowance, indicating the typical frequency of examiner communication before an allowance is granted.
There are 108 pending office actions currently. The 94.28 percent allowance rate is based on the 2983 career applications. The 3.6 average office actions per allowance serves as a metric for the expected volume of examiner correspondence. This data reflects the firm's long-term performance and strategy in the semiconductors sector.
With 2983 career applications, the firm has a well-established track record. The 108 pending office actions represent the current active docket. The 94.28 percent allowance rate and 3.6 average office actions per allowance are key figures for practitioners to consider when evaluating the firm's prosecution efficiency and success.
Based on the USPTO statutory response window for each pending office action. 38 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 38 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 3 (2%) |
| §101 + other | 8 (6%) |
| §103 only | 45 (31%) |
| §102 only | 15 (10%) |
| §112 only | 11 (8%) |
| Double-patenting + other | 4 (3%) |
| Multi-statute (no §101) | 58 (40%) |
| No statute on record | 1 (1%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| KENDALL, CHUCK O | 3 | 86.8% | +8.0% |
| FINCH III, FRED E | 2 | 80.2% | +17.2% |
| RIVERA-PEREZ, CARLOS O | 2 | 72.4% | +19.6% |
| ZABEL, ANDREW JOHN | 2 | 84.2% | +24.0% |
| YECHURI, SITARAMARAO S | 2 | 85.6% | -8.4% |
| PANCHOLI, RINA C | 2 | 86.0% | +22.2% |
| CORTES, HOWARD | 2 | 78.5% | +14.4% |
| TRAN, DZUNG | 2 | 83.6% | +5.7% |
| AHMED, SHAHED | 2 | 90.8% | -0.1% |
| FLORES JR, DONALD M | 2 | 76.9% | +27.3% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 7 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18467786 | REDUCED STRESS CLIP FOR SEMICONDUCTOR DIE | TRAN, DZUNG | 27d |
| 18458589 | VERTICAL SEMICONDUCTOR DEVICE AND MANUFACTURING METHOD THEREFOR | AHMED, SHAHED | 39d |
| 18817690 | MANAGING SOFTWARE APPLICATION TEST INTERACTION | KENDALL, CHUCK O | — |
| 18817711 | MANAGING SOFTWARE APPLICATION TEST INTERACTION | KENDALL, CHUCK O | — |
| 18797582 | MANAGING SOFTWARE APPLICATION TEST INTERACTION | KENDALL, CHUCK O | — |
| 18620317 | VALLEY CURRENT LIMIT DETECTION SCHEME FOR SWITCHING REGULATORS | FINCH III, FRED E | — |
| 18186403 | VERTICAL ORIENTED SEMICONDUCTOR DEVICE HAVING A REDUCED LATERAL FIELD TERMINATION DISTANCE, AS WELL AS A CORRESPONDING METHOD | AHMED, SHAHED | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18454218 | System and Method for Correlating Diverse Medication Information | CHOI, DAVID | 117d overdue |
| 17931066 | CHEMICALLY STRENGTHENED GLASS SHEET AND METHOD FOR ITS PRODUCTION | SAMPLE, DAVID R | 96d overdue |
| 16379133 | SENSOR RECEPTACLE FOR A BIOREACTOR, AND BIOREACTOR WITH SENSOR RECEPTACLE, AND METHOD FOR PROPAGATION OR CULTIVATION OF BIOLOGICAL MATERIAL | ESPERON, NATHAN GREGORY | 72d overdue |
| 18659162 | INDUCTOR-LESS POWER CONVERTER | RIVERA-PEREZ, CARLOS O | 30d overdue |
| 18955416 | SYSTEMS AND METHODS FOR ADDRESSING CROSS-PEGGING IN A MULTI-LEVEL SEARCH | MITCHELL, NATHAN A | 15d overdue |
| 17670893 | SEMICONDUCTOR DEVICE AND A METHOD OF MANUFACTURING A SEMICONDUCTOR DEVICE | ZABEL, ANDREW JOHN | 2d overdue |
| 18349555 | METHOD FOR REDUCING RAISED STRUCTURES ON GLASS ELEMENTS, AND GLASS ELEMENT PRODUCED ACCORDING TO THE METHOD | FLORES JR, DONALD M | 1d overdue |
| 18316281 | ELECTRICALLY CONDUCTIVE POROUS SINTERING BODY HAVING ELECTRICALLY CONDUCTIVE MATERIALS METHOD FOR PRODUCING | TRAN, THIEN S | 7d |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18659162 | INDUCTOR-LESS POWER CONVERTER | RIVERA-PEREZ, CARLOS O | 30d overdue |
| 17670893 | SEMICONDUCTOR DEVICE AND A METHOD OF MANUFACTURING A SEMICONDUCTOR DEVICE | ZABEL, ANDREW JOHN | 2d overdue |
| 18349555 | METHOD FOR REDUCING RAISED STRUCTURES ON GLASS ELEMENTS, AND GLASS ELEMENT PRODUCED ACCORDING TO THE METHOD | FLORES JR, DONALD M | 1d overdue |
