Technology areas: Chemistry & Materials • Transportation, E-Commerce & Mechanical Systems
751 pending office actions • 283 clients • 681 examiners • 244 art units • 0 of 751 (0%) have an AI response strategy ready
DINSMORE & SHOHL LLP has a volume of 34859 career applications, with a primary focus on Transportation, E-Commerce & Mechanical Systems. The firm reports a resolved allowance rate of 85.4 percent. Its prosecution efficiency is marked by 3.06 average office actions per allowance. There are 551 pending office actions currently active.
The 34859 career applications establish the firm's experience level. Maintaining an 85.4 percent allowance rate across this portfolio involves an average of 3.06 office actions per allowance. The 551 pending office actions represent the firm's current workload in the context of its total career applications.
Based on the USPTO statutory response window for each pending office action. 220 of the docket's apps have a known mailing date; the rest are excluded from the tile counts.
Every pending office action with a known statutory deadline, placed on a days-until-due axis. Dots left of Today are overdue; the further right, the more runway. Cases that share a deadline window stack vertically. 220 of the docket's apps have a known mailing date.
Difficulty is derived from the rejection statutes on the most recent pending office action. §101-driven and multi-statute cases are graded Hard; §112-only and obviousness-type double-patenting cases are graded Easy; everything else is Medium. "Unknown" means we have not yet parsed a statute for that office action.
| Bucket | Cases |
|---|---|
| §101 only | 25 (3%) |
| §101 + other | 97 (13%) |
| §103 only | 254 (34%) |
| §102 only | 33 (4%) |
| §112 only | 31 (4%) |
| Double-patenting only | 11 (1%) |
| Double-patenting + other | 24 (3%) |
| Multi-statute (no §101) | 275 (37%) |
| No statute on record | 1 (0%) |
How the docket's pending cases split across USPTO tech-center bands.
Manual office-action response work runs about 10 hours per case. The time-saved bands below show what IP Author's prosecution pipeline typically delivers — a conservative 20% on the low end, 35% in the middle, 50% on the high end.
| Examiner | Apps on this docket | Allow rate | Interview lift |
|---|---|---|---|
| SCHOECH, ASHLEY TIFFANY | 3 | 68.8% | +28.1% |
| WAITS, ALAN B | 3 | 68.8% | +29.8% |
| YANG, WENYUAN | 3 | 67.3% | +18.2% |
| DOYLE, BRANDI M | 3 | 62.7% | +11.9% |
| CHANG, MINKI | 3 | 71.6% | +10.1% |
| CALDERON, DAVID ANDREW | 3 | 100.0% | +0.0% |
| BEANE, RANDALL L | 3 | 32.8% | +36.8% |
| LEE, HWA S | 2 | 72.3% | +3.1% |
| NGUYEN, NGA B | 2 | 53.0% | +25.2% |
| SHUDY, ANGELINA M | 2 | 76.6% | +7.4% |
Cases in front of an examiner with an allow rate of 80%+ where the difficulty is Easy or Medium. The top 2 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18500496 | METHODS FOR MAKING ZEOLITE-Y PARTICLES | CALDERON, DAVID ANDREW | — |
| 18480949 | METHODS FOR MAKING ZEOLITE-Y PARTICLES | CALDERON, DAVID ANDREW | — |
Multi-statute / §101-driven matters, or cases in front of an examiner with an allow rate under 30%. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18000941 | NEW USE OF RABEXIMOD | RODRIGUEZ, RAYNA B | 184d overdue |
| 17719833 | LOW-TEMPERATURE PLASMA CATHETER FOR LESS-INVASIVE, LOCALIZED TREATMENT OF ENDOCARDITIS AND ATHEROSCLEROSIS | DELLA, JAYMI E | 168d overdue |
| 17990137 | METHOD OF FECAL SAMPLE PREPARATION FOR AUTOMATED IMAGE ANALYSIS | LYONS, MARY M | 149d overdue |
| 17862828 | SYSTEMS AND METHODS FOR OPERATING A PARKING FACILITY | GOODMAN, MATTHEW PARKER | 140d overdue |
| 18794360 | RECOGNITION STATE NOTIFICATION DEVICE | LY, MOYA PHUNG | 97d overdue |
| 16971377 | MC4R Agonist Efficacy in Subjects with MC4R Deficiencies and Impaired NFAT Signaling | NIEBAUER, RONALD T | 81d overdue |
| 17784859 | NON-VIRAL VECTORS COMPRISING POLYPROPYLENEIMINE | BOATENG, AFUA BAMFOAA | 67d overdue |
| 18573528 | INTRAVASCULAR CROSSING AND ATHERECTOMY APPARATUSES AND METHODS OF USE | BYRD, BRIGID K | 66d overdue |
Cases in front of an examiner whose interview lift is 10 percentage points or more — i.e. interviewed cases historically resolve more favorably than non-interviewed ones. The top 8 ordered by deadline are shown.
| App # | Title | Examiner | Due in |
|---|---|---|---|
| 18462068 | METHODS FOR OPERATING CONTINUOUS CATALYTIC REFORMER UNITS | DOYLE, BRANDI M | 3d overdue |
| 19270010 | AN INTELLECTUAL PROPERTY VALUATION SYSTEM UTILIZING ARTIFICIAL INTELLIGENCE | NGUYEN, NGA B | 2d overdue |
| 18441035 | SYSTEM AND METHOD TO GENERATE EXTENDED CONTEXT DERIVED FROM CONSUMER RESPONSES | NGUYEN, NGA B | 9d |
| 18989861 | CAGE FOR BALL BEARING AND BALL BEARING COMPRISING SAME | WAITS, ALAN B | 15d |
| 18041727 | ANNEXIN A1-DERIVED POLYPEPTIDE ANALOGUES | BEANE, RANDALL L | 20d |
| 18982506 | VEHICLE AND METHOD FOR DETERMINING CHARACTERISTICS OF BATTERY | SCHOECH, ASHLEY TIFFANY | 48d |
| 19073113 | DRIVER ASSIST APPARATUS, DRIVER ASSIST METHOD, AND NON-TRANSITORY STORAGE MEDIUM | SCHOECH, ASHLEY TIFFANY | 76d |
| 19222008 | SYSTEMS AND METHODS FOR DATA-BASED SHAPED DETECTION FIELDS FOR MATERIALS HANDLING VEHICLES | SCHOECH, ASHLEY TIFFANY | — |
| Art Unit | Apps |
|---|---|
| 3771 | 15 |
| 3663 | 12 |
| 3761 | 8 |
| 3658 | 7 |
| 3661 | 7 |
| 3628 | 7 |
| 3667 | 7 |
| 3625 | 6 |
| 3662 | 6 |
| 3665 | 6 |
| App # | Title | Client | Examiner | Art Unit | Statutes | Status | Due in | AI | Filed |
|---|---|---|---|---|---|---|---|---|---|
| 18957128 | Untitled | Toyota Motor North America, Inc. | ABOUZAHRA, REHAM K | §101§103 | Final Rejection | — | Pending | ||
| 18889008 | Untitled | Saudi Arabian Oil Company | CHONG, JASON Y | §103 | Non-Final OA | — | Pending | ||
| 19395089 | DEHYDRATION CATALYSTS FOR ACROLEIN PRODUCTION FROM GLYCEROL AND METHODS FOR FORMING THE SAME | Trillium Renewable Chemicals | BERNS, DANIEL J | 1736 | §101§112 | Non-Final OA | — | Pending | Nov 20, 2025 |
| 19367348 | MULTIFOCAL SKIN TREATMENT DEVICE FOR AUTOMATICALLY CONTROLLING TRANSDUCER AND THERMOELECTRIC ELEMENT | Healux Co.,Ltd. | MOHAMMED, SHAHDEEP | 3797 | §103§112 | Non-Final OA | — | Pending | Oct 23, 2025 |
| 19351794 | GLASS CONTAINERS FOR STORING PHARMACEUTICAL COMPOSITIONS | Corning Incorporated | ACKUN, JACOB K | 3736 | DP | Non-Final OA | — | Pending | Oct 07, 2025 |
| 19334323 | SECURITY PROFILE STRIP FOR A DOOR OR WINDOW OF A TRANSPORTATION SYSTEM | Hübner GmbH & Co. Kg | DUNAY, CHRISTOPHER E | 2875 | §102§103 | Non-Final OA | — | Pending | Sep 19, 2025 |
| 19166552 | METHOD AND SYSTEM FOR GENERATING REAL-TIME VIDEO CONTENT | Neosapience, Inc. | HUYNH, AN SON PHI | 3795 | §103 | Non-Final OA | — | Pending | Sep 18, 2025 |
| 19308011 | HEAD-MOUNTED STEREOSCOPIC DISPLAY DEVICE WITH DIGITAL LOUPES AND ASSOCIATED METHODS | Augmedics Ltd. | SHIBRU, HELEN | §102 | Non-Final OA | — | Pending | Aug 22, 2025 | |
| 19302758 | Vehicle and Power Apparatus | Toyota Jidosha Kabushiki Kaisha | MUNION, JAMES E | DP | Non-Final OA | — | Pending | Aug 18, 2025 | |
| 19298631 | SLING BARS AND LIFT ASSEMBLIES INCLUDING SLING BARS | Liko Research & Development AB | HALL, LUKE F | §103§112 | Non-Final OA | — | Pending | Aug 13, 2025 | |
| 19282710 | SUPERCHARGER ROTORS FOR INCREASED ENGINE POWER OUTPUT | Brian Tooley Racing, LLC | COMLEY, ALEXANDER BRYANT | 3746 | §102DP | Non-Final OA | — | Pending | Jul 28, 2025 |
| 19282309 | LIDAR REFLECTIVE MATERIAL AND MARKING SYSTEM | Toyota Motor Engineering & Manufacturing North America, Inc. | MILLER, MICHAEL G | DP | Non-Final OA | — | Pending | Jul 28, 2025 | |
| 19279406 | PARTICLE FILTERING FOR LEARNING OBJECT PHYSICS FROM ROBOT INTERACTION VIDEOS | Toyota Research Institute, Inc. | TANG, BRYANT | 3658 | §101§103 | Non-Final OA | — | Pending | Jul 24, 2025 |
| 19274876 | VEHICLE DRIVING ASSISTANCE APPARATUS | Toyota Jidosha Kabushiki Kaisha | GENTILE, ALEXANDER VINCENT | §102§103 | Non-Final OA | — | Pending | Jul 21, 2025 | |
| 19148709 | METHOD FOR PERFORMANCE EVALUATION AND STRUCTURE OPTIMIZATION OF HIGH-POWER SEMICONDUCTOR LASER CHIP, AND SYSTEM FOR PERFORMANCE EVALUATION | Everbright Institute Of Semiconductor Photonics Co., Ltd. | LEE, HWA S | 2877 | §102§112 | Final Rejection | — | Pending | Jul 17, 2025 |
| 19271839 | PHASE DETECTION DEVICE USING PHASE SHIFTING INCLUDING GEOMETRIC PHASE OPTICAL ELEMENT | Psi System Inc. | SMITH, MAURICE C | §102 | Non-Final OA | — | Pending | Jul 17, 2025 | |
| 19270010 | AN INTELLECTUAL PROPERTY VALUATION SYSTEM UTILIZING ARTIFICIAL INTELLIGENCE | Korea Invention Promotion Association | NGUYEN, NGA B | 3625 | §101 | Final Rejection | 2d overdue | Pending | Jul 15, 2025 |
| 19268139 | CHARGING SYSTEM | Toyota Jidosha Kabushiki Kaisha | AZHAR, ARSLAN | 3656 | §102§103§112 | Non-Final OA | — | Pending | Jul 14, 2025 |
| 19266307 | SYSTEMS AND METHODS FOR RELATIVE POSE DETERMINATION AND FIELD ENFORCEMENT OF MATERIALS HANDLING VEHICLES USING ULTRA-WIDEBAND RADIO TECHNOLOGY | Crown Equipment Corporation | SHAIKH, FARIS ASIM | §101Other | Non-Final OA | — | Pending | Jul 11, 2025 | |
| 19257626 | METHOD FOR POWER LOSS ACCOUNTING | Bh Evs Co., Ltd. | GANNON, LEVI | §102§103 | Non-Final OA | — | Pending | Jul 02, 2025 | |
| 19256983 | SALT BATH COMPOSITIONS FOR STRENGTHENING GLASS ARTICLES, METHODS FOR USING THE SALT BATH COMPOSITIONS TO STRENGTHEN GLASS ARTICLES, AND GLASS ARTICLES STRENGTHENED THEREBY | Corning Incorporated | SNELTING, ERIN LYNN | §102§103§112 | Non-Final OA | — | Pending | Jul 01, 2025 | |
| 19252340 | LOCAL SERVER AND METHOD FOR CONTROLLING ROAD TRAFFIC | BITSENSING INC. | MOHL, PATRICK DANIEL | §101§102§103 | Non-Final OA | — | Pending | Jun 27, 2025 | |
| 19250672 | SKIN TREATMENT DEVICE AUTOMATICALLY CONTROLLED ACCORDING TO CONDITION OF SKIN, AND OPERATION METHOD FOR SKIN TREATMENT DEVICE | Healux Co., Ltd. | KLEIN, BROOKE L | 3797 | §101§103§112 | Non-Final OA | — | Pending | Jun 26, 2025 |
| 19249016 | INTEGRATED TRAFFIC CONTROLLER | Yunex LLC | MARTINEZ BORRERO, LUIS A | §103DP | Non-Final OA | — | Pending | Jun 25, 2025 | |
| 19246205 | RECREATIONAL VEHICLE COMPONENT WITH IMAGE AND METHOD OF MANUFACTURING | Thor Tech, Inc. | PAIGE, TYLER D | 3661 | DP | Non-Final OA | — | Pending | Jun 23, 2025 |
| 19243338 | HIGH EFFICIENCY PHARMACEUTICAL FILLING LINE | Corning Incorporated | SONG, HIMCHAN | 3731 | §103§112 | Non-Final OA | — | Pending | Jun 19, 2025 |
| 19136766 | METHOD FOR PRODUCING AN EVALUATION MODEL FOR DETECTING A SEAT OCCUPANCY STATE OF A SEAT ARRANGEMENT | Gestigon GmbH | MORFORD, ALEXANDRA ROBYN | 3658 | §101§102§103§112 | Non-Final OA | — | Pending | Jun 06, 2025 |
| 19224002 | HITCH ANGLE CALCULATION DEVICE, HITCH ANGLE CALCULATION METHOD, AND NON-TRANSITORY RECORDING MEDIUM | DENSO CORPORATION | KAN, YURI | §101 | Non-Final OA | — | Pending | May 30, 2025 | |
| 19222212 | SYSTEMS AND METHODS FOR ORIENTING A MATERIALS HANDLING VEHICLE | Crown Equipment Corporation | SHUDY, ANGELINA M | 3661 | §101§103§112 | Non-Final OA | — | Pending | May 29, 2025 |
| 19222008 | SYSTEMS AND METHODS FOR DATA-BASED SHAPED DETECTION FIELDS FOR MATERIALS HANDLING VEHICLES | Crown Equipment Corporation | SCHOECH, ASHLEY TIFFANY | §101§103§112DP | Non-Final OA | — | Pending | May 29, 2025 | |
| 19221986 | MATERIALS HANDLING FIELD CREATION USING LOCATION DATA | Crown Equipment Corporation | ANWARI, MACEEH | 3661 | §102 | Non-Final OA | — | Pending | May 29, 2025 |
| 19219434 | PROVIDING RANGE-BASED ZONES IN A COVERED ENVIRONMENT | Crown Equipment Corporation | ANFINRUD, GABRIEL P | §103 | Non-Final OA | — | Pending | May 27, 2025 | |
| 19217094 | SYSTEMS AND METHODS FOR USING SENSOR FUSION IN DETERMINING THE POSITION OF MATERIALS HANDLING VEHICLES | Crown Equipment Corporation | NING, PETER Y | §101§102§103 | Non-Final OA | — | Pending | May 23, 2025 | |
| 19217192 | UTILIZING A PLURALITY OF POSITION SYSTEMS TO DETERMINE THE POSITION OF MATERIALS HANDLING VEHICLES WITHIN A COVERED ENVIRONMENT | Crown Equipment Corporation | ALGEHAIM, MOHAMED A | §103§112DP | Non-Final OA | — | Pending | May 23, 2025 | |
| 19216401 | ENCLOSURES FOR PROVIDING A CONTROLLED ENVIRONMENT DURING THE PRODUCTION OF GLASS ARTICLES | Corning Incorporated | DEHGHAN, QUEENIE S | §103 | Non-Final OA | — | Pending | May 22, 2025 | |
| 19216537 | CAMERA SYSTEM | Otos Wing Co., Ltd. | LAM, HUNG H | §103 | Non-Final OA | — | Pending | May 22, 2025 | |
| 19209212 | NANOPLATFORM FOR TARGETING INFLAMMATORY MACROPHAGES, AND COMPOSITION CONTAINING SAME FOR PREVENTING OR TREATING INFLAMMATORY DISEASES | Clichembio, Inc. | JONES, DAMERON LEVEST | 1618 | §103§112Other | Non-Final OA | — | Pending | May 15, 2025 |
| 19208894 | METHOD AND DEVICE FOR OPTIMIZING SHIP NAVIGATION | Hd Hyundai Samho Co., Ltd. | HUTCHINSON, ALAN D | §101§102§103 | Non-Final OA | — | Pending | May 15, 2025 | |
| 19208198 | SOLAR CELL, METHOD FOR PREPARING SAME, AND PHOTOVOLTAIC MODULE | Csi Cells (Yangzhou) Co., Ltd. | CANNON, RYAN SMITH | 1726 | §102§103§112 | Non-Final OA | — | Pending | May 14, 2025 |
| 19206619 | INTELLIGENT VEHICLE NOTIFICATION SYSTEMS AND PROCESSES | Allstate Insurance Company | RUSHING, MARK S | §101§103 | Non-Final OA | — | Pending | May 13, 2025 | |
| 19206740 | SOLAR CELL AND METHOD FOR PREPARING SAME | Csi Cells (Yangzhou) Co., Ltd. | CANNON, RYAN SMITH | 1726 | §102§103 | Non-Final OA | — | Pending | May 13, 2025 |
| 19206613 | HAPTIC KNOB SYSTEM AND HAPTIC HINGE SYSTEM | Ck Materials Lab Co., Ltd. | LA, ANH V | §102 | Non-Final OA | — | Pending | May 13, 2025 | |
| 19204718 | VEHICLE CONTROLLER, METHOD, AND COMPUTER PROGRAM FOR VEHICLE CONTROL | Toyota Jidosha Kabushiki Kaisha | TAN, OLIVER E | 3669 | §103 | Final Rejection | — | Pending | May 12, 2025 |
| 19203037 | Apparatuses, Methods and Systems for Automated Online Data Submission | Mcb Bermuda Ltd. | ARAQUE JR, GERARDO | 3629 | §101§102 | Non-Final OA | — | Pending | May 08, 2025 |
| 19200157 | SALT BATH COMPOSITIONS, SALT BATH SYSTEMS, AND PROCESSES FOR STRENGTHENING GLASS ARTICLES | Corning Incorporated | FRANKLIN, JODI COHEN | §103 | Non-Final OA | — | Pending | May 06, 2025 | |
| 19191204 | SYSTEM FOR DUAL-BAND PLASTIC WAVEGUIDE TRANSMISSION | Point2 Technology, Inc. | WONG, ALAN | §103 | Non-Final OA | — | Pending | Apr 28, 2025 | |
| 19188378 | BIOFILM THICKNESS MEASURING DEVICE | The Wave Talk, Inc. | AMARA, MOHAMED K | §103§112 | Non-Final OA | — | Pending | Apr 24, 2025 | |
| 19186841 | MONITORING APPARATUS AND METHOD FOR A SPRINKLER PUMP TEST RUN | Mecon GmbH | BERTHEAUD, PETER JOHN | 3746 | §103 | Non-Final OA | — | Pending | Apr 23, 2025 |
| 19185789 | INSULATED CONTAINER | Igloo Products Corp. | BUI, LUAN KIM | 3736 | DP | Final Rejection | — | Pending | Apr 22, 2025 |
| 19184496 | VEHICLE WHEEL BEARING INCLUDING SENSOR ASSEMBLY HAVING PLURALITY OF SENSING UNITS | ILJIN Global Co., Ltd. | WAITS, ALAN B | §103§112 | Non-Final OA | — | Pending | Apr 21, 2025 | |
| 19184122 | APPARATUS AND METHOD FOR PROVIDING HAPTIC CONTROL SIGNAL | Ck Materials Lab Co., Ltd. | TUN, NAY L | §103Other | Non-Final OA | — | Pending | Apr 21, 2025 | |
| 19184571 | STEERING CONTROL DEVICE | Toyota Jidosha Kabushiki Kaisha | RICH, JOSEPHINE ELIZABETH | §102§103 | Final Rejection | — | Pending | Apr 21, 2025 | |
| 19184619 | VEHICLE WHEEL BEARING INCLUDING SENSOR ASSEMBLY HAVING SEALING PORTION | ILJIN Global Co., Ltd. | WAITS, ALAN B | §102§103§112 | Non-Final OA | — | Pending | Apr 21, 2025 | |
| 19181885 | TASK SELECTION FOR A HAND-HELD MANIPULATION DEVICE | Toyota Research Institute, Inc. | GAMMON, MATTHEW CHRISTOPHER | 3657 | §101§102§103§112 | Final Rejection | — | Pending | Apr 17, 2025 |
| 19179065 | VEHICLE SEAT | Toyota Jidosha Kabushiki Kaisha | CHEN, JOSE V | §102§103 | Non-Final OA | — | Pending | Apr 15, 2025 | |
| 19179089 | HITCH ANGLE ESTIMATION DEVICE, HITCH ANGLE ESTIMATION METHOD, AND NON-TRANSITORY RECORDING MEDIUM | DENSO CORPORATION | AFRIN, NAZIA | 3666 | §101§103§112 | Final Rejection | — | Pending | Apr 15, 2025 |
| 19178822 | SALT BATH SYSTEMS FOR STRENGTHENING GLASS ARTICLES AND METHODS FOR REGENERATING MOLTEN SALT | Corning Incorporated | FRANKLIN, JODI COHEN | §102§103 | Non-Final OA | — | Pending | Apr 14, 2025 | |
| 19176478 | KINETIC SEAT ASSEMBLIES HAVING DAMPERS FOR FIXED COMPONENTS AND MOVABLE COMPONENTS INCLUDING LATERAL DAMPING MECHANISMS AND FLUID RESERVOIRS | Stabilus GmbH | ISLAM, SYED A | DP | Non-Final OA | — | Pending | Apr 11, 2025 | |
| 19176779 | OPTICAL WIRELESS COMMUNICATION SYSTEM AND RECEIVING DEVICE | Toyota Jidosha Kabushiki Kaisha | LIU, LI | §103 | Non-Final OA | — | Pending | Apr 11, 2025 | |
| 19175731 | SYSTEMS AND METHODS TO GENERATE SUGGESTED RESPONSES TO CUSTOMER INQUIRIES FOR CUSTOMER RELATIONSHIP MANAGEMENT | Zendesk, Inc. | MANEJWALA, ISMAIL A | 3628 | §101§102§103 | Non-Final OA | — | Pending | Apr 10, 2025 |
| 19175527 | ENTITY DETECTION AND EXTRACTION | Zendesk, Inc. | COLUCCI, MICHAEL C | §103 | Non-Final OA | — | Pending | Apr 10, 2025 | |
| 19173449 | FUEL OIL / PARTICULATE MATERIAL SLURRY COMPOSITIONS AND PROCESSES | Arq Ip Limited | TOOMER, CEPHIA D | 1771 | §103 | Non-Final OA | 46d | Pending | Apr 08, 2025 |
| 19173239 | DE-POWDERING OF ADDITIVE MANUFACTURING BUILD | General Electric Company | LEE, DOUGLAS | §102§103 | Non-Final OA | — | Pending | Apr 08, 2025 | |
| 19118105 | DRIVETRAIN ARRANGEMENT FOR A DRIVE UNIT OF AN ELEVATOR SYSTEM AND CORRESPONDING SHAFT AND USE THEREOF | Tk Elevator Innovation And Operations GmbH | TRUONG, MINH D | 3654 | §103§112 | Final Rejection | 9d | Pending | Apr 03, 2025 |
| 19169208 | SYSTEMS AND METHODS FOR MITIGATING LANE-CHANGE DISTURBANCE BASED ON COOPERATIVE MANEUVERING | Toyota Motor Engineering & Manufacturing North America, Inc. | SWEENEY, BRIAN P | §101§103§112 | Non-Final OA | — | Pending | Apr 03, 2025 | |
| 19095346 | AUTOMATED VALET PARKING SYSTEM | Toyota Jidosha Kabushiki Kaisha | WANG, JINGLI | §103Other | Non-Final OA | — | Pending | Mar 31, 2025 | |
| 19116216 | SYSTEMS AND METHODS FOR GROWING AQUATIC BOTANICAL MATERIAL | Ch4 Global, Inc. | TOPOLSKI, MAGDALENA | 3642 | §103§112 | Final Rejection | 35d | Pending | Mar 27, 2025 |
| 19088444 | VEHICLE AND VERIFICATION SYSTEM | Toyota Jidosha Kabushiki Kaisha | WORKU, SARON MATTHEWOS | §102§103§112 | Non-Final OA | — | Pending | Mar 24, 2025 | |
| 19088424 | INFORMATION PROCESSING APPARATUS | Toyota Jidosha Kabushiki Kaisha | MAZUMDER, SAPTARSHI | §103§112 | Non-Final OA | — | Pending | Mar 24, 2025 | |
