← Back to Harrity & Harrity, LLP \ QUALCOMM
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 18707408 | Untitled | Qualcomm Incorporated | SLOMS, NICHOLAS | 2476 | §102 | Non-Final OA | — | Pending | |
| 18895853 | Untitled | Qualcomm Incorporated | MALEK, LEILA | 2632 | §103 | Non-Final OA | — | Pending | |
| 19268716 | LOWER LAYER SECURITY FOR GROUPCAST COMMUNICATION | Qualcomm Incorporated | GADALLA, HANY S | 2493 | §102§103 | Non-Final OA | — | Pending | Jul 14, 2025 |
| 19237729 | CAPABILITY FOR MULTIPLE BEAMFORMING CODEBOOKS | Qualcomm Incorporated | MALEK, LEILA | 2632 | §101§103Other | Non-Final OA | — | Pending | Jun 13, 2025 |
| 19111164 | MULTIPLE INPUT-MULTIPLE OUTPUT RADIO FREQUENCY POWER HARVESTER | Qualcomm Incorporated | GANNON, LEVI | 2836 | §102§103 | Non-Final OA | — | Pending | Mar 12, 2025 |
| 19067393 | RATE MATCHING FOR MULTI-SLOT UPLINK SHARED CHANNEL TRANSMISSION | Qualcomm Incorporated | LOPATA, ROBERT J | 2471 | Other | Non-Final OA | — | Pending | Feb 28, 2025 |
| 19006764 | SIGNAL USING ON-OFF KEYING AND PHASE MODULATION | Qualcomm Incorporated | TADESE, BERHANU | 2632 | §103§112 | Final Rejection | — | Pending | Dec 31, 2024 |
| 18879957 | FREQUENCY DOMAIN COMPRESSION OF CHANNEL STATE INFORMATION | Qualcomm Incorporated | SALTARELLI, DOMINIC D | 2421 | §102Other | Non-Final OA | — | Pending | Dec 30, 2024 |
| 18999299 | ENHANCED RADIO WAVE EXPOSURE MITIGATION USING A COMBINATION OF PROXIMITY & INERTIAL SENSOR DATA | Qualcomm Incorporated | FERGUSON, KEITH | 2648 | §103Other | Non-Final OA | — | Pending | Dec 23, 2024 |
| 18999428 | MODIFYING TRANSMIT POWERS OF UPLINK SIGNALS ASSOCIATED WITH DIFFERENT RADIO ACCESS TECHNOLOGIES (RATS) | Qualcomm Incorporated | TAYLOR, NATHAN SCOTT | 2643 | §103 | Non-Final OA | — | Pending | Dec 23, 2024 |
| 18985970 | TECHNIQUES FOR DUAL CONNECTIVITY MODE OPTIMIZATION | Qualcomm Incorporated | HUYNH, NAM TRUNG | 2647 | DP | Non-Final OA | — | Pending | Dec 18, 2024 |
| 18875329 | RESOURCE ALLOCATION FOR SENSING SERVICES | Qualcomm Incorporated | WU, JIANYE | 2462 | §103 | Non-Final OA | — | Pending | Dec 16, 2024 |
| 18980605 | SINGLE STREAM MEDIA CONNECTION FROM AN ACCESS POINT FOR MULTIPLE DEVICES | Qualcomm Incorporated | VO, TOAN | 2465 | §103 | Non-Final OA | — | Pending | Dec 13, 2024 |
| 18874702 | TECHNIQUES FOR SWITCHING PERIOD CONFIGURATION FOR TRANSMIT SWITCHING | Qualcomm Incorporated | JANGBAHADUR, LAKERAM | 2469 | §103 | Non-Final OA | — | Pending | Dec 13, 2024 |
| 18978448 | PHYSICAL RESOURCE BLOCKS OUTSIDE DOWNLINK SUBBAND FOR PHYSICAL DOWNLINK SHARED CHANNEL | Qualcomm Incorporated | HAQUE, ABUSAYEED M | 2466 | §102Other | Non-Final OA | — | Pending | Dec 12, 2024 |
| 18873961 | POWER SAVING AFTER BEAM FAILURE RECOVERY REQUEST | Qualcomm Incorporated | DAYA, TEJIS A | 2472 | §103 | Non-Final OA | — | Pending | Dec 11, 2024 |
| 18970343 | POWER CONTROL FOR HYBRID AUTOMATIC REPEAT REQUEST | Qualcomm Incorporated | BRADEN, GRACE VICTORIA | 2112 | §103 | Non-Final OA | — | AI Ready | Dec 05, 2024 |
| 18970610 | SYSTEM INFORMATION BLOCK TIMING INDICATION | Qualcomm Incorporated | MAHMUD, RANA HASSAN | 2644 | §102§103 | Non-Final OA | — | Pending | Dec 05, 2024 |
| 18967832 | PACKET DATA CONVERGENCE PROTOCOL STATUS REPORT TRANSMISSION | Qualcomm Incorporated | RUTNAM, SAMUEL DILAN | 2471 | §102§103 | Non-Final OA | — | Pending | Dec 04, 2024 |
| 18871352 | AUTONOMOUS TIMING ADVANCE ADJUSTMENT FOR MULTIPLE TRANSMISSION RECEPTION POINTS | Qualcomm Incorporated | KASSA, ZEWDU A | 2635 | §103 | Final Rejection | 33d | AI Ready | Dec 03, 2024 |
| 18960816 | POWER CONTROL FOR HYBRID AUTOMATIC REPEAT REQUEST FEEDBACK SIGNAL IN RANDOM ACCESS | Qualcomm Incorporated | NGUYEN, DAVID Q | 2643 | §103 | Non-Final OA | — | Pending | Nov 26, 2024 |
| 18869660 | BANDWIDTH PART OPERATIONS FOR SMALL DATA TRANSMISSION PROCEDURES OF A REDUCED CAPABILITY USER EQUIPMENT | Qualcomm Incorporated | ZHAO, YONGHONG | 2472 | §103 | Non-Final OA | — | Pending | Nov 26, 2024 |
| 18960886 | FEEDBACK FOR SIDELINK TRANSMISSIONS | Qualcomm Incorporated | KIM, CHONG G | §102 | Non-Final OA | — | Pending | Nov 26, 2024 | |
| 18868969 | TIMING ADVANCE SIGNALING FOR MULTIPLE TRANSMIT RECEIVE POINTS | Qualcomm Incorporated | WEIDNER, TIMOTHY J | 2469 | §103§112 | Non-Final OA | — | Pending | Nov 25, 2024 |
| 18868055 | MODIFICATION OF MODULATION AND CODING SCHEME | Qualcomm Incorporated | CHOUDHURY, FAISAL | 2478 | §102§103 | Non-Final OA | — | Pending | Nov 21, 2024 |
| 18867610 | SIMULTANEOUS PHYSICAL UPLINK CONTROL CHANNEL TRANSMISSIONS | Qualcomm Incorporated | NGO, ANGELIE THIEN THAN | 2416 | §103§112 | Non-Final OA | — | Pending | Nov 20, 2024 |
| 18867641 | CONFIGURATIONS AND COMPUTATIONAL RESOURCE COUNTING FOR TIME DOMAIN CHANNEL STATE INFORMATION BURSTS | Qualcomm Incorporated | RAHMAN, SHAH M | 2413 | §102§103 | Non-Final OA | — | Pending | Nov 20, 2024 |
| 18865069 | NON-ACTIVE BANDWIDTH PARTS FOR CANDIDATE CELL OPERATIONS IN MOBILITY | Qualcomm Incorporated | OLUBODUN, AYODELE LAWRENCE | 2472 | §102§103 | Non-Final OA | — | Pending | Nov 12, 2024 |
| 18864954 | TRANSMIT SCHEMES FOR CARRIER AGGREGATION WITH PARTIALLY OVERLAPPED SPECTRUM | Qualcomm Incorporated | ABAZA, AYMAN A | 2465 | §102§103 | Non-Final OA | — | Pending | Nov 12, 2024 |
| 18865008 | IMPLICIT TIMING ADVANCE UPDATE FOR DEACTIVATED CELL OR TIMING ADVANCE GROUP | Qualcomm Incorporated | NG, CHRISTINE Y | 2464 | §112 | Non-Final OA | — | Pending | Nov 12, 2024 |
| 18864718 | JOINT ACTIVATION AND/OR DEACTIVATION DOWNLINK CONTROL INFORMATION ASSOCIATED WITH MULTIPLE SEMI-PERSISTENT COMMUNICATION CONFIGURATIONS | Qualcomm Incorporated | KHIRODHAR, MAHARISHI V | §103 | Non-Final OA | — | Pending | Nov 11, 2024 | |
| 18943600 | CHANNEL MEASUREMENT RESOURCE GROUPING | Qualcomm Incorporated | NOORISTANY, SULAIMAN | 2415 | §103 | Non-Final OA | — | Pending | Nov 11, 2024 |
| 18864141 | CHANNEL STATE INFORMATION CONFIGURATION | Qualcomm Incorporated | CRIGLER, RYAN ALEXANDER | 2472 | §102§103 | Non-Final OA | — | Pending | Nov 08, 2024 |
| 18863800 | QUALITY OF EXPERIENCE CONFIGURATION FOR A MULTICAST OR BROADCAST SERVICE | Qualcomm Incorporated | FOLAYAN, TEMITOPE OLUWASEUN | 2414 | §102§103 | Non-Final OA | — | Pending | Nov 07, 2024 |
| 18939028 | DATA BURST INTERVAL AWARENESS FOR HANDOVER PROCEDURES | Qualcomm Incorporated | PATEL, MAHENDRA R | 2645 | §103 | Non-Final OA | — | Pending | Nov 06, 2024 |
| 18863005 | TERRESTRIAL NETWORK AND NON-TERRESTRIAL NETWORK MOBILITY | Qualcomm Incorporated | NGUYEN, BRIAN D | 2469 | §102§103 | Non-Final OA | — | Pending | Nov 05, 2024 |
| 18862597 | CHANNEL ACCESS SELECTION FOR PHYSICAL SIDELINK FEEDBACK CHANNEL (PSFCH) COMMUNICATIONS IN UNLICENSED BANDS | Qualcomm Incorporated | PARK, CHONGSUH | 2478 | §103 | Non-Final OA | — | Pending | Nov 04, 2024 |
| 18936673 | TECHNIQUES FOR INDICATING BEAMS FOR USER EQUIPMENT BEAM REPORTING | Qualcomm Incorporated | MENSAH, PRINCE AKWASI | 2474 | §103 | Non-Final OA | — | Pending | Nov 04, 2024 |
| 18862024 | DIGITAL NON-LINEARITY MODELING | Qualcomm Incorporated | DANG, HUNG Q | 2484 | §102 | Non-Final OA | — | Pending | Oct 31, 2024 |
| 18861718 | SEMI-PERSISTENT SCHEDULING RESOURCE ACTIVATION FOR MOBILE TERMINATED SMALL DATA TRANSMISSION | Qualcomm Incorporated | PATEL, PARTHKUMAR | 2479 | §102§103 | Non-Final OA | — | Pending | Oct 30, 2024 |
| 18861265 | BLOCKAGE PREDICTION REPORT | Qualcomm Incorporated | AHMED, ATIQUE | 2413 | §103 | Non-Final OA | — | Pending | Oct 29, 2024 |
| 18860912 | DYNAMIC ADAPTATION OF SOUNDING REFERENCE SIGNAL FREQUENCY DOMAIN PARAMETERS | Qualcomm Incorporated | TIEU, JANICE N | 2633 | §103 | Non-Final OA | 38d overdue | AI Ready | Oct 28, 2024 |
| 18922828 | EXTENDED REALITY PERCEPTION INFORMATION SHARING | Qualcomm Incorporated | COPPOLA, JACOB C | 3992 | §102 | Non-Final OA | — | Pending | Oct 22, 2024 |
| 18859045 | MOBILITY ENHANCEMENTS UNDER COVERAGE AND CAPACITY OPTIMIZATION | Qualcomm Incorporated | CHRISS, ANDREW W | 2472 | §102§103 | Non-Final OA | — | Pending | Oct 22, 2024 |
| 18923150 | FEEDBACK OVERRIDE | Qualcomm Incorporated | CHOWDHURY, HARUN UR R | 2473 | §102§103§112 | Non-Final OA | — | Pending | Oct 22, 2024 |
| 18858959 | INDICATIONS AND REPORTING FOR BACKSCATTER READING OPERATIONS | Qualcomm Incorporated | JANGBAHADUR, LAKERAM | 2469 | §102§103 | Non-Final OA | — | Pending | Oct 22, 2024 |
| 18920802 | BEAM SELECTION WITH RANDOM ACCESS | Qualcomm Incorporated | CHERY, DADY | 2418 | §102Other | Non-Final OA | — | Pending | Oct 18, 2024 |
| 18919719 | PERFORMING A CONNECTION SETUP BASED AT LEAST IN PART ON A PAGING MESSAGE | Qualcomm Incorporated | SHAH, TANMAY K | 2632 | DP | Non-Final OA | — | Pending | Oct 18, 2024 |
| 18857618 | CONTROL PROTOCOL FEEDBACK REPORT ENVELOPE | Qualcomm Incorporated | WILLIAMS, ELTON S | 2465 | §103 | Non-Final OA | — | Pending | Oct 17, 2024 |
| 18857318 | RECOMMENDATION FOR CROSS-CARRIER SCHEDULING | Qualcomm Incorporated | WELTE, BENJAMIN PETER | 2477 | §103 | Non-Final OA | — | Pending | Oct 16, 2024 |
| 18910126 | TECHNIQUES FOR MEASUREMENT ORDER FOR CARRIER AGGREGATION | Qualcomm Incorporated | LEE, CHI HO A | 2475 | Other | Non-Final OA | — | Pending | Oct 09, 2024 |
| 18854753 | SMALL DATA TRANSMISSIONS FOR MULTIPLE TRANSMISSION RECEPTION POINTS | Qualcomm Incorporated | RUBIN, BLAKE J | 2457 | §102 | Non-Final OA | — | Pending | Oct 07, 2024 |
| 18854667 | FOUR-STEP RACH PROCEDURE FOR ENERGY HARVESTING USER EQUIPMENT | Qualcomm Incorporated | HUA, QUAN M | 2645 | §103 | Non-Final OA | — | Pending | Oct 07, 2024 |
| 18908581 | ALTITUDE-BASED MEASUREMENT REPORTING | Qualcomm Incorporated | CHOI, HAESHIL JESSICA | 2479 | §103§112 | Non-Final OA | — | Pending | Oct 07, 2024 |
| 18905105 | SUBSEQUENT PREAMBLE-LESS EARLY DATA TRANSMISSION | Qualcomm Incorporated | LEE, CHI HO A | 2475 | §102§103 | Non-Final OA | — | Pending | Oct 02, 2024 |