| 18349531 | METHOD FOR PRODUCING RAISED STRUCTURES ON GLASS ELEMENTS, AND GLASS ELEMENT PRODUCED ACCORDING TO THE METHOD | FLORES JR, DONALD M | 71d |
| 19046608 | SWITCHING STAGE OF A SWITCHED MODE POWER SUPPLY, SMPS, AS WELL AS AN SMPS AND CORRESPONDING METHOD | FINCH III, FRED E | — |
| 18926650 | A SWITCHED MODE POWER SUPPLY ARRANGED FOR EFFICIENTLY POWERING A RANGE OF LOADS AND METHOD OF OPERATING SUCH | RIVERA-PEREZ, CARLOS O | — |
| 18754735 | METHOD OF MANUFACTURING SEMICONDUCTOR ASSEMBLIES | ZABEL, ANDREW JOHN | — |
| 18656872 | SYSTEMS AND METHODS FOR DISTRIBUTED UNIT OR CENTRALIZED UNIT FLOW CONTROL OPTIMIZATIONS FOR HIGHLY SCALABLE CELLULAR SYSTEMS | PANCHOLI, RINA C | — |
| Art Unit | Apps |
|---|---|
| 2893 | 8 |
| 2818 | 6 |
| 2813 | 5 |
| 2898 | 5 |
| 2838 | 4 |
| 1781 | 4 |
| 2465 | 3 |
| 2477 | 3 |
| 2897 | 3 |
| 1731 | 3 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 19381185 | SYSTEMS AND METHODS FOR EFFICIENT CONSOLIDATION OF RECORD BLOCKS | Kinaxis Inc. | UDDIN, MD I | 2169 | §101§103Other | Non-Final OA | — | Pending | Nov 06, 2025 |
| 19355719 | DOWNHOLE TOOL | Welltec A/S | GAY, JENNIFER HAWKINS | 3619 | §102§103§112 | Non-Final OA | — | Pending | Oct 10, 2025 |
| 19328872 | TRANSPARENT ACCESS TO AN EXTERNAL DATA SOURCE WITHIN A DATA SERVER | Kinaxis Inc. | OWYANG, MICHELLE N | 2168 | §101§103§112DP | Non-Final OA | — | Pending | Sep 15, 2025 |
| 19298899 | SAFETY SYSTEM FOR A BAGGAGE TRACTOR | Hi Performance Electric Vehicle Systems, Inc. | VON VOLKENBURG, KEITH ALLEN | §103§112 | Non-Final OA | — | Pending | Aug 13, 2025 | |
| 19147183 | FILTER AND MULTIPLEXER | Aniui Anuki Technologies Co., Ltd. | GLENN, KIMBERLY E | 2843 | §102 | Non-Final OA | — | Pending | Jul 10, 2025 |
| 19233024 | SYSTEMS AND METHODS FOR DISTRIBUTED VERSION RECLAIM | Kinaxis Inc. | SYED, FARHAN M | 2161 | §102Other | Final Rejection | — | Pending | Jun 10, 2025 |
| 19225844 | SYSTEM AND METHOD FOR WEB SCRAPING AND COUNTERMEASURE SOLVER | Zyte Group Ltd. | KUDDUS, DANIEL A | 2154 | §103§112 | Final Rejection | 15d | Pending | Jun 02, 2025 |
| 19200304 | PNEUMATIC FERTILIZER SPREADER AND METHOD FOR SPREADING GRANULAR AGRICULTURAL SPREADING MATERIAL | Horsch Leeb Application Systems GmbH | KIM, CHRISTOPHER S | §102§112 | Non-Final OA | — | Pending | May 06, 2025 | |
| 19195873 | QUERY-BASED ISOLATOR | Kinaxis Inc. | WU, TONY | 2166 | §103Other | Non-Final OA | 29d overdue | Pending | May 01, 2025 |
| 19119591 | VALVE OPENING AND CLOSING MEMBER AND STRAIGHT-THROUGH GLOBE VALVE | Oushangyuan Process & Equipment Intelligent Co. | WADDY, JONATHAN J | 3753 | §103§112 | Non-Final OA | — | Pending | Apr 09, 2025 |
| 19171514 | METHODS AND DEVICES TO REDUCE DAMAGING EFFECTS OF CONCUSSIVE OR BLAST FORCES ON A SUBJECT | Thornhill Research, Inc. | LAUER, CHRISTINA C | §112Other | Non-Final OA | — | Pending | Apr 07, 2025 | |
| 19097934 | UE COMMUNICATION EXPERIENCE THROUGH RNA OPTIMIZATION | Mavenir Systems, Inc. | GUZMAN, JAVIER O | §103 | Non-Final OA | — | Pending | Apr 02, 2025 | |
| 19085302 | WRAPPER MACHINE FOR PACKAGING FLEXIBLE ARTICLES WITH AN ELONGATED SHAPE, IN PARTICULAR FLEXIBLE PIPES | Sica S.p.A. | FRY, PATRICK B | 3731 | §103 | Non-Final OA | — | Pending | Mar 20, 2025 |
| 19077523 | SYSTEM AND METHOD FOR PERSISTENCE OF IN-MEMORY ANALYTICS RESULTS | Kinaxis Inc. | CHAPPELL, DANIEL C | 2135 | §103 | Final Rejection | — | Pending | Mar 12, 2025 |
| 19063430 | THREE PIN CURRENT TRIGGERED TVS PROTECTION SEMICONDUCTOR DEVICE | Nexperia B.V | COMBER, KEVIN J | §102§103 | Non-Final OA | — | Pending | Feb 26, 2025 | |
| 19046608 | SWITCHING STAGE OF A SWITCHED MODE POWER SUPPLY, SMPS, AS WELL AS AN SMPS AND CORRESPONDING METHOD | Nexperia B.V. | FINCH III, FRED E | §102§103 | Non-Final OA | — | Pending | Feb 06, 2025 | |
| 19035211 | Method and Apparatus for Passive Intermodulation (PIM) Interference Cancellation in Dual-band Wireless Network | Mavenir Systems, Inc. | SCHWARTZ, JOSHUA L | §102§103 | Non-Final OA | — | Pending | Jan 23, 2025 | |