| 19114124 | SYSTEM AND METHOD FOR ANONYMIZATION BY TRANSFORMING INPUT DATA FOR COMPARISON AND ANALYSIS | Dv Analytics AB | KIM, JUNG W | 2494 | §101§102§103§112 | Non-Final OA | — | Pending | Mar 21, 2025 |
| 19083827 | INFORMATION PROCESSING APPARATUS, METHOD, AND SYSTEM | Toyota Jidosha Kabushiki Kaisha | SCHEUNEMANN, RICHARD N | 3624 | §101§103 | Final Rejection | — | Pending | Mar 19, 2025 |
| 19082906 | AUTOMATED DE-POWDERING OF ADDITIVE MANUFACTURING BUILD | General Electric Company | ROBINSON, MICHAEL | §103Other | Non-Final OA | — | Pending | Mar 18, 2025 | |
| 19083293 | THIN FILM FORMING METHOD EMPLOYING INTERFACE-NITRIDING TECHNIQUE USING HIGH-DENSITY RADICALS | Eq Tech Plus Co., Ltd. | TADAYYON ESLAMI, TABASSOM | 1718 | §103 | Non-Final OA | — | Pending | Mar 18, 2025 |
| 19082483 | POSITION BASED SMART ELBOW CROSSOVER PROTECTION SYSTEM | Knappco, LLC | AFFUL, CHRISTOPHER M | 3753 | §102§103 | Final Rejection | — | Pending | Mar 18, 2025 |
| 19074926 | INFORMATION PROCESSING APPARATUS AND OPERATING METHOD OF INFORMATION PROCESSING APPARATUS | Toyota Jidosha Kabushiki Kaisha | ALZATEEMEH, HUSSAM ALDEEN | 3662 | §103 | Non-Final OA | — | Pending | Mar 10, 2025 |
| 19073168 | DRIVER ASSIST APPARATUS, DRIVER ASSIST METHOD, AND NON-TRANSITORY STORAGE MEDIUM | Toyota Jidosha Kabushiki Kaisha | GAMMON, MATTHEW CHRISTOPHER | 3657 | §102§103§112 | Final Rejection | — | Pending | Mar 07, 2025 |
| 19073113 | DRIVER ASSIST APPARATUS, DRIVER ASSIST METHOD, AND NON-TRANSITORY STORAGE MEDIUM | Toyota Jidosha Kabushiki Kaisha | SCHOECH, ASHLEY TIFFANY | 3669 | §103 | Final Rejection | 76d | Pending | Mar 07, 2025 |
| 19073121 | DRIVER ASSIST APPARATUS, DRIVER ASSIST METHOD, AND NON-TRANSITORY STORAGE MEDIUM | Toyota Jidosha Kabushiki Kaisha | THOMPSON, JOSEPH LEIGH | 3665 | §101§103§112 | Final Rejection | — | Pending | Mar 07, 2025 |
| 19073162 | DRIVER ASSIST APPARATUS, DRIVER ASSIST METHOD, AND NON-TRANSITORY STORAGE MEDIUM | Toyota Jidosha Kabushiki Kaisha | PHAM, CLINT V | 3663 | §102§103§112 | Final Rejection | — | Pending | Mar 07, 2025 |
| 19073094 | DRIVER ASSIST APPARATUS, DRIVER ASSIST METHOD, AND NON-TRANSITORY STORAGE MEDIUM | Toyota Jidosha Kabushiki Kaisha | MARSHALL, JOSHUA DWAYNE | 2686 | §102§103 | Non-Final OA | — | Pending | Mar 07, 2025 |
| 19073109 | DRIVER ASSIST APPARATUS, DRIVER ASSIST METHOD, AND NON-TRANSITORY STORAGE MEDIUM | Toyota Jidosha Kabushiki Kaisha | KASPER, BYRON XAVIER | 3657 | §103 | Final Rejection | — | Pending | Mar 07, 2025 |
| 19063758 | AUTONOMOUS TRAVELING ROBOT OPERATION SYSTEM, AUTONOMOUS TRAVELING ROBOT OPERATION METHOD, AND NON-TRANSITORY COMPUTER READABLE MEDIUM | Toyota Jidosha Kabushiki Kaisha | YANG, WENYUAN | 3667 | §102 | Final Rejection | — | Pending | Feb 26, 2025 |
| 19062737 | INFORMATION PROCESSING APPARATUS AND METHOD | Toyota Jidosha Kabushiki Kaisha | AZARIAN, SEYED H | §102 | Non-Final OA | — | Pending | Feb 25, 2025 | |
| 19062714 | VEHICLE | Toyota Jidosha Kabushiki Kaisha | PHAM, CLINT V | 3663 | §103 | Final Rejection | — | Pending | Feb 25, 2025 |
| 19060167 | SURGERY PLATFORM WITH A ROTATING SURFACE ON A STATIONARY BASE WITH INTEGRATED GAS LINES, INTEGRATED HEATING ELEMENTS, AND LEG POSITIONING STRAP SYSTEM | UNIVERSITY OF KENTUCKY RESEARCH FOUNDATION | ALBERS, KEVIN S | 3786 | §103 | Final Rejection | — | Pending | Feb 21, 2025 |
| 19058336 | SUPPORT SHIRTS INCLUDING A RESTRICTION PANEL | Inzer Advance Designs, Inc. | NUNNERY, GRADY ALEXANDER | 3732 | §103§112Other | Final Rejection | 35d overdue | Pending | Feb 20, 2025 |
| 19058996 | ACTIVE INSULATED CONTAINER | Dometic Sweden AB | GAYE, SAMBA NMN | §103§112 | Non-Final OA | — | Pending | Feb 20, 2025 | |
| 19056846 | THERMAL MANAGEMENT SYSTEM | General Electric Company | EDWARDS, LOREN C | 3746 | §102§103 | Final Rejection | 28d overdue | Pending | Feb 19, 2025 |
| 19055826 | METHOD | Toyota Jidosha Kabushiki Kaisha | SINGH, GURKANWALJIT | 3625 | §101§103 | Final Rejection | — | Pending | Feb 18, 2025 |
| 19055810 | INFORMATION PROCESSING APPARATUS, SYSTEM, AND OPERATING METHOD OF SYSTEM | Toyota Jidosha Kabushiki Kaisha | DAGER, JONATHAN M | 3663 | §103 | Final Rejection | — | Pending | Feb 18, 2025 |
| 19051291 | HAPTIC DEVICE AND HAPTIC MODULE | Ck Materials Lab Co., Ltd. | TRUONG, THOMAS | §102§103 | Non-Final OA | — | Pending | Feb 12, 2025 | |
| 19049025 | ROTOR FOR ELECTRIC MOTOR | Toyota Jidosha Kabushiki Kaisha | ORTEGA, JOSEPH | §103§112 | Non-Final OA | — | Pending | Feb 10, 2025 | |
| 19049030 | INFORMATION PROCESSING APPARATUS AND METHOD | Toyota Jidosha Kabushiki Kaisha | BEATTY, TY MITCHELL | §101§103§112 | Non-Final OA | — | Pending | Feb 10, 2025 | |
| 19048182 | ORGANIC WASTE REDUCTION AND BIOGAS PRODUCTION SYSTEM COMBINED WITH HYDROTHERMAL CARBONIZATION WITH IMPROVED ENERGY CONSUMPTION EFFICIENCY | Tomorrow Water | MILLER, JONATHAN | §102§103§112 | Non-Final OA | — | Pending | Feb 07, 2025 | |
| 19102166 | A CONSTANT BEAMWIDTH LOUDSPEAKER | Pascal A/S | ZHU, QIN | §102§103§112 | Non-Final OA | — | Pending | Feb 07, 2025 | |
| 19044981 | METHOD AND APPARATUS FOR IMPLEMENTING APPLICATION FOR MAINTAINING COGNITIVE FUNCTION AND IMPROVING DECLINE IN COGNITIVE FUNCTION | Emocog Inc. | CHOI, DAVID | 3685 | §101§102§103 | Non-Final OA | — | Pending | Feb 04, 2025 |
| 19044605 | AI-DRIVEN AUDIO-VISUAL LIVE ENTERTAINMENT PLATFORM | Compeller LLC | HE, WEIMING | §103 | Non-Final OA | — | Pending | Feb 03, 2025 | |
| 19042340 | SUPPORT SHIRTS INCLUDING RESTRICTION PANEL | Inzer Advance Designs, Inc. | NUNNERY, GRADY ALEXANDER | 3732 | §101§102§103DP | Final Rejection | 37d overdue | Pending | Jan 31, 2025 |
| 19042620 | SYSTEMS AND METHODS FOR TRAINING A DATA-DRIVEN PLANNER USING RULES-BASED OPTIMIZATION PLANNER PARAMETERS | Toyota Jidosha Kabushiki Kaisha | WEISENFELD, ARYAN E | 3663 | §102§112 | Non-Final OA | — | Pending | Jan 31, 2025 |
| 19040954 | DIRECT CONVERSION OF PLASTIC DERIVED OIL AND LIGHT CRUDE OIL TO PRODUCE CIRCULAR CHEMICALS AND LOW CARBON FUELS | Saudi Arabian Oil Company | SINGH, PREM C | 1771 | §103 | Non-Final OA | — | Pending | Jan 30, 2025 |
| 19040498 | CRUDE PETROLEUM OIL PROCESSING METHOD FOR CRUDE DISTILLATION UNIT | COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH | DOYLE, BRANDI M | §103§112 | Non-Final OA | — | Pending | Jan 29, 2025 | |
| 19039101 | SYSTEMS AND METHODS FOR PROVIDING REAL-TIME ROUTE VIEWS | Toyota Jidosha Kabushiki Kaisha | ROBERT, DANIEL M | 3665 | §103 | Final Rejection | — | Pending | Jan 28, 2025 |
| 19099191 | OVERCURRENT PROTECTION CIRCUIT AND METHOD | Dometic Sweden AB | FINCH III, FRED E | §103 | Non-Final OA | — | Pending | Jan 28, 2025 | |
| 19038282 | PROFILE-BASED DATA AGGREGATION FOR DYNAMIC DOCUMENT GENERATION | BOLD Limited | GOMEZ, CHRISTOPHER ALBERT | 3628 | §101 | Non-Final OA | — | Pending | Jan 27, 2025 |
| 19037360 | DATA COLLECTION DEVICE, DATA COLLECTION METHOD, AND NON-TRANSITORY RECORDING MEDIUM | Toyota Jidosha Kabushiki Kaisha | MCCULLERS, AARON KYLE | 3663 | §101§103 | Final Rejection | — | Pending | Jan 27, 2025 |
| 19037992 | INFORMATION PROVISION APPARATUS, INFORMATION PROVISION SYSTEM, AND INFORMATION PROVISION METHOD | Toyota Jidosha Kabushiki Kaisha | JASMIN, LYNDA C | 3628 | §101§102 | Non-Final OA | — | Pending | Jan 27, 2025 |
| 19037379 | ROTOR | Toyota Jidosha Kabushiki Kaisha | GUGGER, SEAN A | §102§103§112 | Non-Final OA | — | Pending | Jan 27, 2025 | |
| 19038597 | DEVICE AND METHOD FOR COOLING LIVING TISSUE | Recensmedical, Inc. | SMITH, KAITLYN ELIZABETH | §102§103 | Non-Final OA | — | Pending | Jan 27, 2025 | |
| 19037352 | INFORMATION PROCESSING APPARATUS, INFORMATION PROCESSING METHOD, AND NON-TRANSITORY COMPUTER READABLE MEDIUM | Toyota Jidosha Kabushiki Kaisha | KIM, PATRICK | 3628 | §101§103§112 | Final Rejection | — | Pending | Jan 27, 2025 |
| 19037384 | MOTOR HOUSING | Toyota Jidosha Kabushiki Kaisha | ANDREWS, MICHAEL | §102 | Non-Final OA | — | Pending | Jan 27, 2025 | |
| 19037367 | VEHICLE CONTROLLER, METHOD, AND COMPUTER PROGRAM FOR VEHICLE CONTROL | Toyota Jidosha Kabushiki Kaisha | YANG, WENYUAN | 3667 | §102§103§112 | Final Rejection | — | Pending | Jan 27, 2025 |
| 19033653 | METHOD OF PRODUCING A HYDROGEN TANK, HYDROGEN TANK | Toyota Jidosha Kabushiki Kaisha | ALLEN, JEFFREY R | 3733 | §102§112 | Final Rejection | 20d | Pending | Jan 22, 2025 |
| 19033697 | IN-VEHICLE DISPLAY SYSTEM AND CONTROL METHOD OF IN-VEHICLE DISPLAY SYSTEM | DENSO CORPORATION | HA, ALICIA | §102 | Non-Final OA | — | Pending | Jan 22, 2025 | |
| 19034231 | CATALYST FORMULATION FOR CRACKING CRUDE OILS TO PRODUCE LIGHT OLEFINS AND AROMATICS | Saudi Arabian Oil Company | DOYLE, BRANDI M | 1771 | §103 | Non-Final OA | — | Pending | Jan 22, 2025 |
| 19032683 | SYSTEMS AND METHODS FOR PROVIDING AUTOMATED TRAINING FOR MANUALLY CONDUCTED PROCEDURES | The Penn State Research Foundation | MUSSELMAN, TIMOTHY A | §103 | Non-Final OA | — | Pending | Jan 21, 2025 | |
| 19028204 | COMBINING VIDEO-BASED AND OPTIC-BASED AUGMENTED REALITY IN A NEAR EYE DISPLAY | Augmedics Ltd. | CHU, DAVID H | §103Other | Non-Final OA | — | Pending | Jan 17, 2025 | |
| 19027954 | VEHICLE KNUCKLE ASSEMBLY WITH BEARING ASSEMBLY BUMP GUARD | Iljin Usa Corporation | DHANANI, SHAMS | 3614 | §102§103 | Non-Final OA | — | Pending | Jan 17, 2025 |
| 18996196 | MEDICAL WASTE STERILIZER | Mecobi Co.,Ltd. | CHORBAJI, MONZER R | §102§112 | Non-Final OA | — | Pending | Jan 17, 2025 | |
| 19024214 | HEAT PUMP, SYSTEMS, AND METHODS FOR OPERATING THE SAME | Dalrada Financial Corporation | BRADFORD, JONATHAN | §102§103 | Non-Final OA | — | Pending | Jan 16, 2025 | |
| 18995671 | PHOSPHATE MATERIALS HAVING NANO POROUS STRUCTURE, PREPARATION METHOD THEREFOR AND USE THEREOF | Knowlitech Co., Ltd. | YOUNG, WILLIAM D | §103 | Non-Final OA | — | Pending | Jan 16, 2025 | |
| 18995740 | CURVED FIRE-FORWARD NEEDLE FOR PUNCTURING AND TRAVERSING VASCULATURE | BARD PERIPHERAL VASCULAR, INC. | RHODES, NORA W | §102§103 | Non-Final OA | — | Pending | Jan 16, 2025 | |
| 19024220 | HEAT PUMP, SYSTEMS, AND METHODS FOR OPERATING THE SAME | Dalrada Financial Corporation | BRADFORD, JONATHAN | §102§103 | Non-Final OA | — | Pending | Jan 16, 2025 | |
| 19021468 | ROTOR OF ELECTRIC MOTOR AND MANUFACTURING METHOD THEREOF | Toyota Jidosha Kabushiki Kaisha | SINGH, ALEXANDER A | §102§103 | Non-Final OA | — | Pending | Jan 15, 2025 | |
| 19017987 | VEHICLE CONTROL DEVICE, COMPUTER PROGRAM FOR VEHICLE CONTROL, AND METHOD FOR CONTROLLING VEHICLE | Toyota Jidosha Kabushiki Kaisha | LEITE, PAULO ROBERTO GONZ | 3663 | §103 | Final Rejection | — | Pending | Jan 13, 2025 |
| 19018036 | VEHICLE | Toyota Jidosha Kabushiki Kaisha | SHELTON, IAN BRYCE | §103 | Non-Final OA | — | Pending | Jan 13, 2025 | |
| 19018937 | MOULD AND METHOD FOR MANUFACTURING A SWIMMING POOL OR SWIMMING POND OR THE LIKE | Impoolse BV | LIU, XUE H | 1742 | §103§112 | Non-Final OA | — | Pending | Jan 13, 2025 |
| 19017919 | ELECTRIC WORK VEHICLE | Yanmar Holdings Co., Ltd. | PRICE, MITCHELL JAMES | §102§103 | Non-Final OA | — | Pending | Jan 13, 2025 | |
| 19016332 | MOVABLE COATING SYSTEM | Saudi Arabian Oil Company | KURPLE, KARL | 1717 | §103 | Non-Final OA | — | Pending | Jan 10, 2025 |
| 18992624 | DEVICE AND METHOD FOR CLOSING AN OPENING OF A BODY WALL | Katholieke Universiteit Leuven K.U. Leuven Research & Development | KNAUSS, CHRISTIAN D | 3771 | §102§103§112 | Non-Final OA | — | Pending | Jan 09, 2025 |
| 18992233 | Atlantoaxial Prosthetic Joint | University Of Cincinnati | JOHANAS, JACQUELINE T | 3773 | §102§103 | Non-Final OA | — | Pending | Jan 08, 2025 |
| 19012207 | SYSTEM AND METHOD FOR OPERATING A CAMERA OF A HAND-HELD GRIPPER USING A FOOT PEDAL | Toyota Research Institute, Inc. | JEN, MINGJEN | 3657 | §112 | Non-Final OA | — | Pending | Jan 07, 2025 |
| 19011722 | ONE-PIECE ALUMINUM LIVE AXLE CARRIER CONSTRUCTED FROM LOW PRESSURE DIE CASTING FOR MOTOR VEHICLES | Martinrea International US Inc. | BELLINGER, JASON R | §103§112 | Non-Final OA | — | Pending | Jan 07, 2025 | |
| 19010292 | MOTOR | Toyota Jidosha Kabushiki Kaisha | CHANG, MINKI | §102§103 | Non-Final OA | — | Pending | Jan 06, 2025 | |
| 19010290 | MOTOR | Toyota Jidosha Kabushiki Kaisha | ELNAKIB, AHMED | §103 | Non-Final OA | — | Pending | Jan 06, 2025 | |
| 19010297 | TRAVEL MANAGEMENT SYSTEM AND TRAVEL MANAGEMENT METHOD | Toyota Jidosha Kabushiki Kaisha | WHITTINGTON, JESS G | 3666 | §101§102§103 | Non-Final OA | — | Pending | Jan 06, 2025 |
| 19009851 | MACHINE LEARNING-BASED METHOD AND SYSTEM TO RETAIN CUSTOMERS | BOLD Limited | PATEL, DIPEN M | 3621 | §101§103 | Final Rejection | — | Pending | Jan 03, 2025 |
| 19005305 | VEHICLES, COMPUTER APPARATUSES AND METHODS FOR GENERATING A TRAJECTORY OF A VEHICLE ON A MAP | Toyota Jidosha Kabushiki Kaisha | YANG, WENYUAN | 3667 | §112 | Non-Final OA | — | Pending | Dec 30, 2024 |
| 18878793 | CHANNEL COMPUTATION | Fischione Consulting AB | NGUYEN, LINH V | §102§103 | Non-Final OA | — | Pending | Dec 24, 2024 | |
| 19000939 | SHEET BUNDLE TRANSPORT APPARATUS AND CONTROL METHOD OF SHEET BUNDLE TRANSPORT APPARATUS | Horizon Inc. | MORRISON, THOMAS A | 3653 | §103 | Final Rejection | 36d | Pending | Dec 24, 2024 |
| 18999498 | GRADE CONTROL SYSTEMS AND METHODS FOR EARTHMOVING IMPLEMENTS | Caterpillar Trimble Control Technologies LLC | ARELLANO, PAUL WOODWARD | 3658 | DP | Non-Final OA | — | Pending | Dec 23, 2024 |
| 18989526 | NAVIGATION SYSTEM AND VEHICLE INCLUDING NAVIGATION SYSTEM | Toyota Jidosha Kabushiki Kaisha | LEWANDROSKI, SARA J | 3661 | §101§102§103§112 | Non-Final OA | 43d | Pending | Dec 20, 2024 |
| 18989864 | PHYSIOLOGICAL STATE ESTIMATION SYSTEM, PHYSIOLOGICAL STATE ESTIMATION METHOD, AND NON-TRANSITORY COMPUTER READABLE MEDIUM | Toyota Jidosha Kabushiki Kaisha | OGLES, MATTHEW ERIC | §101§112 | Final Rejection | — | Pending | Dec 20, 2024 | |
| 18989861 | CAGE FOR BALL BEARING AND BALL BEARING COMPRISING SAME | ILJIN Global Co., Ltd. | WAITS, ALAN B | 3617 | §102§112 | Non-Final OA | 15d | Pending | Dec 20, 2024 |
| 18989837 | CAGE FOR BALL BEARING AND BALL BEARING COMPRISING SAME | Bearingart | PILKINGTON, JAMES | 3617 | §112 | Final Rejection | — | Pending | Dec 20, 2024 |
| 18989939 | TANK SYSTEM | Thor Tech, Inc. | PAL, PRINCE | 3735 | §102§112 | Non-Final OA | — | Pending | Dec 20, 2024 |
| 18989498 | MOTOR AND PRODUCTION METHOD OF MOTOR | Toyota Jidosha Kabushiki Kaisha | CHANG, MINKI | §102§103 | Non-Final OA | — | Pending | Dec 20, 2024 | |
| 18989611 | CONTROL DEVICE, METHOD, AND NON-TRANSITORY STORAGE MEDIUM | Toyota Jidosha Kabushiki Kaisha | TISSOT, ADAM D | 3663 | §103 | Final Rejection | 5d | Pending | Dec 20, 2024 |
| 18988285 | UNIVERSAL TOOL ADAPTER | Augmedics Ltd. | BAIG, RUMAISA RASHID | §102§103§112Other | Non-Final OA | — | Pending | Dec 19, 2024 | |
| 18986978 | VEHICLE BODY STRUCTURE AND VEHICLE BODY FABRICATION METHOD | Toyota Jidosha Kabushiki Kaisha | SACKINGER, GABRIEL RICHARD | §102§103 | Non-Final OA | — | Pending | Dec 19, 2024 | |
| 18988242 | VULCANIZATION BONDING INSTEAD OF SEAM | Hübner GmbH & Co. Kg | ARCE, MARLON ALEXANDER | §102§103§112 | Non-Final OA | — | Pending | Dec 19, 2024 | |
| 18987871 | MOTOR | Toyota Jidosha Kabushiki Kaisha | MATES, ROBERT E | §102 | Non-Final OA | — | Pending | Dec 19, 2024 | |
| 18987732 | POP-UP ROOF FOR A RECREATIONAL VEHICLE | Thor Tech, Inc. | BUTCHER, CAROLINE N | §103§112 | Non-Final OA | — | Pending | Dec 19, 2024 | |
| 18987632 | RECREATIONAL VEHICLE AND VARIABLE WATER TANK | Thor Tech, Inc. | SANGHERA, SYMREN K | 3735 | §102§103§112 | Final Rejection | 12d | Pending | Dec 19, 2024 |
| 18987834 | MOTOR UNIT | Toyota Jidosha Kabushiki Kaisha | VAZIRI, MASOUD | §102§103 | Non-Final OA | — | Pending | Dec 19, 2024 | |
| 18876211 | SYSTEMS AND METHODS FOR ASSESSING BLOOD PERFUSION | BARD PERIPHERAL VASCULAR, INC. | GEDRA, OLIVIA ROSE | 3681 | §103 | Final Rejection | — | Pending | Dec 18, 2024 |
| 18983851 | CHARGING CONTROL DEVICE FOR AN ELECTRIC VEHICLE | Toyota Jidosha Kabushiki Kaisha | SHAIKH, MOHAMMAD Z | 3694 | §112 | Final Rejection | 84d | Pending | Dec 17, 2024 |
| 18983888 | INTERSECTING ROAD DETECTION DEVICE, INTERSECTING ROAD DETECTION METHOD, AND NON-TRANSITORY RECORDING MEDIUM | Toyota Jidosha Kabushiki Kaisha | RUSH, ERIC | §101§103§112 | Non-Final OA | — | Pending | Dec 17, 2024 | |
| 18982506 | VEHICLE AND METHOD FOR DETERMINING CHARACTERISTICS OF BATTERY | Toyota Jidosha Kabushiki Kaisha | SCHOECH, ASHLEY TIFFANY | 3669 | §103§112 | Final Rejection | 48d | Pending | Dec 16, 2024 |
| 18982556 | DRIVE DEVICE | Toyota Jidosha Kabushiki Kaisha | CHANG, MINKI | §102§103 | Non-Final OA | — | Pending | Dec 16, 2024 | |
| 18982519 | MOTOR UNIT | Toyota Jidosha Kabushiki Kaisha | ANDREWS, MICHAEL | §102 | Non-Final OA | — | Pending | Dec 16, 2024 | |
| 18874263 | PRODUCTION SYSTEM WITH NEAR-INFRARED SPECTROMETER | Atline Aps | TANINGCO, MARCUS H | 2884 | §103 | Non-Final OA | — | Pending | Dec 12, 2024 |
| 18978232 | Method and Device for Endoscopic Endonasal Occipitocervical Fusion | University Of Cincinnati | MATTHEWS, TESSA M | 3773 | §103 | Final Rejection | 84d overdue | Pending | Dec 12, 2024 |
| 18979414 | HYDROTHERAPY SOAKING APPARATUS AND METHOD FOR USE | Sosoak, LLC | LE, HUYEN D | §102§103 | Non-Final OA | — | Pending | Dec 12, 2024 | |
| 18978792 | TOWABLE OFFSHORE FLOATING STRUCTURE | Korea Institute Of Ocean Science & Technology | CHAN, KEVIN | §102§103 | Non-Final OA | — | Pending | Dec 12, 2024 | |
| 18977354 | EDGE-BASED MANAGEMENT OF ELECTRIC VEHICLE CHARGING SESSIONS AND RELATED METHODS | Powerflex Systems, LLC | ANDERSON, FOLASHADE | 3623 | §101§102 | Non-Final OA | — | Pending | Dec 11, 2024 |
| 18977145 | REAL-TIME GUIDANCE AND REPORTING FOR CUSTOMER INTERACTION | Allstate Insurance Company | RILEY, MARCUS T | §103 | Non-Final OA | — | Pending | Dec 11, 2024 | |
| 18973704 | HYDROGEN TANK | Toyota Jidosha Kabushiki Kaisha | CASTELLANO, STEPHEN J | 3733 | §103 | Final Rejection | 22d | Pending | Dec 09, 2024 |
| 18973168 | HYDROGEN CARTRIDGE TANK AND HYDROGEN CONSUMPTION SYSTEM | Toyota Jidosha Kabushiki Kaisha | KIRSCH, ANDREW THOMAS | 3733 | §103§112 | Final Rejection | — | Pending | Dec 09, 2024 |
| 18974495 | CROSSLINKED STRUCTURAL ORTHOPEDIC BIOMATERIAL AND METHOD FOR MANUFACTURE | Orthomod LLC | MEYERS, ELIZABETH ANNE | §103§112 | Non-Final OA | — | Pending | Dec 09, 2024 | |
| 18972273 | HOLLOW ACRYLIC SOLID SURFACE SEAMLESS DOOR | Prusak'S Precision Construction, Inc. | TRIGGS, ANDREW J | §102§103 | Non-Final OA | — | Pending | Dec 06, 2024 | |