| 18853543 | TRANSMITTING FEEDBACK USING SLOTS BASED AT LEAST IN PART ON A SET OF TIMELINES | Qualcomm Incorporated | HO, DUC CHI | 2465 | §102 | Non-Final OA | — | Pending | Oct 02, 2024 |
| 18903325 | INTERFERENCE PREDICTION EVENTS | Qualcomm Incorporated | SAM, PHIRIN | 2476 | §102§103 | Non-Final OA | — | Pending | Oct 01, 2024 |
| 18903462 | UNIFIED MEASUREMENT CONFIGURATIONS FOR CROSS-LINK INTERFERENCE, SELF-INTERFERENCE, AND WIRELESS SENSING | Qualcomm Incorporated | LY, ANH VU H | 2472 | §102Other | Non-Final OA | — | Pending | Oct 01, 2024 |
| 18853215 | SEMI-KNOWN TRANSMISSION CONFIGURATION INDICATOR STATE | Qualcomm Incorporated | WAQAS, SAAD A | 2468 | §102§103 | Non-Final OA | — | Pending | Oct 01, 2024 |
| 18901682 | PER-TUPLE NETWORK PAGING WHITELISTING | Qualcomm Incorporated | CAO, NAM PHUONG | 2479 | §103 | Non-Final OA | — | Pending | Sep 30, 2024 |
| 18899805 | RADIO LINK CONTROL UNACKNOWLEDGED MODE SEQUENCE NUMBER CONTINUITY ACROSS COMPONENT CARRIERS | Qualcomm Incorporated | PARK, JUNG H | 2411 | §103 | Non-Final OA | — | Pending | Sep 27, 2024 |
| 18896019 | POWERING DOWN MEMORY DEVICE BASED ON DISABLING BACKGROUND OPERATION ASSOCIATED WITH MEMORY DEVICE | Qualcomm Incorporated | ADVINCULA, LAURENZ | 2175 | §103 | Final Rejection | — | Pending | Sep 25, 2024 |
| 18894778 | COMMUNICATION COLLISION DETECTION AND MITIGATION | Qualcomm Incorporated | CHEN, JUNPENG | 2645 | §102§103 | Non-Final OA | — | Pending | Sep 24, 2024 |
| 18894691 | SUSPENSION AND RESUMPTION OF A MULTICAST/BROADCAST SERVICE | Qualcomm Incorporated | RENNER, BRANDON M | 2411 | §103§112 | Non-Final OA | — | Pending | Sep 24, 2024 |
| 18894983 | TRANSMISSION CONFIGURATION INDICATION STATE APPLICATION TIMING AFTER LOWER-LAYER TRIGGERED MOBILITY CELL SWITCH | Qualcomm Incorporated | LU, XUAN | 2473 | §102§103 | Non-Final OA | — | Pending | Sep 24, 2024 |
| 18892915 | METHOD AND APPARATUS FOR SIDELINK RADIO LINK FAILURE DETECTION | Qualcomm Incorporated | NGUYEN, BRIAN D | 2475 | §102 | Non-Final OA | — | Pending | Sep 23, 2024 |
| 18849706 | NONLINEAR MODELING FOR CHANNEL ESTIMATION | Qualcomm Incorporated | CHOWDHURY, HARUN UR R | 2473 | §102§112 | Non-Final OA | — | Pending | Sep 23, 2024 |
| 18849161 | CHANNEL STATE INFORMATION REPORTING FOR MULTIPLE CHANNEL MEASUREMENT RESOURCE GROUPS | Qualcomm Incorporated | FOLLANSBEE, KEITH TRAN-DANH | 2411 | §102§112 | Non-Final OA | — | Pending | Sep 20, 2024 |
| 18848732 | SCHEDULING RESTRICTIONS FOR LAYER 1 MEASUREMENTS IN LAYER 1/LAYER 2 INTER-CELL MOBILITY OPERATIONS | Qualcomm Incorporated | ELPENORD, CANDAL | 2473 | §103 | Non-Final OA | — | Pending | Sep 19, 2024 |
| 18889732 | TECHNIQUES FOR PROVIDING AN INDICATION OF A RESERVATION CONFLICT | Qualcomm Incorporated | SAMARA, LOUIS | 2476 | §102 | Non-Final OA | — | Pending | Sep 19, 2024 |
| 18848708 | CHANNEL STATE INFORMATION HYPOTHESES CONFIGURATION FOR COHERENT JOINT TRANSMISSION SCENARIOS | Qualcomm Incorporated | SEYEDVOSOGHI, FARID | 2645 | §102§103 | Non-Final OA | — | Pending | Sep 19, 2024 |
| 18848727 | SCHEDULING ENHANCEMENT FOR A PHYSICAL UPLINK SHARED CHANNEL CONVEYING TIME-DOMAIN CHANNEL STATE INFORMATION | Qualcomm Incorporated | AJID, ABDELTIF | 2478 | §102 | Non-Final OA | — | Pending | Sep 19, 2024 |
| 18848234 | PER-BEAM TIME-DOMAIN BASIS SELECTION FOR CHANNEL STATE INFORMATION CODEBOOK | Qualcomm Incorporated | THAWNG, MANG BOI | 2476 | §102§103§112 | Non-Final OA | — | Pending | Sep 18, 2024 |
| 18847803 | CONFIGURING TRANSMISSION CONFIGURATION INDICATOR TYPES FOR TRANSMISSION RECEPTION POINTS IN MULTIPLE TRANSMISSION RECEPTION POINT OPERATIONS | Qualcomm Incorporated | PATEL, CHANDRAHAS B | §102 | Non-Final OA | — | Pending | Sep 17, 2024 | |
| 18887909 | NETWORK CODING AND SEGMENTATION FOR PACKET DATA CONVERGENCE PROTOCOL COMMUNICATIONS | Qualcomm Incorporated | PARK, CHONGSUH | 2478 | §103 | Non-Final OA | — | Pending | Sep 17, 2024 |
| 18887862 | NETWORK CODING FOR PACKET DATA CONVERGENCE PROTOCOL COMMUNICATIONS | Qualcomm Incorporated | PARK, CHONGSUH | 2478 | §103 | Non-Final OA | — | Pending | Sep 17, 2024 |
| 18847398 | SCHEDULING COLLISION RESOLUTION FOR SIDELINK AND UU COMMUNICATIONS | Qualcomm Incorporated | KO, SITHU | 2414 | §103 | Non-Final OA | — | Pending | Sep 16, 2024 |
| 18883452 | COMMON SEARCH SPACE COLLISION HANDLING FOR SUB-BAND FULL DUPLEX SETS OF SYMBOLS | Qualcomm Incorporated | NGUYEN, VAN TA | 2429 | §103Other | Non-Final OA | — | Pending | Sep 12, 2024 |
| 18883684 | COMMUNICATIONS THROUGH BLOCKING OBJECTS VIA TRANSMISSIVE SURFACES | Qualcomm Incorporated | SHARMA, POONAM | 2472 | §103§112 | Non-Final OA | — | Pending | Sep 12, 2024 |
| 18845549 | TIME-FREQUENCY-ANGULAR RESOURCES | Qualcomm Incorporated | ROUDANI, OUSSAMA | 2413 | §102§103 | Non-Final OA | — | Pending | Sep 10, 2024 |
| 18828616 | DISCARD MECHANISMS FOR DUAL CONNECTIVITY | Qualcomm Incorporated | GUADALUPE CRUZ, AIXA AMYR | 2466 | §102§103 | Non-Final OA | — | Pending | Sep 09, 2024 |
| 18844228 | ADAPTABLE TIME-DOMAIN DENSITY OF A REFERENCE SIGNAL | Qualcomm Incorporated | BHATTACHARYA, SAM | 2646 | §102 | Non-Final OA | — | Pending | Sep 05, 2024 |
| 18825590 | TECHNIQUES FOR PREDICTIVE INTERFERENCE REPORTING AND SCHEDULING ADAPTATION | Qualcomm Incorporated | NGUYEN, STEVEN H D | 2414 | §102§103§112 | Final Rejection | — | Pending | Sep 05, 2024 |
| 18823729 | HIGH PRIORITY CELL SEARCH WITH EXTENDED DISCONTINUOUS RECEPTION | Qualcomm Incorporated | LIN, KENNY S | 2416 | §102§103 | Non-Final OA | — | Pending | Sep 04, 2024 |
| 18819119 | ROBUST ACTION FRAME TRANSMISSION | Qualcomm Incorporated | NOORISTANY, SULAIMAN | §103 | Non-Final OA | — | Pending | Aug 29, 2024 | |
| 18818788 | ACKNOWLEDGMENT ONLY FEEDBACK FOR USER EQUIPMENT COOPERATION WITH SEPARATE PHYSICAL DOWNLINK SHARED CHANNEL PROCESSING | Qualcomm Incorporated | TAHA, SHUKRI ABDALLAH | 2478 | §102§103 | Non-Final OA | — | Pending | Aug 29, 2024 |
| 18841774 | REFERENCE SIGNAL DATA COLLECTION FOR TRAINING MACHINE LEARNING MODELS | Qualcomm Incorporated | JANGBAHADUR, LAKERAM | 2469 | §103 | Final Rejection | — | Pending | Aug 27, 2024 |
| 18816199 | SIDELINK REFERENCE SIGNAL CONFIGURATION | Qualcomm Incorporated | COX, BRIAN P | 2474 | §103Other | Non-Final OA | — | Pending | Aug 27, 2024 |
| 18841518 | CHANNEL STATE INFORMATION PROCESSING UNIT COUNTING | Qualcomm Incorporated | PANCHOLI, RINA C | 2477 | §101§103 | Non-Final OA | — | Pending | Aug 26, 2024 |
| 18815294 | POWER CONTROL FRAMEWORK | Qualcomm Incorporated | MUSA, ABDELNABI O | 2472 | §103 | Non-Final OA | — | Pending | Aug 26, 2024 |
| 18840698 | CODEBOOK SUBSET RESTRICTION CRITERION FOR COHERENT JOINT TRANSMISSION | Qualcomm Incorporated | LI, GUANG W | 2478 | §102 | Non-Final OA | — | Pending | Aug 22, 2024 |
| 18812939 | USER EQUIPMENT CALIBRATION OF MILLIMETER WAVE DEVICES FOR MECHANICAL ALIGNMENTS | Qualcomm Incorporated | TSVEY, GENNADIY | 2648 | §103 | Final Rejection | — | Pending | Aug 22, 2024 |
| 18840386 | SIGNALING FOR AGGREGATED CHANNEL BANDWIDTH FOR CARRIER AGGREGATION | Qualcomm Incorporated | LING, CHHIAN | 2418 | §102§103 | Non-Final OA | — | Pending | Aug 21, 2024 |
| 18839906 | TECHNIQUES FOR CONFIGURING TIMING ADVANCE GROUPS FOR COMPONENT CARRIERS | Qualcomm Incorporated | RAHMAN, M MOSTAZIR | 2411 | §103 | Non-Final OA | — | Pending | Aug 20, 2024 |
| 18839227 | SIGNAL QUALITY MEASUREMENT REPORTING BASED ON DEMODULATION REFERENCE SIGNALS | Qualcomm Incorporated | RIVAS, SALVADOR E | §103 | Non-Final OA | — | Pending | Aug 16, 2024 | |
| 18804286 | CELL DISCONTINUOUS TRANSMISSION OR CELL DISCONTINUOUS RECEPTION WITH CARRIER AGGREGATION | Qualcomm Incorporated | TRAN, PHUC H | 2471 | §102 | Non-Final OA | — | Pending | Aug 14, 2024 |
| 18838379 | QUALITY OF EXPERIENCE REPORTING DURING A NETWORK OVERLOAD | Qualcomm Incorporated | CHOUDHURY, FAISAL | 2478 | §103 | Non-Final OA | — | Pending | Aug 14, 2024 |
| 18804546 | LOGICAL CHANNEL PRIORITIZATION BASED ON TRANSMIT-RECEIVE POINTS | Qualcomm Incorporated | KIM, CHONG G | 2443 | §102 | Non-Final OA | — | Pending | Aug 14, 2024 |
| 18804700 | TECHNIQUES FOR ADAPTATION OF HYBRID AUTOMATIC REPEAT REQUEST RETRANSMISSION HANDLING | Qualcomm Incorporated | CATTUNGAL, AJAY P | 2467 | §102 | Non-Final OA | — | Pending | Aug 14, 2024 |
| 18837984 | LINKED CHANNEL STATE INFORMATION REPORTS FOR COHERENT JOINT TRANSMISSION | Qualcomm Incorporated | DUFFY, JAMES P | 2461 | §102§103 | Non-Final OA | — | Pending | Aug 13, 2024 |
| 18837989 | CHANNEL STATE INFORMATION REPORT CONFIGURATION FOR MULTIPLE TRANSMIT RECEIVE POINTS | Qualcomm Incorporated | BLAIR, DOUGLAS B | 2454 | §102§103§112 | Non-Final OA | — | Pending | Aug 13, 2024 |
| 18799272 | TECHNIQUES FOR CHANNEL SENSING MODE SELECTION | Qualcomm Incorporated | LIU, SIMING | 2411 | §103 | Final Rejection | — | Pending | Aug 09, 2024 |
| 18798246 | EFFECTIVE ISOTROPIC RADIATED POWER (EIRP) TESTING AND MEASUREMENT UNCERTAINTY REPORTING | Qualcomm Incorporated | TALUKDER, MD K | 2648 | §103 | Non-Final OA | — | Pending | Aug 08, 2024 |
| 18836987 | UNIFIED TRANSMISSION CONFIGURATION INDICATOR FOR A SINGLE FREQUENCY NETWORK | Qualcomm Incorporated | LU, XUAN | 2473 | §102§103 | Non-Final OA | — | Pending | Aug 08, 2024 |
| 18836976 | BROADCAST CONFIGURATIONS FOR REDUCED CAPABILITY USER EQUIPMENT | Qualcomm Incorporated | HSU, BAILOR CHIA-JONG | 2461 | §103 | Non-Final OA | — | Pending | Aug 08, 2024 |
| 18798650 | SCALING FACTOR APPLICATION TO LAYER 1 MEASUREMENTS OVERLAPPING WITH A DEACTIVATED MEASUREMENT GAP | Qualcomm Incorporated | ROSE, DERRICK V | 2462 | §103 | Non-Final OA | — | Pending | Aug 08, 2024 |
| 18836190 | TECHNIQUES FOR RESUMING SUSPENDED TRANSMIT SWITCHING | Qualcomm Incorporated | BLAIR, DOUGLAS B | 2454 | §112 | Non-Final OA | — | Pending | Aug 06, 2024 |