| 18993343 | ANIMAL EXCREMENT SCREENER | Petkit Network Technology (Shanghai) Co., Ltd. | CALLAWAY, SPENCER THOMAS | 3642 | §103 | Non-Final OA | — | Pending | Jan 10, 2025 |
| 18992280 | AIR INTAKE DAMPER | Nissens Cooling Solutions A/S | TANENBAUM, TZVI SAMUEL | §102§103 | Non-Final OA | — | Pending | Jan 08, 2025 | |
| 18877459 | BALANCING WEIGHT FOR WHEELS | Wheel Balance Aps | BELLINGER, JASON R | §102§112 | Non-Final OA | — | Pending | Dec 20, 2024 | |
| 18966876 | MIRROR AND MIRROR SUBSTRATE WITH HIGH ASPECT RATIO, AND METHOD AND MEANS FOR PRODUCING SUCH A MIRROR SUBSTRATE | Schott AG | CHUNG, DAVID Y | §103DP | Non-Final OA | — | Pending | Dec 03, 2024 | |
| 18955416 | SYSTEMS AND METHODS FOR ADDRESSING CROSS-PEGGING IN A MULTI-LEVEL SEARCH | Kinaxis Inc. | MITCHELL, NATHAN A | 3627 | §101 | Final Rejection | 15d overdue | Pending | Nov 21, 2024 |
| 18948812 | SEGMENT ROUTING IPV6 EXTENSION TO SUPPORT MULTICAST IN RAN AND PC | Mavenir Systems, Inc. | VANG, MENG | 2443 | §101§103 | Non-Final OA | — | Pending | Nov 15, 2024 |
| 18947066 | METHOD AND APPARATUS FOR USER PLANE GEO REDUNDANCY WITH SESSION CONTINUITY | Mavenir Systems, Inc. | AHMED, ABDULLAHI | §102 | Non-Final OA | — | Pending | Nov 14, 2024 | |
| 18944156 | METHOD AND APPARATUS TO DETECT AND CORRECT RESOURCE ALLOCATION MISMATCH IN DIFFERENT RAN NODES | Mavenir Systems, Inc. | ABU ROUMI, MAHRAN Y | §103 | Non-Final OA | — | Pending | Nov 12, 2024 | |
| 18926650 | A SWITCHED MODE POWER SUPPLY ARRANGED FOR EFFICIENTLY POWERING A RANGE OF LOADS AND METHOD OF OPERATING SUCH | Nexperia B.V | RIVERA-PEREZ, CARLOS O | 2838 | §102§103 | Non-Final OA | — | Pending | Oct 25, 2024 |
| 18925946 | SYSTEM AND METHOD FOR EXTRACTION FOR SMART SPIDER | Zyte Group Limited | NGUYEN, LOAN T | 2165 | §101§103 | Final Rejection | — | Pending | Oct 24, 2024 |
| 18921623 | METHOD FOR A WEB SCRAPING TOOL AND CLASSIFICATION ENGINE | Zyte Group Limited | FUJITA, KATRINA R | 2672 | §112DP | Non-Final OA | — | Pending | Oct 21, 2024 |
| 18920846 | UNMANNED AERIAL VEHICLE (UAV) DATA COLLECTION & CLAIM PRE-GENERATION FOR INSURED APPROVAL | State Farm Mutual Automobile Insurance Company | MILEF, ELDA G | 3694 | §103DP | Non-Final OA | 76d | Pending | Oct 18, 2024 |
| 18907799 | METHOD TO SHUT DOWN AND RESTART RADIO UNITS IN OPEN-RAN CBRS NETWORKS | Mavenir Systems, Inc. | SOE, KYAW Z | §103 | Non-Final OA | — | Pending | Oct 07, 2024 | |
| 18895944 | FIRE RISK DETERMINATION | Nearmap Australia Pty Ltd. | KOROMA, SORIE IBRAHIM | §101§103 | Non-Final OA | — | Pending | Sep 25, 2024 | |
| 18890920 | METHOD AND APPARATUS FOR ENCODING RAN PARAMETERS OVER E2 INTERFACE USING E2SM-RC FOR TRAFFIC STEERING-BASED SLA OPTIMIZATION UPON CELL SHUTDOWN FOR ENERGY SAVINGS ACTIVATION | Mavenir Systems, Inc. | LEE, JUSTIN YE | §102 | Non-Final OA | — | Pending | Sep 20, 2024 | |
| 18889581 | CLIP | Nexperia B.V. | ESKRIDGE, CORY W | §103 | Non-Final OA | — | Pending | Sep 19, 2024 | |
| 18888251 | OPTIMIZED MANAGEMENT OF BANDWIDTH PARTS FOR CELLULAR NETWORKS | Mavenir Systems, Inc. | CHOWDHURY, MAHBUBUL BAR | §102§103 | Non-Final OA | — | Pending | Sep 18, 2024 | |
| 18884234 | EXTRACTION OF COFFEE OIL FROM SPENT COFFEE GROUNDS USING MECHANICAL HYDRAULIC PRESS AND PURIFICATION THEREOF | Kaffa Kuwwa Innovations Pvt. Ltd. | SHELLHAMMER, JAMES PAUL | §103§112 | Non-Final OA | — | Pending | Sep 13, 2024 | |
| 18846771 | BLADE FOR A WIND TURBINE AND CONNECTION METHOD FOR CONNECTING SAID BLADE TO A HUB OF SAID WIND TURBINE | Bladeworks S.r.l. | RIBADENEYRA, THEODORE C | 3745 | §102§103 | Non-Final OA | — | Pending | Sep 13, 2024 |
| 18884343 | Method and Apparatus to Encode RAN OAM-Related Data Over the R1 and Other O-RAN Open Interfaces Using Generic Data Encoding Model and Information Semantics | Mavenir Systems, Inc. | NGUYEN, BRANDON A | §103 | Non-Final OA | — | Pending | Sep 13, 2024 | |