| 18970608 | COMBINING VIDEO-BASED AND OPTIC-BASED AUGMENTED REALITY IN A NEAR EYE DISPLAY | Augmedics Ltd. | CHU, DAVID H | §103Other | Non-Final OA | — | Pending | Dec 05, 2024 | |
| 18871853 | JOYSTICK | Scorpion Joystick Ltd. | DHARIA, PRABODH M | 2629 | §103 | Non-Final OA | — | Pending | Dec 05, 2024 |
| 18966623 | WALKING ROBOT AND POSITION ESTIMATION METHOD THEREOF | Korea Advanced Institute Of Science And Technology | CHU, RANDOLPH I | 3663 | §102§103 | Non-Final OA | — | Pending | Dec 03, 2024 |
| 18965483 | SEAT STRUCTURE | Toyota Motor Kyushu, Inc. | ACOSTA, ERIC LAZARUS | §102§103§112 | Non-Final OA | — | Pending | Dec 02, 2024 | |
| 18965372 | METHOD FOR PRODUCING HYDROGEL MICROBEADS CAPABLE OF MAGNETIC ACTUATION FOR DELIVERY OF THERAPEUTIC SUBSTANCE, HYDROGEL MICROBEADS PRODUCED THEREBY, AND PHARMACEUTICAL COMPOSITION FOR TREATING MUSCULOSKELETAL DISORDERS COMPRISING SAME | Biot Korea Inc. | MARVICH, MARIA | §103§112 | Non-Final OA | — | Pending | Dec 02, 2024 | |
| 18962857 | CONTAINER ASSEMBLY WITH INTERCHANGEABLE RIGID HANDLE AND STRAP | Igloo Products Corp. | PAL, PRINCE | 3735 | §102§103 | Final Rejection | — | Pending | Nov 27, 2024 |
| 18709709 | GRAVIMETRIC METERING UNIT HAVING A MAGNETIC CONNECTION BETWEEN THE CONVEYING SCREW AND ITS HOLDER | K-Tron Technologies, Inc. | CHIANG, JENNIFER C | §102§103§112 | Non-Final OA | — | Pending | Nov 27, 2024 | |
| 18869414 | Method and System for Monitoring a Slide Bearing | Rheinisch-Westfälische Technische Hochschule Aachen | CAMBY, RICHARD M | 3661 | §102§103 | Non-Final OA | — | Pending | Nov 26, 2024 |
| 18959270 | ROTATING MARKER | Augmedics Ltd. | MCDOWELL, JR, MAURICE L | DP | Non-Final OA | — | Pending | Nov 25, 2024 | |
| 18958734 | CONTROLLER FOR ELECTRIC VEHICLE | Toyota Jidosha Kabushiki Kaisha | HOQUE, SHAHEDA SHABNAM | 3658 | §103 | Final Rejection | 30d overdue | Pending | Nov 25, 2024 |
| 18958581 | Controller, System, External Server, and Notification Method | Toyota Jidosha Kabushiki Kaisha | SHORTER, RASHIDA R | 3626 | §101§112 | Final Rejection | 20d | Pending | Nov 25, 2024 |
| 18868495 | VEHICLE, ELECTRIC POWER SUPPLY APPARATUS, AND ELECTRIC POWER SUPPLY METHOD | DENSO CORPORATION | KESSIE, DANIEL | 2836 | §102§103 | Final Rejection | 23d overdue | Pending | Nov 22, 2024 |
| 18956772 | REINFORCEMENT PLATES FOR PROTECTING A BUMPER COVER OF A VEHICLE | Toyota Motor Engineering & Manufacturing North America, Inc. | GUTMAN, HILARY L | 3612 | §103 | Non-Final OA | — | Pending | Nov 22, 2024 |
| 18955371 | DISPLAY CONTROL DEVICE, METHOD, AND NON-TRANSITORY COMPUTER-READABLE MEDIUM RECORDED WITH PROGRAM | Toyota Jidosha Kabushiki Kaisha | KASPER, BYRON XAVIER | 3657 | §101§102§103§112 | Final Rejection | 23d | Pending | Nov 21, 2024 |
| 18952511 | DISPATCH MANAGEMENT DEVICE | Toyota Jidosha Kabushiki Kaisha | KIM, PATRICK | 3628 | §101 | Final Rejection | 53d | Pending | Nov 19, 2024 |
| 18867385 | ATHERECTOMY DEVICES, SYSTEMS, AND METHODS | BARD PERIPHERAL VASCULAR, INC. | HOAG, MITCHELL BRAIN | 3771 | §103 | Non-Final OA | — | Pending | Nov 19, 2024 |
| 18952494 | VEHICLE CONTROL DEVICE, STORAGE MEDIUM STORING COMPUTER PROGRAM FOR VEHICLE CONTROL, AND METHOD FOR CONTROLLING VEHICLE | Toyota Jidosha Kabushiki Kaisha | YANOSKA, JOSEPH ANDERSON | 3664 | §103 | Final Rejection | — | Pending | Nov 19, 2024 |
| 18866766 | IONIZABLE LIPIDS | Etherna Immunotherapies NV | FALKOWITZ, ANNA R | §102§112DP | Non-Final OA | — | Pending | Nov 18, 2024 | |
| 18950735 | BATTERY REPLACEMENT APPARATUS, INFORMATION PROVIDING DEVICE AND BATTERY REPLACEMENT SYSTEM | Toyota Jidosha Kabushiki Kaisha | BREWER, JACK ROBERT | 3663 | §103 | Final Rejection | 32d overdue | Pending | Nov 18, 2024 |
| 18866228 | HIGH-SPEED LASER SPECKLE CONTRAST IMAGING | Aarhus Universitet | LOPEZ, SEVERO ANTON P | §103 | Non-Final OA | — | Pending | Nov 15, 2024 | |
| 18949164 | FIDUCIAL MARKER | Augmedics Ltd. | BAKKAR, AYA ZIAD | §103Other | Non-Final OA | — | Pending | Nov 15, 2024 | |
| 18866123 | Holder for Holding a Guidewire | Straub Medical AG | ROBERTS, ANNA L | 3771 | §102§103§112 | Non-Final OA | — | Pending | Nov 15, 2024 |
| 18865726 | FABRICATION OF LARGE AREA RADIATION DETECTORS AND SHIELDING VIA FIELDASSISTED SINTERING TECHNOLOGY (FAST) | The Penn State Research Foundation | KUNEMUND, ROBERT M | §103 | Non-Final OA | — | Pending | Nov 14, 2024 | |
| 18865948 | SEMI-FINISHED PRODUCT FOR PRODUCING A PHOTO BOOK, SET FOR PRODUCING A PHOTO BOOK, PHOTO BOOK AND A METHOD FOR PRODUCING A PHOTO BOOK | Peleman Industries NV | GRUSBY, REBECCA LYNN | 1785 | §102§103§112 | Final Rejection | — | Pending | Nov 14, 2024 |
| 18865822 | CONTROLLED ENVIRONMENT AGRICULTURE SYSTEM AND METHOD | Leftfield Urban Limited | VALENTI, ANDREA M | 3643 | §102§103 | Final Rejection | 22d | Pending | Nov 14, 2024 |
| 18865113 | MITOXANTHRONE DERIVATIVES AS RAS INHIBITORS | Khr Biotec GmbH | ARCORIA, PAUL JOSEPH | §102§103§112 | Non-Final OA | — | Pending | Nov 12, 2024 | |
| 18944774 | SYSTEMS AND METHODS FOR ADAPTIVE CRUISE CONTROL BASED ON ONLINE LEARNING PREFERENCE | Toyota Motor Engineering & Manufacturing North America, Inc. | PALL, CHARLES J | 3663 | §103 | Final Rejection | — | Pending | Nov 12, 2024 |
| 18865174 | NON-CONTACT POWER FEEDING SYSTEM, VEHICLE, AND NON-CONTACT POWER FEEDING POWER RECEIVING DEVICE | DENSO CORPORATION | CHEN, GEORGE YUNG CHIEH | 3628 | §101§102§103§112DP | Non-Final OA | — | Pending | Nov 12, 2024 |
| 18944981 | VEHICLE FRONT SECTION STRUCTURE | Toyota Jidosha Kabushiki Kaisha | ZHUO, WENWEI | §103 | Non-Final OA | — | Pending | Nov 12, 2024 | |
| 18945031 | HYDROGEN TANK SYSTEM | Toyota Jidosha Kabushiki Kaisha | SHRIEVES, STEPHANIE ALEXANDRA | 3753 | §103 | Final Rejection | 31d overdue | Pending | Nov 12, 2024 |
| 18864926 | AIR SAMPLER ADAPTER | Plair SA | MEGNA FUENTES, ANTHONY W | §102§103§112 | Non-Final OA | — | Pending | Nov 12, 2024 | |
| 18945363 | Determining Body Characteristics Based on Images | Allstate Insurance Company | MILEF, ELDA G | 3694 | §101§103 | Non-Final OA | 24d overdue | Pending | Nov 12, 2024 |
| 18705109 | METHOD, SYSTEM, AND NON-TRANSITORY COMPUTER-READABLE RECORDING MEDIUM FOR SUPPORTING LABELING OF SENSOR DATA | Bodit Inc. | BITAR, NANCY | §101§103 | Non-Final OA | — | Pending | Nov 05, 2024 | |
| 18936459 | END-TO-END PRIVACY ECOSYSTEM | Allstate Insurance Company | ZOUBAIR, NOURA | 2434 | §112 | Non-Final OA | — | Pending | Nov 04, 2024 |
| 18934015 | AUTOMATIC QUALITY ASSURANCE FOR INFORMATION RETRIEVAL AND INTENT DETECTION | Forethought Technologies, Inc. | GOLDBERG, IVAN R | 3619 | §101§103 | Final Rejection | — | Pending | Oct 31, 2024 |
| 18861740 | BRACKET, SYSTEM AND METHOD FOR INTERCONNECTING FURNITURE PARTS | Siso A/S | MCDUFFIE, MICHAEL D | 3632 | §102 | Non-Final OA | 28d overdue | Pending | Oct 30, 2024 |
| 18930646 | SELF-SUPERVISED VISION TRANSFORMERS FOR AERIAL IMAGERY RECOGNITION | Allstate Insurance Company | HESS, MICHAEL J | 2481 | §103 | Final Rejection | — | Pending | Oct 29, 2024 |
| 18859704 | APPARATUS AND METHOD FOR ANAESTHETISING POULTRY TO BE SLAUGHTERED | BAADER Food Systems Denmark A/S | PARSLEY, DAVID J | 3643 | §103 | Non-Final OA | — | Pending | Oct 24, 2024 |
| 18924193 | METHOD AND SYSTEM FOR DETERMINING TREATMENT PROBLEM PROVIDED TO USER | Mata Edu, Inc. | SAINT-VIL, EDDY | 3715 | §101 | Non-Final OA | 4d overdue | Pending | Oct 23, 2024 |
| 18923153 | SIDE-STEP CONCRETE SCREEDING APPARATUS | Ligchine International Corporation | CHU, KATHERINE J | §101§102Other | Non-Final OA | — | Pending | Oct 22, 2024 | |
| 18921293 | INFORMATION PROCESSING DEVICE, INFORMATION PROCESSING METHOD, AND NON-TRANSITORY, COMPUTER-READABLE RECORDING MEDIUM | Toyota Jidosha Kabushiki Kaisha | BLACK-CHILDRESS, RAJSHEED O | 2685 | §103§112 | Final Rejection | — | Pending | Oct 21, 2024 |
| 18858017 | CATHETERS, DEVICES, AND METHODS FOR REMOVAL OF MATERIAL FROM HOLLOW BODIES | BARD PERIPHERAL VASCULAR, INC. | TON, MARTIN TRUYEN | 3771 | §102§103§112 | Non-Final OA | 32d overdue | Pending | Oct 18, 2024 |
| 18858038 | METHOD AND SYSTEM FOR DETECTING AND/OR QUANTIFYING MANUFACTURING INACCURACIES | Dappler Labs AB | BEKELE, MEKONEN T | §103 | Non-Final OA | — | Pending | Oct 18, 2024 | |
| 18838687 | METHOD AND APPARATUS FOR PANORAMIC IMAGE BLENDING | Visit Inc. | WILLIAMS, REBECCA COLETTE | §102§103§112 | Non-Final OA | — | Pending | Oct 17, 2024 | |
| 18857112 | ENDOVASCULAR DEVICES WITH EXTENDIBLE SHAVER | BARD PERIPHERAL VASCULAR, INC. | JAMIALAHMADI, MAJID | 3771 | §103 | Final Rejection | 16d overdue | Pending | Oct 15, 2024 |
| 18857008 | CATHETER ASSEMBLIES HAVING A DILATABLE RETRIEVAL BASKET AND METHODS OF USE | BARD PERIPHERAL VASCULAR, INC. | LE, KHOA TAN | 3771 | §102§103 | Non-Final OA | — | Pending | Oct 15, 2024 |
| 18913579 | APPLICATOR FOR USE WITH A MENSTRUAL COLLECTION DEVICE | Menstrual Mates, Inc. | MARCETICH, ADAM M | §102§103§112 | Non-Final OA | — | Pending | Oct 11, 2024 | |
| 18913169 | CLAMPING MECHANISM AND CLAMPING APPARATUS | Qingzhou Pengcheng Packaging Machinery Co., Ltd. | BESLER, CHRISTOPHER JAMES | §102§112 | Non-Final OA | — | Pending | Oct 11, 2024 | |
| 18910239 | FILTER BLOCK ASSEMBLY AND OPTICAL SYSTEM USING THE SAME | Curiosis Co., Ltd. | LAU, EDMOND C | 2884 | §103 | Non-Final OA | — | Pending | Oct 09, 2024 |
| 18855496 | DEUTERATED BENZODIAZEPINE ANALOGS AND METHODS OF USE IN TREATING CANCER | UWM RESEARCH FOUNDATION, INC. | HAVLIN, ROBERT H | §103 | Non-Final OA | — | Pending | Oct 09, 2024 | |
| 18908300 | ADJUSTABLE OUTSERT SYSTEM | Ethics Archery LLC | YOUNGER, KALYN GABRIELLE | §103DP | Non-Final OA | — | Pending | Oct 07, 2024 | |
| 18854398 | VENOUS ABLATION DEVICE | Clearstream Technologies Limited | MENDEZ, KATHERINE H | 3771 | §102§103 | Non-Final OA | — | Pending | Oct 04, 2024 |
| 18904531 | METHOD FOR COUNTING COUGHS BY ANALYZING SOUND SIGNAL, SERVER PERFORMING SAME, AND NON-TRANSITORY COMPUTER-READABLE RECORDING MEDIUM | Soundable Health Korea, Inc. | BLOCH, MICHAEL RYAN | DP | Non-Final OA | — | Pending | Oct 02, 2024 | |
| 18853286 | SYSTEMS AND METHODS OF MONITORING A CATHETER OR SHUNT DEVICE AND FLUID OF THE SYSTEM | BARD PERIPHERAL VASCULAR, INC. | KIM, ERIN ASA | §102§103 | Non-Final OA | — | Pending | Oct 01, 2024 | |
| 18852781 | DIFFUSION DISCRIMINATING GAS SENSORS | Katholieke Universiteit Leuven | TRAN, TRAN M. | §102§103§112 | Non-Final OA | — | Pending | Sep 30, 2024 | |
| 18852553 | Engineered Probiotic Delivery System for Anti-SARS-COV-2 Treatment and Immunity Against Viruses | University Of Cincinnati | OGUNBIYI, OLUWATOSIN A | §102§112Other | Non-Final OA | — | Pending | Sep 30, 2024 | |
| 18851801 | CHEMICAL VAPOR DEPOSITION APPARATUS | Ihi Bernex AG | MCDONALD, RODNEY GLENN | §103 | Non-Final OA | — | Pending | Sep 27, 2024 | |
| 18897766 | SPECIFIC TETRADENTATE COPPER CHELATORS AS ANTICANCER AGENTS | Centre National De La Recherche Scientifique | KIM, SEONG JONG | §103§112 | Non-Final OA | — | Pending | Sep 26, 2024 | |
| 18851443 | A METHOD FOR DETERMINING THE 6D POSE OF A CAMERA USED TO ACQUIRE AN IMAGE OF A SCENE USING A POINT CLOUD OF THE SCENE AND FEATURES | ETH ZÜRICH | HAUK, EMILY ROSE | §103§112 | Non-Final OA | — | Pending | Sep 26, 2024 | |
| 18850995 | INCLINED APPLICATOR TIPS FOR COOLING DEVICES | Recensmedical, Inc. | BLAISE, BRADFORD CHRISTOPHER | 3794 | §102§103§112 | Non-Final OA | — | Pending | Sep 25, 2024 |
| 18892676 | VEHICLE IDENTIFICATION METHOD | Toyota Jidosha Kabushiki Kaisha | MILLER, PRESTON JAY | 3661 | §103§112 | Non-Final OA | — | Pending | Sep 23, 2024 |
| 18891812 | HEALTH FUTURE PROJECTOR | Toyota Research Institute, Inc. | ELSHAER, ALAAELDIN M | 3687 | §101§103 | Non-Final OA | — | Pending | Sep 20, 2024 |
| 18891429 | DISEASE DIAGNOSIS METHOD USING TRAINED MODEL, AND SYSTEM CARRYING OUT SAME | Thyroscope Inc. | SHELDEN, BION A | 3685 | §101 | Non-Final OA | 4d overdue | Pending | Sep 20, 2024 |
| 18891656 | METHOD OF MONITORING DISEASE OF PATIENT ON BASIS OF HEART RATE INFORMATION AND SERVER FOR PERFORMING SAME | Thyroscope Inc. | ANJARIA, SHREYA PARAG | 3796 | §101§103 | Non-Final OA | — | Pending | Sep 20, 2024 |
| 18848646 | METHODS OF POTENTIATING TEMOZOLOMIDE ACTIVITY AGAINST GLIOBLASTOMA CELLS | University Of Cincinnati | SOROUSH, LAYLA | §102§103 | Non-Final OA | — | Pending | Sep 19, 2024 | |
| 18890349 | CALIBRATION NETWORK SYSTEMS AND METHODS OF USING THE SAME | Labsphere, Inc. | SOHRABY, PARDIS | §101DPOther | Non-Final OA | — | Pending | Sep 19, 2024 | |
| 18888784 | TRUCK BED RACK SYSTEM | Dometic Sweden AB | WAGGENSPACK, ADAM J | 3734 | §103§112 | Non-Final OA | 22d overdue | Pending | Sep 18, 2024 |
| 18886524 | SELF-HEAT-BALANCED HSFCC SYSTEMS AND PROCESSES FOR UPGRADING HYDROCARBON FEEDS | Saudi Arabian Oil Company | ROBINSON, RENEE E | 1772 | §103 | Non-Final OA | — | Pending | Sep 16, 2024 |
| 18883664 | SYSTEMS AND METHODS FOR COMPUTATION OFFLOADING DETERMINATION USING MULTI-MODAL USER INPUT | Toyota Motor Engineering & Manufacturing North America, Inc. | LEE, ADAM | §101§102§103§112 | Non-Final OA | — | Pending | Sep 12, 2024 | |
| 18883411 | Method of Manufacturing Power Storage Cell | Toyota Jidosha Kabushiki Kaisha | PEREZ, JELITZA M | §102§103 | Non-Final OA | — | Pending | Sep 12, 2024 | |
| 18882171 | COATED DISCRETE METALLIC PARTICLES AND MULTILAYER STRUCTURES COMPRISING REFLECTIVE CORE LAYERS | Toyota Jidosha Kabushiki Kaisha | TALLMAN, ROBERT E | §101§102§103 | Non-Final OA | — | Pending | Sep 11, 2024 | |
| 18882239 | HYDRAULIC SYSTEM FOR A ROTOR BRAKE, ROTOR BRAKE AND WIND TURBINE | Hawe Hydraulik SE | NGUYEN, DUSTIN T | 3745 | §102§103 | Non-Final OA | — | Pending | Sep 11, 2024 |
| 18828198 | MULTI-LEVEL SWITCHING POWER CONVERTER SYSTEMS | Mission Power Corp. | TRAN, NGUYEN | 2838 | §102§103§112 | Non-Final OA | — | Pending | Sep 09, 2024 |
| 18825745 | SYSTEMS AND METHODS FOR EDGE-DRIVEN OBJECT DETECTION FOR RESOURCE OPTIMIZATION | Toyota Motor Engineering & Manufacturing North America, Inc. | PROTAZI, BRIGITER DIVULALE | 2612 | §103 | Final Rejection | 12d | Pending | Sep 05, 2024 |
| 18824564 | NEW PYRIDINIUM SALT-BASED CHEMICALS AS BIOCIDE AND THEIR USE | Saudi Arabian Oil Company | THOMAE, EVAN GODFREY | 1623 | §103§112 | Non-Final OA | — | Pending | Sep 04, 2024 |
| 18824556 | NOVEL AND DIRECT SYNTHESIS METHOD FOR PYRIDINIUM SALTS BASED ON ALKYL EPOXIDES AND THEIR USE | Saudi Arabian Oil Company | GODENSCHWAGER, PETER F | 1767 | §102§103 | Non-Final OA | — | Pending | Sep 04, 2024 |
| 18821387 | COMPONENT STATUS ESTIMATION SYSTEM, COMPONENT STATUS ESTIMATION METHODS, AND NON-TRANSITORY RECORDING MEDIUM | Toyota Jidosha Kabushiki Kaisha | OSTERHOUT, SHELLEY MARIE | 3669 | §103§112 | Final Rejection | 23d overdue | Pending | Aug 30, 2024 |
| 18819663 | COT LOADING AND UNLOADING SYSTEMS HAVING A FIXED RAIL | Ferno-Washington, Inc. | SMITH, JASON CHRISTOPHER | §102§103§112 | Non-Final OA | — | Pending | Aug 29, 2024 | |
| 18842619 | APPARATUS AND METHOD FOR WEIGHING OBJECTS | Nordischer Maschinenbau Rud. Baader GmbH + Co. KG | SADATE-MOUALEU, MIREILLE SANDRA | §103§112 | Non-Final OA | — | Pending | Aug 29, 2024 | |
| 18819653 | COT LOADING AND UNLOADING SYSTEMS HAVING A FIXED RAIL WITH A REMOVABLE SECTION | Ferno-Washington, Inc. | DIAZ, THOMAS C | §103§112 | Final Rejection | — | Pending | Aug 29, 2024 | |
| 18813978 | AUTONOMOUS DRIVING SYSTEM | Toyota Jidosha Kabushiki Kaisha | HUYNH, CHRISTINE NGUYEN | 3662 | §103 | Non-Final OA | — | Pending | Aug 23, 2024 |
| 18814008 | RECREATIONAL VEHICLE AND POP-UP ROOF | Thor Tech, Inc. | HAWK, NOAH CHANDLER | 3636 | §102§103§112 | Non-Final OA | — | Pending | Aug 23, 2024 |
| 18813981 | RECREATIONAL VEHICLE AND POP-UP ROOF | Thor Tech, Inc. | LYJAK, LORI LYNN | §102§112 | Non-Final OA | — | Pending | Aug 23, 2024 | |
| 18813355 | OPTICAL STRUCTURE FOR SURGICAL MICROSCOPES AND SURGICAL MICROSCOPE | Zumax Medical Co., Ltd. | QURESHI, MARIAM | §103 | Non-Final OA | — | Pending | Aug 23, 2024 | |
| 18839788 | HUMAN TOOTH ORGANOIDS | UNIVERSITEIT HASSELT | MIANO, JOSEPH PAUL | §102§103§112 | Non-Final OA | — | Pending | Aug 20, 2024 | |
| 18810042 | INTEGRATED APPLIANCE HANDLING SYSTEMS | Midea Group Co., Ltd. | MALLON, BRETT PETERSON | 3762 | §102§103 | Non-Final OA | — | Pending | Aug 20, 2024 |
| 18839249 | Single Waveform, Continuous Squarewave Voltammetry for Optimal Calibration Free Sensing | University Of Cincinnati | KAUR, GURPREET | 1759 | §112 | Non-Final OA | — | Pending | Aug 16, 2024 |
| 18805649 | METHOD OF MANUFACTURING FAN-OUT PACKAGING DEVICE AND FAN-OUT PACKAGING DEVICE MANUFACTURED THEREBY | Silicon Box Pte. Ltd. | REAMES, MATTHEW L | §102§103§112Other | Non-Final OA | — | Pending | Aug 15, 2024 | |
| 18804348 | BATTERY GUIDE BLOCKS FOR A BATTERY RECEIVING SPACE OF A MATERIALS HANDLING VEHICLE, AND MATERIALS HANDLING VEHICLES INCORPORATING THE SAME | Crown Equipment Corporation | HANNON, TIMOTHY | §102Other | Non-Final OA | — | Pending | Aug 14, 2024 | |
| 18804970 | A HYDROCRACKING CATALYST COMPRISING HIERARCHICAL ZEOLITE Y AND MESOPOROUS NANO-SIZED ZEOLITE BETA COMPOSITE | Saudi Arabian Oil Company | MCCLAIN, STARFARI TESHAWN | 1736 | §102 | Non-Final OA | — | Pending | Aug 14, 2024 |
| 18837822 | MEMS ELEMENT | Nisshinbo Micro Devices Inc. | BACHNER, ROBERT G | §102 | Non-Final OA | — | Pending | Aug 12, 2024 | |
| 18800769 | SULFONATO RESORCINARENE-COMPLEXED FLUOROQUINOLONES AND METHODS OF USE | University Of Cincinnati | REILLY, SOPHIA JANE | §103§112 | Non-Final OA | — | Pending | Aug 12, 2024 | |
| 18798122 | DEVICE AND METHOD OF DETECTING FALL | BITSENSING INC. | CROSS, JULIANA MARIA | 3648 | §102§103§112 | Non-Final OA | — | Pending | Aug 08, 2024 |
| 18837013 | DISPLAY PANEL AND DISPLAY APPARATUS | BOE TECHNOLOGY GROUP CO., LTD. | GREAVING, JASON JAMES | §103§112Other | Non-Final OA | — | Pending | Aug 08, 2024 | |
| 18836543 | A SEAL FOR SEALING IN A PIPELINE | Per Aarsleff A/S | OMGBA, ESSAMA | §102§103§112 | Non-Final OA | — | Pending | Aug 07, 2024 | |
| 18836201 | FLOATING-TYPE OFFSHORE WIND POWER MOORING SYSTEM CAPABLE OF REDUCING YAW MOTION | Korea Institute Of Ocean Science & Technology | TOLEDO-DURAN, EDWIN J | 3678 | §103§112 | Non-Final OA | — | Pending | Aug 06, 2024 |
| 18794360 | RECOGNITION STATE NOTIFICATION DEVICE | Toyota Jidosha Kabushiki Kaisha | LY, MOYA PHUNG | 3658 | §101§102§112 | Final Rejection | 97d overdue | Pending | Aug 05, 2024 |
| 18793671 | MATCHING LAYER FOR ACOUSTIC TRANSDUCER | The Penn State Research Foundation | WALKER, CHRISTOPHER RICHARD | 3645 | §102§103 | Final Rejection | 46d overdue | Pending | Aug 02, 2024 |