| 18836181 | INDICATION OF SIMULTANEOUS UPLINK TRANSMISSION FOR MULTIPLE TRANSMIT RECEIVE POINTS | Qualcomm Incorporated | BLAIR, DOUGLAS B | 2454 | §102§103§112 | Non-Final OA | — | Pending | Aug 06, 2024 |
| 18792304 | APERIODIC CONFIGURATION FOR CROSS-LINK INTERFERENCE | Qualcomm Incorporated | ZHU, BO HUI ALVIN | 2465 | §102§103 | Non-Final OA | — | Pending | Aug 01, 2024 |
| 18834405 | DOWNLINK-GRANT DOWNLINK CONTROL INFORMATION ACTIVATED CHANNEL STATE INFORMATION REPORTS | Qualcomm Incorporated | ELPENORD, CANDAL | 2473 | §102§103 | Non-Final OA | — | Pending | Jul 30, 2024 |
| 18788485 | SIDELINK COMMUNICATION USING UPLINK RESOURCES | Qualcomm Incorporated | MOORE JR, MICHAEL J | 2467 | DP | Non-Final OA | — | Pending | Jul 30, 2024 |
| 18788446 | POWER SCALING AND TRAFFIC-TO-PILOT POWER RATIO SIGNALING FOR SHARED DEMODULATION REFERENCE SIGNAL | Qualcomm Incorporated | CHEEMA, HASAN ALI | 2429 | §103 | Non-Final OA | — | Pending | Jul 30, 2024 |
| 18833656 | COMMON TIMING ADVANCE GROUP FOR MULTIPLE TRANSMIT RECEIVE POINT OPERATION | Qualcomm Incorporated | WELTE, BENJAMIN PETER | 2477 | §102§103 | Non-Final OA | — | Pending | Jul 26, 2024 |
| 18833643 | TECHNIQUES FOR USER EQUIPMENT COMPONENT EVENT BASED ANTENNA SWITCHING | Qualcomm Incorporated | KIM, ANDREW CHANUL | 2471 | §103 | Final Rejection | — | Pending | Jul 26, 2024 |
| 18786288 | CROSS-LINK INTERFERENCE RECEIVED SIGNAL STRENGTH INDICATOR RESOURCE IDENTIFICATION | Qualcomm Incorporated | CERLANEK, ADAM JOEL | 2478 | §102§103 | Non-Final OA | — | Pending | Jul 26, 2024 |
| 18833061 | PROVISIONING OF VEHICLE-MOUNTED RELAYS | Qualcomm Incorporated | PHUNG, LUAT | 2468 | §102§103 | Non-Final OA | — | Pending | Jul 25, 2024 |
| 18833103 | NON-PUBLIC NETWORK SELECTION | Qualcomm Incorporated | NGUYEN, BENJAMIN HUY DINH | 2649 | §102§103 | Non-Final OA | — | Pending | Jul 25, 2024 |
| 18783838 | SENSING FOR SIDELINK DISCONTINUOUS RECEPTION (DRX) | Qualcomm Incorporated | KAO, JUTAI | 2473 | §103 | Final Rejection | — | Pending | Jul 25, 2024 |
| 18783987 | LATENCY AND INTERRUPTION INFORMATION FOR LAYER-1/2-TRIGGERED MOBILITY | Qualcomm Incorporated | ALI, SYED | §103 | Final Rejection | — | Pending | Jul 25, 2024 | |
| 18833297 | TIME SYNCHRONIZATION FAILURE INDICATIONS | Qualcomm Incorporated | TRAN, PHUC H | 2471 | §102§103 | Non-Final OA | — | Pending | Jul 25, 2024 |
| 18782051 | SIGNALING ENHANCEMENTS FOR SIMULTANEOUS MULTIPLEXING IN AN INTEGRATED ACCESS AND BACKHAUL NETWORK | Qualcomm Incorporated | VOGEL, JAY L. | 2478 | §102§112 | Non-Final OA | — | Pending | Jul 24, 2024 |
| 18781291 | SERVICES OVER USER PLANE | Qualcomm Incorporated | HIGA, BRENDAN Y | 2447 | §102§103 | Non-Final OA | — | Pending | Jul 23, 2024 |
| 18832361 | TECHNIQUES FOR SIDELINK RETRANSMISSION OF AN ACCESS LINK TRANSPORT BLOCK | Qualcomm Incorporated | CHOUDHRY, SAMINA F | 2462 | §103 | Non-Final OA | — | Pending | Jul 23, 2024 |
| 18730271 | WIRELESS COMMUNICATION SESSIONS FOR RELAY ENTITIES OPERATING IN A VISITED PUBLIC LAND MOBILE NETWORK | Qualcomm Incorporated | MILLER, BRANDON J | 2647 | §103 | Non-Final OA | — | Pending | Jul 18, 2024 |
| 18772934 | DUAL CONNECTIVITY OR CARRIER AGGREGATION FOR USER EQUIPMENT WITH COOPERATION | Qualcomm Incorporated | VAN ROIE, JUSTIN T | 2469 | §102§103 | Non-Final OA | — | Pending | Jul 15, 2024 |
| 18771439 | CONTROL OF SCHEDULING DUTY CYCLE | Qualcomm Incorporated | EISNER, RONALD | 2644 | §103§112 | Non-Final OA | — | Pending | Jul 12, 2024 |
| 18728275 | TECHNIQUES FOR ADJUSTING A RESOURCE PRIORITY ASSOCIATED WITH A DUAL-SUBSCRIBER IDENTIFICATION MODULE DUAL-STANDBY USER EQUIPMENT | Qualcomm Incorporated | MOUTAOUAKIL, MOUNIR | 2476 | §102§103 | Non-Final OA | — | Pending | Jul 11, 2024 |
| 18769922 | AUTOMATIC GAIN CONTROL INITIALIZATION USING A PRIOR MEASUREMENT METRIC | Qualcomm Incorporated | CAMPERO MIRAMONTE, MARIO RICARDO | 2649 | §103 | Final Rejection | — | Pending | Jul 11, 2024 |
| 18768819 | USER-EQUIPMENT-SELECTED MEASUREMENT GAP SCHEDULING CONFIGURATION | Qualcomm Incorporated | PARK, CHONGSUH | 2478 | §103 | Final Rejection | — | Pending | Jul 10, 2024 |
| 18769104 | RESOURCE POOL BASED UPLINK RETRANSMISSIONS | Qualcomm Incorporated | GEORGE, AYANAH S | 2467 | §102§103 | Non-Final OA | — | Pending | Jul 10, 2024 |
| 18768853 | CODE BLOCK BUNDLE INTERLEAVING | Qualcomm Incorporated | KRUEGER, KENT K | 2474 | §102§103 | Non-Final OA | — | Pending | Jul 10, 2024 |
| 18727237 | REPORTING CHANNEL STATE INFORMATION MEASUREMENTS | Qualcomm Incorporated | DIVECHA, NISHANT B | 2419 | §103 | Non-Final OA | — | Pending | Jul 08, 2024 |
| 18761577 | TECHNIQUES FOR SYNCHRONIZATION SIGNAL BLOCK AND CONTROL RESOURCE SET INDICATION | Qualcomm Incorporated | BHATTI, HASHIM S | 2475 | §103 | Non-Final OA | — | Pending | Jul 02, 2024 |
| 18758090 | DYNAMIC UPLINK TRANSMISSION ADAPTATION | Qualcomm Incorporated | YOUNG, STEVE R | 2477 | §103Other | Final Rejection | — | Pending | Jun 28, 2024 |
| 18753827 | SIDELINK SYNCHRONIZATION SIGNAL BLOCK PRIORITY | Qualcomm Incorporated | LA, PHONG | 2469 | §103 | Final Rejection | 8d | AI Ready | Jun 25, 2024 |
| 18748560 | CONTROL CHANNEL MONITORING ADAPTATION FOR A MULTICAST BROADCAST SERVICE | Qualcomm Incorporated | KIM, KI SEOK | 2418 | §102§103 | Non-Final OA | — | Pending | Jun 20, 2024 |
| 18748958 | IDENTIFICATION OF DIRECT-TO-CELL CELLS | Qualcomm Incorporated | JANGBAHADUR, LAKERAM | 2469 | §103 | Final Rejection | — | Pending | Jun 20, 2024 |
| 18747837 | SWITCHING SYNCHRONIZATION TOPOLOGY FOR A RADIO UNIT IN A DISAGGREGATED NETWORK ARCHITECTURE | Qualcomm Incorporated | LEE, CHI HO A | 2475 | §103 | Non-Final OA | — | Pending | Jun 19, 2024 |
| 18747096 | A LOW-POWER WAKE-UP SIGNAL INDICATING A PHYSICAL DOWNLINK CONTROL CHANNEL MONITORING ADAPTATION | Qualcomm Incorporated | BELETE, BERHANU D | 2418 | §102§103 | Non-Final OA | — | Pending | Jun 18, 2024 |
| 18721031 | ACTIVATION OF UNIFIED TRANSMISSION CONFIGURATION INDICATOR STATE | Qualcomm Incorporated | FENNER, RAENITA ANN | 2468 | §103 | Final Rejection | — | Pending | Jun 17, 2024 |
| 18745649 | PAGING RANGE FOR A USER EQUIPMENT | Qualcomm Incorporated | LOUIS-FILS, NICOLE M | 2641 | §103 | Non-Final OA | — | Pending | Jun 17, 2024 |
| 18743813 | SPLIT RENDERING FOR LAYER 3 MULTIPATH RELAY | Qualcomm Incorporated | SLOMS, NICHOLAS | 2476 | §103 | Final Rejection | — | Pending | Jun 14, 2024 |
| 18720012 | SIDELINK FEEDBACK MESSAGING | Qualcomm Incorporated | DANIEL JR, WILLIE J | 2465 | §102 | Final Rejection | — | Pending | Jun 14, 2024 |
| 18742731 | MODEL MANAGEMENT FOR CONTROL CHANNEL ENCODING OR DECODING | Qualcomm Incorporated | THOMPSON, JR, OTIS L | 2477 | §102§103 | Non-Final OA | — | Pending | Jun 13, 2024 |
| 18719317 | REPORTING OF MEASURED AND PREDICTION BASED BEAM MANAGEMENT | Qualcomm Incorporated | NGUYEN, KHAI MINH | 2641 | §103 | Final Rejection | — | Pending | Jun 13, 2024 |
| 18719562 | MULTI-CARRIER SCHEDULING FOR SIDELINK COMMUNICATIONS | Qualcomm Incorporated | COSME, NATASHA W | 2429 | §103 | Non-Final OA | — | Pending | Jun 13, 2024 |
| 18739777 | CONFIGURING SEPARATE POWER CONTROL ADJUSTMENT STATES FOR SOUNDING REFERENCE SIGNAL TRANSMISSIONS | Qualcomm Incorporated | DEAN, RAYMOND S | Other | Final Rejection | — | Pending | Jun 11, 2024 | |
| 18738922 | SELF-SCHEDULED UPLINK TRANSMISSIONS USING RESOURCE POOLS ASSOCIATED WITH TIMING ADVANCE ACCURACIES | Qualcomm Incorporated | PATEL, PARTHKUMAR | 4100 | §102§103 | Non-Final OA | — | Pending | Jun 10, 2024 |
| 18717561 | SOURCE LAYER 2 IDENTIFIER FOR PATH SWITCHING | Qualcomm Incorporated | LOPATA, ROBERT J | 2471 | §102§103 | Non-Final OA | — | Pending | Jun 07, 2024 |
| 18715562 | PHYSICAL RANDOM ACCESS CHANNEL CONFIGURATION IN MULTI-DOWNLINK CONTROL INFORMATION-BASED MULTI-TRANSMIT-RECEIVE-POINT OPERATIONS | Qualcomm Incorporated | MOHEBBI, KOUROUSH | 2471 | §102§103 | Final Rejection | — | Pending | May 31, 2024 |
| 18673166 | TECHNIQUES FOR REPORTING PHYSICAL DOWNLINK SHARED CHANNEL DISCARDING RATE | Qualcomm Incorporated | YANG, ZHAOHUI | 2468 | §103 | Final Rejection | — | Pending | May 23, 2024 |
| 18712868 | PHYSICAL DOWNLINK SHARED CHANNEL DEFAULT BEAM SELECTION | Qualcomm Incorporated | SOLINSKY, PETER G | 2463 | §102§103 | Final Rejection | — | Pending | May 23, 2024 |
| 18671352 | PATCHING HARDWARE FOR PATCHING READ-ONLY MEMORY FIRMWARE | Qualcomm Incorporated | KENDALL, CHUCK O | 2192 | §102 | Non-Final OA | — | Pending | May 22, 2024 |
| 18712015 | PRIORITIZING HIGH SPEED TRAIN (HST) CELLS OVER NON-HST CELLS | Qualcomm Incorporated | AJID, ABDELTIF | 2478 | §102§103 | Final Rejection | — | AI Ready | May 21, 2024 |
| 18669124 | TRANSDUCER SYSTEM WITH OPEN LOOP CORRECTION OF LOW FREQUENCY ROLL OFF POINT | Qualcomm Incorporated | SUTHERS, DOUGLAS JOHN | 2695 | §103 | Final Rejection | — | Pending | May 20, 2024 |
| 18710826 | CONFIGURATION OF CANDIDATE TRANSMISSION CONFIGURATION INDICATOR STATES | Qualcomm Incorporated | THOMAS, WILFRED | 2416 | §103 | Final Rejection | — | Pending | May 16, 2024 |
| 18709988 | UNIFIED TRANSMISSION CONFIGURATION INDICATOR INDICATION FOR SINGLE DOWNLINK CONTROL INFORMATION BASED MULTIPLE TRANSMIT RECEIVE POINT COMMUNICATIONS | Qualcomm Incorporated | OLALEYE, OLADIRAN GIDEON | 2472 | §103 | Non-Final OA | — | Pending | May 14, 2024 |
| 18660024 | CONFIGURATION FOR SUB-BAND FULL-DUPLEX RANDOM ACCESS CHANNEL OCCASION SELECTION | Qualcomm Incorporated | KAUR, PAMIT | 2416 | §102§103 | Non-Final OA | — | Pending | May 09, 2024 |
| 18659879 | UPLINK BEAM DITHERING | Qualcomm Incorporated | BEYEN, ZEWDU A | 2461 | §103 | Final Rejection | — | AI Ready | May 09, 2024 |
| 18708549 | RELAY NODE AIDED MULTIPLE-USER MULTIPLE-INPUT MULTIPLE-OUTPUT COMMUNICATION | Qualcomm Incorporated | NOWLIN, ERIC | 2474 | §103 | Final Rejection | — | Pending | May 08, 2024 |
| 18658184 | FIDELITY INDICATIONS FOR WIRELESS TRANSMISSIONS | Qualcomm Incorporated | SLOMS, NICHOLAS | 2476 | §102§103 | Non-Final OA | — | Pending | May 08, 2024 |