| 18817690 | MANAGING SOFTWARE APPLICATION TEST INTERACTION | Kinaxis Inc. | KENDALL, CHUCK O | §102Other | Non-Final OA | — | Pending | Aug 28, 2024 | |
| 18817711 | MANAGING SOFTWARE APPLICATION TEST INTERACTION | Kinaxis Inc. | KENDALL, CHUCK O | §102 | Non-Final OA | — | Pending | Aug 28, 2024 | |
| 18802923 | VAPOR CHAMBER | Furukawa Electric Co., Ltd. | SCHERMERHORN, JON | 3763 | §112 | Non-Final OA | — | Pending | Aug 13, 2024 |
| 18800753 | SYSTEM AND METHOD FOR FORECAST ADJUSTMENT | Kinaxis Inc. | BYRD, UCHE SOWANDE | 3624 | §103 | Final Rejection | — | Pending | Aug 12, 2024 |
| 18797582 | MANAGING SOFTWARE APPLICATION TEST INTERACTION | Kinaxis Inc. | KENDALL, CHUCK O | §102 | Non-Final OA | — | Pending | Aug 08, 2024 | |
| 18794552 | CU-DU FLOW CONTROL OPTIMIZATIONS FOR LOSSY MIDHAUL IN O-RAN NETWORKS | Mavenir Systems, Inc. | LIN, SHERMAN L | 2447 | §103 | Final Rejection | 15d | Pending | Aug 05, 2024 |
| 18793198 | Method to Categorize SCG Handover Failures in Dual Connectivity | Mavenir Systems, Inc. | MATTIS, JASON E | §103§112 | Non-Final OA | — | Pending | Aug 02, 2024 | |
| 18791858 | ELECTRONIC DEVICE FOR SHIFTING A VOLTAGE LEVEL | Nexperia B.V. | BHATIA, AMIT R | 2842 | §102 | Final Rejection | 9d overdue | Pending | Aug 01, 2024 |
| 18833442 | DELIVERY DEVICE FOR SPRING COIL | Shanghai Shenqi Medical Technology Co., Ltd. | NEMER, OSAMA MOHAMMAD | 3771 | §102§103§112 | Final Rejection | — | Pending | Jul 26, 2024 |
| 18779313 | Virtual RAN Cell Site Resiliency and Energy Efficiency | Mavenir Systems, Inc. | NIKMANESH, SEAHVOSH J | §102 | Non-Final OA | — | Pending | Jul 22, 2024 | |
| 18772601 | Systems and Methods for Energy and Fronthaul Bandwidth Efficient Uplink Performance Improvements for O-RAN-based Radio Access Networks | Mavenir Systems, Inc. | ALSOMIRI, MAJDI A | 2465 | §103 | Non-Final OA | — | Pending | Jul 15, 2024 |
| 18728656 | EYEGLASS LENS WITH WAVEGUIDE | Trulife Optics Limited | WILSON, PAISLEY L | 2871 | §102§103 | Non-Final OA | — | Pending | Jul 12, 2024 |
| 18760530 | Overvoltage Protection of Transistor Switches | Nexperia B.V. | AMRANY, ADI | 2836 | §112 | Final Rejection | 10d overdue | Pending | Jul 01, 2024 |
| 18725557 | HORIZONTAL WELL CUTTINGS BED PROCESSING METHOD AND DEVICE | Cnpc Engineering Technology R&D Company Limited | MARINI, MATTHEW G | §101 | Non-Final OA | — | Pending | Jun 28, 2024 | |
| 18754735 | METHOD OF MANUFACTURING SEMICONDUCTOR ASSEMBLIES | Nexperia B.V. | ZABEL, ANDREW JOHN | §102§103 | Non-Final OA | — | Pending | Jun 26, 2024 | |
| 18679779 | Method to Improve 5G NR PDCCH Decoding Using CCE Interference Randomization | Mavenir Systems, Inc. | BALLOWE, CALEB JAMES | 2419 | §103 | Final Rejection | — | Pending | May 31, 2024 |
| 18678030 | MHC CLASS I EPITOPE DELIVERING POLYPEPTIDES | Molecular Templates, Inc. | HINES, JANA A | §112 | Non-Final OA | — | Pending | May 30, 2024 | |
| 18678801 | DIE PADDLE | Nexperia B.V | MCCUTCHEON, COLIN RUSSELL | §102§103 | Non-Final OA | — | Pending | May 30, 2024 | |
| 18675636 | USER INTERFACE FOR PROVIDING AN ENTITY RELATIONSHIP DIAGRAM | Kinaxis Inc. | WILLOUGHBY, ALICIA M | 2156 | §103Other | Non-Final OA | — | Pending | May 28, 2024 |
| 18666228 | BOND PAD DESIGN FOR SEMICONDUCTOR DEVICE PACKAGES | Nexperia B.V | YECHURI, SITARAMARAO S | §103§112 | Non-Final OA | — | Pending | May 16, 2024 | |
| 18666265 | SEMICONDUCTOR DEVICE PACKAGE INTERCONNECT AND MANUFACTURING METHOD THEREOF | Nexperia B.V | GEYER, SCOTT B | §102 | Non-Final OA | — | Pending | May 16, 2024 | |
| 18660331 | SYSTEM AND METHOD FOR SIB1 OPTIMIZATION DURING NSA AND SA TO NSA CHANGE FOR IMPROVED CELL PERFORMANCE | Mavenir Systems, Inc. | YOUNG, STEVE R | 2477 | §102§103 | Final Rejection | — | Pending | May 10, 2024 |
| 18659162 | INDUCTOR-LESS POWER CONVERTER | Nexperia B.V | RIVERA-PEREZ, CARLOS O | 2838 | §102§103 | Final Rejection | 30d overdue | Pending | May 09, 2024 |