| 18835226 | PROTON RADIOTHERAPY SYSTEM | Region Midtjylland | CASLER, BRIAN L | §102§103§112 | Non-Final OA | — | Pending | Aug 01, 2024 | |
| 18834776 | Lift-Based Peel Separation for Inverted Vat Photopolymerization 3D Printing | University Of Cincinnati | ROBITAILLE, JOHN P | 1743 | §102§103 | Non-Final OA | — | Pending | Jul 31, 2024 |
| 18789880 | SYSTEMS AND METHODS FOR CHARGING A PLURALITY OF ELECTRIC ASSETS | Powerflex Systems, LLC | XU, PETER | §103 | Non-Final OA | — | Pending | Jul 31, 2024 | |
| 18834788 | COMPOSITIONS FOR FOOD COLORING AND ANTIOXIDANT SUPPLEMENTATION DERIVED FROM SORGHUM | Redleaf Biologics, Inc. | CHEN, CATHERYNE | §101§102 | Non-Final OA | — | Pending | Jul 31, 2024 | |
| 18788739 | POSITIVE ELECTRODE ACTIVE MATERIAL PARTICLE, POSITIVE ELECTRODE, AND LITHIUM-ION BATTERY | Toyota Jidosha Kabushiki Kaisha | SMITH, NICHOLAS A | §102§103 | Non-Final OA | — | Pending | Jul 30, 2024 | |
| 18833585 | CXCL9 PEPTIDE FOR THE TREATMENT OF LUNG TISSUE INFLAMMATION IN LUNG INFECTION | Universidade Federal De Minas Gerais | KONOPELSKI SNAVEL, SARA ELIZABETH | §103§112 | Non-Final OA | — | Pending | Jul 26, 2024 | |
| 18776613 | MUCOADHESIVE-PLGA NANOPARTICLES | Prestige Biopharma Limited | YOUNGBLOOD, WILLIAM JUSTIN | 1645 | §102 | Non-Final OA | — | Pending | Jul 18, 2024 |
| 18718318 | MEDICAL EQUIPMENT FOR DIAGNOSING AND MANAGING WOUNDS, AND MEDICAL EQUIPMENT OPERATION METHOD | Finehealthcare | SHIMELES, BEZAWIT NOLAWI | 2673 | §103 | Final Rejection | — | Pending | Jul 18, 2024 |
| 18775365 | TIE PLATE SEPARATOR AND METHOD | B & B Metals, Inc. | KEENAN, JAMES W | 3655 | §102§103 | Non-Final OA | — | Pending | Jul 17, 2024 |
| 18776128 | RESOLUTION GUIDANCE SYSTEM AND METHOD | Verint Americas Inc. | REFAI, SAM M | 3621 | §101 | Non-Final OA | — | Pending | Jul 17, 2024 |
| 18771477 | INDOOR POSITIONING SYSTEM AND METHOD THEREOF USING REFLECTED LIGHT | Seoul National University R&Db Foundation | ALCON, FERNANDO | §112 | Non-Final OA | — | Pending | Jul 12, 2024 | |
| 18764596 | INTELLIGENT SYSTEMS AND METHODS FOR CLICK PRICE GENERATION | Allstate Insurance Company | CARVALHO, ERROL A | 3622 | §101§102§112 | Final Rejection | — | Pending | Jul 05, 2024 |
| 18726463 | Composite Dielectric Material, Capacitor and Methods for producing said Composite Dielectric Material and said Capacitor | UNIVERSITY OF SOUTHERN DENMARK | WIESE, NOAH S | §103§112 | Non-Final OA | — | Pending | Jul 03, 2024 | |
| 18763350 | ELECTRIC VEHICLE | Toyota Jidosha Kabushiki Kaisha | REID JR, CHARLES H | 2834 | §103 | Final Rejection | — | Pending | Jul 03, 2024 |
| 18761922 | AUTONOMOUS DRIVING SYSTEM | Toyota Jidosha Kabushiki Kaisha | STIEBRITZ, NOAH WILLIAM | 3658 | §103 | Final Rejection | 7d | Pending | Jul 02, 2024 |
| 18294049 | ANTI-CORROSION TAPE COMPRISING AT LEAST FOUR PLIES | Denso-Holding GmbH & Co. | PLAKKOOTTAM, DOMINICK L | §102§103§112 | Non-Final OA | — | Pending | Jul 02, 2024 | |
| 18761981 | AUTONOMOUS DRIVING SYSTEM AND CONTROL METHOD | Toyota Jidosha Kabushiki Kaisha | CARDIMINO, CHRISTOPHER RYAN | 3661 | §103 | Non-Final OA | — | Pending | Jul 02, 2024 |
| 18762303 | PORTABLE STORAGE DEVICES AND METHODS OF USING THE SAME | Seat Suite, LLC | MCNURLEN, SCOTT THOMAS | 3734 | §102§103 | Final Rejection | 5d overdue | Pending | Jul 02, 2024 |
| 18725380 | VASCULAR STENOSIS TREATMENT APPARATUS | Suzhou Venmed Technology Co., Ltd. | WHITROCK, ZACHARIAH KIRBY | §103§112 | Non-Final OA | — | Pending | Jun 28, 2024 | |
| 18756589 | VEHICLE DOOR ASSEMBLIES FOR VEHICLES INCLUDING HANDLE SPRING MODULE | Toyota Motor Engineering & Manufacturing North America, Inc. | MERLINO, ALYSON MARIE | 3675 | §102§103§112 | Non-Final OA | — | Pending | Jun 27, 2024 |
| 18756663 | BOWEL CLEANSING COMPOSITION WITH REDUCED DOSAGE ON THE DAY OF EXAMINATION | Hyan Yee Kang | WAX, ROBERT A | §102§103§112 | Non-Final OA | — | Pending | Jun 27, 2024 | |
| 18724545 | DEVICE FOR SYNCHRONIZATION OF FEATURES OF DIGITAL OBJECTS WITH AUDIO CONTENTS | Neuralgarage Private Limited | LI, RAYMOND CHUN LAM | 2614 | §103 | Final Rejection | — | Pending | Jun 26, 2024 |
| 18752647 | METHOD TO SEMI-AUTOMATICALLY DETERMINE VIRTUAL DENTAL OCCLUSION | Materialise N.V. | ORTIZ RODRIGUEZ, CARLOS R | §102 | Non-Final OA | — | Pending | Jun 24, 2024 | |
| 18751637 | ASSEMBLY FOR MACHINING WORKPIECES | P&L GmbH & Co. Kg | COOK, KYLE A | §103§112 | Non-Final OA | — | Pending | Jun 24, 2024 | |
| 18750445 | Vibrational Measurement Assembly for Determining Multiphase Fluid Properties | Saudi Arabian Oil Company | EYASSU, MARRIT | §102§112 | Non-Final OA | — | Pending | Jun 21, 2024 | |
| 18750554 | APPARATUS AND METHOD FOR REVERSE-TIME MIGRATION OF VERTICAL CABLE SEISMIC SURVEY DATA USING DIRECTIONAL PROPAGATION OF RECEIVER WAVEFIELDS | Korea Institute Of Ocean Science & Technology | HUYNH, PHUONG | §101§102§112 | Non-Final OA | — | Pending | Jun 21, 2024 | |
| 18749711 | LIQUID MEDICINE INJECTION DEVICE | Ipv | DIOP, FATIMATA SAHRA | §102 | Non-Final OA | — | Pending | Jun 21, 2024 | |
| 18722254 | SOLUTION ELECTROSPUN FIBERS, COMPOSITIONS COMPRISING THE SAME AND A PROCESS OF MANUFACTURING THEREOF | UNIVERSITEIT GENT | HUSON, MONICA ANNE | 1742 | §103 | Non-Final OA | — | Pending | Jun 20, 2024 |
| 18746164 | ELECTROOSMOTIC PUMP | Ipv | PONTON, JAMES D | §102 | Non-Final OA | — | Pending | Jun 18, 2024 | |
| 18745146 | METHOD FOR CLEANING AN ADDITIVELY MANUFACTURED PART | General Electric Company | WANG, ALEXANDER A | 1741 | §103 | Final Rejection | 29d | Pending | Jun 17, 2024 |
| 18743270 | SYSTEMS AND METHODS FOR GENERATING AND EXPANDING A TAXONOMY | Relx Inc. | CHEUNG, HUBERT G | 2152 | §101§103 | Final Rejection | 41d | Pending | Jun 14, 2024 |
| 18740993 | VEHICLE STAND | Toyota Jidosha Kabushiki Kaisha | BESLER, CHRISTOPHER JAMES | §112Other | Non-Final OA | — | Pending | Jun 12, 2024 | |
| 18719001 | METHOD FOR LAGRE-SCALE PRODUCTION OF LARGE-SIZE LNPs | Etherna Immunotherapies NV | BECKHARDT, LYNDSEY MARIE | 1613 | §103§112 | Non-Final OA | — | Pending | Jun 12, 2024 |
| 18740212 | METHODS AND SYSTEMS FOR PROCESSING A CRUDE OIL FEEDSTOCK | IFP Energies Nouvelles | PO, MING CHEUNG | 1771 | §103 | Non-Final OA | — | Pending | Jun 11, 2024 |
| 18738657 | SYSTEMS AND METHODS FOR COOLING A BATTERY | Toyota Motor Engineering & Manufacturing North America, Inc. | AL SAMIRI, KHALED AHMED ALI | 3700 | §103 | Final Rejection | — | Pending | Jun 10, 2024 |
| 18737359 | SYSTEM, METHOD, AND COMPUTER PROGRAM FOR PROVIDING COGNITIVE AND SOCIAL THERAPY SERVICES TO CHILDREN WITH DEVELOPMENTAL DISABILITIES | Rudolph Child Reserch Center Inc. | GEDRA, OLIVIA ROSE | 3681 | §101§103 | Non-Final OA | 5d | Pending | Jun 07, 2024 |
| 18733058 | MICRONEEDLE ASSEMBLY | Daewoong Therapeutics Inc. | BOSQUES, EDELMIRA | §102§103 | Non-Final OA | — | Pending | Jun 04, 2024 | |
| 18680222 | METHOD FOR MANUFACTURING MICRONEEDLE | Daewoong Therapeutics Inc. | LIANG, SHIBIN | §102§103 | Non-Final OA | — | Pending | May 31, 2024 | |
| 18680016 | STEERING WHEEL AND STEERING MODULE | Toyota Jidosha Kabushiki Kaisha | FIX, THOMAS S | 3618 | §103 | Final Rejection | — | Pending | May 31, 2024 |
| 18678850 | Stowable Boat Top System | White River Marine Group, LLC | VASUDEVA, AJAY | 6212 | §102§103§112 | Non-Final OA | — | Pending | May 30, 2024 |
| 18677035 | SLEEVE FOR AIR SPRING FOR VEHICLE | Iljin Co., Ltd. | BURCH, MELODY M | §102§103 | Non-Final OA | — | Pending | May 29, 2024 | |
| 18675936 | TAPE CASTING APPARATUS AND METHOD OF USING THE SAME | General Electric Company | WOO, JONATHAN BRIAN | 1754 | §103 | Final Rejection | 13d | Pending | May 28, 2024 |
| 18674132 | Lithium Metal Secondary Battery | Toyota Jidosha Kabushiki Kaisha | LUO, KAN | §102§103 | Non-Final OA | — | Pending | May 24, 2024 | |
| 18672418 | Solid Electrolyte Particle | Toyota Jidosha Kabushiki Kaisha | MCNEIL, JENNIFER C | §102§103§112 | Non-Final OA | — | Pending | May 23, 2024 | |
| 18711456 | CLEANING DEVICE AND METHOD FOR CLEANING A LENS | Schneider GmbH & Co. Kg | BERGNER, ERIN FLANAGAN | 1713 | §103 | Final Rejection | — | Pending | May 17, 2024 |
| 18665058 | AIR CIRCULATION DEVICE WITH FILTER CONTROL MECHANISM | Midea Group Co., Ltd. | CARTER, AMY ELIZABETH | §102§103§112 | Non-Final OA | — | Pending | May 15, 2024 | |
| 18662397 | SYSTEMS AND METHODS FOR INSURANCE RATING BASED ON TELEMATICS | Allstate Insurance Company | EKECHUKWU, CHINEDU U | 3695 | §103 | Non-Final OA | — | Pending | May 13, 2024 |
| 18709133 | A ROTOR WITH EMBEDDED MAGNETS FOR A PERMANENT MAGNET MOTOR | Dacs A/S | MULLINS, BURTON S | 2834 | §103 | Final Rejection | 5d overdue | Pending | May 10, 2024 |
| 18659598 | LIDAR DATA PROCESSING METHOD | Sos Lab Co., Ltd. | HAWKINS, ZAKI KEHINDE | §102§103 | Non-Final OA | — | Pending | May 09, 2024 | |
| 18658111 | GAS FLOW SYSTEMS FOR AN ADDITIVE MANUFACTURING MACHINE | General Electric Company | HAUTH, GALEN H | §103 | Non-Final OA | — | Pending | May 08, 2024 | |
| 18658497 | ORGANIC WASTE TREATMENT APPARATUS AND METHOD WITH IMPROVED ENERGY CONSUMPTION EFFICIENCY AND INCREASED TEMPERATURE RISE RATES | Tomorrow Water | MENON, KRISHNAN S | §102§103 | Non-Final OA | — | Pending | May 08, 2024 | |
| 18657041 | CABINETRY FOR RECREATIONAL VEHICLES | Thor Tech, Inc. | WILKENS, JANET MARIE | 3637 | §102§103Other | Non-Final OA | — | Pending | May 07, 2024 |
| 18656717 | STUDENT-INFORMED GENERATIVE EDUCATION PLATFORM | Toyota Research Institute, Inc. | YIP, JACK | 3715 | §103 | Final Rejection | 28d | Pending | May 07, 2024 |
| 18655550 | FLUID MANAGEMENT SYSTEM AND METHODS FOR ADDITIVE MANUFACTURING SYSTEMS | General Electric Company | WILLIAMS, CEDRICK S | 1749 | §103 | Non-Final OA | — | Pending | May 06, 2024 |
| 18656267 | CONDUCTIVE INK COMPOSITION | Enjet Co., Ltd. | YOUNG, WILLIAM D | 1761 | §103§112 | Non-Final OA | — | Pending | May 06, 2024 |
| 18656186 | CONDUCTIVE INK COMPOSITION | Enjet Co., Ltd. | NGUYEN, HAIDUNG D | §102§103DP | Non-Final OA | — | Pending | May 06, 2024 | |
| 18652250 | SIDE MIRROR CONTROL DEVICE AND CONTROL METHOD FOR SIDE MIRROR CONTROL DEVICE | Toyota Jidosha Kabushiki Kaisha | BOURQUINE, MACKENZI TATE | 2872 | §103 | Non-Final OA | — | Pending | May 01, 2024 |
| 18651075 | METHODS AND SYSTEMS FOR TOUCHSCREEN BASED HAPTIC CONTROLLER | Toyota Research Institute, Inc. | MERCADO, GABRIEL S | 2171 | §103§112 | Non-Final OA | 22d overdue | Pending | Apr 30, 2024 |
| 18649042 | LITHIUM ION SECONDARY BATTERY AND MANUFACTURING METHOD THEREOF | Naieel Technology, Inc. | FRANCIS, ADAM JOSEPH | §102§103 | Non-Final OA | — | Pending | Apr 29, 2024 | |
| 18649176 | METHODS OF MAKING HIERARCHICALLY ORDERED CRYSTALLINE MATERIALS | King Abdullah University Of Science And Technology | MCCLAIN, STARFARI TESHAWN | §103 | Non-Final OA | — | Pending | Apr 29, 2024 | |
| 18647074 | METHOD OF MANUFACTURING FAN-OUT PACKAGING DEVICE AND FAN-OUT PACKAGING DEVICE MANUFACTURED THEREBY | Silicon Box Pte. Ltd. | LI, MEIYA | §103§112 | Non-Final OA | — | Pending | Apr 26, 2024 | |
| 18642978 | NATURAL METAL ENRICHMENT USING PRODUCED HYDROCARBON FIELD WATERS | Saudi Arabian Oil Company | PRINCE JR, FREDDIE GARY | §103§112 | Non-Final OA | — | Pending | Apr 23, 2024 | |
| 18642035 | AIR REGISTERS INCLUDING A FIXED BLADE AND ROTATING BARRELS | Toyoda Gosei Co., Ltd. | FAULKNER, RYAN L | §103 | Non-Final OA | — | Pending | Apr 22, 2024 | |
| 18702979 | Catheters, Catheter Assemblies, & Methods | BARD PERIPHERAL VASCULAR, INC. | KHANDKER, RAIHAN R | 3771 | §103 | Final Rejection | 12d | Pending | Apr 19, 2024 |
| 18640716 | HANDLE ASSEMBLIES AND COTS HAVING HANDLE ASSEMBLIES | Ferno-Washington, Inc. | BAILEY, AMANDA LEE | 3673 | §103 | Final Rejection | — | Pending | Apr 19, 2024 |
| 18640746 | FASTENER POST ASSEMBLIES AND EMERGENCY COTS INCLUDING FASTENER POST ASSEMBLIES | Ferno-Washington, Inc. | GUTMAN, HILARY L | 3612 | §112 | Non-Final OA | — | Pending | Apr 19, 2024 |
| 18702090 | VASCULAR OCCLUSION DEVICES AND METHODS FOR OCCLUDING A VESSEL | BARD PERIPHERAL VASCULAR, INC. | HOLWERDA, KATHLEEN SONNETT | 3771 | §102§103 | Non-Final OA | 10d overdue | Pending | Apr 17, 2024 |
| 18632968 | METHOD FOR PRODUCING ANTIBODY POPULATION | Prestige Biologics Co., Ltd. | BATES, KEENAN ALEXANDER | §102§103§112 | Non-Final OA | — | Pending | Apr 11, 2024 | |
| 18699983 | SHORT AMORPHOUS CELLULOSE POLYMERS | Katholieke Universiteit Leuven | LAU, JONATHAN S | §103 | Non-Final OA | — | Pending | Apr 10, 2024 | |
| 18631841 | COOLING DEVICE FOR VEHICLE BATTERY MODULE | Toyota Jidosha Kabushiki Kaisha | LIZARAZU, JESSICA NICOLE | §102§103 | Non-Final OA | — | Pending | Apr 10, 2024 | |
| 18631804 | FIDUCIAL MARKER | Augmedics Ltd. | DAVIS, AMELIE R | 3798 | §103Other | Final Rejection | 2d overdue | Pending | Apr 10, 2024 |
| 18626831 | AUTOMATED AGENT COACHING | Verint Americas Inc. | BOSWELL, BETH V | 3625 | §101 | Non-Final OA | 35d | Pending | Apr 04, 2024 |
| 18623574 | METHODS OF CONVERTING TOLUENE TO BENZENE AND XYLENE USING MESOPOROUS MORDENITE | Saudi Arabian Oil Company | PATEL, SMITA S | §103 | Non-Final OA | — | Pending | Apr 01, 2024 | |
| 18697616 | Continuous Flow Reactor and Process for Synthesis of Substituted Benzoic Acid | COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH | BRADY, KRISTEN WEEKS | §103§112 | Non-Final OA | — | Pending | Apr 01, 2024 | |
| 18622747 | DYNAMIC CONTENT GENERATOR | BOLD Limited | RYLANDER, BART I | §101§103 | Non-Final OA | — | Pending | Mar 29, 2024 | |
| 18619326 | METHODS FOR ADDITIVE MANUFACTURING PARTS WITH INTEGRATED SACRIFICIAL SUPPORTS | CUMMINS INC. | HEVEY, JOHN A | §103§112 | Final Rejection | — | Pending | Mar 28, 2024 | |
| 18617822 | MOBILE TERMINAL AND REMOTE SUPPORT SYSTEM | Toyota Jidosha Kabushiki Kaisha | JAGOLINZER, SCOTT ROSS | 3665 | §103 | Final Rejection | — | Pending | Mar 27, 2024 |
| 18695915 | Integrated Circuit Design for Digital Computing and Information Processing of Mechanical Signals | The Penn State Research Foundation | MAZUMDER, DIDARUL A | §102 | Non-Final OA | — | Pending | Mar 27, 2024 | |
| 18618842 | DEVICE AND METHOD FOR PROCESSING PLASTICS MATERIAL | Coperion GmbH | WOLLSCHLAGER, JEFFREY MICHAEL | 1742 | §102§103 | Non-Final OA | 33d | Pending | Mar 27, 2024 |
| 18617835 | ASSEMBLED BATTERY | Toyota Jidosha Kabushiki Kaisha | BARCENA, CARLOS | §102 | Non-Final OA | — | Pending | Mar 27, 2024 | |
| 18618686 | DEVICE AND METHOD FOR PROCESSING PLASTIC MATERIAL | Coperion GmbH | COOLEY, CHARLES E | §102§103§112 | Non-Final OA | — | Pending | Mar 27, 2024 | |
| 18616313 | MOLECULAR CRYSTAL, ELECTROCHEMICAL DEVICE, AND METHOD FOR PRODUCING MOLECULAR CRYSTAL | Toyota Jidosha Kabusiki Kaisha | SUN, MICHAEL Y | §102§103Other | Non-Final OA | — | Pending | Mar 26, 2024 | |
| 18616328 | ALL-SOLID-STATE BATTERY, METHOD OF PRODUCING BATTERY ELEMENT, AND METHOD OF PRODUCING ALL-SOLID-STATE BATTERY | Toyota Jidosha Kabushiki Kaisha | LA RAIA III, LAWRENCE | §101DP | Non-Final OA | — | Pending | Mar 26, 2024 | |
| 18695621 | DEVICE FOR PROCESSING PRODUCTS | Nordischer Maschinenbau Rud. Baader GmbH + Co. KG | WEEKS, GLORIA R | 3731 | §102 | Final Rejection | 3d overdue | Pending | Mar 26, 2024 |
| 18614919 | ALL SOLID STATE BATTERY | Toyota Jidosha Kabushiki Kaisha | ORTIZ, ARYANA YASMINE | DP | Non-Final OA | — | Pending | Mar 25, 2024 | |
| 18614820 | EXTERNAL ENVIRONMENT RECOGNITION APPARATUS AND METHOD FOR ADJUSTING PARAMETERS OF RECOGNITION ALGORITHM | Toyota Jidosha Kabushiki Kaisha | FRITCHMAN, JOSEPH C | §102§103§112 | Non-Final OA | — | Pending | Mar 25, 2024 | |
| 18615190 | VEHICLES WITH INTERIOR REAR STORAGE STRUCTURES WITH STORAGE PANELS | Toyota Motor Engineering & Manufacturing North America, Inc. | MALIKASIM, JONATHAN L | 3645 | §112 | Final Rejection | — | Pending | Mar 25, 2024 |
| 18613490 | RECREATIONAL VEHICLE WITH A SEAT BELT BRACKET | Hymer GmbH & Co. Kg | MEYER, JACOB B | 3613 | §103§112 | Non-Final OA | — | Pending | Mar 22, 2024 |
| 18614454 | PHASE INVARIANT VARIABLE GAIN AMPLIFIER FOR A WIRELESS SYSTEM | BDCM A2 LLC | RAHMAN, HAFIZUR | §103 | Non-Final OA | — | Pending | Mar 22, 2024 | |
| 18612399 | DRINK CONTAINER | Cool Gear International, LLC | POOS, MADISON LYNN | 3733 | §103 | Non-Final OA | — | Pending | Mar 21, 2024 |
| 18693441 | Rolling Circle Amplification-Coupled Glass Nanopore Counting of Mild Traumatic Brain Injury-Related Salivary miRNAs | The Penn State Research Foundation | BERTAGNA, ANGELA MARIE | §102§103§112 | Non-Final OA | — | Pending | Mar 19, 2024 | |
| 18606411 | ALL SOLID STATE BATTERY | Toyota Jidosha Kabushiki Kaisha | GODO, OLATUNJI A | §103DP | Non-Final OA | — | Pending | Mar 15, 2024 | |
| 18692608 | DEGRADABLE CURING AGENTS, COMPOSITIONS AND CURABLE COMPOSITIONS THEREOF | VITO NV | BOYLE, ROBERT C | §102§103 | Non-Final OA | — | Pending | Mar 15, 2024 | |
| 18604072 | SYSTEM AND METHOD FOR SIMULATION OF MARINE POLLUTION DISPERSION USING NUMERICAL TRACER TECHNIQUE | Korea Institute Of Ocean Science & Technology | HAGOS, EYOB | §101§103§112 | Non-Final OA | — | Pending | Mar 13, 2024 | |
| 18604048 | TRUCK BED EXTENDERS INTEGRATED WITH BED TIE DOWN RAILS | Toyota Motor Engineering & Manufacturing North America, Inc. | ZHUO, WENWEI | 3612 | §103§112 | Final Rejection | — | Pending | Mar 13, 2024 |
| 18691384 | AMINOPEPTIDASE N-SPECIFIC MONOCLONAL ANTIBODIES AND USES THEREOF | UNIVERSITEIT GENT | LANDSMAN, ROBERT S | §112 | Non-Final OA | — | Pending | Mar 12, 2024 | |
| 18601213 | ORGANIC-INORGANIC HYBRID TYPE FIRE-EXTINGUISHING MICROCAPSULE HAVING DOUBLE-WALL STRUCTURE, METHOD FOR MANUFACTURING SAME, AND FIRE-EXTINGUISHING COMPOSITION COMPRISING SAME | Konkuk University Industrial Cooperation Corp. | ANTHONY, JOSEPH DAVID | §103 | Non-Final OA | — | Pending | Mar 11, 2024 | |
| 18595728 | VEHICLE CONTROL DEVICE, STORAGE MEDIUM STORING COMPUTER PROGRAM FOR CONTROLLING VEHICLE AND METHOD FOR CONTROLLING VEHICLE | Toyota Jidosha Kabushiki Kaisha | MERLINO, DAVID P | 3665 | §103 | Final Rejection | 16d overdue | Pending | Mar 05, 2024 |
| 18593263 | ARTIFICIAL INTELLIGENCE AUTOMATED APPLICATION GENERATION | Toyota Motor North America, Inc. | SOUGH, HYUNG SUB | 2192 | §101§103 | Final Rejection | 13d | Pending | Mar 01, 2024 |
| 18688508 | A DEVICE FOR ROCKING A BABY | Membantu Aps | GINES, GEORGE SAMUEL | 3673 | §102§103 | Non-Final OA | — | Pending | Mar 01, 2024 |
| 18591987 | ARTIFICIAL INTELLIGENCE-BASED VEHICLE SOFTWARE MANAGEMENT | Toyota Motor North America, Inc. | GOORAY, MARK A | 2199 | §103 | Final Rejection | — | Pending | Feb 29, 2024 |