| 18657388 | RANDOM ACCESS CHANNEL RESPONSE MESSAGE MONITORING WITH PREAMBLE REPETITION | Qualcomm Incorporated | AMBAYE, MEWALE A | 2469 | §102§103 | Final Rejection | — | Pending | May 07, 2024 |
| 18655706 | NON-CELL-DEFINING SYNCHRONIZATION SIGNAL BLOCKS | Qualcomm Incorporated | AHMED, ATIQUE | 2413 | §103 | Non-Final OA | — | AI Ready | May 06, 2024 |
| 18707674 | UNEVEN REFERENCE SIGNAL TIMING TECHNIQUES FOR WIRELESS COMMUNICATIONS | Qualcomm Incorporated | LAM, KENNETH T | 2631 | §103 | Non-Final OA | — | AI Ready | May 06, 2024 |
| 18654807 | ADAPTATION FOR CARRIER GROUP MEASUREMENT | Qualcomm Incorporated | REYES ORTIZ, HECTOR E | 2472 | §102§103 | Final Rejection | — | Pending | May 03, 2024 |
| 18652357 | FEEDBACK ASSOCIATED WITH MULTIPLE INCREMENTAL REDUNDANCY SCHEME COMMUNICATIONS | Qualcomm Incorporated | PARK, CHONGSUH | 2478 | §103 | Final Rejection | — | Pending | May 01, 2024 |
| 18650929 | NON-CONTIGUOUS RESOURCES FOR CROSS-LINK INTERFERENCE AND CHANNEL STATE INFORMATION REPORTS | Qualcomm Incorporated | NGUYEN, CHUONG M | 2411 | §103 | Final Rejection | — | Pending | Apr 30, 2024 |
| 18651277 | CROSS-TECHNOLOGY SPECTRUM SHARING | Qualcomm Incorporated | KIM, WESLEY LEO | 2648 | §102§103 | Non-Final OA | — | Pending | Apr 30, 2024 |
| 18648019 | REDUCED OVERHEAD FOR INDEPENDENT SPATIAL DOMAIN BASIS SELECTION IN CHANNEL STATE INFORMATION CODEBOOK | Qualcomm Incorporated | CAI, WAYNE HUU | 2644 | §103 | Non-Final OA | — | Pending | Apr 26, 2024 |
| 18648043 | CANDIDATE CELL CONFIGURATION FOR LOWER-LAYER TRIGGERED MOBILITY | Qualcomm Incorporated | GENACK, MATTHEW W | 2645 | §102§103 | Non-Final OA | — | Pending | Apr 26, 2024 |
| 18705147 | ORTHOGONAL TIME FREQUENCY SPACE MODULATION FOR PHYSICAL DOWNLINK CONTROL CHANNEL | Qualcomm Incorporated | AUNG, SAI | 2416 | §102§103 | Final Rejection | — | Pending | Apr 26, 2024 |
| 18643453 | TRANSMISSION CONFIGURATION INDICATION AND BEAM MANAGEMENT FRAMEWORK | Qualcomm Incorporated | MILLS, DONALD L | 2462 | §103 | Final Rejection | — | Pending | Apr 23, 2024 |
| 18642114 | TECHNIQUES FOR RANDOM ACCESS CHANNEL OCCASION CONFIGURATION FOR MULTI-PANEL COMMUNICATION | Qualcomm Incorporated | PARK, CHONGSUH | 2478 | §103 | Final Rejection | — | Pending | Apr 22, 2024 |
| 18640813 | DYNAMIC PAYLOAD SIZES IN SEQUENCE-BASED TRANSMISSIONS | Qualcomm Incorporated | SHIU, HO T | 2443 | §103 | Final Rejection | 28d | AI Ready | Apr 19, 2024 |
| 18634081 | MODEM RECOMMENDATIONS FOR TRAFFIC SPLITTING | Qualcomm Incorporated | GOODWIN, SCHQUITA D | 2459 | §103 | Final Rejection | — | Pending | Apr 12, 2024 |
| 18629621 | LOGICAL CHANNEL PRIORITIZATION USING DELAY STATUS REPORT AND PROTOCOL DATA UNIT SET IMPORTANCE INFORMATION | Qualcomm Incorporated | CHERY, DADY | 2418 | §103 | Final Rejection | — | Pending | Apr 08, 2024 |
| 18626907 | PHYSICAL RANDOM ACCESS CHANNEL CONFIGURATIONS FOR SPATIAL DOMAIN ADAPTATION | Qualcomm Incorporated | RAHMAN, M MOSTAZIR | 2411 | §103 | Final Rejection | — | Pending | Apr 04, 2024 |
| 18627268 | TRANSMITTING MULTIPLE PHYSICAL RANDOM ACCESS CHANNEL (PRACH) CONFIGURATIONS IN ACCORDANCE WITH PRACH CONFIGURATION RESTRICTIONS | Qualcomm Incorporated | LING, CHHIAN | 2446 | §102§103 | Final Rejection | — | Pending | Apr 04, 2024 |
| 18627351 | AGGREGATION FACTOR PARAMETER FOR CONTROL PLANE | Qualcomm Incorporated | HUYNH, DUNG B. | 2469 | §103 | Non-Final OA | — | AI Ready | Apr 04, 2024 |
| 18626093 | BACKHAUL SIGNALING TO SUPPORT NETWORK ENERGY SAVING | Qualcomm Incorporated | PHILLIPS, MICHAEL K | 2464 | §103 | Non-Final OA | 29d | AI Ready | Apr 03, 2024 |
| 18625594 | INITIAL BEAM-PAIRING REFERENCE SIGNALS USING DESTINATION IDENTIFIERS | Qualcomm Incorporated | HAN, CLEMENCE S | 2414 | §103 | Final Rejection | 19d | AI Ready | Apr 03, 2024 |
| 18697942 | UPLINK LOSSLESS TRANSMISSION | Qualcomm Incorporated | ABELSON, RONALD B | 2476 | §103 | Non-Final OA | — | Pending | Apr 02, 2024 |
| 18697857 | USER EQUIPMENT TO CLOUD REPORTING FOR MODE 2 SIDELINK PARAMETER COORDINATION | Qualcomm Incorporated | DAYA, TEJIS A | 2472 | §103 | Final Rejection | — | Pending | Apr 02, 2024 |
| 18623595 | INTER-NODE COMMUNICATION | Qualcomm Incorporated | EBRAHIM, ANEZ C | 2467 | §102§103 | Final Rejection | 29d | AI Ready | Apr 01, 2024 |
| 18622340 | PACKET SYNCHRONIZATION | Qualcomm Incorporated | KIDANE, MEHERET WOLDEGEBREAL | 2464 | §103 | Non-Final OA | 15d | AI Ready | Mar 29, 2024 |
| 18622724 | INTERNET PROTOCOL ADDRESSING FOR ACCESS TRAFFIC STEERING | Qualcomm Incorporated | OLALEYE, OLADIRAN GIDEON | 2472 | §103 | Non-Final OA | — | AI Ready | Mar 29, 2024 |
| 18696585 | ASSOCIATING DEMODULATION REFERENCE SIGNAL PORTS TO SOUNDING REFERENCE SIGNAL RESOURCE SETS FOR SPATIAL DIVISION MULTIPLEXING COMMUNICATIONS | Qualcomm Incorporated | CHAU, PETER P | 2476 | §103 | Non-Final OA | — | AI Ready | Mar 28, 2024 |
| 18696672 | VOICE CALLBACK FEATURE FOR DEVICE WITH MULTIPLE SUBSCRIBER IDENTITY MODULES | Qualcomm Incorporated | SABOURI, MAZDA | 2641 | §103 | Final Rejection | — | Pending | Mar 28, 2024 |
| 18619861 | COMMUNICATION IN A NON-ACTIVE TIME FOR A CELL | Qualcomm Incorporated | SHARMA, GAUTAM | 2467 | §102§103 | Non-Final OA | — | Pending | Mar 28, 2024 |
| 18620066 | EMERGENCY COMMUNICATION PRIORITIZATION | Qualcomm Incorporated | EL-ZOOBI, MARIA | 2692 | §102§103 | Non-Final OA | 33d | AI Ready | Mar 28, 2024 |
| 18695199 | TRANSMISSION CONTROL PROTOCOL KEEP ALIVE PACKET OFFLOADING | Qualcomm Incorporated | ANSARI, NAJEEBUDDIN | 2463 | §102§103 | Final Rejection | — | Pending | Mar 25, 2024 |
| 18613968 | NETWORK NODE DISCONTINUOUS RECEPTION AND TRANSMISSION | Qualcomm Incorporated | DECKER, CASSANDRA L | 2466 | §103 | Non-Final OA | 34d | AI Ready | Mar 22, 2024 |
| 18693373 | FAST RECOVERY AFTER EXITING COVERAGE HOLE | Qualcomm Incorporated | KO, SITHU | 2414 | §103 | Final Rejection | 7d | AI Ready | Mar 19, 2024 |
| 18608062 | LOW-POWER WAKE-UP RECEIVER ANTENNA PORTS FOR RECEPTION OF CHANNEL STATE INFORMATION REFERENCE SIGNAL | Qualcomm Incorporated | PARK, CHONGSUH | 2478 | §103 | Non-Final OA | 12d | AI Ready | Mar 18, 2024 |
| 18608546 | TRUST ESTABLISHMENT IN WIRELESS NETWORKS | Qualcomm Incorporated | NOEL, LYDIA LOUIS-FILS | 2437 | §103 | Non-Final OA | — | Pending | Mar 18, 2024 |
| 18692988 | CHANNEL STATE INFORMATION REPORTS DURING A SMALL DATA TRANSFER SESSION | Qualcomm Incorporated | THOMAS, WILFRED | 2416 | §103 | Final Rejection | 29d | AI Ready | Mar 18, 2024 |
| 18607025 | ALLOCATING MULTIPLE RESOURCE UNITS OF A MULTI-USER TRANSMISSION TO A SINGLE WIRELESS STATION | Qualcomm Incorporated | MATTIS, JASON E | 2461 | §102§103 | Final Rejection | — | AI Ready | Mar 15, 2024 |
| 18604961 | CLOSED LOOP COMMANDS FOR EXTENDING VALIDITY DURATIONS | Qualcomm Incorporated | SABOURI, MAZDA | 2641 | §102§103 | Non-Final OA | — | Pending | Mar 14, 2024 |
| 18603066 | ORTHOGONAL COVER CODE SUPPORT FOR SMALL DATA TRANSMISSION | Qualcomm Incorporated | HAMPTON, TARELL A | 2476 | §102§103§112 | Non-Final OA | 62d | Pending | Mar 12, 2024 |
| 18690948 | SOUNDING REFERENCE SIGNAL RESOURCE INDICATOR AND TRANSMIT PRECODER MATRIX INDICATOR SIGNALING FOR UPLINK SPATIAL DIVISION MULTIPLEXING | Qualcomm Incorporated | COSME, NATASHA W | 2465 | §103 | Non-Final OA | 5d overdue | AI Ready | Mar 11, 2024 |
| 18600239 | TRANSDUCER RESONANCE NOISE REDUCTION USING A LOW-PASS FILTER | Qualcomm Incorporated | PERENY, TYLER J | 2843 | §103 | Final Rejection | 28d overdue | AI Ready | Mar 08, 2024 |
| 18597058 | CONFIGURING A CODEBLOCK SIZE BASED ON DEVICE CAPABILITY | Qualcomm Incorporated | MILLER, SHAWN D | 2412 | §102§103§112 | Non-Final OA | 14d | AI Ready | Mar 06, 2024 |
| 18585281 | INITIAL ACCESS WITH DOWNLINK CARRIER SHARING | Qualcomm Incorporated | LITTLE, DALE L | 2419 | §102§103 | Final Rejection | 28d | AI Ready | Feb 23, 2024 |
| 18586314 | USER-EQUIPMENT-INITIATED DUPLEXING CONFIGURATION | Qualcomm Incorporated | ANDERSON, MARGARET MARIE | 2412 | §103 | Non-Final OA | — | Pending | Feb 23, 2024 |
| 18586328 | COMMUNICATIONS BETWEEN SERVICES IN A WIRELESS COMMUNICATIONS NETWORK | Qualcomm Incorporated | EISNER, RONALD | 2644 | §103 | Final Rejection | — | Pending | Feb 23, 2024 |
| 18583494 | UPLINK CARRIER AGGREGATION USING MULTI-CELL DOWNLINK CARRIER SHARING | Qualcomm Incorporated | NGUYEN, ANH NGOC M | 2473 | §103 | Final Rejection | — | Pending | Feb 21, 2024 |
| 18582245 | DYNAMIC CONFIGURATION FAILURE MESSAGING | Qualcomm Incorporated | LATORRE, IVAN O | 2409 | §103 | Final Rejection | 5d | AI Ready | Feb 20, 2024 |
| 18442335 | APERIODIC RANDOM ACCESS CHANNEL PROCEDURE FOR LAYER 1/LAYER 2 TRIGGERED MOBILITY | Qualcomm Incorporated | CHOWDHURY, HARUN UR R | 2473 | §103 | Non-Final OA | 12d | AI Ready | Feb 15, 2024 |
| 18684085 | FEEDBACK FOR VISIBLE LIGHT COMMUNICATION TRANSMISSIONS | Qualcomm Incorporated | CORS, NATHAN M | 2634 | §103 | Final Rejection | 28d | AI Ready | Feb 15, 2024 |
| 18443148 | UPDATING SYSTEM INFORMATION IN A NON-TERRESTRIAL NETWORK | Qualcomm Incorporated | CRIGLER, RYAN ALEXANDER | 2472 | §103 | Non-Final OA | 14d | AI Ready | Feb 15, 2024 |
| 18442799 | SYSTEM INFORMATION BLOCK COMMUNICATIONS | Qualcomm Incorporated | YOUNG, STEVE R | 2477 | §103 | Final Rejection | 27d | AI Ready | Feb 15, 2024 |
| 18441438 | BACKHAUL SIGNALING FOR CROSS-LINK INTERFERENCE MITIGATION | Qualcomm Incorporated | LEMA LEMOS, LUIS GUILLERMO | 2419 | §103 | Final Rejection | 22d | AI Ready | Feb 14, 2024 |
| 18683722 | PARAMETER-LEVEL COORDINATION FOR SIDELINK COMMUNICATION IN A DISTRIBUTED SCHEDULING MODE | Qualcomm Incorporated | NGUYEN, PHUONGCHAU BA | 2464 | §102§103 | Final Rejection | — | Pending | Feb 14, 2024 |
| 18683718 | REALLOCATION OF UNMANNED AIRCRAFT SYSTEM SERVICE SUPPLIER | Qualcomm Incorporated | HAMMONDS, MARCUS C | 2647 | §102 | Final Rejection | — | AI Ready | Feb 14, 2024 |