| 18656872 | SYSTEMS AND METHODS FOR DISTRIBUTED UNIT OR CENTRALIZED UNIT FLOW CONTROL OPTIMIZATIONS FOR HIGHLY SCALABLE CELLULAR SYSTEMS | Mavenir Systems, Inc. | PANCHOLI, RINA C | 2477 | §102§103§112 | Non-Final OA | — | Pending | May 07, 2024 |
| 18656890 | SYSTEM AND METHOD TO ADJUST PUCCH CAPACITY | Mavenir US Inc. | PANCHOLI, RINA C | 2477 | §103§112 | Final Rejection | — | Pending | May 07, 2024 |
| 18653199 | ENCASEMENT SYSTEM FOR INTEGRATION OF SOLAR DEVICES INTO A STRUCTURE AND SOLAR DEVICES FOR USE IN THE SAME | Structural Solar Designs, LLC | NGUYEN, NGOC T | §102§103 | Non-Final OA | — | Pending | May 02, 2024 | |
| 18648771 | Forming of Slope Liners in Trench Based Semiconductor Devices | Nexperia B.V | SEDOROOK, DAVID PAUL | §102§103 | Non-Final OA | — | Pending | Apr 29, 2024 | |
| 18648791 | Schottky Barrier Control in Vertically Oriented Semiconductor Devices As Well As a Corresponding Power Device | Nexperia B.V | ANDERSON, WILLIAM H | §102§103 | Non-Final OA | — | Pending | Apr 29, 2024 | |
| 18647412 | SYSTEM AND METHOD FOR REDUCING INTER-CELL INTERFERENCE IN CELLULAR NETWORKS | Mavenir Systems, Inc. | NGUYEN, VAN TA | 2465 | §103§112 | Non-Final OA | — | Pending | Apr 26, 2024 |
| 18644203 | METHOD AND SYSTEM FOR DATA ROUTING FOR SPLIT-BEARER AT A CELLULAR BASE STATION FOR A DUAL CONNECTIVITY NETWORK ARCHITECTURE | Mavenir Systems, Inc. | WONG, XAVIER S | 2415 | §102§103 | Non-Final OA | — | Pending | Apr 24, 2024 |
| 18701526 | MILK MODULE FOR PREPARING MILK-BASED BEVERAGES | Heylo S.r.l. | DANGOL, ASHESH | §103 | Non-Final OA | — | Pending | Apr 15, 2024 | |
| 18635603 | Downlink Throughput of 5G NR Using PUCCH HARQ Resource Assignment | Mavenir Systems, Inc. | CHEEMA, HASAN ALI | 2465 | §103§112 | Final Rejection | 35d | Pending | Apr 15, 2024 |
| 18620300 | METHOD FOR MANUFACTURING A SEMICONDUCTOR PACKAGE ASSEMBLY AS WELL AS A SEMICONDUCTOR PACKAGE ASSEMBLY OBTAINED WITH THIS METHOD | Nexperia B.V. | HOANG, DZUNG T | §103§112 | Non-Final OA | — | Pending | Mar 28, 2024 | |
| 18620317 | VALLEY CURRENT LIMIT DETECTION SCHEME FOR SWITCHING REGULATORS | Nexperia Technology (Shanghai) Ltd. | FINCH III, FRED E | 2838 | §102 | Final Rejection | — | Pending | Mar 28, 2024 |
| 18618216 | BARRIER ASSEMBLY | Eni S.p.A. | SADLON, JOSEPH | 3635 | §103§112 | Non-Final OA | — | Pending | Mar 27, 2024 |
| 18695648 | PREPARATION METHOD FOR COMPOSITE SUBSTRATE | Tj Innovative Semiconductor Substrate Technology Co., Ltd. | KUNEMUND, ROBERT M | 1714 | §103 | Non-Final OA | — | Pending | Mar 26, 2024 |
| 18583331 | ELECTRONIC COMPONENT TRANSFER SYSTEM AND METHOD | Nexperia B.V. | CORTES, HOWARD | 2818 | §103 | Non-Final OA | — | Pending | Feb 21, 2024 |
| 18583334 | ELECTRONIC COMPONENT TRANSFER SYSTEM AND METHOD | Nexperia B.V. | CORTES, HOWARD | 2818 | §103 | Non-Final OA | — | Pending | Feb 21, 2024 |
| 18440017 | DIE PADDLE STANDOFFS IN SEMICONDUCTOR PACKAGES | Nexperia B.V. | TRAN, DZUNG | 2893 | §102§103§112 | Non-Final OA | — | Pending | Feb 13, 2024 |
| 18437647 | HEAT SINK | Furukawa Electric Co., Ltd. | ATTEY, JOEL M | 3763 | §102§103§112 | Non-Final OA | — | Pending | Feb 09, 2024 |
| 18414417 | OPEN BACK HEADPHONE WITH TACTILE VIBRATION DRIVER AND RELATED METHODS | Skullcandy, Inc. | DIAZ, SABRINA | 2693 | §103 | Non-Final OA | — | Pending | Jan 16, 2024 |
| 18396934 | Semiconductor Device | Nexperia B.V. | CRAWFORD EASON, LATANYA N | 2813 | §103§112 | Non-Final OA | — | Pending | Dec 27, 2023 |
| 18392194 | Nonlinear Gate Vertical Transistor | Nexperia B.V. | SHAMSUZZAMAN, MOHAMMED | 2897 | §103 | Non-Final OA | — | Pending | Dec 21, 2023 |
| 18392212 | Nonlinear Gate Vertical Transistor | Nexperia B.V. | YECHURI, SITARAMARAO S | 2893 | §103§112 | Non-Final OA | — | Pending | Dec 21, 2023 |
| 18542367 | TRANSPARENT GLASS CERAMIC, ESPECIALLY AS A COVER PANE | Schott AG | GAITONDE, MEGHA MEHTA | 1781 | §103DP | Non-Final OA | 7d | Pending | Dec 15, 2023 |