| 18590442 | ACTIVE MATERIAL COMPOSITE AND SECONDARY BATTERY | Toyota Jidosha Kabushiki Kaisha | DIAMOND, BRIAN GWYN | §102Other | Non-Final OA | — | Pending | Feb 28, 2024 | |
| 18588497 | GLASS CONTAINERS WITH IMPROVED STRENGTH AND IMPROVED DAMAGE TOLERANCE | Corning Incorporated | HIGGINS, GERARD T | 1785 | §103§112 | Final Rejection | 21d | Pending | Feb 27, 2024 |
| 18582994 | DRIVER MONITORING DEVICE, DRIVER MONITORING METHOD, AND NON-TRANSITORY RECORDING MEDIUM | Toyota Jidosha Kabushiki Kaisha | LEE, HANA | 3662 | §101§103§112 | Final Rejection | 4d overdue | Pending | Feb 21, 2024 |
| 18583560 | ANTIBODY-UREASE CONJUGATES FOR THERAPEUTIC PURPOSES | Helix Biopharma Corporation | PUTTLITZ, KARL J | 1642 | §103§112DP | Non-Final OA | — | Pending | Feb 21, 2024 |
| 18685037 | MYOPEPTIDES AND METHODS OF USE IN TREATING HEART FAILURE | Amgen, Inc. | CHERNYSHEV, OLGA N | §112 | Non-Final OA | — | Pending | Feb 20, 2024 | |
| 18683680 | AUGMENTED REALITY ASSISTANCE FOR OSTEOTOMY AND DISCECTOMY | Augmedics Ltd. | LHYMN, SARAH | 2613 | §103 | Non-Final OA | — | Pending | Feb 14, 2024 |
| 18441035 | SYSTEM AND METHOD TO GENERATE EXTENDED CONTEXT DERIVED FROM CONSUMER RESPONSES | Toyota Research Institute, Inc. | NGUYEN, NGA B | 3625 | §101§103 | Non-Final OA | 9d | Pending | Feb 14, 2024 |
| 18441244 | SENSING ASSEMBLY FOR DICHOTOMIC SENSING | Ksr Ip Holdings, LLC | AURORA, REENA | 2858 | §102 | Final Rejection | 34d | Pending | Feb 14, 2024 |
| 18438943 | Non-Aqueous Electrolyte Secondary Battery | Toyota Jidosha Kabushiki Kaisha | MONDIE, AKIL JALIL | §103§112 | Non-Final OA | — | Pending | Feb 12, 2024 | |
| 18439008 | MOBILE AIR CONDITIONER | Dometic Sweden AB | ZERPHEY, CHRISTOPHER R | 3799 | §103 | Non-Final OA | — | Pending | Feb 12, 2024 |
| 18437898 | ILIAC PIN AND ADAPTER | Augmedics Ltd. | BOLES, SAMEH RAAFAT | §112 | Non-Final OA | — | Pending | Feb 09, 2024 | |
| 18436190 | METHOD OF FORMING IMPROVED INTERFACES AND THIN FILM BY USING HIGH-DENSITY RADICAL | Eq Tech Plus Co., Ltd. | CHOWDHARY, NIMARTA KAUR | 2898 | §102§103§112 | Non-Final OA | — | Pending | Feb 08, 2024 |
| 18434984 | IMAGE-BASED DEMENTIA DIAGNOSIS SYSTEM AND METHOD | Emocog Inc. | SASS, KIMBERLY A. | 3686 | §101 | Non-Final OA | 69d | Pending | Feb 07, 2024 |
| 18435398 | SYSTEM AND METHOD FOR RECOVERING PLASTIC RECYCLING MATERIAL | Coperion GmbH | AYALEW, TINSAE B | 1711 | §103 | Non-Final OA | 33d | Pending | Feb 07, 2024 |
| 18435015 | METHOD AND SYSTEM FOR DIAGNOSING DEMENTIA THROUGH STORY-BASED QUESTION-AND-ANSWER TYPE ASSESSMENT AND STORY-BASED VOICE EXTRACTION | Emocog Inc. | MARSH, OWEN LEWIS | 3796 | §101§112 | Final Rejection | — | Pending | Feb 07, 2024 |
| 18434675 | MACHINE LEARNING DOCUMENT PARSER | BOLD Limited | ANDERSON, SCOTT C | §101§103§112 | Non-Final OA | — | Pending | Feb 06, 2024 | |
| 18433954 | ANOMALY DETECTION DEVICE, ANOMALY DETECTION METHOD, AND COMPUTER PROGRAM FOR DETECTING ANOMALY | Toyota Jidosha Kabushiki Kaisha | SHEN, YUZHEN | 2623 | §103 | Final Rejection | 28d | Pending | Feb 06, 2024 |
| 18433977 | SYSTEMS AND METHODS FOR SELECTING VEHICLES FOR DECENTRALIZED MACHINE LEARNING | Toyota Motor Engineering & Manufacturing North America, Inc. | PANDE, ASHUTOSH | §103 | Non-Final OA | — | Pending | Feb 06, 2024 | |
| 18434024 | SYSTEMS AND METHODS FOR DISTRIBUTED MACHINE LEARNING WITH LESS VEHICLE ENERGY AND INFRASTRUCTURE COST | Toyota Motor Engineering & Manufacturing North America, Inc. | PANDE, ASHUTOSH | §101 | Non-Final OA | — | Pending | Feb 06, 2024 | |
| 18432307 | EDGE-ASSISTED PERSONALIZED HIGH-DEFINITION MAP DELIVERY BASED ON DRIVERS’ INTERESTS | Toyota Motor Engineering & Manufacturing North America, Inc. | ALSOMAIRY, IBRAHIM ABDOALATIF | 3667 | §103 | Non-Final OA | 17d overdue | Pending | Feb 05, 2024 |
| 18432283 | SYSTEMS AND METHODS FOR ELIMINATING FLARING IN AMINE SWEETENING | Saudi Arabian Oil Company | KUMAR, SRILAKSHMI K | 1759 | §112 | Non-Final OA | 6d | Pending | Feb 05, 2024 |
| 18430775 | VEHICLE BATTERY COOLING DEVICE | Toyota Jidosha Kabushiki Kaisha | SONG, KEVIN | §103 | Final Rejection | — | Pending | Feb 02, 2024 | |
| 18294502 | HEART VALVE CLAMP AND MANUFACTURING METHOD THEREFOR | Shanghai Shape Memory Alloy Co., Ltd. | COCHRAN, KARI LEE | 3774 | §102§103§112 | Non-Final OA | — | Pending | Feb 01, 2024 |
| 18430242 | SYSTEMS AND METHODS FOR OBTAINING VIDEO ANALYTIC OUTPUT | Toyota Motor Engineering & Manufacturing North America, Inc. | SUMMERS, GEOFFREY E | 2669 | §103 | Non-Final OA | — | Pending | Feb 01, 2024 |
| 18428526 | AUTOMATED DE-POWDERING OF ADDITIVE MANUFACTURING BUILD | General Electric Company | CAMPBELL, NATASHA N. | 1714 | §103 | Non-Final OA | — | Pending | Jan 31, 2024 |
| 18427125 | BATTERY AND METHOD FOR PRODUCING BATTERY | Toyota Jidosha Kabushiki Kaisha | YUSIF, HUNSUYADOR MUGEESATU | §103 | Non-Final OA | — | Pending | Jan 30, 2024 | |
| 18426999 | SYSTEMS AND METHODS FOR RESOLVING POSITIONAL OFFSETS BETWEEN ADJACENT LIDAR DATA SETS | Toyota Jidosha Kabushiki Kaisha | NAPIER, JAMES WILBURN | §101§102§103 | Non-Final OA | — | Pending | Jan 30, 2024 | |
| 18425778 | VEHICLE RECHARGE MATCHING SYSTEMS AND METHODS | Toyota Motor Engineering & Manufacturing North America, Inc. | HENZE, DAVID V | §101§102§103§112 | Non-Final OA | — | Pending | Jan 29, 2024 | |
| 18424293 | SYSTEM AND METHOD FOR PROVIDING DRIVER ASSISTANCE FEATURES | Toyota Jidosha Kabushiki Kaisha | JIN, GEORGE C. | 3747 | §102§103 | Final Rejection | — | Pending | Jan 26, 2024 |
| 18422654 | SYSTEMS AND METHODS FOR PROCESSING DIGITAL HIGH DEFINITION MAPS | Woven By Toyota, Inc. | SLAUGHTER, ETHAN JAKOB | §102§112 | Non-Final OA | — | Pending | Jan 25, 2024 | |
| 18421231 | SYSTEMS AND METHODS FOR PERSONALIZED FEDERATED LEARNING UNDER BITWIDTH FOR CLIENT RESOURCE AND DATA HETEROGENEITY | Toyota Motor Engineering & Manufacturing North America, Inc. | TSAI, JAMES T | §101§103§112 | Non-Final OA | — | Pending | Jan 24, 2024 | |
| 18421473 | MATTRESS WITH SEGMENTED FOAM CORE | BIA IP Holdco, LLC | BAILEY, AMANDA LEE | 3673 | §103 | Final Rejection | — | Pending | Jan 24, 2024 |
| 18420395 | Power Storage Cell | Toyota Jidosha Kabushiki Kaisha | WEI, YVONNE | §102§103 | Final Rejection | — | Pending | Jan 23, 2024 | |
| 18418922 | POSITIVE ELECTRODE ACTIVE MATERIAL FOR FLUORIDE ION BATTERY AND FLUORIDE ION BATTERY | Toyota Jidosha Kabushiki Kaisha | CULLEN, SEAN P | §103 | Final Rejection | — | Pending | Jan 22, 2024 | |
| 18416528 | AUTOMATED FIRMWARE ANALYSIS AND REPORTING TOOL | Saudi Arabian Oil Company | SIMITOSKI, MICHAEL J | 2493 | §103 | Final Rejection | 23d | Pending | Jan 18, 2024 |
| 18416412 | ENERGY CONVERSION DEVICE AND BATTERY CHARGER ASSEMBLY | Scorpion Steel, LLC | SILVA, FRANK ALEXIS | §103 | Non-Final OA | — | Pending | Jan 18, 2024 | |
| 18414521 | SYSTEMS AND METHODS FOR SMOOTHING A CONTOUR OF AN OBJECT FORMED DURING ADDITIVE MANUFACTURING | General Electric Company | CARDA, DANIELLE MARIE | 1738 | §102§103 | Non-Final OA | — | Pending | Jan 17, 2024 |
| 18578877 | APPARATUS AND METHOD FOR ELECTRON IRRADIATION SCRUBBING | Daphne Technology SA | TURNER, SONJI | 1776 | §102§112 | Non-Final OA | — | Pending | Jan 12, 2024 |
| 18410246 | ROLL FORMING PROCESS WITH HEAT SOURCE LOCATIONS FOR FORMING A METAL ARTICLE WITH SELECTIVE THERMAL FORMING/FLANGING/TRIMMING OPERATIONS | Martinrea International US Inc. | WALCK, BRIAN D | 1738 | §102 | Non-Final OA | — | Pending | Jan 11, 2024 |
| 18410513 | LAMINATED BATTERY, BATTERY STACK, AND METHOD OF MANUFACTURING LAMINATED BATTERY | Toyota Jidosha Kabushiki Kaisha | CANTELMO, GREGG | §102§103§112 | Non-Final OA | — | Pending | Jan 11, 2024 | |
| 18577947 | METHOD AND APPARATUS FOR DETERMINING WORKING CONDITION OF EXCAVATOR | Shanghai Sany Heavy Machinery Co., Ltd. | LI, HELEN | 3665 | §103 | Final Rejection | 22d | Pending | Jan 09, 2024 |
| 18407984 | ADDITIVE MANUFACTURING SUPPORTS AND METHODS FOR USING SAME IN ADDITIVELY MANUFACTURING PARTS | General Electric Company | SMITH, CATHERINE P | 1735 | §102§112 | Non-Final OA | — | Pending | Jan 09, 2024 |
| 18577585 | PEPTIDASE FORMULATION FOR TREATMENT OF MICROBIAL INFECTIONS IN THE UPPER RESPIRATORY TRACT | Zymiq Technology AB | FAN, LYNN Y | 1759 | §101§103§112 | Non-Final OA | — | Pending | Jan 08, 2024 |
| 18400372 | Collet for a Polyaxial Screw Assembly | Seaspine Orthopedics Corporation | SUMMITT, LYNNSY M | 3773 | §102§103DP | Non-Final OA | — | Pending | Dec 29, 2023 |
| 18398360 | SYSTEM AND METHOD FOR ENHANCING RADAR DATA | BITSENSING INC. | HENSON, BRANDON JAMES | 3648 | §103 | Non-Final OA | 3d overdue | Pending | Dec 28, 2023 |
| 18397069 | WAVEGUIDE ANTENNA DEVICE | BITSENSING INC. | HENSON, BRANDON JAMES | 3648 | §102 | Non-Final OA | — | Pending | Dec 27, 2023 |
| 18395927 | WATER PURIFIER FOR PETS | Purrsong, Inc. | KIM, SUN U | 1777 | §102§103 | Non-Final OA | 16d | Pending | Dec 26, 2023 |
| 18573528 | INTRAVASCULAR CROSSING AND ATHERECTOMY APPARATUSES AND METHODS OF USE | BARD PERIPHERAL VASCULAR, INC. | BYRD, BRIGID K | 3771 | §102§103 | Final Rejection | 66d overdue | Pending | Dec 22, 2023 |
| 18257202 | TWO-DIMENSIONAL MATERIAL AND HETEROSTRUCTURES ON AN INTERMEDIATE POLYMER TRANSFER LAYER AND THEIR FABRICATION | Danmarks Tekniske Universitet | KUNEMUND, ROBERT M | 1714 | §102 | Final Rejection | 29d | Pending | Dec 20, 2023 |
| 18544699 | POSITIVE ELECTRODE ACTIVE MATERIAL, LITHIUM ION SECONDARY BATTERY, AND METHOD OF MANUFACTURING POSITIVE ELECTRODE ACTIVE MATERIAL | Toyota Jidosha Kabushiki Kaisha | VENTURA HERNANDEZ, DOUGLAS EDENILSON | §102 | Final Rejection | — | Pending | Dec 19, 2023 | |
| 18571533 | COMPOSITION AND PROCESS FOR AN INFILTRATION AND TRANSPORT MEDIUM FOR ADIPOSE TISSUE CELLS | UNIVERSITEIT GENT | NOBLE, MARCIA STEPHENS | 1632 | §102§103§112 | Non-Final OA | — | Pending | Dec 18, 2023 |
| 18542958 | PACKAGING ENVELOPE INSERTION-TYPE PAPER BUFFER SAFETY MEMBER | K&L Pack Co., Ltd. | DEMEREE, CHRISTOPHER R | 3734 | §102§112 | Final Rejection | 41d | Pending | Dec 18, 2023 |
| 18556515 | SEPARABLE SCREW AND JUICER USING SAME | Hurom Co., Ltd. | ROSARIO-APONTE, ALBA T | §102§103 | Non-Final OA | — | Pending | Dec 15, 2023 | |
| 18540458 | Synthesis of Thiophene Derivatized Polyphenolic Calixarenes | University Of Cincinnati | GREENE, IVAN A | 1619 | §103 | Final Rejection | 113d overdue | Pending | Dec 14, 2023 |
| 18570271 | METHODS AND YEAST CELLS FOR PRODUCTION OF DESATURATED COMPOUNDS | Fmc Agricultural Solutions A/S | MCKNIGHT, CIARA A | 1656 | §103§112DP | Non-Final OA | — | Pending | Dec 14, 2023 |
| 18570210 | SORLA MINI-RECEPTOR FOR TREATMENT OF ALZHEIMER'S DISEASE | Aarhus Universitet | RIGA, MICHAEL ANGELO | 1634 | §112 | Non-Final OA | — | Pending | Dec 14, 2023 |
| 18570291 | WEIGHING AND TRANSPORTATION SYSTEM | BAADER Food Systems USA, Inc. | HULS, NATALIE F | 2855 | §102§112 | Non-Final OA | 20d | Pending | Dec 14, 2023 |
| 18538513 | SYSTEMS, METHODS, AND APPARATUSES FOR INSTITUTING A QUIET BLENDING MODE | Vita-Mix Management Corporation | INSLER, ELIZABETH | §103 | Final Rejection | — | Pending | Dec 13, 2023 | |
| 18536996 | METAL NANOSTRUCTURE PREPARATION METHOD USING GALVANIC REPLACEMENT REACTION, AND METAL NANOSTRUCTURE PREPARED THEREBY | Konkuk University Industrial Cooperation Corp. | SU, XIAOWEI | 1733 | §102 | Non-Final OA | — | Pending | Dec 12, 2023 |
| 18535446 | METHODS OF TRANSPORTING HYDROGEN | Saudi Arabian Oil Company | NASSIRI MOTLAGH, ANITA | §103§112 | Non-Final OA | — | Pending | Dec 11, 2023 | |
| 18535569 | ELECTRONIC DEVICE COOLING SYSTEM | Toyota Motor Engineering & Manufacturing North America, Inc. | SCHULT, ALLEN | 3762 | §103 | Final Rejection | 5d overdue | Pending | Dec 11, 2023 |
| 18535132 | METHODS OF TRANSPORTING HYDROGEN - FISCHER-TROPSCH REACTIONS AND DEHYDROGENATION AT SEPARATE CHEMICAL PROCESSING FACILITIES | Saudi Arabian Oil Company | SIMKINS, SLONE ELIZABETH | 1735 | §103§112 | Non-Final OA | — | Pending | Dec 11, 2023 |
| 18533507 | METHOD AND SYSTEM FOR GENERATING SYNTHESIS VOICE USING STYLE TAG REPRESENTED BY NATURAL LANGUAGE | Neosapience, Inc. | SIRJANI, FARIBA | 2659 | §103 | Non-Final OA | — | Pending | Dec 08, 2023 |
| 18568646 | Drainage System Including Actuation Device For Providing A Negative Pressure For Draining And Collecting Bodily Fluids | BECTON, DICKINSON AND COMPANY | WRUBLESKI, MATTHEW JAMES | 3781 | §103 | Non-Final OA | 3d overdue | Pending | Dec 08, 2023 |
| 18530490 | METHODS OF TRANSPORTING HYDROGEN THAT INCLUDE HYDROCRACKING AND DEHYDROGENATION AT SEPARATE HYDROCARBON PROCESSING FACILITIES | Saudi Arabian Oil Company | CAMPANELL, FRANCIS C | §103Other | Non-Final OA | — | Pending | Dec 06, 2023 | |
| 18530454 | INTEGRATED NAPHTHA REFORMING AND BENZYL TOLUENE PRODUCTION PROCESS | Saudi Arabian Oil Company | CEPLUCH, ALYSSA L | 1772 | §103 | Final Rejection | 56d overdue | Pending | Dec 06, 2023 |
| 18529230 | Battery Replacement Apparatus | Toyota Jidosha Kabushiki Kaisha | ZHOU, ZIXUAN | §102 | Non-Final OA | — | Pending | Dec 05, 2023 | |
| 18526865 | SYSTEMS AND METHODS FOR VEHICLE RECOMMENDATIONS | Toyota Motor Credit Corporation | RUHL, DENNIS WILLIAM | 3626 | §101§102 | Non-Final OA | — | Pending | Dec 01, 2023 |
| 18253517 | MULTIPLEXED METHOD FOR ASSESSING GLOBAL OR GENOMIC LOCUS-SPECIFIC LEVELS OF CHROMATIN MODIFICATION | Epigenica AB | LAFAVE, ELIZABETH ROSE | §101§103§112 | Non-Final OA | — | Pending | Nov 30, 2023 | |
| 18522824 | VEHICLE CONTROLLER, METHOD, AND COMPUTER PROGRAM FOR VEHICLE CONTROL | Toyota Jidosha Kabushiki Kaisha | SHUDY, ANGELINA M | 3668 | §103 | Non-Final OA | 128d overdue | Pending | Nov 29, 2023 |
| 18523383 | MAGNET WIRE WITH A COMPOSITE COATING | Magnekon, S.A. De C.V. | PIERCE, JEREMY R | 1789 | §102§103§112 | Non-Final OA | — | Pending | Nov 29, 2023 |
| 18523344 | EXTENDING NETWORK COORDINATION FOR SHORT-RANGE NETWORKS TO REMOTE DEVICES | Powerflex Systems, LLC | CHEN, ZHITONG | 2649 | §103 | Non-Final OA | 4d overdue | Pending | Nov 29, 2023 |
| 18564398 | PEPTIDES DERIVED FROM RUMINOCOCCUS TORQUES | UNIVERSITY OF COPENHAGEN | STEELE, AMBER D | 1658 | §101§112 | Non-Final OA | — | Pending | Nov 27, 2023 |
| 18514473 | Battery Replacement Apparatus and Battery Replacement Method | Toyota Jidosha Kabushiki Kaisha | LEGASPI, EUGENE REY DEVERA | §102 | Non-Final OA | — | Pending | Nov 20, 2023 | |
| 18514537 | Electrically Powered Vehicle | Toyota Jidosha Kabushiki Kaisha | FANTU, YALKEW | §103 | Non-Final OA | — | Pending | Nov 20, 2023 | |
| 18514398 | Vehicle | Toyota Jidosha Kabushiki Kaisha | ZORIJ, COLIN MICHAEL | §103 | Non-Final OA | — | Pending | Nov 20, 2023 | |
| 18512840 | ALL-SOLID-STATE BATTERY, METHOD OF PRODUCING BATTERY ELEMENT, AND METHOD OF PRODUCING ALL-SOLID-STATE BATTERY | Toyota Jidosha Kabushiki Kaisha | LA RAIA III, LAWRENCE | 1722 | §101DP | Non-Final OA | — | Pending | Nov 17, 2023 |
| 18561862 | METHODS FOR STORING MRNA COMPOSITIONS | Etherna Immunotherapies NV | PRONZATI, GINA | 1633 | §103 | Final Rejection | 8d overdue | Pending | Nov 17, 2023 |
| 18513033 | Battery Replacement Apparatus and Battery Replacement Method | Toyota Jidosha Kabushiki Kaisha | AHMED, ISTIAQUE | 2116 | §103 | Final Rejection | — | Pending | Nov 17, 2023 |
| 18512866 | Battery Replacement Apparatus and Method | Toyota Jidosha Kabushiki Kaisha | KIM, PAUL D | §103 | Non-Final OA | — | Pending | Nov 17, 2023 | |
| 18510581 | SYSTEMS AND METHODS FOR CREATING ENHANCED DOCUMENTS FOR PERFECT AUTOMATED PARSING | BOLD Limited | WILLIS, AMANDA LYNN | 2156 | §103DP | Non-Final OA | 44d overdue | Pending | Nov 15, 2023 |
| 18509974 | REFRIGERATION SYSTEM, ICE MAKER, AND METHODS OF FORMING ICE | Midea Group Co., Ltd. | GAYE, SAMBA NMN | 3763 | §103 | Non-Final OA | — | Pending | Nov 15, 2023 |
| 18388706 | PRE-LITHIATED ELECTRODE MATERIALS AND CELLS EMPLOYING THE SAME | Camx Power LLC | MARTIN, ANGELA J | 1727 | §102§103 | Non-Final OA | 17d overdue | Pending | Nov 10, 2023 |
| 18388365 | LAMINATED BATTERY, BATTERY MODULE, AND METHOD OF MANUFACTURING LAMINATED BATTERY | Toyota Jidosha Kabushiki Kaisha | SUN, MICHAEL Y | §103 | Non-Final OA | — | Pending | Nov 09, 2023 | |
| 18504610 | DRIVER-ASSISTANCE SYSTEM FOR CONTROLLING A SPEED OF A VEHICLE DEPENDENT ON A WEIGHTING OF SPEEDS OF FURTHER VEHICLES IN FRONT OF THE VEHICLE TO EACH OTHER | Fev Group GmbH | WAKELY, REECE ANTHONY | 3667 | §103 | Final Rejection | 29d | Pending | Nov 08, 2023 |
| 18504427 | Actuation Devices Including Fast and Slow Actuators and Methods for Forming the Same | The University Of Texas AT Dallas | AGARED, GABRIEL T | 2846 | §103 | Final Rejection | 63d | Pending | Nov 08, 2023 |
| 18504730 | SEPARATION OF RARE EARTH ELEMENTS | Shine Technologies, LLC | PULLEN, NIKOLAS TAKUYA | 1733 | §103§112 | Final Rejection | 34d | Pending | Nov 08, 2023 |
| 18504298 | Electronic Device for Performing User Authentication by Using User Biometric Information and Operation Method Thereof | Ghost Pass Inc. | CELANI, NICHOLAS P | 2449 | §103 | Non-Final OA | — | Pending | Nov 08, 2023 |
| 18502701 | HYDROCARBON MIXTURES THAT INCLUDE CORROSION INHIBITOR ADDITIVES AND METHODS FOR INHIBITING CORROSION BY USE THEREOF | Saudi Arabian Oil Company | OYER, ANDREW J | 1767 | §103§112 | Non-Final OA | — | Pending | Nov 06, 2023 |
| 18500496 | METHODS FOR MAKING ZEOLITE-Y PARTICLES | Saudi Arabian Oil Company | CALDERON, DAVID ANDREW | 1742 | §103 | Final Rejection | — | Pending | Nov 02, 2023 |
| 18498153 | METHODS AND SYSTEMS FOR FACILITATING ANNOTATION OF VIDEOS | Toyota Jidosha Kabushiki Kaisha | HAUK, EMILY ROSE | 2669 | §103 | Final Rejection | 4d overdue | Pending | Oct 31, 2023 |
| 18288957 | SYNTHETIC METHOD AND CATALYST OF 3-(3-OXO-2-PENTYL)CYCLOPENTYL DIMETHYL MALONATE | Ningxia Xinhua Chemical Co., Ltd. | BONAPARTE, AMY C | 1692 | §103 | Non-Final OA | — | Pending | Oct 30, 2023 |
| 18288977 | METHOD FOR PREPARING TERTIARY AMINE WITH SECONDARY AMINE AS RAW MATERIAL | ZHEJIANG UNIVERSITY | O DELL, DAVID K | 1621 | §102§103§112 | Non-Final OA | — | Pending | Oct 30, 2023 |
| 18288493 | DEVICE FOR DETERMINING A BALL IMPACT IN THE CORNER BETWEEN A WALL AND THE GROUND | Redd Point BV | ARYANPOUR, MITRA | 3711 | §102§103§112 | Non-Final OA | 51d overdue | Pending | Oct 26, 2023 |
| 18495235 | SYSTEMS AND METHODS FOR DETERMINING DIFFERENCES BETWEEN VECTOR DATASETS | Woven By Toyota, Inc. | MAY, ROBERT F | 2154 | §103§112 | Non-Final OA | — | Pending | Oct 26, 2023 |
| 18557208 | POLYPEPTIDE, FUSION-TYPE MULTIMERIC PROTEIN AND USES THEREOF | Sunresin New Materials Co., Ltd. | JONES-FOSTER, ERICA NICOLE | 1656 | §102§112Other | Final Rejection | — | Pending | Oct 25, 2023 |