| 18441861 | CONTROL RESOURCE SET AND PHYSICAL DOWNLINK CONTROL CHANNEL PUNCTURING | Qualcomm Incorporated | WEBB, MARGARET G | 2641 | §102§103 | Final Rejection | 14d | AI Ready | Feb 14, 2024 |
| 18440138 | REPORT CONFIGURATION FOR SERVING CELL AND CANDIDATE CELL | Qualcomm Incorporated | ANWAR, MOHAMMAD S | 2463 | §102 | Non-Final OA | 17d overdue | AI Ready | Feb 13, 2024 |
| 18440587 | PHYSICAL RANDOM ACCESS CHANNEL CONFIGURATIONS FOR FULL DUPLEX SYMBOLS | Qualcomm Incorporated | SHIVERS, ASHLEY L | 2477 | §102§103 | Non-Final OA | 10d overdue | AI Ready | Feb 13, 2024 |
| 18439539 | TRANSMIT RECEIVE POINT CARRIER CONFIGURATION | Qualcomm Incorporated | HO, CHUONG T | 2412 | §103 | Non-Final OA | — | AI Ready | Feb 12, 2024 |
| 18435737 | SYSTEM INFORMATION BLOCK TRANSMISSION STATUS SHARING | Qualcomm Incorporated | MILLER, BRANDON J | 2647 | §102§103 | Non-Final OA | — | Pending | Feb 07, 2024 |
| 18434080 | FUNCTIONALITY-BASED MANAGEMENT BY A NETWORK NODE FOR ARTIFICIAL INTELLIGENCE OR MACHINE LEARNING MODELS AT A USER EQUIPMENT | Qualcomm Incorporated | BATTINA, RAAJITA | 2125 | §102§103§112 | Non-Final OA | — | Pending | Feb 06, 2024 |
| 18433772 | MOBILITY FOR A MOBILE INTEGRATED ACCESS AND BACKHAUL CELL | Qualcomm Incorporated | KRUEGER, KENT K | 2474 | §103 | Final Rejection | 27d | AI Ready | Feb 06, 2024 |
| 18294127 | SWITCHING CONFIGURATIONS FOR UPLINK TRANSMISSION SWITCHING | Qualcomm Incorporated | JENSEN, NICHOLAS A | 2472 | §102 | Non-Final OA | 49d overdue | AI Ready | Jan 31, 2024 |
| 18428660 | BLIND DECODING AND CELL DISCONTINUOUS TRANSMISSION | Qualcomm Incorporated | LIU, SIMING | 2411 | §103 | Non-Final OA | — | Pending | Jan 31, 2024 |
| 18293983 | MEASUREMENT OF LINKS ASSOCIATED WITH A PASSIVE DEVICE | Qualcomm Incorporated | MENSAH, PRINCE AKWASI | 2474 | §103 | Non-Final OA | — | Pending | Jan 31, 2024 |
| 18428695 | EMERGENCY ALERTS FOR NON-TERRESTRIAL NETWORK BASED USER EQUIPMENTS | Qualcomm Incorporated | HUYNH, CHUCK | 2644 | §103 | Final Rejection | 31d overdue | AI Ready | Jan 31, 2024 |
| 18293176 | TRANSMISSION RECEPTION POINT MODE CONFIGURATION | Qualcomm Incorporated | CAIRNS, THOMAS R | 2468 | §103§112 | Non-Final OA | 76d | AI Ready | Jan 29, 2024 |
| 18292682 | RECOVERING PROCEDURE FOR INTER USER EQUIPMENT COORDINATION MESSAGE REQUEST AND RESPONSE FAILURE | Qualcomm Incorporated | AHMED, NIZAM U | 2461 | §103 | Final Rejection | 22d | AI Ready | Jan 26, 2024 |
| 18292601 | TRANSMISSION CONFIGURATION INDICATOR STATE INDICATIONS | Qualcomm Incorporated | SANTOS, FRANCESCA LIMA | 2468 | §103 | Final Rejection | 22d | AI Ready | Jan 26, 2024 |
| 18292182 | DUAL CONNECTIVITY CELL PRIORITIZATION | Qualcomm Incorporated | WHITAKER, JUSTIN MICHAEL | 2415 | §103 | Final Rejection | 22d | AI Ready | Jan 25, 2024 |
| 18423228 | SUB-BAND-FULL-DUPLEX INTERFERENCE MITIGATION | Qualcomm Incorporated | BAIG, ADNAN | 2461 | §112 | Non-Final OA | — | Pending | Jan 25, 2024 |
| 18421077 | VALIDITY TIME FOR A CONFIGURATION | Qualcomm Incorporated | PATEL, NIMESH | 2642 | §103 | Non-Final OA | — | Pending | Jan 24, 2024 |
| 18291738 | RESOURCE CONFLICT INDICATIONS FOR SIDELINK RESOURCES | Qualcomm Incorporated | EBRAHIM, ANEZ C | 2467 | §102§103 | Non-Final OA | 19d | AI Ready | Jan 24, 2024 |
| 18291381 | PHYSICAL UPLINK CONTROL CHANNEL (PUCCH) TRANSMISSION WITH SIMULTANEOUS BEAMS | Qualcomm Incorporated | NGUYEN, THAI | 2469 | §102§103 | Final Rejection | 13d | AI Ready | Jan 23, 2024 |
| 18417823 | TRANSMISSION CONTROL PROTOCOL RESET BURST HANDLING | Qualcomm Incorporated | RECEK, JASON D | 2458 | §103 | Non-Final OA | — | Pending | Jan 19, 2024 |
| 18417515 | DYNAMIC INDICATION TO SKIP RECEPTION OR TRANSMISSION DURING TIME INTERVAL | Qualcomm Incorporated | MORLAN, ROBERT M | 2409 | §102§103 | Final Rejection | 70d | Pending | Jan 19, 2024 |
| 18579077 | MULTIPLE TRANSMISSION CONFIGURATION INDICATOR STATES FOR SERVING CELLS NOT CONFIGURED FOR SINGLE FREQUENCY NETWORK TRANSMISSIONS | Qualcomm Incorporated | AHMED, NIZAM U | 2461 | §103 | Final Rejection | — | Pending | Jan 12, 2024 |
| 18411553 | TRANSMISSION OF REFERENCE SIGNALS IN ASSOCIATION WITH CELL DISCONTINUOUS TRANSMISSION AND RECEPTION CONFIGURATIONS | Qualcomm Incorporated | NGUYEN, THUONG | 2416 | §103 | Non-Final OA | — | Pending | Jan 12, 2024 |
| 18578577 | BEAM REPORTING FOR INTER-CELL BEAM MANAGEMENT | Qualcomm Incorporated | NELSON, RYA TEON | 2419 | §103 | Non-Final OA | 49d overdue | AI Ready | Jan 11, 2024 |
| 18578206 | SMALL DATA TRANSFER COMMUNICATIONS | Qualcomm Incorporated | GOODWIN, SCHQUITA D | 2459 | §103 | Non-Final OA | — | Pending | Jan 10, 2024 |
| 18409457 | MODEL SELECTION AND DELIVERY | Qualcomm Incorporated | AMBAYE, MEWALE A | 2469 | §103 | Non-Final OA | 70d | Pending | Jan 10, 2024 |
| 18407508 | VALIDITY OF CONFIGURED GRANT UPLINK TRANSMISSION OCCASION IN SUB-BAND FULL DUPLEX SYMBOL | Qualcomm Incorporated | SHAH, CHIRAG G | 2472 | §103 | Non-Final OA | 8d overdue | AI Ready | Jan 09, 2024 |
| 18576282 | SYSTEM INFORMATION AND PAGING FORWARDING IN RELAY | Qualcomm Incorporated | SHARMA, GAUTAM | 2467 | §102§103 | Non-Final OA | — | Pending | Jan 03, 2024 |
| 18400790 | BEAM PREDICTION AT A REPEATER DEVICE | Qualcomm Incorporated | HAILU, KIBROM T | 2461 | §103 | Non-Final OA | — | Pending | Dec 29, 2023 |
| 18398673 | CARRIER SWITCHING AND ANTENNA SWITCHING FOR LONG TERM EVOLUTION AND NEW RADIO DUAL CONNECTIVITY | Qualcomm Incorporated | ROUDANI, OUSSAMA | 2413 | §103 | Non-Final OA | 23d | AI Ready | Dec 28, 2023 |
| 18398264 | BEAM SWITCHING BASED ON USER EQUIPMENT BEAM REFINEMENT PROCEDURE | Qualcomm Incorporated | TORRES, MARCOS L | 2647 | §102§103 | Non-Final OA | — | Pending | Dec 28, 2023 |
| 18574505 | MEDIUM ACCESS CONTROL SIGNALING TRIGGERING TRANSMISSION CONFIGURATION INDICATOR STATE UPDATE AND BEAM MEASUREMENT OR REPORT | Qualcomm Incorporated | CROMPTON, CHRISTOPHER R | 2463 | §102§103 | Final Rejection | 72d | Pending | Dec 27, 2023 |
| 18574643 | TRACKING TRANSMISSION CONFIGURATION INDICATION STATES IN INTER-CELL BEAM MANAGEMENT | Qualcomm Incorporated | MAPA, MICHAEL Y | 2645 | §103 | Final Rejection | — | Pending | Dec 27, 2023 |
| 18396252 | DELAY STATUS REPORTING | Qualcomm Incorporated | NG, CHRISTINE Y | 2464 | §102§103 | Non-Final OA | — | AI Ready | Dec 26, 2023 |
| 18394086 | GENERATING RECOMMENDATION INFORMATION BASED AT LEAST IN PART ON USER INTENT | Qualcomm Incorporated | OBEID, MAMON A | 3687 | §101§103§112 | Non-Final OA | — | Pending | Dec 22, 2023 |
| 18392442 | PHYSICAL CELL IDENTIFIER MANAGEMENT | Qualcomm Incorporated | KINCAID, LESTER G | 2649 | §103 | Final Rejection | 3d overdue | AI Ready | Dec 21, 2023 |
| 18391391 | DISCONTINUOUS RECEPTION AND SEARCH SPACE FEATURES | Qualcomm Incorporated | CRUTCHFIELD, CHRISTOPHER M | 2466 | §103 | Non-Final OA | — | Pending | Dec 20, 2023 |
| 18543390 | NEURAL NETWORK BASED CHANNEL STATE INFORMATION FEEDBACK | Qualcomm Incorporated | KELLEY, STEVEN SHAUN | 2646 | §102§103 | Non-Final OA | — | Pending | Dec 18, 2023 |
| 18537330 | FLEXIBLE DISTRIBUTIONS OF MONITORING LOADS ACROSS CARRIERS ASSOCIATED WITH PHYSICAL DOWNLINK CONTROL CHANNEL MONITORING IN MULTI-CARRIER OPERATIONS | Qualcomm Incorporated | DABIRI, HIDAYAT T | 2414 | §102§103 | Final Rejection | — | Pending | Dec 12, 2023 |
| 18534177 | USER EQUIPMENT HANDOVER AND CONFIGURATION CHANGE FOR SENSING SERVICE | Qualcomm Incorporated | FAYED, RASHA K | 2413 | §103 | Final Rejection | 9d | AI Ready | Dec 08, 2023 |
| 18567863 | WAVEFORM FOR SIDELINK WAKEUP SIGNAL | Qualcomm Incorporated | AREVALO, JOSEPH | 2642 | §103 | Final Rejection | — | Pending | Dec 07, 2023 |
| 18515757 | RADIO ACCESS NETWORK NODE REQUEST FOR CORE NETWORK PAGING | Qualcomm Incorporated | AVELLINO, JOSEPH E | 2478 | §102§103 | Non-Final OA | 69d | AI Ready | Nov 21, 2023 |
| 18516206 | PHYSICAL UPLINK SHARED CHANNEL POWER CONTROL | Qualcomm Incorporated | CUNNINGHAM, KEVIN M | 2423 | §103 | Non-Final OA | 55d | Pending | Nov 21, 2023 |
| 18514676 | CHANNEL AWARE INTERLEAVING | Qualcomm Incorporated | SEYMOUR, JAMES PAUL | 2419 | §103§112 | Non-Final OA | — | Pending | Nov 20, 2023 |
| 18513180 | USER EQUIPMENT CONTEXT HANDLING | Qualcomm Incorporated | BEAMER, TEMICA M | 2646 | §102§103 | Non-Final OA | — | Pending | Nov 17, 2023 |
| 18508934 | COMPACT, MICROCOMPOSITE GAS FILTER | Qualcomm Incorporated | ABEL, LENORA A | 1799 | §102§103 | Non-Final OA | — | Pending | Nov 14, 2023 |
| 18507270 | BEAM MANAGEMENT OF A LAYER-1 MILLIMETER WAVE REPEATER USING WIDEBAND SIGNAL | Qualcomm Incorporated | REGO, DOMINIC E | 2648 | §103 | Non-Final OA | — | AI Ready | Nov 13, 2023 |
| 18506412 | NETWORK NODE ENERGY USAGE REPORTING | Qualcomm Incorporated | DINH, JOSEPH NGHIA | 2641 | §102 | Non-Final OA | — | Pending | Nov 10, 2023 |
| 18505618 | PEAK-TO-AVERAGE POWER RATIO BASED FREQUENCY INTERLEAVING | Qualcomm Incorporated | DAVIS, CHRISTOPHER RYAN | 2476 | §102§103 | Non-Final OA | — | AI Ready | Nov 09, 2023 |
| 18505605 | TECHNIQUES FOR A REFERENCE SIGNAL FOR ON-DEMAND BROADCAST COMMUNICATIONS | Qualcomm Incorporated | CHRISS, ANDREW W | 2472 | §103 | Non-Final OA | 27d | AI Ready | Nov 09, 2023 |
| 18502335 | LAYER 1 AND LAYER 2 MOBILITY IN MULTIPLE DISTRIBUTED UNIT DEPLOYMENTS | Qualcomm Incorporated | SIDDIQUEE, INTEKHAAB AALAM | 2462 | §103 | Final Rejection | 14d | AI Ready | Nov 06, 2023 |
| 18502272 | SPATIAL MULTIPLEXING AT REFLECTING DEVICE | Qualcomm Incorporated | HUANG, WEIBIN | 2471 | §103 | Final Rejection | 41d | AI Ready | Nov 06, 2023 |
| 18558884 | EFFICIENT CONFIGURATION OF MULTIPLE TRANSMISSION CONFIGURATION INDICATOR STATE INDICATION MODES | Qualcomm Incorporated | BHATTI, HASHIM S | 2475 | §103 | Non-Final OA | 46d | AI Ready | Nov 03, 2023 |
| 18558887 | REPORTING BEAM INFORMATION IN BEAM FAILURE RECOVERY | Qualcomm Incorporated | SAMLUK, JESSE PAUL | 2411 | §103 | Final Rejection | — | Pending | Nov 03, 2023 |