| 18540210 | DC-DC Converter with Dynamic MPPT | Nexperia B.V. | BEHM, HARRY RAYMOND | 2838 | §103 | Final Rejection | — | Pending | Dec 14, 2023 |
| 18517178 | SEMICONDUCTOR DEVICE | Nexperia B.V. | MULERO FLORES, ERIC MANUEL | 2898 | §102§103 | Non-Final OA | — | Pending | Nov 22, 2023 |
| 18514338 | MOSFET GATE FORMATION | Nexperia B.V. | CHIU, TSZ K | 2898 | §103 | Non-Final OA | — | Pending | Nov 20, 2023 |
| 18502475 | ULTRATHIN GLASSES WITH HIGH EDGE IMPACT RESISTANCE | Schott Glass Technologies (Suzhou) Co. Ltd. | VAN SELL, NATHAN L | 1783 | §103 | Final Rejection | 15d overdue | Pending | Nov 06, 2023 |
| 18558984 | A Biological Entity for Treating Brain Cancer | Alivid LLC | SHIN, DANA H | 1635 | §102§103§112 | Non-Final OA | — | Pending | Nov 03, 2023 |
| 18488376 | SEMICONDUCTOR POWER DEVICE WITH IMPROVED JUNCTION TERMINATION EXTENSION | Nexperia B.V. | GONZALES, VICENTE ROLANDO | 2899 | §103 | Non-Final OA | — | Pending | Oct 17, 2023 |
| 18482163 | FOUR-LAYER SEMICONDUCTOR DEVICE AND ESD PROTECTION CIRCUIT | Nexperia B.V. | NGUYEN, CUONG B | 2818 | §112 | Final Rejection | 22d | Pending | Oct 06, 2023 |
| 18482201 | Method of Manufacturing a Semiconductor Package, Such Semiconductor Package as well as an Electronic System Comprising a PCB Element and at Least Such Semiconductor Package | Nexperia B.V. | HALL, VICTORIA KATHLEEN | 2897 | §112 | Final Rejection | 38d overdue | Pending | Oct 06, 2023 |
| 18479175 | CASTING COMPOUNDS, COMPOSITE MATERIAL AND CHANNEL SYSTEMS WITH STABILIZING CASTING COMPOUND | Schott AG | WIESE, NOAH S | 1731 | §103§112 | Final Rejection | 34d | Pending | Oct 02, 2023 |
| 18467786 | REDUCED STRESS CLIP FOR SEMICONDUCTOR DIE | Nexperia B.V. | TRAN, DZUNG | 2893 | §103 | Final Rejection | 27d | Pending | Sep 15, 2023 |
| 18467258 | MPS DIODE HAVING NON-UNIFORMLY SPACED WELLS AND METHOD FOR MANUFACTURING THE SAME | Nexperia B.V. | SPRENGER, JAIME LYNN | 2893 | Other | Final Rejection | 34d | Pending | Sep 14, 2023 |
| 18461608 | SYSTEMS AND METHODS FOR DYNAMIC DEMAND SENSING AND FORECAST ADJUSTMENT | Kinaxis Inc. | NGUYEN, NGA B | 3625 | §101§112 | Final Rejection | 54d | Pending | Sep 06, 2023 |
| 18458589 | VERTICAL SEMICONDUCTOR DEVICE AND MANUFACTURING METHOD THEREFOR | Nexperia B.V. | AHMED, SHAHED | 2813 | §103 | Non-Final OA | 39d | Pending | Aug 30, 2023 |
| 18458561 | CARRIER POSITIONING DEVICE | Nexperia B.V. | STARK, JARRETT J | 2898 | §103§112 | Final Rejection | 30d | Pending | Aug 30, 2023 |
| 18454218 | System and Method for Correlating Diverse Medication Information | Coveredrx LLC | CHOI, DAVID | 3684 | §101§103 | Final Rejection | 117d overdue | Pending | Aug 23, 2023 |
| 18451217 | LIGHT APPLICATION DEVICE | Schott AG | MORAN, EDWARD JOHN | 3772 | §103 | Non-Final OA | 20d | Pending | Aug 17, 2023 |
| 18546760 | PRODUCT DISTRIBUTION | South Pacific Laundry (Melbourne) Pty Ltd. | LIM, STEVEN | 2688 | §103 | Non-Final OA | 34d | Pending | Aug 16, 2023 |
| 18361502 | CLIP STRUCTURE FOR A PACKAGED SEMICONDUCTOR DEVICE | Nexperia B.V. | KLEIN, JORDAN M | 2893 | §102§103 | Final Rejection | — | Pending | Jul 28, 2023 |
| 18358985 | GLASS SYRINGE BARREL WITH INCREASED FLANGE BREAKING RESISTANCE | Schott Pharma Schweiz AG | THOMAN, EVELYN ANNE | 3783 | §103§112 | Non-Final OA | — | Pending | Jul 26, 2023 |
| 18356769 | PICK-AND-PLACE APPARATUS AND METHOD | Nexperia B.V. | KIM, PAUL D | 3729 | §112 | Non-Final OA | — | Pending | Jul 21, 2023 |
| 18355700 | TRAINING METHOD AND PREDICTION METHOD FOR DIAGENETIC PARAMETER PREDICTION MODEL BASED ON ARTIFICIAL INTELLIGENCE ALGORITHM | China University Of Petroleum-Beijing | MOUNDI, ISHAN NMN | 2141 | §103 | Final Rejection | — | Pending | Jul 20, 2023 |
| 18349555 | METHOD FOR REDUCING RAISED STRUCTURES ON GLASS ELEMENTS, AND GLASS ELEMENT PRODUCED ACCORDING TO THE METHOD | Schott AG | FLORES JR, DONALD M | 1781 | §102§103§112 | Non-Final OA | 1d overdue | Pending | Jul 10, 2023 |