| 18494224 | Server and Method | Toyota Jidosha Kabushiki Kaisha | SHERR, MARIA CRISTI OWEN | 3697 | §101§103 | Final Rejection | — | Pending | Oct 25, 2023 |
| 18557147 | RECOMBINANT COAGULATION FACTOR VIII AND USE THEREOF | BEIJING MEIKANG GENO-IMMUNE BIOTECHNOLOGY CO., LTD. | BEANE, RANDALL L | 1654 | §102§112 | Non-Final OA | — | Pending | Oct 25, 2023 |
| 18382788 | Power Storage Device and Vehicle | Toyota Jidosha Kabushiki Kaisha | SERVAGNO, SANTINO MICHALE | 1713 | §102§103 | Non-Final OA | — | Pending | Oct 23, 2023 |
| 18382783 | SYSTEMS, METHODS, AND PROGRAM FOR PRESENTING AN INTERVENTION FOR AN ERRONEOUS CAUSE OF BELIEF | Toyota Research Institute, Inc. | CIRNU, ALEXANDRU | 4100 | §101 | Final Rejection | — | Pending | Oct 23, 2023 |
| 18382613 | INFORMATION PROCESSING SYSTEM, CONTROLLER FOR VEHICLE, AND STORAGE MEDIUM | Toyota Jidosha Kabushiki Kaisha | LEVY, MERRITT E | 3663 | §101§103 | Final Rejection | 22d | Pending | Oct 23, 2023 |
| 18382771 | Method of Controlling Battery Replacement and Battery Replacement Control System | Toyota Jidosha Kabushiki Kaisha | ALVAREZ, RAQUEL | §103§112 | Non-Final OA | — | Pending | Oct 23, 2023 | |
| 18556559 | PANCREATIC CANCER DETECTION | Reccan AB | LUSI, ELLIS FOLLETT | 1677 | §102§103§112DP | Non-Final OA | — | Pending | Oct 20, 2023 |
| 18381890 | FINGER PROTECTION SECTION WITH INTEGRATED SWITCHING SYSTEM | Hübner GmbH & Co. Kg | ABRAHAM, JOSE K | §102§103§112 | Non-Final OA | — | Pending | Oct 19, 2023 | |
| 18381708 | MANAGEMENT APPARATUS | Toyota Jidosha Kabushiki Kaisha | IVEY, DANA DESHAWN | 3662 | §103§112 | Non-Final OA | — | Pending | Oct 19, 2023 |
| 18556060 | LITHIUM EXTRACTION METHOD FOR ALKALINE SOLUTION | Sunresin New Materials Co., Ltd. | LUK, VANESSA TIBAY | 1733 | §103§112 | Non-Final OA | — | Pending | Oct 18, 2023 |
| 18489172 | PHASE CHANGE RAM DEVICE AND METHOD FOR FABRICATING THE SAME | Korea Advanced Institute Of Science And Technology | PARENDO, KEVIN A | 2896 | §102§103 | Final Rejection | 33d | Pending | Oct 18, 2023 |
| 18381201 | ELECTRODE, BATTERY, AND METHOD FOR PRODUCING ELECTRODE | Toyota Jidosha Kabushiki Kaisha | MURPHY, RYAN PATRICK | 4100 | §102§103Other | Non-Final OA | — | Pending | Oct 18, 2023 |
| 18555940 | A VACCINE ADJUVANT FOR INFECTIOUS DISEASES | University Of Cincinnati | BARRERA, IMMACULADA | 1671 | §101§102§103§112 | Non-Final OA | — | Pending | Oct 18, 2023 |
| 18380984 | NanoMesh Drug Delivery for Treatment of Brain Tumors | The Johns Hopkins University | KIM, DANIELLE A | 1613 | §103 | Non-Final OA | 25d overdue | Pending | Oct 17, 2023 |
| 18488099 | AR OPTICAL SYSTEM FOR MEASUREMENT OF OCULAR DYSKINESIA WITH QUALITY OF PHOTOGRAPHED IMAGES AND AR APPARATUS INCLUDING THE SAME | Korea Photonics Technology Institute | NIGAM, NATASHA | 2872 | §103§112 | Non-Final OA | — | Pending | Oct 17, 2023 |
| 18380684 | Power Supply System and Method of Controlling Power Supply System | Toyota Jidosha Kabushiki Kaisha | KOUSAR, SADIA | §102§103 | Non-Final OA | — | Pending | Oct 17, 2023 | |
| 18555318 | NERVE CONDUIT | Tissium | MENDEZ, KATHERINE H | 3771 | §102§103§112 | Final Rejection | 16d overdue | Pending | Oct 13, 2023 |
| 18379695 | BATTERY UNIT | Toyota Jidosha Kabushiki Kaisha | WEI, YVONNE | 1748 | §103§112 | Final Rejection | — | Pending | Oct 13, 2023 |
| 18486247 | METHODS FOR TRAINING AND DEPLOYING AN ARTIFICIAL INTELLIGENCE MODEL FOR USE WITH PREDICTING A TASK OUTPUT | Toyota Research Institute, Inc. | TRAN, DAVID HOANG | 2147 | §101§103 | Non-Final OA | — | Pending | Oct 13, 2023 |
| 18379354 | HYBRID STAMPING PROCESS INCORPORATING TRADITIONAL COLD STAMPING WITH SELECTIVE THERMAL FORMING/FLANGING/TRIMMING OPERATIONS | Martinrea International US Inc. | TOLAN, EDWARD THOMAS | 3725 | §102§103 | Final Rejection | 70d | Pending | Oct 12, 2023 |
| 18485436 | VCSEL DIODE AND VCSEL DIODE ARRAY HAVING COMMON ANODE STRUCTURE | Korea Photonics Technology Institute | NIU, XINNING | §103§112 | Non-Final OA | — | Pending | Oct 12, 2023 | |
| 18378193 | VEHICLE WHEEL | Toyota Jidosha Kabushik! Kaisha | KOTTER, KIP T | 3615 | §102§112 | Non-Final OA | — | Pending | Oct 10, 2023 |
| 18554129 | METHODS FOR REDUCING WATER CONSUMPTION, CARBON EMISSIONS AND CHEMICAL USAGE | Wizso Limited | MRUK, BRIAN P | 1761 | §102§103§112 | Non-Final OA | 3d overdue | Pending | Oct 05, 2023 |
| 18377043 | ELECTRODE BODY AND BATTERY | Toyota Jidosha Kabushiki Kaisha | TRAN, UYEN M | 1726 | §103 | Non-Final OA | — | Pending | Oct 05, 2023 |
| 18480949 | METHODS FOR MAKING ZEOLITE-Y PARTICLES | Saudi Arabian Oil Company | CALDERON, DAVID ANDREW | 1742 | §103 | Final Rejection | — | Pending | Oct 04, 2023 |
| 18548718 | METHOD, SYSTEM, AND NON-TRANSITORY COMPUTER-READABLE RECORDING MEDIUM FOR MONITORING OBJECT | Bodit Inc. | CHOI, DAVID | 3684 | §101§112 | Final Rejection | 17d overdue | Pending | Oct 04, 2023 |
| 18376205 | PROCESSING SYSTEM AND METHOD FOR PROCESSING A POLYMER-FILLER COMPOSITION, ESPECIALLY A POLYVINYLCHLORIDE-FILLER COMPOSITION | Coperion GmbH | FISCHER, JUSTIN R | 1749 | §103 | Final Rejection | — | Pending | Oct 03, 2023 |
| 18270408 | METHOD, DEVICE, AND NON-TRANSITORY COMPUTER-READABLE RECORDING MEDIUM FOR ANALYZING VISITOR ON BASIS OF IMAGE IN EDGE COMPUTING ENVIRONMENT | May-I Inc. | ZHAO, LEI | 2668 | §103 | Non-Final OA | 3d overdue | Pending | Oct 03, 2023 |
| 18477724 | DOSAGE IN FILM PACKAGE FORM, A FILM COMPOSITION AND A PROCESS FOR PREPARATION THEREOF | Rks Global Pte. Ltd. | PHAN, DOAN THI-THUC | 1613 | §103§112 | Final Rejection | 4d overdue | Pending | Sep 29, 2023 |
| 18285112 | SYSTEMS AND METHODS FOR TRAINING SYSTEMS TO DETECT OFFENSIVE CYBER OPERATIONS | Aries Security, LLC | KAZIMI, HANI M | 3691 | §101 | Final Rejection | 44d overdue | Pending | Sep 29, 2023 |
| 18374085 | SYSTEM AND METHOD FOR IMPLEMENTING BROADBAND RF COMMUNICATION | Point2 Technology, Inc. | SEYMOUR, JAMES PAUL | 2419 | §103 | Non-Final OA | 22d | Pending | Sep 28, 2023 |
| 18552838 | MEANS AND METHOD FOR CYTOSOLIC DELIVERY | UNIVERSITEIT GENT | HAGHIGHATIAN, MINA | 1616 | §103 | Final Rejection | 12d | Pending | Sep 27, 2023 |
| 18372284 | NEGATIVE ELECTRODE ACTIVE MATERIAL LAYER AND SOLID-STATE BATTERY | Toyota Jidosha Kabushiki Kaisha | CHAU, LINDA N | 1785 | §103 | Final Rejection | — | Pending | Sep 25, 2023 |
| 18371482 | VEHICLE CONTROLLER | Toyota Jidosha Kabushiki Kaisha | IVEY, DANA DESHAWN | 3662 | §103§112 | Final Rejection | 30d | Pending | Sep 22, 2023 |
| 18471418 | METHODS AND SYSTEMS FOR TRACKING ROADWAY LANE MARKINGS | Woven By Toyota, Inc. | WHITTINGTON, JESS G | 3666 | §103 | Final Rejection | 52d overdue | Pending | Sep 21, 2023 |
| 18369877 | All-Solid-State Battery | Toyota Jidosha Kabushiki Kaisha | KOROVINA, ANNA | 1729 | §103 | Final Rejection | — | Pending | Sep 19, 2023 |
| 18282735 | FILTER DEVICE FOR CLEANING AIR, EMBODIED AS A FACE MASK | Universität Kassel | SIPPEL, RACHEL T | 3785 | §103 | Final Rejection | 27d | Pending | Sep 18, 2023 |
| 18282138 | PREECLAMPSIA DIAGNOSIS | Katholieke Universiteit Leuven | WILDER, CYNTHIA B | 1681 | §101§103§112 | Final Rejection | 30d overdue | Pending | Sep 14, 2023 |
| 18466345 | FLUIDIC OSCILLATORS FOR THE PASSIVE COOLING OF ELECTRONIC DEVICES | Toyota Motor Engineering & Manufacturing North America, Inc. | TAVAKOLDAVANI, KAMRAN | 3763 | §103 | Final Rejection | 13d | Pending | Sep 13, 2023 |
| 18466456 | Advanced Battery Bank and Management Thereof | Dometic Sweden AB | OMAR, AHMED H | 1752 | §102§103 | Non-Final OA | — | Pending | Sep 13, 2023 |
| 18243758 | WHEEL HUB ASSEMBLIES AND METHODS OF PRODUCING A WHEEL HUB ASSEMBLY | Iljin Usa Corporation | KOTTER, KIP T | 3615 | §103 | Final Rejection | 6d | Pending | Sep 08, 2023 |
| 18242582 | WORK STATUS MONITORING SYSTEM, WORK STATUS MONITORING METHOD, AND WORK STATUS MONITORING PROGRAM | Toyota Jidosha Kabushiki Kaisha | SHARMIN, ANZUMAN | 2115 | §101§103§112 | Final Rejection | — | Pending | Sep 06, 2023 |
| 18242593 | COMMUNICATION SYSTEM, BASE STATION, AND COMMUNICATION METHOD | Toyota Jidosha Kabushiki Kaisha | YEA, JI-HAE P | 2471 | §112 | Final Rejection | — | Pending | Sep 06, 2023 |
| 18462068 | METHODS FOR OPERATING CONTINUOUS CATALYTIC REFORMER UNITS | Saudi Arabian Oil Company | DOYLE, BRANDI M | 1771 | §103 | Final Rejection | 3d overdue | Pending | Sep 06, 2023 |
| 18242592 | COMMUNICATION SYSTEM AND COMMUNICATION METHOD | Toyota Jidosha Kabushiki Kaisha | PATEL, PARTHKUMAR | 2479 | §103 | Non-Final OA | — | Pending | Sep 06, 2023 |
| 18242567 | NONCONTACT POWER SUPPLY APPARATUS | Toyota Jidosha Kabushiki Kaisha | LIAN, MANG TIN BIK | §103 | Final Rejection | — | Pending | Sep 06, 2023 | |
| 18242594 | PARKINSON'S DISEASE PREDICTION APPARATUS AND PARKINSON'S DISEASE PREDICTION METHOD | Emocog Co., Ltd. | DARRIGRAND, EMILY ANN | §101§102§103 | Non-Final OA | — | Pending | Sep 06, 2023 | |
| 18461872 | DEVICE FOR REDUCING THE AIR RESISTANCE OF RAIL VEHICLES | Hübner GmbH & Co. Kg | SMITH, JASON CHRISTOPHER | 3615 | §103 | Non-Final OA | 20d | Pending | Sep 06, 2023 |
| 18242309 | COMPOSITIONS AND METHODS FOR DETECTION OF A MATERIAL OF INTEREST | Tiax LLC | BOWMAN, ANDREW J | 1717 | §103 | Non-Final OA | — | Pending | Sep 05, 2023 |
| 18239967 | PEDAL ASSEMBLY HAVING A RELEASABLY COUPLED CONNECTOR ASSEMBLY AND METHODS OF FORMING THEREOF | Ksr Ip Holdings, LLC | LE, THANH TAM T | 2831 | §102§103 | Final Rejection | — | Pending | Aug 30, 2023 |
| 18239357 | SYSTEMS AND METHODS FOR SIMULATING CHARGER FOR ELECTRIC VEHICLES | Toyota Research Institute, Inc. | COCCHI, MICHAEL EDWARD | §101§102§103 | Non-Final OA | — | Pending | Aug 29, 2023 | |
| 18237010 | ELECTRODE, BATTERY, AND METHOD FOR PRODUCING ELECTRODE | Toyota Jidosha Kabushiki Kaisha | CHAU, LISA N | 1785 | §102§103§112 | Final Rejection | — | Pending | Aug 23, 2023 |
| 18237006 | BATTERY MODULE AND METHOD OF PRODUCING THE SAME | Toyota Jidosha Kabushiki Kaisha | MAYES, MELVIN C | 1759 | §102§103 | Non-Final OA | — | Pending | Aug 23, 2023 |
| 18236712 | Power Management Apparatus, Power Management System, and Method for Providing Power Service | Toyota Jidosha Kabushiki Kaisha | PARK, SAMUEL SUNWOOK | §103 | Non-Final OA | — | Pending | Aug 22, 2023 | |
| 18236374 | MACHINE LEARNING BASED CLINICAL RESOURCE CONTROLLER | Carefusion 303, Inc. | ANDERSON-FEARS, KEENAN NEIL | §101§103 | Non-Final OA | — | Pending | Aug 21, 2023 | |
| 18547076 | Improved Electrochemical Ammonia Synthesis | The Board Of Trustees Of The Leland Stanford Junior University | RIPA, BRYAN D | 1794 | §103§112 | Non-Final OA | 27d | Pending | Aug 18, 2023 |
| 18234948 | METHOD AND DEVICE FOR CONTROLLING IMPROVED COGNITIVE FUNCTION TRAINING APP | Emocog Co., Ltd. | RASNIC, HUNTER J | 3684 | §101§103 | Non-Final OA | — | Pending | Aug 17, 2023 |
| 18546648 | SUBCUTANEOUS PHOTOBIOMODULATION | Case Western Reserve University | KUO, JONATHAN T | 3792 | §103§112 | Final Rejection | 51d overdue | Pending | Aug 16, 2023 |
| 18233447 | MODEL TRAINING METHOD AND MODEL TRAINING SYSTEM | Toyota Jidosha Kabushiki Kaisha | BASOM, BLAINE T | 2141 | §103 | Final Rejection | — | Pending | Aug 14, 2023 |
| 18233443 | TRAINING DATA GENERATION METHOD AND TRAINING DATA GENERATION SYSTEM | Toyota Jidosha Kabushiki Kaisha | BASOM, BLAINE T | 2141 | §103 | Final Rejection | 29d | Pending | Aug 14, 2023 |
| 18232922 | MICRO VCSEL WITH IMPROVED BEAM QUALITY AND MICRO VCSEL ARRAY | Korea Photonics Technology Institute | HAGAN, SEAN P | 2828 | §103§112 | Final Rejection | — | Pending | Aug 11, 2023 |
| 18276698 | A METHOD FOR OPTIMISING A MACHINING TIME OF A LASER MACHINING PROCESS, METHOD FOR CARRYING OUT A LASER MACHINING PROCESS ON A WORKPIECE, AND LASER MACHINING SYSTEM DESIGNED FOR CARRYING OUT THIS PROCESS | Precitec GmbH & Co. Kg | TRAN, TIFFANY T | 3761 | §102§103 | Non-Final OA | — | Pending | Aug 10, 2023 |
| 18232054 | COMBINATION GENERATOR AND ALTERNATOR ARRANGEMENTS FOR USE IN DIRECT CURRENT CHARGING OF ELECTRIC VEHICLES | Maymaan Research, Inc. | KESSIE, DANIEL | §102§103 | Final Rejection | — | Pending | Aug 09, 2023 | |
| 18231573 | FASTENER HANDLING TOOLS AND METHODS OF HANDLING FASTENERS | Toyota Motor Engineering & Manufacturing North America, Inc. | CHIN, PAUL T | §102§103§112 | Non-Final OA | — | Pending | Aug 08, 2023 | |
| 18364966 | TREATMENT ELEMENT FOR TREATING MATERIAL BY MEANS OF A SCREW MACHINE | Coperion GmbH | BHATIA, ANSHU | 1774 | §102§103 | Non-Final OA | 16d | Pending | Aug 03, 2023 |
| 18263997 | METHOD FOR DETERMINING A TOXICITY AND/OR GROWTH PROMOTION EFFECT OF A TREATMENT OR COMPOUND | UNIVERSITEIT HASSELT | IBRAHIM, MEDINA AHMED | 1662 | §103§112 | Non-Final OA | 37d overdue | Pending | Aug 02, 2023 |
| 18228198 | GENERATION AND EXECUTION OF MELTING PATHS IN ADDITIVE MANUFACTURING | Arcam AB | BACHNER, ROBERT G | 2898 | §101 | Non-Final OA | — | Pending | Jul 31, 2023 |
| 18227470 | FINING PACKAGES FOR GLASS COMPOSITIONS | Corning Incorporated | MILLER, CAMERON KENNETH | 1731 | §103DP | Non-Final OA | 29d | Pending | Jul 28, 2023 |
| 18360483 | Multi-Platform Machine Learning Systems | Allstate Insurance Company | VINCENT, DAVID ROBERT | 2123 | §101 | Non-Final OA | — | Pending | Jul 27, 2023 |
| 18359626 | POLYMER PARTICLE PRODUCTION METHOD | Agency for Science, Technology and Research | ILLING, CAITLIN NORINE | 1767 | §103 | Final Rejection | 23d | Pending | Jul 26, 2023 |
| 18225857 | BATTERY PACK FRAME ASSEMBLIES | Toyota Motor Engineering & Manufacturing North America, Inc. | ARCIERO, ADAM A | 1727 | §103 | Final Rejection | 7d | Pending | Jul 25, 2023 |
| 18262635 | Ultrasonic Catheter System With Longitudinal Pressure Sensing | BARD PERIPHERAL VASCULAR, INC. | LE, KHOA TAN | 3771 | §103 | Non-Final OA | — | Pending | Jul 24, 2023 |
| 18357124 | FLEET MANAGEMENT TOOLS FOR CHARGING STATION OPTIMIZATION | Powerflex Systems, LLC | CHONG CRUZ, NADJA N | 3623 | §102§103§112 | Final Rejection | 5d overdue | Pending | Jul 23, 2023 |
| 18354836 | SECONDARY BATTERY SYSTEM AND MANUFACTURING METHOD OF SECONDARY BATTERY | Toyota Jidosha Kabushiki Kaisha | APICELLA, KARIE O | 1725 | §103 | Non-Final OA | — | Pending | Jul 19, 2023 |
| 18002189 | PULMONARY FORMULATION COMPRISING CANNABINOIDS | Cannovex BV | ARNOLD, ERNST V | 1613 | §103 | Non-Final OA | 52d overdue | Pending | Jul 19, 2023 |
| 18272507 | ZEOLITE CATALYST, PROCESS FOR PREPARATION AND APPLICATION THEREOF | COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH | KETCHAM, HANNAH ELIZABETH | 1692 | §102§112 | Non-Final OA | — | Pending | Jul 14, 2023 |
| 18221688 | POWER STORAGE DEVICE | Toyota Jidosha Kabushiki Kaisha | SCHULER, JACOB JEROME | 1727 | §103 | Final Rejection | 26d | Pending | Jul 13, 2023 |
| 18260875 | Embolisation System for Promoting Blood Clot Formation | Clearstream Technologies Limited | LABRANCHE, BROOKE N | 3771 | §103 | Final Rejection | 14d | Pending | Jul 10, 2023 |
| 18349352 | LASER MACHINING HEAD AND METHOD FOR MACHINING A WORKPIECE | Precitec GmbH & Co. Kg | CHEN, SIMPSON ABRAHAM | 3761 | §103 | Final Rejection | — | Pending | Jul 10, 2023 |
| 18219190 | METHOD OF PRODUCING ELECTRODE, AND ELECTRODE | Toyota Jidosha Kabushiki Kaisha | KHANAL, ARTI | 1746 | §103 | Final Rejection | 43d | Pending | Jul 07, 2023 |
| 18260748 | SPLICE SWITCHING OLIGONUCLEOTIDES TARGETING PSEUDOEXONS | Syddansk Universitet | SHIN, DANA H | 1635 | §101§112 | Non-Final OA | — | Pending | Jul 07, 2023 |
| 18219198 | Sulfide Solid-State Battery, Printed Circuit Board with Sulfide Solid-State Battery, and Manufacturing Method of Sulfide Solid-State Battery | Toyota Jidosha Kabushiki Kaisha | OTERO, KENNETH MAX | 1725 | §103 | Final Rejection | 61d | Pending | Jul 07, 2023 |
| 18218672 | ADDITIVE MANUFACTURING SYSTEMS OR METHODS FOR COMPRESSION OF MATERIAL BASED ON DETECTED TEMPERATURE | GE Avio S.r.l. | DARNELL, BAILEIGH K | 1744 | §103§112 | Non-Final OA | — | Pending | Jul 06, 2023 |
| 18347969 | SEPARATION PLATES, HEAT PUMP SYSTEMS, AND METHODS OF FILTERING CONDENSATE | Midea Group Co., Ltd. | SULLENS, TAVIA L | 3763 | §103 | Final Rejection | — | Pending | Jul 06, 2023 |
| 18218667 | APPARATUS FOR APPLYING A COMPRESSIVE LOAD | GE Avio S.r.l. | GRAHAM, ANDREW D | 1744 | §103 | Non-Final OA | — | Pending | Jul 06, 2023 |
| 18346611 | LASER MACHINING HEAD WITH OVERHEAT PROTECTION DEVICE | Precitec GmbH & Co. Kg | LAZO, THOMAS E | 3745 | §102§103 | Non-Final OA | — | Pending | Jul 03, 2023 |
| 18216777 | TRANSPORT TRAILERS FOR RAISING AND TRANSPORTING DOLLIES | Toyota Motor Engineering & Manufacturing North America, Inc. | KEENAN, JAMES W | 3655 | §103§112 | Non-Final OA | 15d | Pending | Jun 30, 2023 |
| 18270369 | METHOD TO PRODUCE MEDIUM CHAIN FATTY ACIDS | Dranco, Naamloze Vennootschap | HOLLAND, PAUL J | 1656 | §103 | Non-Final OA | — | Pending | Jun 29, 2023 |
| 18343317 | SYSTEMS AND METHODS FOR ADDITIVE MANUFACTURING | General Electric Company | MORENO HERNANDEZ, JERZI H | 1743 | §103§112 | Non-Final OA | 6d | Pending | Jun 28, 2023 |
| 18215231 | SYSTEMS AND METHODS FOR ANALYZING A VEHICLE NOISE | Toyota Motor North America, Inc. | KNUDSON, ELLE ROSE | 3667 | §101 | Final Rejection | — | Pending | Jun 28, 2023 |
| 18259687 | METHOD FOR PRODUCING REGENERATED T CELL VIA IPS CELL | Kotai Biotechnologies, Inc. | SPENCE, JENNIFER SUZANNE | 1633 | §102§103§112DP | Final Rejection | 15d overdue | Pending | Jun 28, 2023 |
| 18269380 | IMMUNE CHECKPOINTS | Vrije Universiteit Brussel | BORGEEST, CHRISTINA M | 1675 | §112 | Final Rejection | 4d overdue | Pending | Jun 23, 2023 |
| 18339677 | SYSTEMS AND METHODS OF VOICEPRINT AUTHENTICATION AND INTERPOLATION | Toyota Connected North America, Inc. | HINCKLEY, CHASE PAUL | 2124 | §101§103 | Final Rejection | 53d | Pending | Jun 22, 2023 |
| 18339750 | SYSTEMS AND METHODS FOR GENERATING VIRTUAL ENVIRONMENTS INCLUDING VEHICLES | Toyota Motor North America, Inc. | SUN, HAI TAO | 2616 | §103 | Non-Final OA | — | Pending | Jun 22, 2023 |
| 18212736 | POWER STORAGE MODULE AND METHOD OF PRODUCING POWER STORAGE MODULE | Toyota Jidosha Kabushiki Kaisha | LIANG, JACKIE | 1726 | §103§112 | Final Rejection | 39d | Pending | Jun 22, 2023 |
| 18212784 | COMPOSITIONS COMPRISING RADIOPAQUE SUBSTANCES WITH IMPROVED BIOABSORBABILITY | Maruchi Co., Ltd. | LI, JUN | 1732 | §103DP | Final Rejection | — | Pending | Jun 22, 2023 |
| 18268861 | VERTICAL AXIS WIND TURBINES AND DEVICES THEREFOR | University Of Cincinnati | GUGGER, SEAN A | 2834 | §103 | Non-Final OA | 32d overdue | Pending | Jun 21, 2023 |