| 18558559 | METHODS AND SYSTEMS FOR SUBSCRIPTION SHARING IN A MULTI-SUBSCRIBER IDENTITY MODULE (MSIM) USER EQUIPMENT IN DUAL CONNECTIVITY MODE | Qualcomm Incorporated | TODD, GREGORY G | 2443 | §103 | Non-Final OA | — | Pending | Nov 02, 2023 |
| 18499916 | CONFIGURATION SWITCH | Qualcomm Incorporated | GIDADO, RASHEED | 2464 | §103 | Non-Final OA | — | Pending | Nov 01, 2023 |
| 18498723 | TIME WINDOW ASSOCIATED WITH SIDELINK TRANSMISSION | Qualcomm Incorporated | MAK, RODRICK | 2416 | §103 | Final Rejection | — | AI Ready | Oct 31, 2023 |
| 18499161 | CHANNEL OCCUPANCY TIME SHARING ELIGIBILITY | Qualcomm Incorporated | PHAM, BRENDA H | 2412 | §103 | Non-Final OA | 57d | Pending | Oct 31, 2023 |
| 18498136 | RATE MATCHING FOR CELL DISCONTINUOUS RECEPTION OR DISCONTINUOUS TRANSMISSION | Qualcomm Incorporated | TRAN, THINH D | 2466 | §103 | Final Rejection | 22d | AI Ready | Oct 31, 2023 |
| 18497488 | TECHNIQUES FOR UPDATING AN ARTIFICIAL INTELLIGENCE OR MACHINE LEARNING MODEL FOR OBJECT RECOGNITION | Qualcomm Incorporated | SIDDIQUEE, ISMAAEEL ABDULLAH | 3648 | §103 | Non-Final OA | — | Pending | Oct 30, 2023 |
| 18557776 | TECHNIQUES FOR SHARED RADIO FREQUENCY COMMUNICATIONS OVER MULTIPLE FREQUENCY BANDS | Qualcomm Incorporated | COSME, NATASHA W | 2465 | §103 | Final Rejection | — | Pending | Oct 27, 2023 |
| 18488695 | USER EQUIPMENT AND NETWORK NODE COORDINATION | Qualcomm Incorporated | KANG, SUK JIN | 2477 | §103 | Non-Final OA | 42d | AI Ready | Oct 17, 2023 |
| 18486800 | LAYER 1 OR LAYER 2 TRIGGERED MOBILITY FOR NON-TERRESTRIAL NETWORKS | Qualcomm Incorporated | AJAYI, JOEL | 2646 | §103 | Final Rejection | 19d | AI Ready | Oct 13, 2023 |
| 18552618 | RANDOM ACCESS PARTITIONS FOR DIFFERENT USE CASES | Qualcomm Incorporated | DANIEL JR, WILLIE J | 2465 | §102 | Non-Final OA | — | Pending | Sep 26, 2023 |
| 18474031 | METHODS AND SYSTEM FOR MANAGING UPLINK BUFFER AT USER EQUIPMENT IN TETHERED CALL MODE | Qualcomm Incorporated | SINKANTARAKORN, PAWARIS | 2409 | §103 | Final Rejection | 16d | AI Ready | Sep 25, 2023 |
| 18473710 | REDUCED FLIGHT PATH REPORTING OVERHEAD | Qualcomm Incorporated | BATISTA, MARCOS | 2642 | §103Other | Final Rejection | — | Pending | Sep 25, 2023 |
| 18471082 | PARAMETER SETS FOR USER EQUIPMENT COMMUNICATION MODES | Qualcomm Incorporated | SUGDEN, NOAH JAMES | 2475 | §103 | Non-Final OA | — | Pending | Sep 20, 2023 |
| 18550811 | RADIO LINK MONITORING REFERENCE SIGNAL SELECTION | Qualcomm Incorporated | KIM, SUN JONG | 2469 | §103 | Non-Final OA | 82d | AI Ready | Sep 15, 2023 |
| 18467266 | INDICATING RELATIVE POSITION AND SIDELINK SYNCHRONIZATION SIGNAL IDENTIFIER OF USER EQUIPMENT | Qualcomm Incorporated | ABDULLAEV, ERKIN SHAVKATOVICH | 2648 | §103 | Non-Final OA | — | AI Ready | Sep 14, 2023 |
| 18466441 | TRANSMITTING INTER-USER-EQUIPMENT CROSS-LINK INTERFERENCE (CLI) REFERENCE SIGNALS FOR CLI MITIGATION | Qualcomm Incorporated | HOANG, THAI D | 2463 | §103 | Final Rejection | 27d | AI Ready | Sep 13, 2023 |
| 18550370 | BEAM FAILURE DETECTION FOR A PHYSICAL DOWNLINK CONTROL CHANNEL MONITORING OPERATION CORRESPONDING TO AT LEAST TWO TRANSMISSION CONFIGURATION INDICATOR STATES | Qualcomm Incorporated | KIM, HARRY H | 2411 | §103 | Non-Final OA | 30d | AI Ready | Sep 13, 2023 |
| 18464980 | TECHNIQUES FOR MONITORING A PHYSICAL DOWNLINK CONTROL CHANNEL IN A MULTI-CELL SCHEDULING SCENARIO | Qualcomm Incorporated | WYLLIE, CHRISTOPHER T | 2465 | §103 | Final Rejection | 56d | Pending | Sep 11, 2023 |
| 18463044 | CYCLIC SHIFT HOPPING FOR UPLINK REFERENCE SIGNALS | Qualcomm Incorporated | FAYED, RASHA K | 2413 | §103 | Non-Final OA | 10d overdue | AI Ready | Sep 07, 2023 |
| 18462057 | TRANSMITTING ON NON-IMPAIRED PORTS FOR LAYER REDUCTION | Qualcomm Incorporated | BETTENDORF, SAMUEL ROBERGE | 2400 | §102§103 | Final Rejection | — | Pending | Sep 06, 2023 |
| 18548960 | DOWNLINK TRANSMISSION AND DETECTION FOR UPLINK TRANSMISSIONS IN SEMI-STATIC CHANNEL ACCESS | Qualcomm Incorporated | WEI, SIREN | 2467 | §102§103 | Final Rejection | 9d | AI Ready | Sep 05, 2023 |
| 18240896 | MULTI-CHANNEL AUDIO INPUT MIXER | Qualcomm Incorporated | NGUYEN, THE HY | 2400 | §103 | Final Rejection | — | Pending | Aug 31, 2023 |
| 18240993 | FREQUENCY DEPENDENT RESIDUAL SIDEBAND DISTORTION CANCELLATION | Qualcomm Incorporated | FAYED, RASHA K | 2413 | §103 | Final Rejection | — | AI Ready | Aug 31, 2023 |
| 18458695 | CONDITIONAL HANDOVER AND SELECTIVE SECONDARY CELL GROUP ACTIVATION | Qualcomm Incorporated | DONADO, FRANK E | 2641 | §103 | Final Rejection | — | Pending | Aug 30, 2023 |
| 18279537 | ADDITIONAL GUARD RESOURCE ELEMENTS IN A FREQUENCY DOMAIN | Qualcomm Incorporated | BAIG, ADNAN | 2461 | §103 | Non-Final OA | — | Pending | Aug 30, 2023 |
| 18454544 | TECHNIQUES FOR POWER AMPLIFIER BACKOFF ADAPTATION COORDINATION | Qualcomm Incorporated | HUANG, WEN WU | 2648 | §102§103 | Non-Final OA | 28d | AI Ready | Aug 23, 2023 |
| 18547635 | CHANNEL SENSING DURING AWAY PERIOD | Qualcomm Incorporated | CUNNINGHAM, KEVIN M | 2461 | §103§112 | Non-Final OA | 70d | Pending | Aug 23, 2023 |
| 18547373 | AIR TO GROUND SIGNALING ENHANCEMENT FOR INTERFERENCE COMPENSATION | Qualcomm Incorporated | KAO, JUTAI | 2473 | §103 | Non-Final OA | — | AI Ready | Aug 22, 2023 |
| 18452762 | HANDOVER OPTIMIZATION BASED ON UE MOBILITY PREDICTION | Qualcom Incorporated | DONADO, FRANK E | 2641 | §103 | Final Rejection | 34d | Pending | Aug 21, 2023 |
| 18448114 | SIDELINK SYNCHRONIZATION SIGNAL BLOCK COMMUNICATION | Qualcomm Incorporated | SLOMS, NICHOLAS | 2476 | §103§112 | Non-Final OA | 14d | AI Ready | Aug 10, 2023 |
| 18446336 | CONFIGURATION FOR TIMING OF CELL DISCONTINUOUS TRANSMISSION OR RECEPTION | Qualcomm Incorporated | LEE, CHI HO A | 2475 | §102§103 | Non-Final OA | — | Pending | Aug 08, 2023 |
| 18365905 | SYNCHRONIZING A POLICY CONTROL FUNCTION WITH A USER EQUIPMENT | Qualcomm Incorporated | SLOMS, NICHOLAS | 2476 | §102§103 | Non-Final OA | 28d | AI Ready | Aug 04, 2023 |
| 18264131 | IDLE PERIOD HANDLING FOR MULTIPLE TRANSMIT RECEIVE POINT OPERATION | Qualcomm Incorporated | ABAZA, AYMAN A | 2429 | §112 | Non-Final OA | 70d overdue | Pending | Aug 03, 2023 |
| 18363636 | REFERENCE SIGNAL FOR INITIAL BEAM-PAIRING WITH RESOURCE COORDINATION AMONG USER EQUIPMENTS | Qualcomm Incorporated | BETTENDORF, SAMUEL ROBERGE | 2414 | §103 | Final Rejection | 30d overdue | Pending | Aug 01, 2023 |
| 18362668 | REQUESTED SYNCHRONIZATION SIGNAL BLOCKS | Qualcomm Incorporated | CASTANEYRA, RICARDO H | 2473 | §103 | Non-Final OA | — | Pending | Jul 31, 2023 |
| 18263487 | USER EQUIPMENT SLICE-SPECIFIC CELL SELECTION AND RESELECTION | Qualcomm Incorporated | GELIN, JEAN ALLAND | 2643 | §103 | Non-Final OA | — | AI Ready | Jul 28, 2023 |
| 18262700 | MAXIMUM TIME FOR DEFERRED FEEDBACK MESSAGE | Qualcomm Incorporated | LITTLE, DALE L | 2419 | §103 | Non-Final OA | 4d overdue | AI Ready | Jul 24, 2023 |
| 18357427 | EXTENDED DEMODULATION REFERENCE SIGNAL SCRAMBLING IDENTIFIER FOR DEMODULATION REFERENCE SIGNAL COMMUNICATION | Qualcomm Incorporated | THOMAS, WILFRED | 2416 | §103 | Final Rejection | — | Pending | Jul 24, 2023 |
| 18356866 | SYNCHRONIZATION SIGNAL BLOCK RESOURCE SELECTION ACCORDING TO MOBILITY STATE | Qualcomm Incorporated | CASTANEYRA, RICARDO H | 2473 | §103Other | Non-Final OA | — | AI Ready | Jul 21, 2023 |
| 18356929 | COVERAGE GAP MANAGEMENT FOR NON-TERRESTRIAL NETWORKS | Qualcomm Incorporated | DOUGLAS, MICHELE CAMILLE | 2646 | §103 | Non-Final OA | 16d | AI Ready | Jul 21, 2023 |
| 18262368 | MULTICAST RADIO BEARER CONFIGURATION INFORMATION | Qualcomm Incorporated | HENSON, JAMAAL R | 2411 | §102§103 | Final Rejection | 28d | AI Ready | Jul 20, 2023 |
| 18352806 | SYMBOL SCRAMBLING FOR COMBINING | Qualcomm Incorporated | PASIA, REDENTOR M | 2413 | §103 | Non-Final OA | 29d | AI Ready | Jul 14, 2023 |
| 18352065 | SIGNALING ASSOCIATED WITH UPLINK RESOURCE MUTING | Qualcomm Incorporated | RAHMAN, SHAH M | 2413 | §102§103 | Final Rejection | — | Pending | Jul 13, 2023 |
| 18260720 | CHANNEL MEASUREMENTS IN CHANNEL SENSING CONTENTION SLOTS | Qualcomm Incorporated | LEE, SANG CHEON | 2467 | §103 | Non-Final OA | 31d overdue | AI Ready | Jul 07, 2023 |
| 18260540 | GROUP BASED BEAM REPORTING FOR NON-SERVING CELLS | Qualcomm Incorporated | CHRISS, ANDREW W | 2472 | §103 | Non-Final OA | — | Pending | Jul 06, 2023 |
| 18347466 | LAYER 1 SIGNALING FOR SIDELINK SCHEDULING | Qualcomm Incorporated | NGUYEN, STEVEN H D | 2414 | §102§103 | Non-Final OA | — | AI Ready | Jul 05, 2023 |
| 18341096 | SELECTING A NEIGHBOR NODE IN A WIRELESS MULTI-HOP NETWORK USING A COST PARAMETER | Qualcomm Incorporated | VU, QUOC THAI NGOC | 2642 | §102§103 | Non-Final OA | — | Pending | Jun 26, 2023 |
| 18339661 | CHANNELS OR SIGNALS IN SUB-BANDS ASSOCIATED WITH SUB-BAND FULL DUPLEX SLOTS OR SYMBOLS | Qualcomm Incorporated | JAIN, RAJ K | 2411 | §103 | Non-Final OA | — | AI Ready | Jun 22, 2023 |
| 18338932 | PATH SWITCH FOR CONNECTED STATE MOBILITY | Qualcomm Incorporated | PEREZ, JOSE L | 2474 | §103§112 | Non-Final OA | — | Pending | Jun 21, 2023 |
| 18338228 | COLLISION HANDLING FOR TWO-STAGE DOWNLINK CONTROL INFORMATION | Qualcomm Incorporated | AUNG, SAI | 2416 | §103§112 | Final Rejection | 70d | Pending | Jun 20, 2023 |
| 18336608 | ALLOCATING UPLINK CHANNEL RESOURCES FOR NEGATIVE ACKNOWLEDGEMENT ONLY BASED MULTICAST FEEDBACK | Qualcomm Incorporated | WIDHALM DE RODRIG, ANGELA MARIE | 2443 | §102§103 | Non-Final OA | — | Pending | Jun 16, 2023 |
| 18335930 | CELL GROUP TRANSMISSION CONFIGURATION INDICATOR MANAGEMENT FOR LAYER 1/LAYER 2 TRIGGERED MOBILITY | Qualcomm Incorporated | HAILU, KIBROM T | 2461 | §103 | Non-Final OA | 84d | AI Ready | Jun 15, 2023 |