| 18349531 | METHOD FOR PRODUCING RAISED STRUCTURES ON GLASS ELEMENTS, AND GLASS ELEMENT PRODUCED ACCORDING TO THE METHOD | Schott AG | FLORES JR, DONALD M | 1781 | §102§103 | Final Rejection | 71d | Pending | Jul 10, 2023 |
| 18258143 | ULTRA-THIN SOLDERING GASKET AND PREPARATION METHOD THEREFOR, SOLDERING METHOD, AND SEMICONDUCTOR DEVICE | Ningbo S J Electronics Co., Ltd. | PARENDO, KEVIN A | 2896 | §102§103§112 | Final Rejection | — | Pending | Jun 16, 2023 |
| 18333854 | METHOD FOR MANUFACTURING A SEMICONDUCTOR PACKAGE ASSEMBLY AS WELL AS SUCH SEMICONDUCTOR PACKAGE ASSEMBLY | Nexperia B.V. | SON, ERIKA HEERA | 2893 | §102§103 | Final Rejection | — | Pending | Jun 13, 2023 |
| 18332467 | ELECTRONIC COMPONENT TRANSFER BY LEVITATION | Nexperia B.V. | KOCH, GEORGE R | 1745 | §103 | Non-Final OA | — | Pending | Jun 09, 2023 |
| 18329872 | LATERAL ORIENTED METAL-OXIDE-SEMICONDUCTOR, MOS DEVICE COMPRISING A SEMICONDUCTOR BODY | Nexperia B.V. | SHOOK, DANIEL P | 2896 | §102§103 | Final Rejection | — | Pending | Jun 06, 2023 |
| 18329845 | SEMICONDUCTOR PACKAGE ASSEMBLY AND A METHOD OF MANUFACTURING SUCH SEMICONDUCTOR PACKAGE ASSEMBLY | Nexperia B.V. | ZARNEKE, DAVID A | 2891 | §103 | Final Rejection | 22d | Pending | Jun 06, 2023 |
| 18316281 | ELECTRICALLY CONDUCTIVE POROUS SINTERING BODY HAVING ELECTRICALLY CONDUCTIVE MATERIALS METHOD FOR PRODUCING | Schott AG | TRAN, THIEN S | 3761 | §102§103§112 | Non-Final OA | 7d | Pending | May 12, 2023 |
| 18313141 | Bioactive Peptides, Compositions, Production Process, and Use of Bioactive Peptides as Anti-Tumoral Agents | Php Biotech International Inc. | MOEHLMAN, ANDREW TERRY | 1655 | §112 | Final Rejection | 18d overdue | Pending | May 05, 2023 |
| 18310993 | SEMICONDUCTOR DEVICE AND METHOD FOR MANUFACTURING THE SAME | Nexperia B.V. | GHEYAS, SYED I | 2893 | §103 | Non-Final OA | — | Pending | May 02, 2023 |
| 18250049 | BLOOD PRODUCT FOR PREVENTING SURGICAL ADHESION | Reapplix A/S | HELM, CARALYNNE E | 1615 | §112 | Non-Final OA | — | Pending | Apr 21, 2023 |
| 18250045 | MULTIFUNCTIONAL TRACERS FOR ANALYSIS OF OILFIELDS | Eni S.p.A. | LI, AIQUN | 1766 | §103 | Final Rejection | — | Pending | Apr 21, 2023 |
| 18299820 | TRENCH-GATE SEMICONDUCTOR DEVICE AND METHOD FOR MANUFACTURING THE SAME | Nexperia B.V. | NICELY, JOSEPH C | 2813 | §102 | Non-Final OA | — | Pending | Apr 13, 2023 |
| 18300087 | GLASS ELEMENT WITH STRUCTURED WALL AND METHOD FOR THE PRODUCTION THEREOF | Schott AG | SAMPLE, DAVID R | 1784 | §102 | Final Rejection | 21d | Pending | Apr 13, 2023 |
| 18295977 | APPARATUS FOR TRANSFERRING SEMICONDUCTOR CIRCUITS | Nexperia B.V. | TRINH, MINH N | 3729 | §103 | Final Rejection | 21d | Pending | Apr 05, 2023 |
| 18186403 | VERTICAL ORIENTED SEMICONDUCTOR DEVICE HAVING A REDUCED LATERAL FIELD TERMINATION DISTANCE, AS WELL AS A CORRESPONDING METHOD | Nexperia B.V. | AHMED, SHAHED | 2813 | §103 | Final Rejection | — | Pending | Mar 20, 2023 |
| 18043189 | ANODE MATERIAL AND PREPARATION METHOD THEREOF, LITHIUM ION BATTERY | Dingyuan New Energy Technology Co., Ltd. | ZEMUI, NATHANAEL T | 1727 | §103 | Final Rejection | 7d | Pending | Feb 27, 2023 |
| 18041847 | COMPOSITION | Sphera Limited | WEISS, PAMELA HL | 1732 | §103 | Non-Final OA | — | Pending | Feb 16, 2023 |
| 18040689 | ADAPTIVE LACING DEVICE | BETTERGUARDS TECHNOLOGY GMBH | TRIEU, TIMOTHY K | 3732 | §103 | Final Rejection | — | Pending | Feb 06, 2023 |
| 18153761 | ELECTRONIC PACKAGE AND METHOD FOR MANUFACTURING THE SAME | Nexperia B.V. | BULLARD-CONNOR, GENEVIEVE GRACE | 2899 | §103 | Non-Final OA | — | Pending | Jan 12, 2023 |
| 18152845 | SEMICONDUCTOR DEVICE AND ESD PROTECTION DEVICE COMPRISING THE SAME | Nexperia B.V. | NICELY, JOSEPH C | 2813 | §112 | Final Rejection | 15d overdue | Pending | Jan 11, 2023 |