| 18337677 | SYSTEMS AND METHODS FOR STIMULATION PARAMETER CONTRAST (SPC) IMAGING | Case Western Reserve University | WELCH, WILLOW GRACE | 3792 | §101§103 | Final Rejection | 54d | Pending | Jun 20, 2023 |
| 18337705 | SELECTIVE STIMULATION OF GROUPS OF NEURAL ELEMENTS WITHIN A REGION OF THE BRAIN | The UAB Research Foundation | SISON, CHRISTINE ANDREA PAN | 3796 | §103 | Final Rejection | 60d overdue | Pending | Jun 20, 2023 |
| 18336625 | ZEOLITE BETA PARTICLES WITH CENTER-RADIAL CONFIGURED MESOPORES AND METHODS OF MAKING THE SAME | King Abdullah University Of Science And Technology | CALDERON, DAVID ANDREW | 1742 | §102§103 | Final Rejection | — | Pending | Jun 16, 2023 |
| 18257554 | NUCLEIC ACID VACCINES | Adaptvac Aps | LU, CHENG | 1671 | §103§112DP | Non-Final OA | — | Pending | Jun 14, 2023 |
| 18209831 | MODULAR SYSTEM FOR UPSTREAM WASTEWATER SAMPLING | Biobot Analytics, Inc. | FAYYAZ, NASHMIYA SAQIB | 2855 | §103DP | Final Rejection | 86d overdue | Pending | Jun 14, 2023 |
| 18267180 | GENOMIC ANALYSIS METHOD | Perseus Biomics BV | FLINDERS, JEREMY C | 1684 | §102§103 | Non-Final OA | — | Pending | Jun 14, 2023 |
| 18333934 | Microspheres Containing Decellularized Donor Tissue and Their Use in Fabricating Polymeric Structures | Children'S Hospital Medical Center | BOECKELMAN, JACOB A | 1655 | §103 | Non-Final OA | 62d | Pending | Jun 13, 2023 |
| 18333787 | LAYER ORIENTATION CONTROL FOR PIXEL-BASED ADDITIVE MANUFACTURING | General Electric Company | HAUTH, GALEN H | 1700 | §103§112 | Non-Final OA | — | Pending | Jun 13, 2023 |
| 18256775 | COMPOSITIONS, CONSTRUCTS AND VECTORS FOR CELL REPROGRAMMING | Asgard Therapeutics AB | WEHBE, ANNE MARIE SABRINA | 1634 | §103 | Final Rejection | — | Pending | Jun 09, 2023 |
| 18265897 | CHARGED PARTICLE MICROSCOPY MEMS SAMPLE SUPPORT | UNIVERSITEIT ANTWERPEN | STOFFA, WYATT A | 2881 | §103 | Final Rejection | 16d overdue | Pending | Jun 07, 2023 |
| 18255971 | POWDER MANUFACTURING FOR POWDER METALLURGY | Nordic Metals ApS | POLLOCK, AUSTIN M | 1738 | §103 | Final Rejection | 12d | Pending | Jun 05, 2023 |
| 18265366 | IONIZABLE LIPIDS | UNIVERSITEIT GENT | CARR, DEBORAH D | 1691 | §112 | Non-Final OA | — | Pending | Jun 05, 2023 |
| 18255617 | EMBOLISATION SYSTEM FOR PROMOTING CLOT FORMATION | Clearstream Technologies Limited | MCGINNITY, JAMES RYAN | 3771 | §103 | Non-Final OA | 9d | Pending | Jun 02, 2023 |
| 18255623 | SYSTEMS, METHODS AND APPARATUS FOR PRODUCING AN ELECTROLYSIS GAS, HYDROGEN GAS, A HYDROGEN STORAGE AND DELIVERY SYSTEM AND STORAGE CANISTER | Eco-Global Energy Pty Limited | RUFO, LOUIS J | 1795 | §102 | Non-Final OA | — | Pending | Jun 02, 2023 |
| 18205431 | PARALLEL INTERACTION INTERFACE FOR MACHINE LEARNING MODELS | BOLD Limited | ROSTAMI, MOHAMMAD S | 2154 | §101§103 | Final Rejection | 9d overdue | Pending | Jun 02, 2023 |
| 18255748 | A PROCESS AND A KIT FOR DETECTION OF CORONAVIRUS AND OTHER RESPIRATORY VIRUSES | COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH | BARRERA, IMMACULADA | 1671 | §102§103§112 | Final Rejection | 49d overdue | Pending | Jun 02, 2023 |
| 18201278 | AUTOMATED VALET PARKING MANAGEMENT SYSTEM AND AUTOMATED VALET PARKING MANAGEMENT METHOD | Toyota Jidosha Kabushiki Kaisha | ALZATEEMEH, HUSSAM ALDEEN | 3662 | §103 | Non-Final OA | 19d overdue | Pending | May 24, 2023 |
| 18201313 | MANAGEMENT APPARATUS, MANAGEMENT METHOD, AND SETTLEMENT SYSTEM | Toyota Jidosha Kabushiki Kaisha | PARK, YONG S | 3694 | §101§103 | Final Rejection | — | Pending | May 24, 2023 |
| 18038044 | CRISPR/CAS SCREENING SYSTEM MATERIALS AND METHODS | UNIVERSITY OF COPENHAGEN | TRAN, KHOA NHAT | 1632 | §101§103§112 | Final Rejection | — | Pending | May 22, 2023 |
| 18319236 | AUTOMATED FLOODED LEAD-ACID BATTERY MAINTENANCE | Saudi Arabian Oil Company | CHUO, TONY SHENG HSIANG | 1751 | §103§112 | Final Rejection | 77d | Pending | May 17, 2023 |
| 18197289 | INFORMATION PROCESSING APPARATUS, VEHICLE, AND NON-TRANSITORY STORAGE MEDIA | Toyota Jidosha Kabushiki Kaisha | BADERMAN, SCOTT T | 2118 | §103 | Non-Final OA | — | Pending | May 15, 2023 |
| 18252647 | Data Processing Method and Apparatus | BEIJING JINGDONG CENTURY TRADING CO., LTD. | BARNES JR, CARL E | 2178 | §103 | Non-Final OA | 83d | Pending | May 11, 2023 |
| 18036337 | TECHNIQUES FOR COVALENT BONDING OF CARBON NANOTUBES TO SUBSTRATES | University Of Cincinnati | PENNY, TABATHA L | 1712 | §103 | Non-Final OA | 46d | Pending | May 10, 2023 |
| 18036275 | CREATING A BIOMIMETIC VEGAN VERSION OF COLLAGEN USING PLANT-BASED AMINO ACIDS AND OPTIONAL INDUCTORS TO EMULATE THE BODY'S NATURAL COLLAGEN BUILDING PROCESS FOR NUTRACEUTICAL AND COSMECEUTICAL PURPOSES | Corpowell BV | MOAZZAMI, NAGHMEH NINA | 1652 | §103 | Non-Final OA | 43d | Pending | May 10, 2023 |
| 18144820 | AUTONOMOUS AND SEMANTIC OPTIMIZATION APPROACH FOR REAL-TIME PERFORMANCE MANAGEMENT IN A BUILT ENVIRONMENT | University College Cardiff Consultants Limited (Uc3) | MONTES, NARCISO EDUARDO | 2129 | §101§102§103 | Non-Final OA | — | Pending | May 08, 2023 |
| 18142846 | POSITIVE ELECTRODE ACTIVE MATERIAL, LITHIUM-ION SECONDARY BATTERY, AND MANUFACTURING METHOD FOR POSITIVE ELECTRODE ACTIVE MATERIAL | Toyota Jidosha Kabushiki Kaisha | WANG, PIN JAN | 1717 | §102§103 | Final Rejection | 14d | Pending | May 03, 2023 |
| 18311142 | APPARATUS AND METHOD FOR DETERMINING OPERATING PARAMETERS FOR DEGASSING AND/OR DEODORIZING PLASTIC PARTICLES | Coperion GmbH | NIA, FATEMEH ESFANDIARI | 2855 | §103 | Final Rejection | 8d overdue | Pending | May 02, 2023 |
| 18137040 | COLORECTAL CANCER SUBTYPE IDENTIFIER | Indivumed GmbH | BAUSCH, SARAE L | 1699 | §101§102§112 | Final Rejection | 9d | Pending | Apr 20, 2023 |
| 18249941 | A MULTI-LAYERED STRUCTURE HAVING ANTIPAD FORMATIONS | BDCM A2 LLC | KARIMY, TIMOR | 2818 | §102§112 | Non-Final OA | 26d | Pending | Apr 20, 2023 |
| 18303903 | SYSTEMS AND METHODS FOR MANAGING VIRTUAL VEHICLES ASSOCIATED WITH CORRESPONDING PHYSICAL VEHICLES | Toyota Connected North America, Inc. | SAX, TIMOTHY PAUL | 3698 | §103 | Non-Final OA | — | Pending | Apr 20, 2023 |
| 18135888 | SECONDARY BATTERY SYSTEM | Toyota Jidosha Kabushiki Kaisha | RAMOS RIVERA, GILBERTO | 1725 | §103 | Non-Final OA | — | Pending | Apr 18, 2023 |
| 18249174 | SPHEROIDAL SELF-ASSEMBLED PEPTIDE HYDROGELS COMPRISING CELLS | Tampere University Foundation Sr | BOWERS, ERIN M | 1653 | §103 | Final Rejection | — | Pending | Apr 14, 2023 |
| 18031453 | METHOD, SYSTEM, AND APPARATUS FOR PROCESSING WAFER | Meere Company Inc. | LARSON, JOHN MICHAEL | 3723 | §102§103 | Non-Final OA | — | Pending | Apr 12, 2023 |
| 18133365 | Data Processing System for Secure Data Sharing and Customized Output Generation | Allstate Insurance Company | MALHOTRA, SANJEEV | 3691 | §101 | Non-Final OA | — | Pending | Apr 11, 2023 |
| 18132652 | METHOD AND APPARATUS FOR ASSIGNING REMOTE OPERATION ON VEHICLE TO REMOTE OPERATOR, AND NON-TRANSITORY COMPUTERREADABLE STORAGE MEDIUM | Toyota Jidosha Kabushiki Kaisha | XIE, THEODORE L | 3623 | §103§112 | Final Rejection | — | Pending | Apr 10, 2023 |
| 18131941 | TURNING DIRECTION PREDICTION SYSTEM, MOVING SYSTEM, TURNING DIRECTION PREDICTION METHOD, AND PROGRAM | Toyota Jidosha Kabushiki Kaisha | ORANGE, DAVID BENJAMIN | 2663 | §102 | Final Rejection | 14d | Pending | Apr 07, 2023 |
| 18295615 | Sports Training Goggle | Edward Allen Sprigler | DEAN, RAY ALEXANDER | 2872 | §103 | Final Rejection | — | Pending | Apr 04, 2023 |
| 18128388 | POSITIVE ELECTRODE ACTIVE MATERIAL, PREPARATION METHOD THEREOF, AND POSITIVE ELECTRODE | Centre National De La Recherche Scientifique | CARRICO, ROBERT SCOTT | 1727 | §103 | Non-Final OA | — | Pending | Mar 30, 2023 |
| 18123167 | WEARABLE ITEMS | Rheon Labs Ltd. | EMRICH, LARISSA ROWE | 1789 | §103 | Non-Final OA | — | Pending | Mar 17, 2023 |
| 18122428 | ELECTRIC VEHICLE | Toyota Jidosha Kabushiki Kaisha | WEINMANN, RYU-SUNG PETER | 2859 | §103 | Final Rejection | 23d overdue | Pending | Mar 16, 2023 |
| 18121847 | ALL SOLID STATE BATTERY AND METHOD FOR PRODUCING ALL SOLID STATE BATTERY | Toyota Jidosha Kabushiki Kaisha | BARTON, JEFFREY THOMAS | 1726 | §103DP | Final Rejection | 32d overdue | Pending | Mar 15, 2023 |
| 18121857 | ALL SOLID STATE BATTERY AND ALL SOLID STATE BATTERY SYSTEM | Toyota Jidosha Kabushiki Kaisha | MARROQUIN, DOUGLAS C | 1723 | §103 | Final Rejection | — | Pending | Mar 15, 2023 |
| 18245046 | CLOSURE DEVICES, VASCULAR REPAIR ASSEMBLIES, AND METHODS FOR REPAIRING VEIN VALVE INSUFFICIENCY | BARD PERIPHERAL VASCULAR, INC. | MANNAN, MIKAIL A | 3774 | §103 | Non-Final OA | — | Pending | Mar 13, 2023 |
| 18182840 | SYSTEMS AND METHODS FOR LEASE DEFERRAL BASED ON WEATHER DATA | Toyota Motor North America, Inc. | BROWN, LUIS A | 3626 | §101 | Final Rejection | 5d overdue | Pending | Mar 13, 2023 |
| 18044876 | RETRO - INVERSO REGULATORY T CELL EPITOPES | Epivax, Inc. | MARTINEZ, TARA L | 1654 | §101§102§112DP | Non-Final OA | — | Pending | Mar 10, 2023 |
| 18119542 | SULFIDE SOLID ELECTROLYTE AND SOLID STATE BATTERY | Toyota Jidosha Kabushiki Kaisha | KERNS, KEVIN P | 1735 | §102§103 | Non-Final OA | 76d | Pending | Mar 09, 2023 |
| 18119519 | DEVICE, METHOD AND COMPUTER PROGRAM FOR SCORING SLEEP QUALITY | BITSENSING INC. | HOLMES, REX R | 3796 | §101 | Final Rejection | 29d | Pending | Mar 09, 2023 |
| 18043940 | SOLID-PHASE SYNTHESIS CARRIER, PREPARATION METHOD THEREFOR AND USE THEREOF | Sunresin New Materials Co., Ltd. | REDDY, KARUNA P | 1763 | §102§103§112 | Non-Final OA | — | Pending | Mar 03, 2023 |
| 18043470 | DOPED DLC FOR TRIBOLOGICAL APPLICATIONS | Ihi Ionbond AG | DAVIS, SHENG HAN | 1732 | §103 | Non-Final OA | 3d overdue | Pending | Feb 28, 2023 |
| 18023969 | Method for Analyzing a Workpiece Surface for a Laser Machining Process and Analysis Device for Analyzing a Workpiece Surface | Precitec GmbH & Co. Kg | TRAN-LE, THAO UYEN | 3761 | §103§112 | Final Rejection | — | Pending | Feb 28, 2023 |
| 18175144 | BIOREACTOR ASSEMBLIES, PERFUSION BIOREACTOR SYSTEMS, AND METHODS | Advanced Solutions Life Sciences, LLC | HASSAN, LIBAN M | 1799 | §102§103§112 | Non-Final OA | — | Pending | Feb 27, 2023 |
| 18113782 | METHOD FOR RECOMMENDING FINANCIAL PRODUCT SALES STRATEGY BASED ON DETECTION OF FINANCIAL PRODUCTS IN SIMILAR TREND | Moneystation Inc. | BUI, TOAN D. | 3693 | §101 | Final Rejection | 28d | Pending | Feb 24, 2023 |
| 18111049 | APPARATUS, METHOD AND COMPUTER PROGRAM FOR GENERATING DE-IDENTIFIED TRAINING DATA FOR CONVERSATIONAL SERVICE | Tunib Inc. | VAUGHN, RYAN C | 2127 | §101§103§112 | Non-Final OA | — | Pending | Feb 17, 2023 |
| 18041727 | ANNEXIN A1-DERIVED POLYPEPTIDE ANALOGUES | Reso Ther Pharma A/S | BEANE, RANDALL L | 1654 | §103§112DP | Final Rejection | 20d | Pending | Feb 15, 2023 |
| 18041729 | ANNEXIN A1 N-TERMINAL PEPTIDE FORMULATIONS AND METHODS | Resother Pharma A/S | NIEBAUER, RONALD T | 1658 | §102§103§112DP | Final Rejection | — | Pending | Feb 15, 2023 |
| 18041485 | COMPOSITIONS AND METHODS OF PRODUCTION THEREOF | Optibiotix Limited | AL-AWADI, DANAH J | 1615 | §112 | Non-Final OA | — | Pending | Feb 13, 2023 |
| 18041455 | METHODS, ASSEMBLY AND SYSTEM FOR HIGH-THROUGHPUT, PARALLEL MONITORING OF REACTION SYSTEMS | Danmarks Tekniske Universitet | NGUYEN, HENRY H | 1758 | §103§112 | Non-Final OA | — | Pending | Feb 13, 2023 |
| 18108168 | INFORMATION PROCESSING APPARATUS AND INFORMATION PROCESSING SYSTEM FOR CONTROLLING OPERATION OF AUTONOMOUS VEHICLES BASED ON VISIBILITY OF LANES | Toyota Jidosha Kabushiki Kaisha | MATTA, ALEXANDER GEORGE | 3668 | §103 | Final Rejection | 142d overdue | Pending | Feb 10, 2023 |
| 18167172 | HYDRAULIC LOCKING DEVICE FOR AN EXOSKELETON JOINT AND EXOSKELETON JOINT | Hawe Hydraulik SE | PATEL, AREN | 3774 | §103 | Final Rejection | — | Pending | Feb 10, 2023 |
| 18108080 | METHOD FOR PERFORMING SYNTHETIC SPEECH GENERATION OPERATION ON TEXT | Neosapience, Inc. | WITHEY, THEODORE JOHN | 2655 | §103 | Non-Final OA | — | Pending | Feb 10, 2023 |
| 18108172 | POLYMER POROUS FILM, SEPARATOR FOR BATTERY, ELECTRODE UNIT, ELECTRODE FRAMEWORK, BATTERY, AND METHOD OF PRODUCING POLYMER POROUS FILM | Toyota Jidosha Kabushiki Kaisha | HEMINGWAY, TIMOTHY G | 1754 | §103 | Non-Final OA | 23d | Pending | Feb 10, 2023 |
| 18020100 | HEART VALVE ASSEMBLY AND PREPARATION METHOD THEREFOR | Shanqian (Zhuhai) Biomaterials Technology Co., Ltd. | WOZNICKI, JACQUELINE | 3774 | §102§103 | Non-Final OA | — | Pending | Feb 07, 2023 |
| 18106779 | CHIP-ON-CHIP POWER CARD HAVING EMBEDDED THERMAL CONDUCTOR | Toyota Motor Engineering & Manufacturing North America, Inc. | MELLINGER, CORBYN DAVID | 2899 | §102§103§112 | Final Rejection | — | Pending | Feb 07, 2023 |
| 18103925 | BATTERY PACK FRAME ASSEMBLIES | Toyota Motor Engineering & Manufacturing North America, Inc. | DIGNAN, MICHAEL L | 1723 | §103 | Non-Final OA | 34d | Pending | Jan 31, 2023 |
| 18040084 | NOVEL PEPTIDES AND USES THEREOF | Aarhus Universitet | WANG, CHANG YU | 1675 | §112DP | Non-Final OA | — | Pending | Jan 31, 2023 |
| 18103063 | CHARGING SYSTEM | Toyota Jidosha Kabushiki Kaisha | KOUSAR, SADIA | 2859 | §103 | Final Rejection | — | Pending | Jan 30, 2023 |
| 18160166 | SYSTEMS AND METHODS FOR IMPROVED SEARCH AND INTERACTION WITH AN ONLINE PROFILE | BOLD Limited | DAUD, ABDULLAH AHMED | 2164 | §103 | Final Rejection | 29d | Pending | Jan 26, 2023 |
| 18156591 | ADVERSARIAL SIMULATION FOR DEVELOPING AND TESTING ASSISTIVE DRIVING TECHNOLOGY | Toyota Research Institute, Inc. | BODENDORF, ANDREW | 3715 | §101§103 | Final Rejection | — | Pending | Jan 19, 2023 |
| 18156722 | METHODS, SYSTEMS, AND NON-TRANSITORY COMPUTER-READABLE STORAGE MEDIA FOR SHARING A VEHICLE | Toyota Motor North America, Inc. | ULLAH, ARIF | 3625 | §103 | Final Rejection | — | Pending | Jan 19, 2023 |
| 18005944 | SYSTEMS AND METHODS RELATING TO WATER ELECTROLYSIS | The Penn State Research Foundation | CHUNG, HOSUNG CHARLES | 1794 | §103 | Final Rejection | 20d | Pending | Jan 18, 2023 |
| 18016325 | Cell culture vessel capable of obtaining a clean image by preventing distortion and dew condensation during cell imaging and method for producing same | Curiosis Co.,Ltd | RAMDHANIE, BOBBY | 1779 | §103§112 | Non-Final OA | — | Pending | Jan 13, 2023 |
| 18004122 | THERAPEUTIC NUCLEIC ACIDS, PEPTIDES AND USES I | Imperial College Innovations Limited | LEONARD, ARTHUR S | 1631 | §112 | Non-Final OA | — | Pending | Jan 03, 2023 |
| 18012798 | PROGNOSIS OF CHRONIC INFLAMMATORY DEMYELINATING POLY-NEUROPATHY | Katholieke Universiteit Leuven | IVICH, FERNANDO NMN | 1678 | §101§102§103 | Non-Final OA | 4d overdue | Pending | Dec 23, 2022 |
| 18069650 | METHODS AND COMPOSITIONS FOR THE TREATMENT OF ALS | University Of Cincinnati | ARON, KIMBERLY A | 1633 | §103 | Final Rejection | — | Pending | Dec 21, 2022 |
| 18009449 | IMPLANTABLE DEVICE FOR ORGAN OPERATION MODULATION | VANDERBILT UNIVERSITY | PATEL, NIKETA I | 3792 | §103 | Final Rejection | — | Pending | Dec 09, 2022 |
| 18076700 | NIR TO SWIR FLUORESCENT COMPOUNDS FOR IMAGING AND DETECTION | PerkinElmer Health Sciences, Inc. | PERREIRA, MELISSA JEAN | §102§103§112 | Non-Final OA | — | Pending | Dec 07, 2022 | |
| 18000941 | NEW USE OF RABEXIMOD | Cyxone AB | RODRIGUEZ, RAYNA B | 1628 | §102§112 | Non-Final OA | 184d overdue | Pending | Dec 07, 2022 |
| 18007516 | FEEDBACK PROVIDING FACIAL MASKS | University Of Cincinnati | ZHANG, TINA | 3785 | §103 | Non-Final OA | 73d overdue | Pending | Dec 01, 2022 |
| 17994900 | AUTOMATIC QUALITY CATEGORIZATION METHOD AND SYSTEM FOR PHARMACEUTICAL GLASS CONTAINERS | Corning Incorporated | LEE, HWA S | 2877 | §103§112 | Non-Final OA | — | Pending | Nov 28, 2022 |
| 17992008 | IMPLANT FOR CORRECTING A DEFECT OF A BONE STRUCTURE WITH NAVIGATION FIDUCIALS | Materialise NV | BLASS, PARIS MARIE | 3774 | §102§103§112 | Non-Final OA | — | Pending | Nov 22, 2022 |
| 17990137 | METHOD OF FECAL SAMPLE PREPARATION FOR AUTOMATED IMAGE ANALYSIS | Parasight System Inc. | LYONS, MARY M | 1645 | §103§112 | Non-Final OA | 149d overdue | Pending | Nov 18, 2022 |
| 17989415 | DEFLECTORS FOR ION BEAMS AND MASS SPECTROMETRY SYSTEMS COMPRISING THE SAME | Perkinelmer Health Sciences Canada, Inc. | GASSEN, CHRISTOPHER J | 2881 | §103§112 | Non-Final OA | — | Pending | Nov 17, 2022 |
| 17989124 | ALL-SOLID-STATE BATTERY AND METHOD FOR PRODUCING IT | Panasonic Holdings Corporation | HAMMOND, KRISHNA R | 1725 | §103 | Non-Final OA | 40d | Pending | Nov 17, 2022 |
| 17987919 | CHARGING SYSTEM, SAFETY MANAGEMENT PROGRAM FOR CHARGING SYSTEM AND SAFETY MANAGEMENT METHOD FOR CHARGING SYSTEM INCLUDING CHARGING CABLE PREDETERMINED SAFETY CONDITIONS | Toyota Jidosha Kabushiki Kaisha | HERNANDEZ, MANUEL J | 2859 | §103 | Final Rejection | 22d | Pending | Nov 16, 2022 |
| 17998620 | Air Conditioning Unit | Dometic Sweden AB | MALLON, BRETT PETERSON | 3762 | §103 | Final Rejection | — | Pending | Nov 11, 2022 |
| 17980705 | DECOMPOSITION OF GAS FIELD CHEMICALS BY PLASMA TREATMENT | Saudi Arabian Oil Company | DIETERLE, JENNIFER M | 1779 | §102 | Non-Final OA | — | Pending | Nov 04, 2022 |
| 17923124 | Stem Cells for Treatment of Respiratory Disorders | Xintela AB | JOHNSON, ALLISON MARIE | 1638 | §103§112 | Final Rejection | — | Pending | Nov 03, 2022 |
| 17978300 | Prevention and treatment of bone and cartilage damage or disease | Xintela AB | NOBLE, MARCIA STEPHENS | 1632 | §101 | Final Rejection | — | Pending | Nov 01, 2022 |
| 17975107 | GRAPHENE BASED ADSORBENT MATERIAL FOR A SCRUBBER CONNECTED BY A VENT PORT TO AN EVAP CANISTER AND FORMING A PORTION OF A VEHICLE EVAP EMISSIONS MANAGEMENT SYSTEM FOR PREVENTING BLEED EMISSIONS AND PROVIDING LOW FLOW RESTRICTIONS | Martinrea International US Inc. | BUI, DUNG H | 1773 | §103 | Non-Final OA | 149d overdue | Pending | Oct 27, 2022 |
| 17776723 | PROCESS FOR PRODUCING AN ORALLY ADMINISTERED PHARMACEUTICAL COMPOSITION WITH COLONIC DELIVERY | Shanghai Ethypharm Pharmaceuticals Co. Ltd. | BASQUILL, SEAN M | 1614 | §103 | Final Rejection | 29d overdue | Pending | Oct 26, 2022 |
| 17973938 | ISOLATION OF FETAL CELLS USING FACS | Arcedi Biotech ApS | SVEIVEN, MICHAEL CAMERON | 1678 | §102§103DP | Non-Final OA | — | Pending | Oct 26, 2022 |
| 17972053 | GREEN HIGH STRENGTH CEMENT | William Marsh Rice University | GUINO-O UZZLE, MARITES A | 1731 | §103 | Non-Final OA | 2d overdue | Pending | Oct 24, 2022 |
| 17996748 | DRAINAGE SHUNT DEVICES AND METHODS FOR DRAINING ASCITES FLUID FROM PERITONEAL CAVITIES | Carefusion 2200, Inc. | WENG, KAI H | 3781 | §103 | Non-Final OA | — | Pending | Oct 20, 2022 |
| 17968115 | VIRUS-LIKE PARTICLE WITH EFFICIENT EPITOPE DISPLAY | UNIVERSITY OF COPENHAGEN | CHEN, STACY BROWN | 1672 | §112DP | Non-Final OA | 164d overdue | Pending | Oct 18, 2022 |
| 17917214 | PEPTIDE TAGS AND BINDING PARTNERS | Adaptvac Aps | JAUHARI, SACHI | 1654 | §112 | Non-Final OA | — | Pending | Oct 05, 2022 |
| 17959809 | BIOERODIBLE LIFE SUPPORT HYDROGELS FOR THE DELIVERY OF VIABLE MITOCHONDRIA | UNIVERSITY OF KENTUCKY RESEARCH FOUNDATION | TAKENAKA, RISA | 1632 | §103 | Final Rejection | 31d overdue | Pending | Oct 04, 2022 |
| 17958738 | TRACTION CONTROLLER, TRACTION CONTROL METHOD, AND NON-TRANSITORY COMPUTER-READABLE STORAGE MEDIUM | Toyota Jidosha Kabushiki Kaisha | LI, HELEN | 3665 | §103 | Final Rejection | 36d overdue | Pending | Oct 03, 2022 |
| 17954928 | FINING PACKAGES FOR GLASS COMPOSITIONS | Corning Incorporated | BOLDEN, ELIZABETH A | 1731 | §102§103§112 | Non-Final OA | 26d | Pending | Sep 28, 2022 |
| 17907455 | A FLEXIBLE FOIL FOR THE DELIVERY OF THERAPEUTIC CARGOS | UNIVERSITY OF COPENHAGEN | KWON, JOHN SEUNGJAI | 1615 | §103 | Final Rejection | — | Pending | Sep 27, 2022 |
| 17912162 | Heating Apparatus and Recreational Vehicle With Heating Apparatus | Dometic Sweden AB | WARD, THOMAS JOHN | 3761 | §112 | Non-Final OA | 29d | Pending | Sep 16, 2022 |
| 17906138 | TREATMENT OF EPILEPSY | Katholieke Universiteit Leuven | FETTEROLF, BRANDON J | 1626 | §112 | Final Rejection | 27d | Pending | Sep 12, 2022 |
| 17941141 | VEHICLE POSITION ESTIMATION METHOD AND VEHICLE CONTROL SYSTEM | Toyota Jidosha Kabushiki Kaisha | WAKELY, REECE ANTHONY | 3667 | §103 | Final Rejection | 30d | Pending | Sep 09, 2022 |
| 17940722 | LANCING AND BLOOD GLUCOSE LEVEL MEASURING DEVICE | Lameditech Co., Ltd. | HERBERT, MADISON TAYLOR | 1797 | §103 | Non-Final OA | 3d overdue | Pending | Sep 08, 2022 |
| 17909538 | SYSTEM AND METHOD FOR REPORTING AN ENVIRONMENT CHARACTERISTIC FROM A MAIN VEHICLE TO A CLOUD SERVER | Toyota Motor Europe | ALKIRSH, AHMED | 3668 | §103 | Non-Final OA | — | Pending | Sep 06, 2022 |
| 17909187 | METHODS OF CONTROLLING BODYWEIGHT BY MODULATING PHOSPHATIDYLINOSITOL 5-PHOSPHATE 4-KINASE BETA ACTIVITY | University Of Cincinnati | PENNINGTON, KATIE LEIGH | 1634 | §112 | Final Rejection | — | Pending | Sep 02, 2022 |
| 17905374 | COMPOSITIONS AND METHODS FOR ELECTRO-CHEMICAL CELL COMPONENT FABRICATION | Navitas Systems, LLC | PAGE, HANA C | 1745 | §103 | Non-Final OA | 33d | Pending | Aug 31, 2022 |
| 17908086 | DIFFUSIVITY CONTRAST AGENTS FOR MEDICAL IMAGING | Jinghua Wang | SHOMER, ISAAC | 1612 | §101§112 | Non-Final OA | 3d overdue | Pending | Aug 30, 2022 |
| 17905282 | Electrochemical ammonia synthesis | Danmarks Tekniske Universitet | RIPA, BRYAN D | 1794 | §103 | Final Rejection | 8d | Pending | Aug 30, 2022 |
| 17892347 | MULTI-STAGE VACUUM MEMBRANE DISTILLATION SYSTEM AND PROCESS | King Fahd University Of Petroleum & Minerals | GEISBERT, WILLIAM ADDISON | 1779 | DP | Final Rejection | — | Pending | Aug 22, 2022 |
| 17801157 | METHOD FOR ANALYSING A WELD DURING LASER WELDING OF WORKPIECES | Precitec GmbH & Co. Kg | NGUYEN, PHUONG T | 3761 | §103 | Non-Final OA | 44d overdue | Pending | Aug 19, 2022 |
| 17800418 | OPTIMIZED METHOD FOR BEVACIZUMAB PURIFICATION | Prestige Biopharma Pte. Ltd. | HUANG, RYAN | 1777 | §103 | Non-Final OA | 53d | Pending | Aug 17, 2022 |
| 17820452 | METHOD FOR DETECTION OF ESCHERICHIA COLI AND ANTIBIOTIC RESISTANT BACTERIA IN WATER | Eastern Kentucky University | AFREMOVA, VERA | 1653 | §103§112 | Final Rejection | 19d overdue | Pending | Aug 17, 2022 |
| 17799556 | Wavelength Supplemented Light Bulbs and Lighting Fixtures | University Of Cincinnati | LUQUE, RENAN | 2896 | §102§103 | Non-Final OA | 3d overdue | Pending | Aug 12, 2022 |
| 17886072 | VEHICLE CONTROLLER, VEHICLE, POWER SUPPLY SYSTEM, DISCHARGE CONNECTOR, POWER EQUIPMENT, AND POWER SUPPLY METHOD | Toyota Jidosha Kabushiki Kaisha | FLYNN, ABBY J | 3663 | §102§103 | Non-Final OA | — | Pending | Aug 11, 2022 |
| 17817497 | METHODS FOR MANUFACTURING PANEL ASSEMBLIES | Toyota Motor Engineering & Manufacturing North America, Inc. | RAIMUND, CHRISTOPHER W | 1746 | §103 | Non-Final OA | — | Pending | Aug 04, 2022 |
| 17797391 | REFLECTARRAY ANTENNA FOR ENHANCED WIRELESS COMMUNICATION COVERAGE AREA | BDCM A2 LLC | PATEL, AMAL A | 2845 | §102§103§112 | Final Rejection | 56d | Pending | Aug 03, 2022 |
| 17796798 | Customizable Extended Reality Patient Simulator and Method Thereof for Healthcare Education | Ves, LLC | BROCKETTI, JULIE K | 3700 | §102§103 | Non-Final OA | 18d overdue | Pending | Aug 01, 2022 |
| 17878624 | LAYERED MANUFACTURING OF SINGLE CRYSTAL ALLOY COMPONENTS | General Electric Company | WUNDERLICH, ERWIN J | 3761 | §103§112 | Non-Final OA | — | Pending | Aug 01, 2022 |
| 17796630 | METHOD OF MAKING MINERAL FIBRES | Rockwool A/S | HERRING, LISA L | 1741 | §103Other | Final Rejection | 13d | Pending | Jul 29, 2022 |
| 17796588 | METHOD FOR MAKING MAN-MADE VITREOUS FIBRES | Rockwool A/S | HERRING, LISA L | 1741 | §103Other | Final Rejection | 13d | Pending | Jul 29, 2022 |
| 17876993 | Method of Demineralizing Bone with an Ionic Solution | Newsouth Innovations Pty Ltd | PAULUS, ERIN VIRGINIA | 1631 | §103§112 | Final Rejection | 20d | Pending | Jul 29, 2022 |
| 17815849 | METHOD OF TREATING HER2-POSITIVE BREAST CANCER | University Of Cincinnati | PERSONS, JENNA L | 1637 | §112 | Final Rejection | 4d overdue | Pending | Jul 28, 2022 |
| 17873271 | INFLUENCE SCORING FOR SEGMENT ANALYSIS SYSTEMS AND METHODS | Verint Americas Inc. | FEACHER, LORENA R | 3625 | §101 | Final Rejection | 72d | Pending | Jul 26, 2022 |
| 17869401 | MATED COMPONENTS AND METHOD AND SYSTEM THEREFORE | General Electric Company | MANCINI, EVAN THOMAS | 2855 | §102§103 | Final Rejection | — | Pending | Jul 20, 2022 |
| 17792571 | RADIONUCLIDE-LHRH CONJUGATES FOR DIAGNOSIS OF REPRODUCTIVE CANCERS | Eastern Kentucky University | DONOHUE, SEAN R | 1618 | §103§112Other | Final Rejection | 8d | Pending | Jul 13, 2022 |
| 17863046 | PRIVACY ECOSYSTEM ENVIRONMENTAL IMPACT MONITORING | Allstate Insurance Company | STEWART, CRYSTOL | 3624 | §101§102§103§112 | Non-Final OA | 16d | Pending | Jul 12, 2022 |
| 17863131 | USER-CONTROLLED VEHICLE TELEMATICS | Allstate Insurance Company | GEE, JASON KAI YIN | 2495 | §112 | Non-Final OA | — | Pending | Jul 12, 2022 |
| 17862828 | SYSTEMS AND METHODS FOR OPERATING A PARKING FACILITY | Spothero, Inc. | GOODMAN, MATTHEW PARKER | 3628 | §101 | Non-Final OA | 140d overdue | Pending | Jul 12, 2022 |
| 17791788 | MONITORING OF A LASER MACHINING PROCESS USING A NEUROMORPHIC IMAGE SENSOR | Precitec GmbH & Co. Kg | DODSON, JUSTIN C | 3761 | §103§112 | Non-Final OA | 15d | Pending | Jul 08, 2022 |
| 17789357 | HIGHLY SELECTIVE ULTRATHIN POLYMER NANOFILM COMPOSITE MEMBRANE AND PROCESS FOR PREPARATION THEREOF | COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH | HUANG, RYAN | 1777 | §103§112 | Final Rejection | 34d | Pending | Jun 27, 2022 |
| 17841423 | Metal Ion Separation Technique Using pH Adjustment And Resin Packed Columns | Shine Technologies, LLC | FUNG, CHING-YIU | 1732 | §112 | Non-Final OA | — | Pending | Jun 15, 2022 |
| 17784859 | NON-VIRAL VECTORS COMPRISING POLYPROPYLENEIMINE | UNIVERSITEIT GENT | BOATENG, AFUA BAMFOAA | 1614 | §103§112 | Non-Final OA | 67d overdue | Pending | Jun 13, 2022 |
| 17784286 | SUPPORTING DEVICE FOR SUPPORTING A BODY PART OF A USER | Co12 GmbH | FISHER, VICTORIA HICKS | 3786 | §101§103 | Non-Final OA | — | Pending | Jun 10, 2022 |
| 17783955 | Yeast cells and methods for production of E8,E10-dodecadienyl coenzyme A, codlemone and derivatives thereof | Fmc Agricultural Solutions A/S | ROBINSON, HOPE A | 1652 | §112 | Non-Final OA | — | Pending | Jun 09, 2022 |
| 17783948 | MODIFIED INTERFERON-ALPHA-2 HAVING REDUCED IMMUNOGENICITY | CONSEJO NACIONAL DE INVESTIGACIONES CIENTÍFICAS Y TÉCNICAS | PATTERSON, SARAH COOPER | 1675 | §112 | Final Rejection | — | Pending | Jun 09, 2022 |
| 17783393 | GRAPHENE-BASED GAS SENSING PLATFORM | The Penn State Research Foundation | HERON, VELVET ELIZABETH | 1798 | §103 | Non-Final OA | 35d overdue | Pending | Jun 08, 2022 |
| 17781647 | SEALING ARRANGEMENT, FILTER AND FILTER HOUSING, METHOD OF MONITORING LEAK TIGHTNESS, AND LEAK TIGHTNESS MONITORING SYSTEM | Camfil AB | SLAUGOVSKY, RACHEL MARIE | 1776 | §103 | Final Rejection | 29d | Pending | Jun 01, 2022 |
| 17778901 | COMPOSITIONS FOR REPROGRAMMING CELLS INTO DENDRITIC CELLS TYPE 2 COMPETENT FOR ANTIGEN PRESENTATION, METHODS AND USES THEREOF | Asgard Therapeutics AB | MONTANARI, DAVID A | 1632 | §103 | Final Rejection | — | Pending | May 23, 2022 |
| 17776129 | A QUANTUM RANDOM NUMBER GENERATOR | Danmarks Tekniske Universitet | KLOSTERMAN II, JEROME ANTHONY | 2182 | §103§112 | Non-Final OA | — | Pending | May 11, 2022 |
| 17742307 | PREDICTING A SET OF FITTED KNOWLEDGE ELEMENTS | Zendesk, Inc. | MAC, GARY | 2127 | §101§103§112 | Non-Final OA | — | Pending | May 11, 2022 |
| 17739298 | RESIN FRAME AND BATTERY MODULE | Toyota Jidosha Kabushiki Kaisha | BILLIET, AMANDA JUNE | 1729 | §102§103§112 | Final Rejection | — | Pending | May 09, 2022 |
| 17773209 | System for Use in Sealing a Portion of Pleural Layers Together | BARD PERIPHERAL VASCULAR, INC. | CLARK, RYAN T | 3794 | §103 | Non-Final OA | — | Pending | Apr 29, 2022 |
| 17768525 | Agonist of Tacr2 | UNIVERSITY OF COPENHAGEN | BEANE, RANDALL L | 1654 | §102§103 | Final Rejection | — | Pending | Apr 13, 2022 |
| 17719833 | LOW-TEMPERATURE PLASMA CATHETER FOR LESS-INVASIVE, LOCALIZED TREATMENT OF ENDOCARDITIS AND ATHEROSCLEROSIS | The Penn State Research Foundation | DELLA, JAYMI E | 3794 | §103§112 | Non-Final OA | 168d overdue | Pending | Apr 13, 2022 |
| 17767642 | LASER WORKING SYSTEM FOR PERFORMING A WORKING PROCESS ON A WORKPIECE BY MEANS OF A LASER BEAM AND METHOD FOR MONITORING A WORKING PROCESS ON A WORKPIECE BY MEANS OF A LASER BEAM | Precitec GmbH & Co. Kg | SCHNASE, PAUL DANIEL | 2877 | §103 | Non-Final OA | — | Pending | Apr 08, 2022 |
| 17715208 | SYSTEM AND METHOD FOR PETROPHYSICAL MODELING AUTOMATION BASED ON MACHINE LEARNING | Saudi Arabian Oil Company | OCHOA, JUAN CARLOS | 2186 | §101§103§112 | Non-Final OA | — | Pending | Apr 07, 2022 |
| 17705675 | DELIVERY SYSTEMS FOR IMPLANTS | Clearstream Technologies Limited | DUBOSE, LAUREN | 3771 | §103§112 | Non-Final OA | 22d | Pending | Mar 28, 2022 |
| 17704696 | TOOL FOR SCAN PATH VISUALIZATION AND DEFECT DISTRIBUTION PREDICTION | General Electric Company | NORTON, JOHN J | 3700 | §112 | Non-Final OA | — | Pending | Mar 25, 2022 |
| 17693669 | FAULT TOLERANT BATTERY ARCHITECTURE | Camx Power LLC | KYLE, MADISON LEIGH | 1722 | §103 | Final Rejection | — | Pending | Mar 14, 2022 |
| 17641840 | DEVICE FOR PROCESSING A PARTICLE FOAM MATERIAL TO PRODUCE A PARTICLE FOAM MOULDED PART | Siegfried Hofmann GmbH | ROY, DEBJANI | 1741 | §103 | Non-Final OA | 29d | Pending | Mar 10, 2022 |
| 17310869 | MAINTENANCE METHOD FOR A LIFT SYSTEM, WHICH VERIFIES MAINTENANCE STEPS | Tk Elevator Innovation And Operations GmbH | CARRASQUILLO, JORGE L | 2846 | §101 | Final Rejection | 16d | Pending | Mar 10, 2022 |
| 17632323 | COMPOUND FOR COMBINATION TREATMENT | Initiator Pharma A/S | MCKOY, QUINCY ANDRE | 1626 | §103 | Final Rejection | 157d overdue | Pending | Feb 02, 2022 |
| 17585749 | LASER PROCESSING HEAD HAVING A DIAPHRAGM TO INCREASE SCAN FIELD OF THE LASER BEAM | Precitec GmbH & Co. Kg | KERR, ELIZABETH M | 3761 | §103 | Non-Final OA | — | Pending | Jan 27, 2022 |
| 17597659 | COMPOSITIONS FOR MAINTAINING OR MODULATING MIXTURES OF ETHER LIPID MOLECULES IN A TISSUE OF A HUMAN SUBJECT | BAKER HEART AND DIABETES INSTITUTE | RICCI, CRAIG D | 1611 | §103§112 | Non-Final OA | — | Pending | Jan 17, 2022 |
| 17562589 | SYSTEM FOR DETERMINING FEATURE OF ACRYLONITRILE BUTADIENE STYRENE USING ARTIFICIAL INTELLECTUAL AND OPERATION METHOD THEREOF | Daejin Advanced Materials Inc. | SANFORD, DIANA PATRICIA | 1687 | §101§102§103§112Other | Non-Final OA | 31d overdue | Pending | Dec 27, 2021 |
| 17620167 | BIODEGRADABLE DRUG-ELUTING EMBOLIC PARTICLES FOR DELIVERY OF THERAPEUTIC AGENTS | Jeffrey Wang | KWON, JOHN SEUNGJAI | 1615 | §103 | Final Rejection | 19d | Pending | Dec 17, 2021 |
| 17617131 | COMPRESSED SOLID COMPOSITION FOR MRI | Ascelia Pharma AB | MEJIAS, SAMANTHA LEE | 1618 | §103Other | Non-Final OA | — | Pending | Dec 07, 2021 |
| 17617191 | RED BLOOD CELL STORAGE SOLUTIONS, ADDITIVES, AND METHODS FOR IMPROVING THE STORAGE OF RED BLOOD CELLS USING INORGANIC PYROPHOSPHATES | University Of Cincinnati | BEHARRY, ZANNA MARIA | 1632 | §103 | Final Rejection | 8d | Pending | Dec 07, 2021 |
| 17612461 | WET WIPER APPARATUSES FOR USE IN ADDITIVE MANUFACTURING APPARATUSES | General Electric Company | SHUM, KENT N | 3723 | §103 | Non-Final OA | — | Pending | Nov 18, 2021 |
| 17607130 | SOLID FOOD COMPOSITION | Gloobe Pte. Ltd. | PURDY, KYLE A | 1611 | §103 | Non-Final OA | — | Pending | Oct 28, 2021 |
| 17507187 | SYSTEMS AND METHODS FOR PROTOTYPE GENERATION | Toyota Research Institute, Inc. | NGUYEN, NHAT HUY T | 2147 | §103 | Final Rejection | 13d | Pending | Oct 21, 2021 |
| 17604559 | MRNA FORMULATION | Vrije Universiteit Brussel | HOPKINS, SAMANTHA LAKE | 1641 | §103DP | Final Rejection | — | Pending | Oct 18, 2021 |
| 17602891 | BREATH ANALYSIS DEVICE | Pnoe Inc. | XU, JUSTIN | 3791 | §103§112 | Non-Final OA | — | Pending | Oct 11, 2021 |
| 17599188 | METHODS AND COMPOSITIONS RELATING TO TREATMENT OF CANCER | The Penn State Research Foundation | MAHLUM, JONATHAN DAVIS | 1625 | §103Other | Non-Final OA | 42d overdue | Pending | Sep 28, 2021 |
| 17439970 | MEDICAL DEVICE WITH DRUG-ELUTING COATING ON MODIFIED DEVICE SURFACE | BARD PERIPHERAL VASCULAR, INC. | DANIEL, ANTARIUS S | 3783 | §103§112 | Non-Final OA | — | Pending | Sep 16, 2021 |
| 17409188 | SYSTEMS AND METHODS FOR DYNAMIC CHOICE FILTERING | Toyota Research Institute, Inc. | LI, LIANG Y | 2143 | §103 | Non-Final OA | 36d overdue | Pending | Aug 23, 2021 |
| 17431928 | SEALANT DELIVERY APPARATUS, AND SYSTEM AND METHOD FOR PREPARING SAME, FOR USE IN A LUNG PROCEDURE | C.R. Bard, Inc. | DIPERT, FORREST BLAKE | 3783 | §103 | Non-Final OA | 27d | Pending | Aug 18, 2021 |
| 17396342 | CONTAINER FOR IMMERSION BLENDER | Vita-Mix Management Corporation | MCCARTY, PATRICK M | 1774 | §103 | Final Rejection | 19d overdue | Pending | Aug 06, 2021 |
| 17393262 | PIPELINED FFT WITH LOCALIZED TWIDDLE | BDCM A2 LLC | MAGLOIRE, VLADIMIR | 3648 | §103 | Non-Final OA | — | Pending | Aug 03, 2021 |
| 17426365 | ELECTROCHEMICAL WAVEFORM FOR CALIBRATION-FREE AND BASAL LEVEL SENSING WITH APTASENSORS | University Of Cincinnati | JOHANNSEN, DIANA B | 1682 | §101§102§112 | Non-Final OA | — | Pending | Jul 28, 2021 |
| 17420556 | mRNA Vaccine | Etherna Immunotherapies NV | PATTERSON, SARAH COOPER | 1675 | Other | Final Rejection | 34d | Pending | Jul 02, 2021 |
| 17353258 | HYDRAULIC LIFTING DEVICE FOR A CHASSIS OF A MOBILE DEVICE, CHASSIS AND MOBILE DEVICE | Hawe Hydraulik SE | COLLINS, DANIEL S. | 3745 | §103 | Final Rejection | 11d overdue | Pending | Jun 21, 2021 |
| 17239210 | METHODS AND SYSTEMS FOR VENOUS DISEASE TREATMENT | VENCLOSE, INC. | ZIEGLER, ABIGAIL M | 3794 | §103 | Final Rejection | 34d | Pending | Apr 23, 2021 |
| 17231522 | ELECTRONIC DEVICES AND METHODS FOR DISPLAYING INFORMATION ON ELECTRONIC DISPLAYS BASED ON LEARNED USER BEHAVIOR | Toyota Research Institute, Inc. | HOPE, DARRIN | 2178 | §103 | Non-Final OA | — | Pending | Apr 15, 2021 |
| 17283995 | VIRALLY EXPRESSED INHIBITORS OF PDZ DOMAINS, SUCH AS PICK1 AND USES THEREOF | UNIVERSITY OF COPENHAGEN | ZAHORIK, AMANDA MARY | 1636 | §112 | Non-Final OA | — | Pending | Apr 09, 2021 |
| 17283378 | SINGLE-MOLECULE EPIGENETIC LOCALIZATION | Chancellor, Masters And Scholars Of The Unviversity Of Oxford | SALMON, KATHERINE D | 1682 | §103§112 | Non-Final OA | — | Pending | Apr 07, 2021 |
| 17265718 | TEST TO ASSESS LIVER DISEASE SEVERITY | University Of Cincinnati | IVICH, FERNANDO NMN | 1600 | §101§103§112 | Final Rejection | — | Pending | Feb 03, 2021 |
| 17264196 | HEALTHCARE MONITORING SYSTEM | Medisyne Limited | FREDRICKSON, COURTNEY B | 3783 | §103 | Non-Final OA | 73d overdue | Pending | Jan 28, 2021 |
| 17253255 | MOTOR VEHICLE, COMPRISING AN APPARATUS FOR OUTPUTTING AN AUDIO SIGNAL TO A PASSENGER COMPARTMENT OF THE MOTOR VEHICLE | Ask Industries GmbH | NELESKI, ELIZABETH ROSE | 3658 | §103 | Final Rejection | — | Pending | Dec 17, 2020 |
| 17054618 | MICROSPHERES CONTAINING RADIOACTIVE ISOTOPES AND OTHER MARKERS AND ASSOCIATED METHODS | BARD PERIPHERAL VASCULAR, INC. | BAEK, JONGHWAN NMN | 1618 | §103§112 | Non-Final OA | 53d | Pending | Nov 11, 2020 |
| 17054552 | RADIOEMBOLIZATION DELIVERY DEVICE | BARD PERIPHERAL VASCULAR, INC. | ZAMORY, JUSTIN L | 3783 | §102§103 | Final Rejection | 43d | Pending | Nov 11, 2020 |
| 16971377 | MC4R Agonist Efficacy in Subjects with MC4R Deficiencies and Impaired NFAT Signaling | Charite - Universitatsmedizin Berlin | NIEBAUER, RONALD T | 1658 | §103§112 | Final Rejection | 81d overdue | Pending | Aug 20, 2020 |
| 16857754 | METHOD AND SYSTEM FOR AUTOMATED CONFIGURATION LEARNING FOR DIGITAL ELEVATOR IN-CAR DISPLAYS AND VOICE ANNUNCIATORS | Tk Elevator Innovation And Operations GmbH | UHLIR, CHRISTOPHER J | 3619 | §103§112 | Final Rejection | — | Pending | Apr 24, 2020 |
| 16775205 | RADAR SYSTEM WITH THREE-DIMENSIONAL BEAM SCANNING | BDCM A2 LLC | SIDDIQUEE, ISMAAEEL ABDULLAH | 3648 | §103 | Final Rejection | 128d overdue | Pending | Jan 28, 2020 |
| 16732491 | GROWTH SUBSTRATE PRODUCT | Rockwool A/S | WORRELL, KEVIN | 1789 | §103§112 | Non-Final OA | — | Pending | Jan 02, 2020 |
| 16262525 | Connector for Surgical Handpiece | Integra Lifesciences Enterprises, Lllp | FREHE, WILLIAM R | 3783 | §103 | Non-Final OA | 30d overdue | Pending | Jan 30, 2019 |
| 16258556 | BIOFUNCTIONAL MATERIALS | The University of Akron | KUMAR, PREETI | 1761 | §103 | Final Rejection | — | Pending | Jan 26, 2019 |
| 16135405 | SYSTEMS, METHODS AND DATA STRUCTURES FOR WORKFLOW BLOCKCHAINS | Toyota Motor Engineering & Manufacturing North America, Inc. | BLACK, LINH | 2163 | §101 | Final Rejection | — | Pending | Sep 19, 2018 |
| 15897189 | Protective Vent and Method for Producing a Protective Vent | Sefar AG | TATESURE, VINCENT | 1786 | §103 | Non-Final OA | 79d overdue | Pending | Feb 15, 2018 |
IP Author helps law firms respond to office actions faster with AI-generated responses, examiner analytics, and prosecution intelligence.
Start Free Trial