| 18335808 | CONTROLLING DISPLAY SCREEN INTERACTION BASED ON FINGERPRINT INFORMATION AND FORCE INFORMATION | Qualcomm Incorporated | WORKU, SARON MATTHEWOS | 2408 | §103 | Final Rejection | 82d | Pending | Jun 15, 2023 |
| 18335021 | MULTI-STAGE GRANT FOR MULTIPLE RADIO ACCESS TECHNOLOGY SPECTRUM SHARING | Qualcomm Incorporated | BROCKMAN, ANGEL T | 2412 | §103 | Non-Final OA | — | AI Ready | Jun 14, 2023 |
| 18334848 | TECHNIQUES FOR SIGNALING TRANSITION BETWEEN TYPES OF CHANNEL STATE INFORMATION PROCESSING | Qualcomm Incorporated | PARK, JUNG H | 2411 | §103 | Final Rejection | — | Pending | Jun 14, 2023 |
| 18334111 | INTERFERENCE-BASED LAYER COORDINATION | Qualcomm Incorporated | VIDAL CARPIO, MARIELA | 2476 | §103§112 | Non-Final OA | 36d | AI Ready | Jun 13, 2023 |
| 18257246 | SIGNALING TO INDICATE INTENDED SLICE INFORMATION IN PAGING | Qualcomm Incorporated | LAM, YEE F | 2465 | §103 | Non-Final OA | 70d | Pending | Jun 13, 2023 |
| 18257079 | TRANSMISSION CONFIGURATION INDICATOR INDICATION FOR NON-SERVING CELL INFORMATION | Qualcomm Incorporated | FOLLANSBEE, JOHN A | 2444 | §102 | Non-Final OA | 3d overdue | AI Ready | Jun 12, 2023 |
| 18331718 | MODEL GENERALIZATION | Qualcomm Incorporated | SAMS, MATTHEW C | 2646 | §103 | Final Rejection | 28d | AI Ready | Jun 08, 2023 |
| 18331537 | CONDITIONAL MEASUREMENT GAPS FOR DELAY CRITICAL TRAFFIC | Qualcomm Incorporated | RIVAS, RAUL | 2471 | §103 | Final Rejection | — | AI Ready | Jun 08, 2023 |
| 18330269 | INTERFERENCE ASSISTANCE INFORMATION FOR MULTIPLE USER MULTIPLE-INPUT MULTIPLE-OUTPUT GROUPS | Qualcomm Incorporated | PATEL, PARTHKUMAR | 2479 | §103 | Final Rejection | 17d overdue | Pending | Jun 06, 2023 |
| 18255329 | PANEL-SPECIFIC MAXIMUM PERMITTED EXPOSURE INDICATIONS | Qualcomm Incorporated | KINCAID, LESTER G | 2649 | §102§103Other | Final Rejection | — | AI Ready | May 31, 2023 |
| 18254513 | DETECTION AND MITIGATION FOR UPLINK DATA STALL | Qualcomm Incorporated | SAMLUK, JESSE PAUL | 2411 | §103 | Non-Final OA | — | Pending | May 25, 2023 |
| 18322273 | FLIGHT PATH BASED USER EQUIPMENT AUTONOMOUS TIMING ADVANCE COMPENSATION | Qualcomm Incorporated | DANIEL JR, WILLIE J | 2465 | §102 | Final Rejection | 70d | Pending | May 23, 2023 |
| 18253239 | Multiplexing Of Configured Grant-UCI (CG-UCI) And Uplink Control Information (UCI) In Shared Frequency Bands | Qualcomm Incorporated | LAM, YEE F | 2465 | §103§112 | Final Rejection | — | Pending | May 17, 2023 |
| 18318412 | AUTOMATIC GAIN CONTROL IN A FULL-DUPLEX NETWORK | Qualcomm Incorporated | SHARMA, GAUTAM | 2467 | §103 | Non-Final OA | 5d | AI Ready | May 16, 2023 |
| 18252856 | CHANNEL SENSING FOR SPECTRUM SHARING WITH HIGH PRIORITY SYSTEMS | Qualcomm Incorporated | KIDANE, MEHERET WOLDEGEBREAL | 2464 | §103 | Non-Final OA | 19d overdue | Pending | May 12, 2023 |
| 18252708 | TECHNIQUES FOR USER EQUIPMENT INITIATED CHANNEL OCCUPANCY TIME CONFIGURATION AND INDICATION | Qualcomm Incorporated | SAIFUDDIN, AHMED | 2475 | §102§103 | Non-Final OA | — | AI Ready | May 11, 2023 |
| 18252678 | UPLINK CONTROL INFORMATION COOPERATION | Qualcomm Incorporated | CHENG, CHI TANG P | 2463 | §102§103 | Non-Final OA | — | Pending | May 11, 2023 |
| 18315986 | CHANNEL STATE INFORMATION REPORTING THAT CAPTURES CROSS-LINK INTERFERENCE | Qualcomm Incorporated | JAIN, RAJ K | 2411 | §103§112 | Final Rejection | 49d | AI Ready | May 11, 2023 |
| 18315331 | TECHNIQUES FOR USER EQUIPMENT INITIATED HANDOVER | Qualcomm Incorporated | BEDNASH, JOSEPH A | 2461 | §102 | Final Rejection | — | AI Ready | May 10, 2023 |
| 18252333 | RELAY ADAPTATION LAYER CONFIGURATION FOR A SIDELINK INTERFACE | Qualcomm Incorporated | BEDNASH, JOSEPH A | 2461 | §103§112Other | Non-Final OA | — | AI Ready | May 09, 2023 |
| 18313033 | WIDEBAND AND SUBBAND CROSS-LINK INTERFERENCE MEASUREMENTS | Qualcomm Incorporated | SCIACCA, SCOTT M | 2478 | §103 | Final Rejection | — | AI Ready | May 05, 2023 |
| 18308069 | LAYER 2 SIGNALING OF A COMPRESSED CHANNEL STATE INFORMATION REPORT | Qualcomm Incorporated | REYES, CHRISTOPHER ANTHONY | 2475 | §103 | Final Rejection | 60d | AI Ready | Apr 27, 2023 |
| 18304753 | PHYSICAL DOWNLINK CONTROL CHANNEL PARTITIONING FOR MULTI-CELL MULTI-SLOT SCHEDULING | Qualcomm Incorporated | JEONG, MOO RYONG | 2418 | §102§103§112 | Final Rejection | 44d overdue | AI Ready | Apr 21, 2023 |
| 18302442 | CONFIGURABLE SYNCHRONIZATION SIGNAL AND PHYSICAL BROADCAST CHANNEL BLOCK PATTERN | Qualcomm Incorporated | LAM, YEE F | 2465 | §103 | Non-Final OA | — | AI Ready | Apr 18, 2023 |
| 18301467 | TRANSMISSION CONFIGURATIONS FOR FULL DUPLEX TRANSMISSIONS | Qualcomm Incorporated | DIVECHA, NISHANT B | 2419 | §103 | Non-Final OA | — | AI Ready | Apr 17, 2023 |
| 18249004 | OBTAINING UPLINK RESOURCES FOR A LOGICAL CHANNEL WITHOUT AN ASSOCIATED SCHEDULING REQUEST CONFIGURATION | Qualcomm Incorporated | CHENG, CHI TANG P | 2463 | §103 | Non-Final OA | 11d overdue | AI Ready | Apr 13, 2023 |
| 18298154 | POWER SAVINGS IN A MULTI-CONNECTIVITY USER EQUIPMENT | Qualcomm Incorporated | KAO, JUTAI | 2473 | §103 | Non-Final OA | — | Pending | Apr 10, 2023 |
| 18296129 | GUARD PERIODS OR GAPS BETWEEN SYMBOLS OR SLOTS OR WITHIN A SLOT | Qualcomm Incorporated | SANDHU, NEVENA ZECEVIC | 2474 | §103 | Non-Final OA | 30d overdue | AI Ready | Apr 05, 2023 |
| 18192235 | TECHNIQUES FOR ACTIVATING THROUGHPUT-CONSTRAINED BEAM MANAGEMENT | Qualcomm Incorporated | SHAHEED, KHALID W | 2643 | §103 | Final Rejection | — | Pending | Mar 29, 2023 |
| 18184188 | USER-EQUIPMENT-TO-USER-EQUIPMENT RELAY OPERATIONS | Qualcomm Incorporated | SUNDARA, NICK ANON | 2479 | §102§103 | Non-Final OA | 22d overdue | AI Ready | Mar 15, 2023 |
| 18181365 | MAXIMUM TRANSMIT POWER INDICATION FOR BANDWIDTHS ABOVE 160 MHZ OR FOR PUNCTURED BANDWIDTHS | Qualcomm Incorporated | DEAN, RAYMOND S | 2645 | §102 | Final Rejection | — | Pending | Mar 09, 2023 |
| 18044139 | CONFIGURED GRANT (CG) UPLINK CONTROL INFORMATION AND RETRANSMISSIONS FOR NON-CONFIGURATION OF CG RETRANSMISSION TIMER | Qualcomm Incorporated | LI, GUANG W | 2478 | §102§103 | Non-Final OA | 14d | AI Ready | Mar 06, 2023 |
| 18178989 | HYBRID AUTOMATIC REPEAT REQUEST FEEDBACK CODEBOOK FOR MULTI-CELL SCHEDULING | Qualcomm Incorporated | BLANTON, JOHN D | 2466 | §102§103 | Non-Final OA | — | AI Ready | Mar 06, 2023 |
| 18041754 | DUAL AUDIO CHANNELS OVER DUAL QUALITY OF SERVICE FLOWS | Qualcomm Incorporated | MIAN, OMER S | 2461 | §103§112 | Non-Final OA | 13d | AI Ready | Feb 15, 2023 |
| 18168942 | DOWNLINK CONTROL INFORMATION FORMAT FOR MULTI-CELL SCHEDULING | Qualcomm Incorporated | OH, ANDREW CHUNG SUK | 2466 | §103 | Non-Final OA | 8d | AI Ready | Feb 14, 2023 |
| 18162000 | MULTIPLE PATH SUPPORT FOR LAYER 3 USER EQUIPMENT TO NETWORK RELAY | Qualcomm Incorporated | LYTLE JR., BRADLEY D | 2473 | §103 | Non-Final OA | 30d | Pending | Jan 31, 2023 |
| 18162145 | UNIFORM RESOURCE LOCATOR INDICATING PARAMETERS FOR RECEPTION OF A SERVICE ANNOUNCEMENT FOR A RECEIVE ONLY MODE SERVICE | Qualcomm Incorporated | HO, CHUONG T | 2412 | §103 | Final Rejection | 89d overdue | Pending | Jan 31, 2023 |
| 18160772 | INDICATION TO REDUCE TRANSMISSION POWER | Qualcomm Incorporated | WILLIAMS, ELTON S | 2465 | §103 | Non-Final OA | — | AI Ready | Jan 27, 2023 |
| 18158793 | PRIORITIZATIONS FOR TRANSMISSION POWER REDUCTIONS IN CARRIER AGGREGATION FOR SIMULTANEOUS TRANSMISSIONS | Qualcomm Incorporated | DEAN, RAYMOND S | 2645 | §103 | Final Rejection | 49d | Pending | Jan 24, 2023 |
| 18006357 | TRANSMISSION CONFIGURATION INDICATORS (TCIS) FOR JOINT DOWNLINK/UPLINK BEAMS | Qualcomm Incorporated | WHITAKER, JUSTIN MICHAEL | 2415 | §103 | Final Rejection | 61d | AI Ready | Jan 20, 2023 |
| 18153105 | TECHNIQUES FOR PACKET DATA CONVERGENCE PROTOCOL REORDERING WITHIN A TIMER | Qualcomm Incorporated | RANDHAWA, MANDISH K | 2477 | §102§103 | Final Rejection | — | AI Ready | Jan 11, 2023 |
| 18153184 | LIVENESS DETECTION FOR AN ELECTRONIC DEVICE | Qualcomm Incorporated | SHAUGHNESSY, AIDAN EDWARD | 2432 | §103 | Non-Final OA | — | AI Ready | Jan 11, 2023 |
| 18148241 | CARRIER INDICATOR FIELD MAPPING | Qualcomm Incorporated | LEE, CHI HO A | 2475 | §102 | Final Rejection | 30d | AI Ready | Dec 29, 2022 |
| 18066822 | SELECTIVE REPORTING OF USER EQUIPMENT CAPABILITY INFORMATION | Qualcomm Incorporated | TRAN, CONGVAN | 2647 | §102 | Final Rejection | — | AI Ready | Dec 15, 2022 |
| 18001825 | LAYER 2 RELAY INITIAL CONFIGURATION | Qualcomm Incorporated | SEFCHECK, GREGORY B | 2477 | §102§103 | Final Rejection | — | Pending | Dec 14, 2022 |
| 18064679 | CONTROL RESOURCE SET TYPE CONFIGURATIONS | Qualcomm Incorporated | ABELSON, RONALD B | 2476 | §103 | Non-Final OA | 17d overdue | AI Ready | Dec 12, 2022 |
| 18062919 | INTER-USER-EQUIPMENT SIDELINK SCHEDULING | Qualcomm Incorporated | HUQ, OBAIDUL | 2473 | §103 | Non-Final OA | — | Pending | Dec 07, 2022 |
| 18057725 | RELAYED WAKE-UP SIGNAL FOR AN ACCESS LINK USING A SIDELINK | Qualcomm Incorporated | DABIRI, HIDAYAT T | 2414 | §103 | Final Rejection | — | Pending | Nov 21, 2022 |
| 17997895 | INTER-OPERATOR MULTICAST AND UNICAST CONVERGENCE TRANSMISSION | Qualcomm Incorporated | HEIBER, SHANTELL LAKETA | 2645 | §103 | Non-Final OA | 53d | AI Ready | Nov 03, 2022 |
| 18052451 | INDICATION OF UPLINK TRANSMISSION PRECODING PARAMETER CHANGE | Qualcomm Incorporated | WELTE, BENJAMIN PETER | 2477 | §103 | Non-Final OA | 6d | AI Ready | Nov 03, 2022 |
| 17997624 | TECHNIQUES FOR THERMAL MITIGATION AND OVERHEATING ASSISTANCE SIGNALING | Qualcomm Incorporated | ZUNIGA ABAD, JACKIE | 2469 | §103 | Final Rejection | 9d | AI Ready | Oct 31, 2022 |
| 18049159 | MULTI-DOMAIN NETWORK DATA FLOW MODELING | Qualcomm Incorporated | DINH, DUNG C | 6214 | §103 | Final Rejection | 295d overdue | AI Ready | Oct 24, 2022 |
| 18048568 | APPLYING WEIGHTED AVERAGING TO MEASUREMENTS ASSOCIATED WITH REFERENCE SIGNALS | Qualcomm Incorporated | LIU, SHU | 2417 | §103 | Final Rejection | 28d | AI Ready | Oct 21, 2022 |
| 17995646 | TECHNIQUES FOR UPDATING DEFAULT BEAMS AND PATHLOSS REFERENCE SIGNALS IN A MULTI-COMPONENT CARRIER COMMUNICATION LINK | Qualcomm Incorporated | RAHMAN, SHAH M | 2413 | §102§103 | Non-Final OA | 57d | Pending | Oct 06, 2022 |
| 17938159 | EARLY MESSAGE FOR CONDITIONAL HANDOVER | Qualcomm Incorporated | LEE, SANG CHEON | 2467 | §103 | Non-Final OA | 4d overdue | AI Ready | Oct 05, 2022 |
| 17995537 | PIGGYBACKING DOWNLINK CONTROL INFORMATION (DCI) FOR SEMI-PERSISTENT SCHEDULING | Qualcomm Incorporated | SMITH, MARCUS | 2468 | §102§103 | Non-Final OA | 44d overdue | Pending | Oct 05, 2022 |
| 17995534 | RADIO LINK CONTROL LAYER FEEDBACK REPORTING FOR RATELESS CODES | Qualcomm Incorporated | SMITH, JOSHUA Y | 2477 | §103 | Final Rejection | 26d | AI Ready | Oct 05, 2022 |
| 17935653 | TECHNIQUES FOR ENERGY ALLOCATION | Qualcomm Incorporated | BLAIR, DOUGLAS B | 2454 | §102§103§112 | Final Rejection | — | Pending | Sep 27, 2022 |
| 17934762 | CARRIER SWITCHING FOR A PHYSICAL UPLINK CONTROL CHANNEL | Qualcomm Incorporated | MILLER, GARY ADDISON ELDO | 2417 | §103§112 | Non-Final OA | 42d overdue | AI Ready | Sep 23, 2022 |
| 17933400 | SIDELINK RESOURCE ALLOCATION | Qualcomm Incorporated | LEE, SANG CHEON | 2467 | §103 | Non-Final OA | — | Pending | Sep 19, 2022 |
| 17906305 | TECHNIQUES FOR SOFT CANCELLING UPLINK TRANSMISSION | Qualcomm Incorporated | YANG, ZHAOHUI | 2468 | §103 | Non-Final OA | 34d | AI Ready | Sep 14, 2022 |
| 17931875 | MULTIPLEXING AT A FORWARDING NODE | Qualcomm Incorporated | NGUYEN, BAO G | 2461 | §103 | Non-Final OA | 26d | AI Ready | Sep 13, 2022 |
| 17822307 | PRESSURE ADJUSTMENT FOR BIOMETRIC MEASUREMENT | Qualcomm Incorporated | WOO, JAE KYUN | 3795 | §103 | Non-Final OA | 19d overdue | Pending | Aug 25, 2022 |
| 17820991 | PRIORITY FOR HALF-DUPLEX USER EQUIPMENT | Qualcomm Incorporated | LAMONT, BENJAMIN S | 2461 | §103 | Non-Final OA | — | AI Ready | Aug 19, 2022 |
| 17904574 | ASSOCIATION OF PHASE TRACKING REFERENCE SIGNAL PORTS AND DEMODULATION REFERENCE SIGNAL PORTS FOR MULTI-BEAM UPLINK REPETITIONS | Qualcomm Incorporated | DECKER, CASSANDRA L | 2466 | §103 | Final Rejection | — | Pending | Aug 18, 2022 |
| 17820136 | CROSS SUB-BAND SCHEDULING IN A FULL-DUPLEX NETWORK | Qualcomm Incorporated | FOLLANSBEE, KEITH TRAN-DANH | 2411 | §103 | Non-Final OA | — | Pending | Aug 16, 2022 |
| 17819534 | PREDICTIVE BEAM MANAGEMENT WITH PER-BEAM ERROR STATISTICS | Qualcomm Incorporated | HARLEY, JASON A | 2468 | §102§103 | Non-Final OA | 4d overdue | AI Ready | Aug 12, 2022 |
| 17819141 | UPLINK TRANSMISSION CONFIGURATION INDICATOR STATES IN A UNIFIED TRANSMISSION CONFIGURATION INDICATOR STATE | Qualcomm Incorporated | CHEN, PETER | 2462 | §103 | Non-Final OA | 93d overdue | Pending | Aug 11, 2022 |
| 17885398 | SLOT PATTERN FOR REPETITIONS OF SLOT TYPE | Qualcomm Incorporated | VU, HOANG-CHUONG Q | 2476 | §112 | Non-Final OA | — | Pending | Aug 10, 2022 |
| 17885293 | TRANSPORT BLOCK SIZE FOR SIDELINK COMMUNICATIONS | Qualcomm Incorporated | FAN, GUOXING | 2462 | §103 | Non-Final OA | — | AI Ready | Aug 10, 2022 |
| 17759841 | CYCLIC PREFIX EXTENSION FOR SOUNDING REFERENCE SIGNAL TRANSMISSION IN NR-U | Qualcomm Incorporated | BAIG, ADNAN | 2461 | §103 | Final Rejection | 28d | AI Ready | Jul 29, 2022 |
| 17759148 | DIFFERENT RELIABILITY LEVELS FOR ACKNOWLEDGEMENT/NEGATIVE ACKNOWLEDGEMENT (ACK/NACK) TRANSMISSIONS | Qualcomm Incorporated | LINDENBAUM, ALAN LOUIS | 2413 | §103 | Final Rejection | 26d | AI Ready | Jul 20, 2022 |
| 17813502 | SYNCHRONIZED LONG RANGE SIDELINK COMMUNICATION | Qualcomm Incorporated | DAVIS, CHRISTOPHER RYAN | 2476 | §103 | Non-Final OA | — | Pending | Jul 19, 2022 |
| 17812831 | LAYER TWO PROCESSING PROCEDURES FOR PROTOCOL DATA UNIT SETS WITH DEPENDENCY | Qualcomm Incorporated | CHAKRAVARTHY, LATHA | 2461 | §103§112 | Final Rejection | — | Pending | Jul 15, 2022 |
| 17812228 | CONFIGURED GRANT SIDELINK COMMUNICATIONS IN A SHARED OR UNLICENSED FREQUENCY BAND | Qualcomm Incorporated | NGUYEN, CHUONG M | 2411 | §103 | Non-Final OA | 9d | AI Ready | Jul 13, 2022 |
| 17806926 | CONDITIONAL HANDOVER CONDITIONS ASSOCIATED WITH A HEIGHT OF A USER EQUIPMENT | Qualcomm Incorporated | DABIRI, HIDAYAT T | 2414 | §103 | Non-Final OA | — | Pending | Jun 14, 2022 |
| 17806598 | TWO-WAY ULTRA-WIDEBAND SENSING | Qualcomm Incorporated | BARKER, MATTHEW M | 3646 | §102§103 | Final Rejection | 55d | Pending | Jun 13, 2022 |
| 17806071 | DISCONTINUOUS RECEPTION METHODOLOGY FOR MULTIMEDIA | Qualcomm Incorporated | BLAIR, DOUGLAS B | 2454 | §103§112 | Non-Final OA | — | AI Ready | Jun 08, 2022 |
| 17756006 | RANDOM ACCESS FOR SECONDARY USER EQUIPMENT | Qualcomm Incorporated | RAHMAN, M MOSTAZIR | 2411 | §103 | Non-Final OA | — | Pending | May 13, 2022 |
| 17663099 | COMMUNICATIONS CARRIED VIA A USER EQUIPMENT | Qualcomm Incorporated | YANG, ZHAOHUI | 2468 | §103 | Final Rejection | 29d | AI Ready | May 12, 2022 |
| 17662831 | INTER USER EQUIPMENT COORDINATION FOR RESOURCE POOLS | Qualcomm Incorporated | SEFCHECK, GREGORY B | 2477 | §103§112 | Final Rejection | — | Pending | May 10, 2022 |
| 17662196 | INDICATION OF UNAVAILABLE RESOURCES | Qualcomm Incorporated | KHAWAR, SAAD | 2412 | §103§112 | Non-Final OA | — | Pending | May 05, 2022 |
| 17661525 | EFFICIENT RADIO RESOURCE MANAGEMENT MEASUREMENTS FOR REDUCED CAPABILITY USER EQUIPMENT | Qualcomm Incorporated | WELLS, KENNETH B | 2842 | §103 | Non-Final OA | 17d overdue | AI Ready | Apr 29, 2022 |
| 17660294 | RADIO ACCESS TECHNOLOGY SPECTRUM SHARING | Qualcomm Incorporated | MATTIS, JASON E | 2461 | §103 | Final Rejection | 2d overdue | AI Ready | Apr 22, 2022 |
| 17657566 | ASSOCIATING DEVICES WITH ACCESS POINTS USING CREDENTIALS | Qualcomm Incorporated | MADANI, FARIDEH | 2643 | §103 | Final Rejection | 34d | Pending | Mar 31, 2022 |
| 17653412 | TECHNIQUES FOR TUNNELING FOR A MULTI-SUBSCRIPTION USER EQUIPMENT | Qualcomm Incorporated | YI, ALEXANDER J. | 2643 | §103 | Non-Final OA | — | Pending | Mar 03, 2022 |
| 17634530 | FAILED RECEIVING OF TIMING ADVANCE (TA) COMMAND FOR RADIO RESOURCE CONTROL (RRC) CONNECTED USER EQUIPMENT (UE) IN TWO-STEP RANDOM ACCESS PROCEDURE | Qualcomm Incorporated | NGUYEN, THUONG | 2416 | §103 | Non-Final OA | 28d | AI Ready | Feb 10, 2022 |
| 17649740 | THREE BIT SUB-BAND CHANNEL QUALITY INDICATOR FEEDBACK | Qualcomm Incorporated | SIDDIQUEE, INTEKHAAB AALAM | 2462 | §103 | Non-Final OA | — | Pending | Feb 02, 2022 |
| 17647258 | BEAM INDICATIONS OF VARIOUS BEAM INDICATION TYPES | Qualcomm Incorporated | MESFIN, YEMANE | 2462 | §102§103 | Non-Final OA | — | Pending | Jan 06, 2022 |
| 17647159 | LAYER 3 MEASUREMENT ASSOCIATED WITH DEDICATED POLARIZATION | Qualcomm Incorporated | PEREZ GUTIERREZ, RAFAEL | 2642 | §103 | Non-Final OA | — | Pending | Jan 05, 2022 |
| 17454639 | TECHNIQUES FOR RADIO ACCESS TECHNOLOGY DEPRIORITIZATION | Qualcomm Incorporated | ADHAMI, MOHAMMAD SAJID | 2471 | §103 | Non-Final OA | — | Pending | Nov 12, 2021 |
| 17452628 | GUARD INTERVAL COMMUNICATIONS | Qualcomm Incorporated | AUNG, SAI | 2416 | §103§112 | Final Rejection | — | Pending | Oct 28, 2021 |
| 17451781 | COOPERATIVE OPERATION FOR SIDELINK BANDWIDTH PART | Qualcomm Incorporated | LAMONT, BENJAMIN S | 2461 | §103 | Final Rejection | — | Pending | Oct 21, 2021 |
| 17450222 | DYNAMIC REPETITION FOR A CONTROL CHANNEL | Qualcomm Incorporated | ALAWDI, SHEHAB A | 2466 | — | Final Rejection | — | Pending | Oct 07, 2021 |
| 17450032 | NULLING FOR INTER-USER EQUIPMENT INTERFERENCE CANCELLATION | Qualcomm Incorporated | BEDNASH, JOSEPH A | 2461 | §103§112 | Non-Final OA | — | AI Ready | Oct 05, 2021 |
| 17449568 | ASSISTANCE DATA FOR POSITION ESTIMATION USING CARRIER PHASE COMBINATION IN A CELLULAR POSITIONING SYSTEM | Qualcomm Incorporated | MANOHARAN, MUTHUSWAMY GANAPATHY | 2647 | §101§102§103§112 | Non-Final OA | 6d | AI Ready | Sep 30, 2021 |
| 17448653 | MACHINE LEARNING COMPONENT UPDATE REPORTING IN FEDERATED LEARNING | Qualcomm Incorporated | PAULA, CESAR B | 2145 | §103 | Non-Final OA | — | Pending | Sep 23, 2021 |
| 17448298 | QUANTIZED FEEDBACK IN FEDERATED LEARNING WITH RANDOMIZATION | Qualcomm Incorporated | PHUNG, STEVEN HUYNH | 2125 | §101 | Non-Final OA | — | Pending | Sep 21, 2021 |
| 17305065 | SPREADING ASPECTS OF RANDOM ACCESS CHANNEL PROCEDURE | Qualcomm Incorporated | ALAWDI, SHEHAB A | 2466 | — | Non-Final OA | 44d overdue | AI Ready | Jun 30, 2021 |
| 17309590 | CONDITIONAL HANDOVER PROCEDURE SIGNALING | Qualcomm Incorporated | CHOWDHURY, HARUN UR R | 2473 | §103 | Final Rejection | 61d | Pending | Jun 08, 2021 |
| 17303820 | WIRELESS COMMUNICATION WITH A CONFIGURABLE GAP | Qualcomm Incorporated | YANG, ZHAOHUI | 2468 | §103 | Final Rejection | — | Pending | Jun 08, 2021 |
| 17303356 | POWER CONTROL FOR CONCURRENT RECEPTION | Qualcomm Incorporated | PEREZ, JOSE L | 2474 | §102§103§112 | Non-Final OA | — | AI Ready | May 27, 2021 |
| 17325663 | INDICATIONS OF A POWER AMPLIFIER NONLINEARITY STATE | Qualcomm Incorporated | RAHMAN, M MOSTAZIR | 2411 | §112 | Non-Final OA | — | AI Ready | May 20, 2021 |
| 17233374 | USER EQUIPMENT REPORTING FOR UPDATING OF MACHINE LEARNING ALGORITHMS | Qualcomm Incorporated | HEFFINGTON, JOHN M | 2145 | §103 | Non-Final OA | — | Pending | Apr 16, 2021 |
| 17188125 | TECHNIQUES FOR APERIODIC CHANNEL STATE INFORMATION REPORTING AND MODULATION AND CODING SCHEME CONTROL WITH LAYER 2 RELAYING | Qualcomm Incorporated | BEDNASH, JOSEPH A | 2461 | §103§112 | Non-Final OA | 41d | AI Ready | Mar 01, 2021 |
| 17149539 | SERVING CELL WITH DISTINCT PCI INDEX PER RRH FOR DL TCI STATE, SPATIAL RELATION, AND UL TCI STATE | Qualcomm Incorporated | LAM, YEE F | 2465 | §103 | Non-Final OA | — | AI Ready | Jan 14, 2021 |
| 17247183 | Data Channel Resource Allocation | Qualcomm Incorporated | NG, CHRISTINE Y | 2464 | §103 | Non-Final OA | 56d | Pending | Dec 02, 2020 |