| 18147957 | A MULTI-LAYER SEMICONDUCTOR DEVICE INTERCONNECT INCLUDING INTERWEAVED FINGERS | Nexperia B.V. | CUTLER, ETHAN EDWARD | 2892 | §103§112 | Final Rejection | — | Pending | Dec 29, 2022 |
| 18147999 | SEMICONDUCTOR DEVICE AND BIDIRECTIONAL ESD PROTECTION DEVICE COMPRISING THE SAME | Nexperia B.V. | FOX, BRANDON C | 2818 | §102 | Non-Final OA | — | Pending | Dec 29, 2022 |
| 18147735 | SEMICONDUCTOR DEVICE AND A METHOD OF MANUFACTURING A SEMICONDUCTOR DEVICE | Nexperia B.V. | MARIN, JACOB RAUL | 2818 | §102§103§112 | Non-Final OA | — | Pending | Dec 29, 2022 |
| 18061130 | STEP INTERCONNECT METALLIZATION TO ENABLE PANEL LEVEL PACKAGING | Nexperia B.V. | WEGNER, AARON MICHAEL | 2897 | §103 | Non-Final OA | — | Pending | Dec 02, 2022 |
| 18057381 | SHEET-LIKE GLASS ARTICLE, METHOD FOR PRODUCING SAME, AND USE THEREOF | Schott Technical Glass Solutions GmbH | ZHANG, MICHAEL N | 1781 | §103§112 | Non-Final OA | — | Pending | Nov 21, 2022 |
| 17979279 | SEMICONDUCTOR PACKAGE ASSEMBLY AND METHOD OF MANUFACTURING | Nexperia B.V. | ARROYO, TERESA M | 2893 | §112 | Non-Final OA | 78d | Pending | Nov 02, 2022 |
| 17952698 | METHODS AND SYSTEMS FOR INTEGRATION OF EXTERNAL CALCULATIONS TO CORE HEURISTIC ALGORITHMS | Kinaxis Inc. | SITIRICHE, LUIS A | 2126 | §103§112 | Final Rejection | — | Pending | Sep 26, 2022 |
| 17931066 | CHEMICALLY STRENGTHENED GLASS SHEET AND METHOD FOR ITS PRODUCTION | Schott AG | SAMPLE, DAVID R | 1784 | §103§112 | Non-Final OA | 96d overdue | Pending | Sep 09, 2022 |
| 17929743 | NON-FLAT FORMED GLASS, METHOD FOR PRODUCING SAME, AND USE THEREOF | Schott AG | MILLER, CAMERON KENNETH | 1731 | §103 | Non-Final OA | — | Pending | Sep 05, 2022 |
| 17692229 | PACKAGED HALF-BRIDGE CIRCUIT | Nexperia B.V. | ISAAC, STANETTA D | 2898 | §102 | Non-Final OA | — | Pending | Mar 11, 2022 |
| 17670893 | SEMICONDUCTOR DEVICE AND A METHOD OF MANUFACTURING A SEMICONDUCTOR DEVICE | Nexperia B.V. | ZABEL, ANDREW JOHN | 2818 | §102§103§112 | Final Rejection | 2d overdue | Pending | Feb 14, 2022 |
| 17592541 | SHEET-LIKE CHEMICALLY TOUGHENED OR CHEMICALLY TOUGHENABLE GLASS ARTICLE AND METHOD FOR PRODUCING SAME | Schott AG | COLGAN, LAUREN ROBINSON | 1784 | §103 | Final Rejection | 78d overdue | Pending | Feb 04, 2022 |
| 17588846 | HOLOGRAPHIC OPTICAL SYSTEM | Trulife Optics Ltd. | CHANG, AUDREY Y | 2872 | §103§112 | Non-Final OA | — | Pending | Jan 31, 2022 |
| 17541319 | RULE-BASED SYSTEMS AND METHODS FOR CUSTOMIZING COMPLEX BUSINESS SOLUTIONS | Kinaxis Inc. | EVANS, KIMBERLY L | 3629 | §101§103§112 | Non-Final OA | — | Pending | Dec 03, 2021 |
| 17516187 | SOLID ELECTROLYTE AND A LITHIUM-ION CONDUCTIVE GLASS-CERAMICS | Schott AG | SON, TAEYOUNG | 1751 | §103 | Final Rejection | 15d | Pending | Nov 01, 2021 |
| 17380769 | SEMICONDUCTOR DEVICE AND A METHOD OF MANUFACTURE | Nexperia B.V. | ISAAC, STANETTA D | 2898 | §102§103 | Final Rejection | 20d | Pending | Jul 20, 2021 |
| 17414549 | LUMINESCENT SOLAR CONCENTRATOR COMPRISING DITHIENYLPYRIDINETHIADIOAZOLE COMPOUNDS | Eni S.p.A. | JOHNSON, CHRISTOPHER LINDSAY | 1691 | §103 | Final Rejection | — | Pending | Jun 16, 2021 |
| 17222482 | METHOD AND SYSTEM FOR ATTAINING SUSTAINABLE PRODUCTIVITY GROWTH IN AN ENTITY | Tight Line Advisors, LLC | ULLAH, ARIF | 3625 | §101 | Final Rejection | — | Pending | Apr 05, 2021 |
| 16986203 | PLATE-SHAPED, CHEMICALLY PRESTRESSED OR CHEMICALLY PRESTRESSABLE GLASS ARTICLES, AND METHODS OF PRODUCING | Schott AG | HANDVILLE, BRIAN | 1783 | §103 | Non-Final OA | — | Pending | Aug 05, 2020 |
| 16986191 | PLATE-SHAPED GLASS ARTICLES AND METHODS OF PRODUCING AND USING | Schott AG | MILLER, CAMERON KENNETH | 1731 | §103§112 | Non-Final OA | — | Pending | Aug 05, 2020 |
| 16379133 | SENSOR RECEPTACLE FOR A BIOREACTOR, AND BIOREACTOR WITH SENSOR RECEPTACLE, AND METHOD FOR PROPAGATION OR CULTIVATION OF BIOLOGICAL MATERIAL | Schott AG | ESPERON, NATHAN GREGORY | 1799 | §103§112 | Non-Final OA | 72d overdue | Pending | Apr 09, 2019 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial